Loading...
002-05 - Berger Abam - Supplement / Change Order 5AMk � Washington State -IS Department of Transportation Supplemental Agreement p p g Organization and Address BERGER/ABAM Engineers Inc. Number 5 33301 Ninth Avenue S., Suite 300 Federal Way, WA 98003 Original Agreement Number Federal Aid No. STPUS-6601 (004) Phone: 206/431-2300 Project Number Execution Date Completion Date 8/20/2005 6/30/2008 Project Title New Maximum Amount Payable Tremont St. Widening/SR 16 to Port Orchard Blvd $ 667,546.00 Description of Work This supplement authorizes and provides for additional right-of-way support services. The Local Agency of City of Port Orchard desires to supplement the agreement entered into with BERGER/ABAM Engineers Inc. and executed on 8/10/2005 and identified as Agreement No. STPUS-6601 (004) All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See attached Exhibit A-1 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No change III Section V, PAYMENT, shall be amended as follows: See attached Exhibit F.-1. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: BERGER/ABAM Engineers Inc. By: Citv of Port Orchard 2L'� Consultant Signature A ,Wfovi th rly Signature CJ /� '51/ 10 e DOT Form 140-063 EF Date Revised 9/2005 EXHIBIT A-1 SUPPLEMENT NO. 5 SCOPE OF SERVICES (ADDITIONAL RIGHT-OF-WAY SUPPORT SERVICES) TREMONT STREET WIDENING (SR 16 to Port Orchard Blvd.) The services to be furnished by BERGER/ABAM Engineers Inc. (hereinafter referred to as the CONSULTANT), upon receipt of written direction to proceed from the City of Port Orchard (hereinafter referred to as the AGENCY), are supplemented as follows. The CONSULTANT shall provide the following services, which are either expanded scope from the original scope of work, or represent additional out -of -scope services, in support of the right- of-way (ROW) acquisition process. Additional Right of Way Effort ROW services are covered in Task 7 of the original contract, dated 10 August 2005. The additional services listed below, considered additional to the original scope of work, are due to an increase in complexity of the ROW effort for the project. In Task 7.2, Legal Descriptions, it was "estimated that 20 legal descriptions will be required" for the project. Based on the project layout today, the completed preliminary ROW plans identify 75 legal descriptions will be required. These 55 additional legal descriptions have a ripple affect through the level of effort required to prepare the ROW plans, produce the legal descriptions themselves, and to support the AGENCY's ROW consultant. This supplement only addresses the two items listed below. ■ Provide support to City ROW consultant during parcel acquisition ■ Provide legal descriptions (75 total, 55 additional) This supplement excludes the extra work already performed below, that was identified in our original supplement request to the City Council in February 2008. ■ Additional R/W plan effort ■ Provide support to City R/W consultant during pre -appraisal efforts This work will be addressed in a future supplement. Supplement No. 5, Exhibit A-1, Scope of Services BERGER/ABAM, FAPWT-06-036 Tremont Street Widening, City of Port Orchard 1 May 2008 CD .1 00 N O O 00 V, c cr 0 0 T- o C Lrl 00 T T 0 0 < < CD CD 0 0 v n F< v � (D 0 cn 0 0 c o' 0 0_ c 1 1 0 CD a) 0 C. r-F 0 2 E O (Q _ 1 y � Vt � CP O = m o � c � Y O 00 D� 5.0 rr cn O M OM c 0 Q, m ui 7 n O (Q V (D m my c� � o 7 w (0 m a' 0 O n N N D c�i, °; o 2 � O 0 4 W 4:�A P. O A EXHIBIT E-1: PROJECT FEE DETE...dINATION 5/8/2008 BERGER/ABAM ENGINEERS DIRECT SALARY COSTS (DSC) for BERGER/ABAM Engineers, Inc. Personnel Hours Rate Cost 1 Project Manager 71 X $ 58.38 = $ 4,145 2 Project Engineer 158 X $ 47.65 = $ 7,529 3 Tech/CAD 245 X $ 29.39 = $ 7,201 BERGER/ABAM Hours, TOTAL 474 Subtotal Direct Salary Costs (DSC) = $ 18,874 Overhead (OH) 161.47% of (DSC + SE) = $ 30,476 Fixed Fee (FF) 30.00% of (DSC + SE) = $ 5,662 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 55,013 DIRECT NONSALARY COSTS (DNSC) TOTAL REIMBURSABLE EXPENSES (DNSC) = $ - TOTAL BERGER/ABAM FEE (DSC + SE + OH + FF + DNSC) = $ 55,013 Page 1 of 1