001-15 - Aspect Consulting, LLC - Contract Amendment 1Amendment No. 1 to Contract No. 001-15
CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH
ASPECT CONSULTING, LLC.
THIS AMENDMENT to Contract No. 001-15 ("Amendment") is made effective as of the 19`' day
of December, 2019, by and between the City of Port Orchard ("City), a municipal corporation, organized
under the laws of the State of Washington, and Aspect Consulting, LLC, a company organized under the
laws of the State of Washington, located and doing business at 401 2°d Avenue South, Suite 201, Seattle WA
98104 ("Consultant").
WHEREAS, on November 12, 2014, the City executed a Professional Services Agreement with
Consultant, for the provision of 2015-2019 Marina Mart/Vlist Property Environmental Services ("Underlying
Agreement"); and
WHEREAS, the Underlying Agreement's expiration date is December 30, 2019 and the yearly
tasks/scope of work is defined in Exhibit A attached thereto; and
WHEREAS, Section 1 B ("Services by Consultant") of the Underlying Agreement provides that "The
City may from time to time require changes or modifications in the Scope of Work. Such changes, including
any decrease or increase in the amount of compensation, shall be agreed to by the parties and incorporated
in written amendments to the Agreement"; and
WHEREAS, the Consultant and the City have conferred and agreed to extend the Underlying
Agreement, update the Scope of Work, and provide for an increase in compensation; and
WHEREAS, the parties wish to memorialize their agreement to so extend the Underlying Agreement;
NOW, THEREFORE,
In consideration of the mutual benefits accruing, it is agreed by and between the parties thereto as
follows:
1. The Underlying Agreement of November 12, 2014 between the parties, is amended in, but
only in, the following respects:
A. Schedule of Work. The Scope of Work referenced in Section 2 and set forth in Exhibit A to the
Underlying Agreement is hereby amended to include the additional scope of work outlined in
the attached Exhibit A.
B. Term of Agreement. Section 3 of the Underlying Agreement, which provides a termination
date of December 31, 2019 is hereby amended to state that the termination date shall be
December 31, 2023.
C. Compensation. Section 4 of the Underlying Agreement, which includes a contract amount of
Twenty -Six Thousand Six Hundred Forty Eight Dollars ($26,648.00), stated as an amount that
shall not be exceeded, is hereby amended to include an additional not to exceed amount of
Twenty Five Thousand Six Hundred Seventy Dollars ($25,670) for the additional scope of work
and time identified in Exhibit A to this Amendment No. 1. As a result of this Amendment No.
1, the total contract amount is increased to a new not to exceed amount of Fifty -Two Thousand
Three Hundred Eighteen Dollars ($52,318).
2. In all other respects, the Underlying Agreement between the parties shall remain in full force
and effect, amended as set forth herein, but only as set forth herein.
IN WITNESS WHEREOF, the parties have executed this Amendment on the day and year set
forth above.
CITY OF PORT ORCHARD,
WASHINGTON
Roberl Put suu, Mayor
ATTEST/AUTHENTICATED:
Brandy RinearsS4 MMC, City Clerk
APPROVED AS TO FORM:
Sharon Cates, City Attorney
1`� O �� Cs R tt '%�>''•
/�'�'ccOF�WAS; 0� \"
ASPECT CONSULTING, LLC
Signature
Cayla P. Pra)t-. e 6
Printed Name and Title
EXHIBIT A
As pect
CONSULTING
November 21, 2019
Mr. Mark Dorsey
City of Port Orchard
216 Prospect Street
Port Orchard, Washington 98366
Re: Proposal for Ongoing Groundwater Compliance Monitoring
Marina Mart/Vlist Property, Port Orchard, WA
Project No. 140310-001
Dear Mark:
Aspect Consulting, LLC (Aspect) is pleased to present this proposal to the City of Port Orchard
(City) for ongoing groundwater compliance monitoring at the former Marina MartNlist Property,
located in Port Orchard, Washington (herein referred to as the Site). Aspect has been monitoring
groundwater quality at the Site since 2014. Aspect was previously contracted by the City to provide
environmental consulting services at the Site for five years, through 2019. At the request of the
City, we have prepared this proposal to present the scope, cost, and schedule for annual
groundwater monitoring and reporting for an additional four years, through 2023.
