Loading...
075-20 - Rice Fergus Miller, Inc. - Contract Amendment 1Amendment No. 1 to Contract No. 075-20 CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH RICE FERGUS MILLER, INC. THIS AMENDMENT to Contract No. 075-20 ("Amendment') is made effective as of the 23rd day of March, 2021, by and between the City of Port Orchard ("City), a municipal corporation, organized under the laws of the State of Washington, and Rice Fergus Miller, Inc., a company organized under the laws of the State of Washington, located and doing business at 275 Fifth Street, Bremerton, WA 98337 ("Consultant'). WHEREAS, the City issued a Request for Qualifications Advertisement called for the 2020-2021 Ad Ready (100% PS&E) City Hall Improvement Project, including Schematic (30%), and Design Development (60%) and selected the Consultant as the most qualified firm for this project; and WHEREAS, on October 13, 2020, the City executed a Professional Services Agreement with the Consultant, for the 2020-2021 Schematic Design (30%) City Hall Improvement Project ("Underlying Agreement'); and WHEREAS, the parties desire to expand the scope to include all work to advance to the 100% Ad Ready PS&E and Bid Support Phase of the project; NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by and between the parties thereto as follows: 1. The Underlying Agreement of October 13, 2020, between the parties, is amended in, but only in, the following respect: The professional services in connection with the Following Project shall now read as: "The 2020- 2021 City Hall Improvement Project — 30% to 100% Ad Ready PS&E and Bid Support." Section I.A. and Exhibit A are amended to include the work identified in the February 17, 2021 letter from Consultant to the City describing the work necessary to advance to the 100% Ad Ready PS&E and Bid Support Phase of the Project, a copy of which is attached hereto as Attachment l and incorporated herein by this reference. Section 4. Compensation. LUMP SUM. Compensation for these additional services shall be for the Lump Sum of $394,676.00, for a total contract price for all work of $501,176.00. 2. In all other respects, the Underlying Agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. IN WITNESS WHEREOF, the parties have executed this Amendment on the day and year set forth above. CITY OF PORT ORCHARD, WASHINGTON Robert Putaansuu, Mayor ATTEST/AUTHENTICATED: Br, le, on, MMC, City Clerk APPROVED AS TO FORM: Charlotte A. A sppgl City Attorney A '' �� WA H •• RICE FERGUS MILLER, INC. Si e Steve Rice, Principal Printed Name and Title Rico gusmILLER ARCHITECTURE INTERIORS PLANNING VIZLAB February 17, 2021 275 Fifth Street, Suite 100 Bremerton, WA 98337 (360) 377-8773 rfmarch.com Mark Dorsey, Director of Public Works City of Port Orchard 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard City Hall RFM Project Number: 2020013.00 Amendment 01 - 30% Design - Bid Support Dear Mark, Rice Fergus Miller is pleased to present the following Amendment Request 01 to provide architectural services for the City Hall Improvement Project. Project Description The existing City Hall building has had an ongoing maintenance issue for many years with a failing building envelope and issues with the current electrical service and generator connections to the building. This project will provide solutions to remedy these problems, including a new roofing assembly, new clock tower weatherization and new digital clock components, new siding and weather barrier, new windows, new exterior doors, sealing of the existing brick veneer, and added exterior installation to comply with the current building code. We will also be adding a new canopy at the lower -level entry. Inside the building we will provide a new HVAC system while re -using some of the existing ducting and a complete LED retrofit for all the lighting. Outside of the building, there will be a new electrical service with modified generator connections and a solar panel array located over the existing pump house. We are basing our proposal on a total construction budget of $5,049,100 which was determined from the 30% cost estimate. II. Scope of Services This proposal takes the project to 100% Plans and Specifications, Ad Ready through Bid Support. Basic Services: 30% Design through Bid Support include: • Architectural, Mechanical, Electrical, and Structural services to prepare an Ad Ready package including Bid drawings and Specifications. Drawings will include site plan, all levels of demo plans, all levels of construction plans, wall sections, details, and schedules. • Bidding support to include Bidding RFI responses and Addenda if required. • Up to (4) Zoom meetings including a team kick-off with all consultants and project progress meetings. Amendment 01 - 30% - Bid Support Port Orchard City Hall February 17, 2021 Page 2 Supplemental Services 30% Design through Bid Support include: • Envelope Consultant • (2) Cost Estimates for Design Development and Construction Document level designs • Enhanced Management Services o Includes (1) City Council Meeting or Work Session with support material • Full Mechanical/Plumbing Commissioning Services • Phasing of Interior Work o Provide a document in the bid set to assist contractors in factoring additional scope related to interior work while allowing current City operations to continue. • Permit fees and submission for permit review plus (1) round of response comments. III. Additional Services The following services, though they could be provided by RFM, are not included in our Scope of Basic Services and, if requested, would be billed as Additional Services. Additional meetings Design Review Board approval Additional Consultants o Civil Engineering o Landscape Architecture o Lighting Design o Traffic Engineering o AN, IT and Telecommunications IV. Owner Responsibilities • LEED or other certifications requiring planning & documentation • FF & E Design & Specifications • Construction Administration • Additional rounds of response comments from Jurisdiction It is our understanding that the City of Port Orchard will provide full information, including a program, setting forth its design objectives, constraints and criteria; a legal description and certified land survey showing boundary and topography of the site, if one exists; existing buildings drawings; and the services of soil engineers, hazardous materials surveyors, or other specialty consultants when such services are deemed to be necessary. V. Schedule Project schedule is assumed to be 20 weeks for 30% through 100% Plans and Specifications, Ad Ready plus an additional 4 weeks for Bid Support. Assuming the design team has a notice to proceed by the end of March 2020, the current schedule for Ad Ready documents will be concluded by August 31, 2021. Bid support will be an additional 4 weeks after bid documents are advertised. VI. Compensation For the Basic Services outlined above, compensation shall be as a Fixed Fee of three hundred forty thousand one hundred twenty-nine dollars ($340,129), plus reimbursable expenses, plus any applicable tax. For Supplemental Services outline above, compensation shall be billed as a Fixed Fee of fifty- four thousand five hundred forty-seven dollars ($54,547), plus any applicable taxes. Supplemental Services includes an estimated reimbursable budget of $12,000.00 for permit fees. Amendment 01 - 30% - Bid Support Port Orchard City Hall February 17, 2021 Page 3 Additional Services, when requested, will be billed on an hourly basis at our standard hourly rates, as listed in the attached 2021 Hourly Billing Rate Sheet, or as agreed to prior to commencement of the Additional Services. VII. Terms of Agreement This amendment request, when accepted, will become an exhibit to our executed contract with the City of Port Orchard dated October 13, 2020. Vill. Summary Thank you for this important opportunity! If this Amendment is acceptable, please sign in the space provided below. We look forward to discussing our proposal with you and getting to work. Sincerely, Rice Fergus Miller, Inc. Approved for Rice Fergus Miller by, Steve Rice, Principal Attachments: 2021 RFM Hourly Rate Sheet Authorized for Owner by: Name Title p DART titi; OF fl140'y" =y • �Q�P O Rye•% SEAL ' �Ar1'`\�� RIC eYgusmILLER ARCHITECTURE INTERIORS PLANNING VIZLAB 275 Fifth Street, Suite 100 Bremerton, WA 98337 Phone: (360) 377-8773 rfmarch.com 2021 Hourly Billing Rates Date of Proposal: February 17, 2021 Project: Port Orchard City Hall Improvement - 30% - Bid Support Project No.: 2020013.00 The hourly billing rates shall be annually adjusted in accordance with normal salary review practices of Rice Fergus Miller. Principal in Charge: $ 275.00 Senior Planner: $ 175.00 - $ 275.00 Project Manager: $ 130.00 - $ 190.00 Project Architect: $ 120.00 - $ 190.00 Staff Architect: $ 125.00 - $ 160.00 Project Designer: $ 115.00 - $ 190.00 Staff Designer: $ 115.00 - $ 155.00 Interior Designer: $ 90.00 - $ 160.00 Technical Designer: $ 95.00 - $ 155.00 Production Support: $ 85.00 - $ 155.00 Graphics Visualization: $ 115.00 - $ 125.00 Project Coordinator: $ 80.00 - $ 120.00 Administrative Support Staff: $ 80.00 - $ 120.00 CITY OF PORT ORCHARD Authorization for Amendment No. 1 Date: _MARCH 9, 2021 2020-2021 CITY HALL Project: IMPROVEMENTS Contractor: RICE FERGUS MILLER, INC. 275 FIFTH STREET, SUITE 100 Contract / Job # C075-20 BREMERTON, WA 98337 THIS CHANGE ORDER AUTHORIZES THE ADDITIONAL WORK: ADDITIONAL SCOPE AND BUDGET ASSOCIATED WITH ADVANCING THE CURRENT 30% SCHEMATIC DESIGN TO 100% AD READY PS&E AND BID SUPPORT. Contract History Amount Sales Tax Total Date Ap vd by Original Contract 1 $106,500.00 Included $106,500.00 13-Oct-20 COUNCIL 1 Amendment #1 1 $394,676.00 Included $394,676.00 09-Mar-21 COUNCIL i I i I (Total Contract $501,176.00 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and'accurate. Cons ant oval Signature Publl orks D' or/Cit gineer \'Z Steve Rice, Principal Printed Name & Title Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. MARK R. DORSEY, P.E. Printed Name Approved: Mayor r Attest:AP 0& ,��iniur JJ 41. Council Approval Date = , ZF.AT. UAStaff Repons\2021120210323\7J 03 RFM_COPO Amendment #1 doc Page 1