Loading...
043-14 - WA State Public Works Board - Contract Amendment AAMENDMENT FACE SHEET Loan Number: DM13-952-185 Amendment Number: A Washington State Department of Commerce PUBLIC WORKS BOARD DRINKING WATER STATE REVOLVING FUND 1. Contractor 2. Contractor Doing Business As (optional) City of Port Orchard N/A 216 Prospect Street Port Orchard, WA 98366 3. Contractor Representative (only if updated) 4. Public Works Board Representative (only if updated) N/A N/A 5. Original Contract Amount $ 6,060,000.00 6. Amendment Amount 7. New Contract Amount N/A $ 6,060,000.00 8. Amendment Funding Source Federal: ® State: Q Other: ❑ N/A: ❑ 11. Federal Funds (as applicable): N/A 9. Amendment Start Date 10. Amendment End Date Amendment Execution Date October 1, 2037 Federal Agency: CFDA Number: EPA 66.468 12. Amendment Purpose: The purpose of this amendment is to revise the Scope of Work of the Loan. The Board, defined as the Washington State Public Works Board, and Borrower/Contractor acknowledge and accept the terms of this Agreement/Contract As Amended and attachments and have executed this Agreement/Contract Amendment on the date below to start as of the date and year referenced above. The rights and obligations of both parties to this Agreement/Contract As Amended are governed by this Agreement/Contract Amendment and the following other documents incorporated by reference: Amendment Terms and Conditions, including any attachments. A copy of this Agreement/Contract Amendment shall be attached to and made a part of the original Agreement/Contract between the Board and the Borrower/Contractor. Any reference in the original Agreement/Contract to the "Agreement" or the "Contract" shall mean the "Agreement As Amended" or "Contract As Amended," respectively. FOR THE =ONTRACTOR FORM,-7, SBOARD Signature J.C. Bald in, n eri C Public Works Board A ��,� Print Name ,QpR7 QR''•y,,• Date 1 ■ r Title � APPROVED AS TO FORM ONLY of • ATT - S �L� I -This 141� Day of March. 2013 �3 Bob Ferguson Date %e�+�; F� R+►�.''�; Attorney General Si nature on File Kathryn Wyatt Assistant Attornev General Page 4 Revised Scope of Work Amendment 3/16/2017 Drinking Water State Revolving Fund AMENDMENT TERMS AND CONDITIONS Washington State Department of Commerce PUBLIC WORKS BOARD DRINKING WATER STATE REVOLVING FUND Amendment Number: A Contractor/Borrower: City of Port Orchard Contract Number: DM13-952-185 Amendment Number: Enter Amendment Designator The purpose of this amendment is to revise the Scope of Work of the above referenced Drinking Water State Revolving Fund. The Public Works Board (or its successors), a department of the State of Washington, (hereafter referred to as the "Board") and the Contractor, listed above and on the attached Face Sheet, agree to amend the declared loan as described below. The SCOPE OF WORK is amended to delete the original declared Scope of Work and replace it with the SCOPE OF WORK as shown on the attached Declarations Page. The Scope of Work, where referenced in the Contract's Special Terms and Conditions section, shall refer to this amended text. Page 5 Revised Scope of Work Amendment 3/16/2017 Drinking Water State Revolving Fund DECLARATIONS CLIENT INFORMATION Legal Name: Loan Number: Amendment: PROJECT INFORMATION Project Title - Project City: Project State: Project Zip Code: LOAN INFORMATION Loan Amount: Loan Term: Interest Rate: Payment Month: Earliest Date for Construction Reimbursement: Time of Performance City of Port Orchard DM13-952-185 A City of Port Orchard Well 10 Water Treatment Project Port Orchard Washington 98366 $ 6,060,000.00 24 years 1.50% October 1 7/1/2013 48 months from Contract execution date to Project Completion date. SPECIAL TERMS AND CONDITIONS GOVERNING THIS LOAN AGREEMENT none Scope of Work (revised): The primary elements of the project include: 1. Well 13 Water Campus Improvements. a. Well 13. Drill a new Well 13 on City -owned property adjacent to the existing Sedgwick Reservoir in the southeast section of the City's water supply area. Equip with high -efficiency, variable speed well pumps. b. Conveyance. Well 13 discharge will be treated onsite and discharged into the existing Sedgwick Reservoir. c. Water Treatment Facility. Construct a new water treatment facility at the Well 13 site, including a new building with pressure filters, fluoridation and disinfection. d. Additional project elements include telemetry and instrumentation, controls, standby electrical generator, landscaping, parking, fencing, security improvements, site work and site restoration. 2. Conveyance. a. Water will be conveyed from the Sedgwick Reservoir through existing pipelines to an intertie with a new pipeline on the east edge of Blackjack Creek ravine. b. A new 12-inch diameter pipeline will convey water south to a connection point with existing piping at the existing Well 6 site. Road and slope stabilization along the pipeline route will be included. 3. Overall project activities will include, but not be limited to, engineering and design, cultural and historical resources review, environmental review, permits, public involvement, bid documents, construction administration, staking, site work and facility construction.