Background and Coordination with Others
Two Kitsap County tax parcels, located at 514 and 528 Bay Street, are currently operated by Vlist
Motors for used car sales and service. These properties are defined as:
Vlist Property - The property located at 514 Bay Street, which includes the Vlist Motors
sales offices, three garage bays, and asphalt parking areas, was previously owned and
operated by the City as a maintenance shop for City vehicles. Three underground storage
tanks (USTs) were used by the City between approximately 1972 and 1990 for the storage
and distribution of gasoline and diesel fuel. The USTs were temporarily closed -in -place in
1990 and removed in 1999.
Marina Mart Property - The property located at 528 Bay Street is an asphalt parking lot
and was previously a retail gasoline service station, known as the Marina Mart. Three USTs
were formerly located on the Marina Mart Property. The USTs were removed in 1992.
Remedial actions, that consisted of limited soil excavation on both properties, were
conducted between 1999 and 2002. Environmental contractors working for Vlist Motors
continue operating an in situ remediation system to treat groundwater on the Marina Mart
Property. Groundwater has been monitored periodically on both properties since 2003.
Groundwater on both properties contains gasoline -range petroleum hydrocarbons and benzene
at concentrations that exceed the Washington State Model Toxics Control Act cleanup
regulation (MTCA) Method A cleanup levels. Seven monitoring wells are located on the Vlist
Property to monitor groundwater quality following soil cleanup activities conducted in 1999,
2001, and 2002. Two monitoring wells, installed by others in 2017, are located on the Marina
Mart Property. The City is responsible for completing an annual groundwater monitoring and
sampling event, typically during the first half of the year. Filco Company Inc. (Filco), an
City of Port Orchard
November 21, 2019
Project No. 140310-001
environmental consultant representing the owners of the former Marina Mart Property,
completes compliance monitoring at the same nine monitoring wells during the second half of
the year.
Scope of Work
The work will consist of annual groundwater monitoring, sampling, and reporting in 2020, 2021,
2022, and 2023. Each sampling event will include measurement of water levels and collection and
analysis of groundwater samples from the nine wells, review of the data collected by Filco, and
preparation of an annual groundwater data report. The schedule for the work will be coordinated
with Filco so that the sampling events are completed two times per year and separated by
approximately 6 months. Based on the 2019 sampling schedule, and communication with Filco, the
2020 sampling event will be conducted in June.
Prior to sampling, the monitoring wells will be opened and the water level in each well will be
measured using an electronic water level meter to the nearest 0.01-inch. Each well will be sampled
using a peristaltic pump and dedicated tubing in accordance with standard U.S. Environmental
Protection Agency (EPA) low -flow purge techniques. Upon stabilization, groundwater samples will
be collected from each monitoring well for laboratory analysis of gasoline -range petroleum
hydrocarbons by Northwest Method NWTPH-Gx and benzene, toluene, ethylbenzene and xylenes
(BTEX) by EPA Method 8260C on standard laboratory turnaround times of 10 days. Purge water
that is generated by the sampling will be temporarily stored on the Vlist Property in a 55-gallon
steel drum pending receipt of the laboratory results. The cost estimate presented below includes the
disposal of two drums of non -hazardous investigation -derived wastewater.
Following receipt of the laboratory results each year, we will prepare a brief data report to
summarize the results of the sampling event. The report will include a text summary of the field
activities and results, summary tables of water level measurements and chemical data compared to
the applicable MTCA Method A cleanup levels, a figure depicting the groundwater flow direction,
and an evaluation of contaminant trends over time. If warranted, the report will include
recommendations for modifications to the monitoring program.
