Loading...
002-05 - Berger Abam - Supplement / Change Order 3� Washington State vI/ Department of Transportation Supplemental Agreement p p g Organization and Address BERGER/ABAM Engineers Inc. Number 3 33301 Ninth Avenue S., Suite 300 Federal Way, WA 98003 Original Agreement Number Federal Aid No. STPUS-6601 (004) Phone: 206/431-2300 Project Number Execution Date Completion Date 3/15/2007 12/30/2007 Project Title New Maximum Amount Payable Tremont St. Widening/SR 16 to Port Orchard Blvd. $ 602,533.00 Description of Work This supplement authorizes and provides compensation for the additional services necessary for BERGER/ABAM to provide coordination of plans, specifications, and engineer's estimate for utility (public and private) upgrades associated with the widening of Tremont Street. The Local Agency of City of Port Orchard desires to supplement the agreement entered into with BERGER/ABAM Engineers Inc. and executed on 8/10/2005 and identified as Agreement No. STPUS-6601 (004) All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See attached Exhibit A-1 , Supplement No. 3, Scope of Services Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: C'omnletion date is revised to 12/1 /07 III Section V, PAYMENT, shall be amended as follows: See attached Exhibit-, F,-1,F-2,F-3, and F.-4 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. Inc- ,AZ-XaA)-q DOT Form 140-063 EF Revised 9/2005 s • '•r • e. • I'K F..."Y� Approving Authority Signature ?Y?&AckZ6,-A 20 a " Date EXHIBIT A-1 SUPPLEMENT NO. 3 SCOPE OF SERVICES (Utility Coordination and Design) TREMONT STREET WIDENING (SR 16 to Port Orchard Blvd.) The services to be furnished by BERGER/ABAM Engineers Inc. (hereinafter referred to as the CONSULTANT), upon receipt of written direction to proceed from the City of Port Orchard (hereinafter referred to as the AGENCY), are supplemented as follows. We understand that design and engineering of the respective utility systems will be performed by the utility owners except for the water and sewer. These owners include Puget Sound Energy, Qwest and Wave Broadband, and Cascade Natural Gas. Berger/ABAM will facilitate coordination between these utilities and the City of Port Orchard, with respect to construction of the improved roadway corridor. Our proposal is based on the private utility owners preparing their own independent designs with integration of these designs into the master document package by Berger/ABAM Engineers, Inc. The CONSULTANT shall provide the following. ■ Coordination with Utility Providers - Coordinate with Puget Sound Energy, Qwest, Wavebroadband, and Cascade Natural Gas., to locate a combined utility corridor and duct bank within Tremont Road Rights of Way for power, cable and communication, and a corridor for gas. - Determine Right of Way requirements for construction of the utility corridors, and advise City on requirements - Identify conflicts of the utility corridors with other improvements on Tremont Road - Meet with all utility providers to review concept design drawings - Advise utility providers on schedule, work product requirements and coordination issues ■ Preliminary Design (30 Percent Submittal) - Incorporate preliminary utility plan and profile information from utility companies into Berger/Abram's drawing set for the 30% level of completion. Supplement with additional text as required to define the requirements and responsibilities of the construction contractors. - Perform evaluation of plan documents to identify underground conflicts between proposed utilities. Either adjust proposed city -owned utility systems design to avoid conflicts, or submit correspondence to utility company(s) with explanation of conflict and suggested methods and /or solutions to address the conflict. - Meet with Public Works staff to gather any relevant data on existing conditions which may affect utility corridor construction. - Coordinate preparation of an engineers construction cost estimate for the utility corridors - Perform internal quality control of the submittal and make appropriate revisions - Attend a review meeting and provide responses to review comments Supplement No. 3, Exhibit A-1, Scope of Services BERGER/ABAM, FAPWT-06-036 Tremont Street Widening, City of Port Orchard 1 March 2007 ■ Plans, Specifications, and Engineers Estimate - Incorporate final utility plan and profile information from utility companies into Berger/ABAM's drawing set for the final level of completion - Prepare language in the Special provisions which addresses coordination with utility companies and responsibilities of the construction contractor. - Review of submittals for quality control - Conduct field visits to compare plan information with actual field conditions - Attend review meeting and provide response to review comments Supplement No. 3, Exhibit A-1, Scope of Services BERGERIABAM, FAPWT-06-036 Tremont Street Widening, City of Port Orchard 2 March 2007 EXHIBIT E-1 Consultant Fee Determination -Summary Sheet BERGER/ABAM Engineers Inc. Direct Salary Cost (DSC PERSONNEL Hours Pay Rate Cost Project Executive 0 $ 55.76 $ - Project Manager 58 42.20 2,448 Senior Project Engineer 0 46.54 - Project Engineer/Senior Engineer 100 27.88 2,788 Utility Engineer 0 42.56 - Engineer/Sr. Technician 188 29.30 5,508 Graphics/CAD D 124 23.90 2,964 Project Coordinator 0 23.70 - Clerical 4 23.70 95 Direct Salary Cost SubTotal 474 $ 13,802 Direct Salary Cost Escalation - 5% increase for FY2007 (Assuming 30% of labor hours after June 2006) $ 207 Direct Salary Cost Total: $ 14,009 Overhead Cost 161.47% of DSC $ 22,621 Net Fee 30.00% of DSC $ 4,203 SUBTOTAL $ 40,833 Reimbursables Travel/Parking $ - Reproduction SUBTOTAL BERGER/ABAM SUBTOTAL $ 40,833 Subconsultants: (See Exhibit G) Cascade Design Collaborative 0.0% Participation $ - GeoEngineers 0.0% Participation r SUBCONSULTANTS SUBTOTAL $ GRAND TOTAL $ 40,833 Date EXHIBIT E-2 Reimbursables Travel: Mileage to Port Orchard, Subconsultant Offices, and Miscellaneous 4 meetings at 50 miles per meeting at $.405/mile Data Gathering: Digital Ortho Photo Traffic Counts: Turning Movement Counts 7 @ $100 ea Tube Counts (8 machines +5% for Excel + Tax) Preliminary Title Commitments (cancellation fees assuming 10 @ $50 ea) Cancellation Fees (assuming 1/2 of 40 parcels do not go to escrow, 20 @ $50) Reproduction Reproduction Design Reports (5 at $40) Plan Review Sets Miscellaneous Bid Documents (provided by CITY) $81 $0 � u cc q � ) \ LU j k j 0 0 IL k � ( e ) 2 §2 }k )A> §�2� 3LU LUcc >F- §§2 LU ;. ILLu %alu §w�� 0LU §2s� LU §2 LULU .0 CL § @ \ § § ( k n §! �Q § r 7 2 [ �mf/ k�\/ fm/ \ 2222 / cc E � ) LU B � � k � i 4 § d m J §� )k G2a § § }\\§ , 3Lu� >� § (2 §> IL � , � _ « Lu }Lum j 0uj §)mom [% §` �m )wx 2 z } =e ]5 2 n \{ i { [ 2 \ \ ( § . u ( § 2#jm2 & 4 (n 7777\& D»/=\a ] ° § )i+i45,o k �v«J#iK% o 4 z{{{{{§§@\ § ( \\\ 2\\\\\\\\o /222}%2/2% �KCCCSCttt