002-05 - Berger Abam - Supplement / Change Order 5AMk
� Washington State
-IS Department of Transportation
Supplemental Agreement
p p g
Organization and Address
BERGER/ABAM Engineers Inc.
Number 5
33301 Ninth Avenue S., Suite 300
Federal Way, WA 98003
Original Agreement Number
Federal Aid No. STPUS-6601 (004)
Phone: 206/431-2300
Project Number
Execution Date
Completion Date
8/20/2005
6/30/2008
Project Title
New Maximum Amount Payable
Tremont St. Widening/SR 16 to Port Orchard Blvd
$ 667,546.00
Description of Work
This supplement authorizes and provides for additional right-of-way support services.
The Local Agency of
City of Port Orchard
desires to supplement the agreement entered into with BERGER/ABAM Engineers Inc.
and executed on
8/10/2005 and identified as Agreement No.
STPUS-6601 (004)
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
See attached Exhibit A-1
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: No change
III
Section V, PAYMENT, shall be amended as follows:
See attached Exhibit F.-1.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By: BERGER/ABAM Engineers Inc. By: Citv of Port Orchard
2L'�
Consultant Signature A ,Wfovi th rly Signature
CJ /�
'51/ 10 e
DOT Form 140-063 EF Date
Revised 9/2005
EXHIBIT A-1
SUPPLEMENT NO. 5
SCOPE OF SERVICES
(ADDITIONAL RIGHT-OF-WAY SUPPORT SERVICES)
TREMONT STREET WIDENING
(SR 16 to Port Orchard Blvd.)
The services to be furnished by BERGER/ABAM Engineers Inc. (hereinafter referred to as the
CONSULTANT), upon receipt of written direction to proceed from the City of Port Orchard
(hereinafter referred to as the AGENCY), are supplemented as follows.
The CONSULTANT shall provide the following services, which are either expanded scope from
the original scope of work, or represent additional out -of -scope services, in support of the right-
of-way (ROW) acquisition process.
Additional Right of Way Effort
ROW services are covered in Task 7 of the original contract, dated 10 August 2005. The
additional services listed below, considered additional to the original scope of work, are due to
an increase in complexity of the ROW effort for the project. In Task 7.2, Legal Descriptions, it
was "estimated that 20 legal descriptions will be required" for the project. Based on the project
layout today, the completed preliminary ROW plans identify 75 legal descriptions will be
required. These 55 additional legal descriptions have a ripple affect through the level of effort
required to prepare the ROW plans, produce the legal descriptions themselves, and to support
the AGENCY's ROW consultant.
This supplement only addresses the two items listed below.
■ Provide support to City ROW consultant during parcel acquisition
■ Provide legal descriptions (75 total, 55 additional)
This supplement excludes the extra work already performed below, that was identified in our
original supplement request to the City Council in February 2008.
■ Additional R/W plan effort
■ Provide support to City R/W consultant during pre -appraisal efforts
This work will be addressed in a future supplement.
Supplement No. 5, Exhibit A-1, Scope of Services BERGER/ABAM, FAPWT-06-036
Tremont Street Widening, City of Port Orchard 1 May 2008
CD
.1
00
N
O
O
00
V,
c
cr
0
0
T-
o
C
Lrl
00
T T
0 0
< <
CD CD
0 0
v n
F<
v �
(D 0
cn 0
0
c
o'
0
0_
c
1
1
0
CD
a)
0
C.
r-F
0
2
E
O
(Q
_
1
y
�
Vt �
CP O
=
m
o
�
c
�
Y
O 00
D�
5.0
rr
cn
O M
OM
c
0 Q,
m
ui 7
n
O (Q
V
(D m
my
c�
� o
7
w
(0
m a'
0
O
n
N
N
D
c�i, °;
o
2
�
O
0
4 W
4:�A
P. O
A
EXHIBIT E-1: PROJECT FEE DETE...dINATION
5/8/2008
BERGER/ABAM ENGINEERS
DIRECT SALARY COSTS (DSC) for BERGER/ABAM Engineers, Inc.
Personnel
Hours
Rate
Cost
1 Project Manager
71
X $
58.38 =
$
4,145
2 Project Engineer
158
X $
47.65 =
$
7,529
3 Tech/CAD
245
X $
29.39 =
$
7,201
BERGER/ABAM Hours, TOTAL
474
Subtotal Direct
Salary Costs (DSC) =
$
18,874
Overhead (OH)
161.47%
of (DSC + SE) =
$
30,476
Fixed Fee (FF)
30.00%
of (DSC + SE) =
$
5,662
TOTAL SALARY COSTS (DSC + SE + OH + FF) =
$
55,013
DIRECT NONSALARY COSTS (DNSC)
TOTAL REIMBURSABLE EXPENSES (DNSC) = $ -
TOTAL BERGER/ABAM FEE (DSC + SE + OH + FF + DNSC) = $ 55,013