Schedule and Cost Estimate
Groundwater sampling is estimated to occur in June of each year. However, this schedule may be
modified based on the Filco sampling schedule. Any decisions regarding changes to the sampling
schedule will be made in consultation with the City. The data report will be submitted to the City
within 15 working days of receipt and validation of the final laboratory report.
The cost estimate to perform the work described herein is provided in Table 1.
Page 2
City of Port Orchard
November 21, 2019
Project No. 140310-001
Table 1. Cost Estimate for Ongoing Compliance Groundwater Monitoring
Task Name
Labor
Field
Equipment
Subcontractors
Total
Project Management &
Communications
$2,520
$0
$0
$2,520
2020 Sampling & Reporting
$3,800
$275
$1,445
$5,520
2021 Sampling & Reporting
$3,900
$300
$1,490
$5,690
2022 Sampling & Reporting
$4,020
$325
$1,535
$5,880
2023 Sampling & Reporting
$4,140
$340
$1,580
$6,060
Total
$25,670
Closing
The above Services will be billed on a time and materials basis in accordance with the attached
Schedule of Charges. We will notify you and obtain your authorization if additional effort above
and beyond the estimated scope of this work is required. We will use a Contract Change Form to
request your authorization for any changes to the above description of Services. This cost proposal
is valid for 90 days unless extended in writing by Aspect Consulting.
Sincerely,
Aspect consulting, LLC
Carla E. Brock, LG
Associate Geologist
cbrock@aspectconsulting.com
Doug Hillman, LHG
Principal Hydrogeologist
dhillmangaaspectconsulting.com
Attachments: Schedule of Charges
V\140310 Marina Mart\Contracts\Proposal Material\Proposal_2020 to 2023_20191121.docx
Page 3
Aspect
CONSULTING
SCHEDULE OF CHARGES
Effective January 2019
Unless otherwise stated in the proposal or services agreement, current rates are as follows:
PERSONNEL CHARGES: ENGINEERS, SCIENTISTS, AND ANALYSTS Hourly Rate
Principals and Associates
Principal Scientist/Engineer/Analyst 2 $253
Principal Scientist/Engineer/Analyst 1 $239
Sr. Associate Scientist/Engineer/Analyst
$221
Associate Scientist/Engineer/Analyst
$207
Tech -r Professionals
Senior Scientist/Engineer/Analyst 3
$207
Senior Scientist/Engineer/Analyst 2
$195
Senior Scientist/Engineer/Analyst 1
$182
Project Scientist/Engineer/Analyst 3
$167
Project Scientist/Engineer/Analyst 2
$155
Project Scientist/Engineer/Analyst 1
$145
Staff Scientist/Engineer/Analyst 3 $134
Staff Scientist/Engineer/Analyst 2 $121
Staff Scientist/Engineer/Analyst 1 $1 13
PERSONNEL CHARGES: TECHNICAL AND PROJECT SUPPORT STAFF Hourly Rate
Field/Construction Staff
Field/Construction Supervisor
$124
Field Technician 2
$101
Field Technician 1
$94
Design, CAD, and Graphics Staff
Engineering Designer
$145
Sr. CAD Technician/Specialist
$130
CAD Technician
$115
Technical Editing and Project Operations
Sr. Technical Editor
$1 15
Technical Editor
$104
Project Coordinator 2
Project Coordinator 1
PERSONNEL CHARGES: TECHNOLOGY AND SOFTWARE DEVELOPMENT
Sr. Technology Project Manager
Technology Project Manager
Senior Software/Database Architect/Developer
Software/Database Architect/Developer
OTHER DISBURSEMENT CHARGES
$98
$93
Hourly Rate
$215
$200
$205
$180
Legal Testimony (4-hour minimum) $350/hr
Mileage Federal Gov Rate Plus 157.
Subcontractors and Miscellaneous Expenses Cost Plus 15%
Other equipment, rentals, and expenses will be provided on a per job basis.
Client acknowledges that Aspect will adjust the Schedule of Charges annually, and that the Agreement will remain valid for any and all
annually adjusted Schedule of Charges.