Loading...
043-14 - WA State Public Works Board - Contract Amendment BAMENDMENT FACE SHEET Loan Number: DM13-952-185 Amendment Number: B Washington State Department of Commerce PUBLIC WORKS BOARD DRINKING WATER STATE REVOLVING FUND 1. Contractor 2. Contractor Doing Business As (optional) City of Port Orchard N/A 216 Prospect Street,PW Dir. Port Orchard, WA 98366 I 3. Contractor Representative (only if updated) 4. Public Works Board Representative (only if updated) N/A 5. Original Contract Amount ` 6. Amendment Amount 7. New Contract Amount $6,060,000.00 N/A I N/A 8. Amendment Funding Source 9. Amendment Start Date 10. Amendment End Date Federal:Q State:Q Other: ❑ N/A: ❑ At Execution October 1, 2037 11. Federal Funds (as applicable): Federal Agency: CFDA Number: EPA 66.468 12. Amendment Purpose: The purpose of this amendment is to extend the project completion date of this Drinking Water State Revolving Loan Agreement/Contract. The Board, defined as the Washington State Public Works Board and Borrower/Contractor acknowledge and accept the terms of this Agreement/Contract As Amended and have executed this Agreement/Contract Amendment on the date below to start as of the date and year referenced above. The rights and obligations of both parties to this Agreement/Contract As Amended are governed by this Agreement/Contract Amendment and the following other documents incorporated by reference: Amendment Terms and Conditions. A copy of this Agreement/Contract Amendment shall be attached to and made a part of the original Agreement/Contract between the Board and the Borrower/Contractor. Any reference in the original Agreement/Contract to the "Agreement" or the "Contract" shall mean the "Agreement As Amended" or "Contract As Amended," respectively. FOR THE BORROWERICONTRACTOR Sign t Print Name 1 Title Date Page 1 4/28/2018 FOR PUBLIC WORKS BOARD Scott Hutsell, Public Works Board Chair s--/�-rg Date This 5th Day of January_2015 Bob Ferguson Attorney General Si nature on File Kathryn Wyatt Assistant Attorney General Extension Amendment Drinking Water State Revolving Fund AMENDMENT TERMS AND CONDITIONS PUBLIC WORKS BOARD DRIKING WATER STATE REVOLVING FUND Loan Number: DM13-952-185 Amendment Number: B The purpose of this amendment is to extend the project completion date from 04/23/2018 to 06/30/2019 of the Drinking Water State Revolving Loan Contract displayed on the Declarations Page. This amendment was approved by the Public Works Board, a department of the State of Washington, (hereinafter referred to as the "Board"). The Board and the Contractor agree to amend the Drinking Water State Revolving Fund Loan Contract as described below. Section 1.7 Time of Performance. (first paragraph) is amended to read as follows: The contractor shall begin the activities identified within the declared Scope of Work no later than 30 days after Contract execution. No later than eighteen (18) months after Contract execution, the Contractor must issue a Notice to Proceed which follows the formal award of a construction contract. The Contractor must reach project completion no later than the Project Completion Date stated on the Declarations page. Section 1.9 Repayment. (first paragraph) is amended to read as follows: Pursuant to 40 CFR Section 35.3525(a)(1)(i), an assistance recipient begins annual repayment of principal and interest no later than one year after project completion. The first repayment installment of principal and any interest accrued to date under this Contract is due on the Repayment Start Date shown on the Declarations page. All subsequent payments shall consist of principal and accrued interest due on October 1s' of each year during the remaining term of the loan. Page 2 Extension Amendment 4/28/2018 Drinking Water State Revolving Fund AMENDMENT DECLARATIONS Amendment Title Drinking Water Extension Amendment Amendment Number B CLIENT INFORMATION Legal Name City of Port Orchard Loan Number DM13-952-185 PROJECT INFORMATION Title Project City Project State Project Zip City of Port Orchard Well 10 Water Treatment Project Port Orchard Washington 98366 LOAN TERMS and CONDITIONS Loan Amount Loan Term Interest Rate Repayment Start Date Project Completion Date $6,060,000.00 24 years 1.50% 10/01/2018 06/30/2019 SCOPE OF WORK The primary elements of the project include: 1. Well 13 Water Campus Improvements. a. Well 13. Drill a new Well 13 on City -owned property adjacent to the existing Sedgwick Reservoir in the southeast section of the City's water supply area. Equip with high -efficiency, variable speed well pumps. b. Conveyance. Well 13 discharge will be treated onsite and discharged into the existing Sedgwick Reservoir. c. Water Treatment Facility. Construct a new water treatment facility at the Well 13 site, including a new building with pressure filters, fluoridation and disinfection. d. Additional project elements include telemetry and instrumentation, controls, standby electrical generator, landscaping, parking, fencing, security improvements, site work and site restoration. 2. Conveyance. a. Water will be conveyed from the Sedgwick Reservoir through existing pipelines to an intertie with a new pipeline on the east edge of Blackjack Creek ravine. b. A new 12-inch diameter pipeline will convey water south to a connection point with existing piping at the existing Well 6 site. Road and slope stabilization along the pipeline route will be included. 3. Overall project activities will include, but not be limited to, engineering and design, cultural and historical resources review, environmental review, permits, public involvement, bid documents, construction administration, staking, site work and facility construction.