002-05 - Berger Abam - Supplement / Change Order 13AM >�s ai I of 7hMparta-don Supplemental Agreement pp 9 Organization and Address BERGER/ABAM Engineers, Inc. Number 13 33301 Ninth Avenue South, Suite 300 Federal Way, WA 98003 Original Agreement Number STPUS-6601(004) Phone: 206-431-2300 Project Number Execution Date Completion Date 1 8/20/2005 12/21 /2018 Project Title New Maximum Amount Payable Tremont Widening/SR 16 to Port Orchard Blvd. $ 1,012,406.00 Description of Work This supplement adds additional funds to Berger/Abam Engineer's contract to allow for project completion as needed. The Local Agency of City of Port Orchard desires to supplement the agreement entered into with BERGER/ABAM Engineers, Inc. and executed on 8/20/2005 and identified as Agreement No. STPUS-6601(004) All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Additional services for Droject coml2letion 2-, needed 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: N/A III Section V, PAYMENT, shall be amended as follows: Additional %46,044-00 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. I� By: By: Consultant Signature 1/. • ' • u• • '•r • .. . 0 Approving DOT Form 140-063 EF AT Date Revised 9/2005 Ira4nyy/ieWas, K yerk „nnnn pRT C i! EXHIBIT A-1 SUPPLEMENTAL SCOPE OF SERVICES SUPPLEMENT NO. 13 TREMONT STREET WIDENING (SR 16 to PORT ORCHARD BOULEVARD) The services to be furnished by BergerABAM (hereinafter referred to as the CONSULTANT), upon receipt of written direction to proceed from the City of Port Orchard (hereinafter referred to as the AGENCY), are supplemented as described below. Unless otherwise noted, the following scope of work supplements the original scope of work, as well as the scope of work for previous supplements. We understand that federal funding may be used for the construction of this project. Therefore, the Plans Specifications, and engineer's Estimate (PS&E) package will need to be tailored to these more stringent requirements. This includes adhering to the Buy America provision, not only for the roadway construction, but also for the separate public and private utility purveyors. This work will require coordination with the AGENCY and the WSDOT Highways and Local Programs engineers. In addition, the AGENCY will provide support as necessary to ensure that the public and private utility companies coordinate their proposed designs with the CONSULTANT, who will review these designs and incorporate them into the final contract documents. The estimated level of effort for the Supplement No. 13 work is shown in EXHIBIT E. The CONSULTANT shall provide the following. 1.0 PROJECT ADMINISTRATION Project administration services shall continue as described in the original scope of work and the task budgets detailed in previous supplements. This work will include additional project meetings, invoicing, and coordination with subconsultants and public and private utility companies. 6.0 CONSTRUCTION PS&E The CONSULTANT shall prepare the final Plans, Specifications and engineer's Estimate (PS&E) package in accordance with the federal funding requirements and then submit this package to the AGENCY for review. The AGENCY will forward this package to the Highways and Local Programs (H&LP) engineer for review and comment. Once the review is complete, the AGENCY will forward the comments to the CONSULTANT to be evaluated and incorporated into the final construction documents as shown in EXHIBIT E for Supplement No. 13. The following is a detailed list of tasks to perform the work described above. 1. The CONSULTANT shall prepare the final Plans, Specifications and engineer's Estimate (PS&E) package in accordance with the federal funding requirements and then submit this package to the AGENCY for review. 2. The CONSULTANT shall review and evaluate the comments received from the AGENCY and incorporate these comments into the final advertisement ready contract documents. Exhibit A- 1, Supplement No. 13 Scope of Services Tremont Street Widening, City of Port Orchard Page 1 of 2 2118/2013 12.0 UTILITY UPGRADES COORDINATION The CONSULTANT shall coordinate with the public and private utility companies to obtain their separate designs and then review them for conformance to the roadway design and the designs of the other utility companies. The AGENCY will provide support as necessary to ensure that the public and private utility companies coordinate their proposed designs with the CONSULTANT, who will review these designs and incorporate them into the final contract documents. The following is a detailed list of tasks to perform the work described above. 