Loading...
004-13 - Pacific Air Control, Inc. - Supplement / Change Order 3-2018CITY OF PORT ORCHARD Authorization for Change Order No. 3-2018 Date: Noeember 131h 2018 Contractor: Pacific Air Control, Inc. Project: Contract / Job # HVAC Maintenance C004-13 — 2018 Extension 1916 220th Street SE, M9101 Bothell, WA 99021 THIS CHANGE ORDER AUTHORIZES THE REPAIRS RECOMMENDED BY SERVICE TECHNICIAN (SEE ATTACHED PROPOSALS FROM CONTRACTOR) FOR PROPER FUNCTION OF HVAC SYSTEM. Contract --- �� - - — — �� l70�Li/1�y _ Amount a m Tax Total— Date Asp vd bv_,- Original Contract $7,616.07 $685.45 - $8,301.52 11-Dec-12 COUNCIL Contract Amendment $9,110.00 $819.90 $9,929.90 26-Sep-17 COUNCIL Change Order 1- 2019 $6,586.00 $592.74 $7,178.74 09-Jan-18 COUNCIL Change Order 2 - 2018 $6,422.00 $462.151 $6,884.15 11-Sep-18 COUNCIL Change Order 3 - 2018 $2,080.00 $187.20 $2,267.20 13-Nov 18 COUNCIL Total Contract for 2018 $31,814.07 $2,747.441 $34,561.51 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. �n actor Ap roval Signature � �� ✓ c, ri *cli.�7J�f11� Printed Name & Title Works MARK R. DORSEY, P.E. Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contact Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $200,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Engineer t t'N tot Count if Ap royal Date SEAS, U:1S1alr ReparI02019120161113WD 02 Charge Order 32018 PACIFIC AIR,dae Page 1 Ppacific air control, inc. 9 LAir Conditioning, Heating, Controls, Sales, Service, Installation October 31, 2018 City of Port Orchard Attn: Mark Dorsey & Thomas Hunter 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard, City Hall While on site performing a recent repair, our technician noted the following, BP-1 sin 3-10A serving the Entire Building The motor starter and the overload protection on the Boller pump have failed. We recommend replacing these parts for proper operation on this Boiler pump. Cost of the above: i 2,080.00 plus tax Once the above work has been completed, the units will be tested for proper operation. If further repairs are necessary, we will contact you. Thank you for the opportunity to work with you on this project. If you have any questions regarding this report, or If ou would like to schedule the above -mentioned work, please feel free to give us a caul. t%- ti aL by PO# NJ Date Cc: Bert Chadwick, Service Mani Price quoted is valid for 30 days. Proposal # 1018052 Contractors License 9PACIFAC230P8 1916 22& Street SE, Suite M101, