Loading...
004-13 - Pacific Air Control, Inc. - Supplement / Change Order 7CITY OF PORT ORCHARD Authorization for Change Order No. 7 Date: July 6, 2016 Contractor: Pacific Air Control, Inc. Project: HVAC Maint. Program 1916 220th Street SE, M#101 Contract / Job # C004-13 Bothell, WA 98021 Brief Description of Change Order work: During service call technician noted the following: B-1 s/n 899W gas valve failing; B-2 s/n 799W gas valve failing; VAV305 A-26 s/n 1502 heat contactor has burnt and pitted; all of these services the whole building. They recommend replacing all three items. (See attached). Original Contract $8,225.36 1 1-Dec-12 Council Change Order 1 $325,80 10-Jun-13 PWD Change Order 2 $628.79 21-Oct-13 Council Change Order 3 $4,012.12 18-Feb-14 PWD Change Order 4 $1,021.78 27-Jan-15; PWD Change Order 5 $3,542.53 22-Oct-15I PWD Change Order 6 $2,604.45 19-Apr-16 PWD Change Order 7� $3,733.83 06-Jul-16 PWD Total Contract $24,094.66 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Submitted by: Title: PublicWarks Director/City Enginee Change Orders over $15,000 up to $24,999 are to be approved by the Mayor. Approved: Attest: Mayor City Clerk Council Approval Date U:\ENGINEERING\CITY FACILITIES\HVAM20MCOV HVAC Upgrades doc Page 1 pacific air control, inc. CAir Conditioning, Heating, Controls, Sales, Service, Installation July 1, 2016 City of Port Orchard Attn: Mark Dorsey & Thomas Hunter 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard, City Hall During a recent service call and while performing the regularly scheduled maintenance, our technician noted the following: B-1 s/n 899W serving the Whole Building The fluid power gas valve is failing. We recommend replacing the fluid power gas valve for proper operation of this unit. Cost of the above: $ 1,448.00 plus tax B-2 s/n 799W serving the Whole Building The fluid power gas valve is failing. We recommend replacing the fluid power gas valve for proper operation of this unit. Cost of the above: $ 1,448.00 plus tax VAV305 A-26 s/n 1502 serving the Whole Building The heat contactor for this unit has burnt and pitted contacts and needs to be replaced. The contactor sends the correct voltage and current to the heater, turning on the heater. Burnt and pitted contact points do not make good contact and can cause costly motor and compressor failure if not replaced. Cost of the above: $ 539.00 plus tax Once the above work has been completed, the units will be tested for proper operation. If further repairs are necessary, we will contact you. Thank you for the opportunity to work with you on this project. If you have any questions regarding this report, or if youould like to schedule the above -mentioned work, please feel free to give us a ca1J;_ ccepted by PO#V Date Cc: Ben Chadwick, Service Manager 616086 Price quoted is valid for 30 days. Proposal # 616086 Contractors License #PACIFAC230P8 1916 2201h Street SE, Suite M101, Bothell, WA 98021 Ph: (206) 682-6393 Fax: (206) 340-2270 Caro[Str*ht Customer Service Representative