1. The CONSULTANT shall coordinate with the public and private utility companies to obtain their final separate designs. 2. The CONSULTANT shall review these designs and verify that they are compatible with the roadway design features and other utility designs. 3. The CONSULTANT shall prepare a conduit schedule for the common utility trenches and incorporate that into the final plans. 4. The CONSULTANT shall review and evaluate the comments received from the AGENCY and incorporate these comments into the final advertisement ready contract documents. FAPWT-06-036erABAM, Exhibit A-1, Supplement No. 13 Scope of Services Berg Tremont Street Widening, City of Port Orchard Page 2 of 2 2/18/2013 EXHIBIT E - SUPPLEMENT NO. 13 FEE DETERMINATION BergerABAM DIRECT SALARY COSTS (DSC) for BergerABAM 2/18/2013 Personnel Hours Rate (see note) Cost Project Manager 44 X $58.44 = $ 2,571 Project Engineer 76 X $55.41 = $ 4,211 Senior Engineer 102 X $40.77 = $ 4,158 CADD / Designer 104 X $32.84 = $ 3,415 Project Coordinator 48 X $29.62 = $ 1,422 Clerical 0 X $29.61 = $ - BergerABAM Hours, Total 374 Subtotal Direct Salary Costs (DSC) = $ 15,778 0.00% Salary Escalation = $ Subtotal (DSC + SE) = $ 15,178 Overhead (OH) 161.47%, of (DSC + SE) = $ 25,476 Fixed Fee (FF) 30.00%, of (DSC + SE) = $ 4,733 SUBTOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 45,987 DIRECT NONSALARY COSTS (DNSC Mileage for Meetings (2 Road Trips) 100 miles @ $ 0.565 $ 57 Drawing Reproduction Estimated $ - Courier & Postage 0 packages @ 25 $ - SUBTOTAL REIMBURSABLE EXPENSES (DNSC) = $ 57 TOTAL BergerABAM COST (DSC + SE + OH + FF + DNSC) = $ 46,044 SUBCONSULTANTS Widener & Associates $ - TOTAL SUBCONSULTANT COST = $ CONTINGENCY FUND MANAGEMENT RESERVE FOR OTHER UNANTICIPATED PROJECT ISSUES = TOTAL COST = $ 46,044 Note: DSC for BergerABAM Fiscal Year 2013 Effective Through June 2013 Page 1 of 2 2/19/2013 3:34 PM CITY OF PORT ORCHARD Authorization for Change Order #13 Date: February 26, 2013 Contractor: Berger/Abam Engineers, Inc. Project: Tremont Street Widening Contract / Job # STPUS-6610 (004) Brief Description of Change Order work (Documentation to be attached): Additional Scope of Services needed for "shovel ready/ready to go" status using remaining PE grant funding, for qualification of potential "2013 returned obligated funding" through WSDOT/PSRC. Contract History $ Date Appvd b Original Contract $455,000.00 10-Aug-05 Council Change Order 1 _ $47,800.00 23-May-06 Council Change Order 2 $58,900.00 16-Jan-07 Council Change Order 3 $40,833.00 26-Mar-07 Council Change Order 4 $10,000.00 07-Jan-08 Council Change Order 5 $55,013.00 14-May-08 Council Change Order 6 $15,000.00 07-Jul-08 Council Change Order 7 $55,579.00 07-Jul-08 Council Change Order 8 $0.00 26-May-09 Council Change Order 9 Change Order 10 Change Order 11 Change Order 12 Change Order 13 $228,237.00 $0.00 $0.00 $0.00 $46,044.00 09-Jun-09 Council 22-Jun-10 Council 26-Oct-10 Council 12-Apr-I1 Council 26-Feb-13 Council Total Contract $1,012,406.00 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate, Submitted by: lic rks Director/City in er Change Orders over $15,000 up to $25,000 are to be ��� d G�C�I"1r Approved by the Mayor, Approved; a=P-A an�=� Mayor Pro Tempore Attest; Change Orders over $25,000 (per project) require Council action. erk Council �roval Date � �A ,�:: EXHIBIT A-1 SUPPLEMENTAL SCOPE OF SERVICES SUPPLEMENT NO. 18 TREMONT STREET WIDENING (SR 16 to PORT ORCHARD BOULEVARD) The services to be furnished by BergerABAM (hereinafter referred to as the CONSULTANT), upon receipt of written direction to proceed from the City of Port Orchard (hereinafter referred to as the AGENCY), are supplemented as described below. Unless otherwise noted, the following scope of work supplements the original scope of work, as well as the scope of work for previous supplements. We understand that federal funding may be used for the construction of this project. Therefore, the Plans Specifications, and engineer's Estimate (PS&E) package will need to be tailored to these more stringent requirements. This includes adhering to the Buy America provision, not only for the roadway construction, but also for the separate public and private utility purveyors. This work will require coordination with the AGENCY and the WSDOT Highways and Local Programs engineers. In addition, the AGENCY will provide support as necessary to ensure that the public and private utility companies coordinate their proposed designs with the CONSULTANT, who will review these designs and incorporate them into the final contract documents. The estimated level of effort for the Supplement No. 13 work is shown in EXHIBIT E. The CONSULTANT shall provide the following. 1.0 PROJECT ADMINISTRATION Project administration services shall continue as described in the original scope of work and the task budgets detailed in previous supplements. This work will include additional project meetings, invoicing, and coordination with subconsultants and public and private utility companies. 6.0 CONSTRUCTION PS&E The CONSULTANT shall prepare the final Plans, Specifications and engineer's Estimate (PS&E) package in accordance with the federal funding requirements and then submit this package to the AGENCY for review. The AGENCY will forward this package to the Highways and Local Programs (H&LP) engineer for review and comment. Once the review is complete, the AGENCY will forward the comments to the CONSULTANT to be evaluated and incorporated into the final construction documents as shown in EXHIBIT E for Supplement No. 13. The following is a detailed list of tasks to perform the work described above. 1. The CONSULTANT shall prepare the final Plans, Specifications and engineer's Estimate (PS&E) package in accordance with the federal funding requirements and then submit this package to the AGENCY for review. 2. The CONSULTANT shall review and evaluate the comments received from the AGENCY and incorporate these comments into the final advertisement ready contract documents. Exhibit A-1, Supplement No. 13 Scope of Services BergerABAM, FAPWT-06.036 Tremont Street Widening, City of Port Orchard Page 1 of 2 2/1812013 12.0 UTILITY UPGRADES COORDINATION The CONSULTANT shall coordinate with the public and private utility companies to obtain their separate designs and then review them for conformance to the roadway design and the designs of the other utility companies. The AGENCY will provide support as necessary to ensure that the public and private utility companies coordinate their proposed designs with the CONSULTANT, who will review these designs and incorporate them into the final contract documents. The following is a detailed list of tasks to perform the work described above. 1. The CONSULTANT shall coordinate with the public and private utility companies to obtain their final separate designs. 2. The CONSULTANT shall review these designs and verify that they are compatible with the roadway design features and other utility designs. 3. The CONSULTANT shall prepare a conduit schedule for the common utility trenches and incorporate that into the final plans. 4. The CONSULTANT shall review and evaluate the comments received from the AGENCY and incorporate these comments into the final advertisement ready contract documents. Exhibit A-1, Supplement No. 13 Scope of Services BergerABAM, FAPWT-06-036 Tremont Street Widening, City of Port Orchard Page 2 of 2 2/18/2013 EXHIBIT E - SUPPLEMENT NO. 13 FEE DETERMINATION BergerABAM DIRECT SALARY COSTS (DSC) for BergerABAM 2/18/2013 Personnel Hours Rate (see note) Cost Project Manager 44 X $58.44 = $ 2,571 Project Engineer 76 X $55.41 = $ 4,211 Senior Engineer 102 X $40.77 = $ 4,158 CADD / Designer 104 X $32.84 = $ 3,415 Project Coordinator 48 X $29.62 = $ 1,422 Clerical 0 X $29.61 = $ - BergerABAM Hours, Total 374 Subtotal Direct Salary Costs (DSC) _ $ 15,778 0.00% Salary Escalation = $ - Subtotal (DSC + SE) _ $ 15,778 Overhead (OH) 161.47% of (DSC + SE) _ $ 25,476 Fixed Fee (FF) 30.00% of (DSC + SE) _ $ 4,733 SUBTOTAL SALARY COSTS (DSC + SE + OH + FF) _ $ 45,987 DIRECT NONSALARY COSTS (DNSC Mileage for Meetings (2 Road Trips) 100 miles @ $ 0.565 $ 57 Drawing Reproduction Estimated $ - Courier & Postage 0 packages @ 25 $ - SUBTOTAL REIMBURSABLE EXPENSES (DNSC) _ $ 57 TOTAL BergerABAM COST (DSC + SE + OH + FF + DNSC) = 46,044 SUBCONSULTANTS Widener & Associates $ - TOTAL SUBCONSULTANT COST = $ - CONTINGENCY FUND MANAGEMENT RESERVE FOR OTHER UNANTICIPATED PROJECT ISSUES TOTAL COST = $ 46,044 Note: DSC for BergerABAM Fiscal Year 2013 Effective Through June 2013 Page 1 of 2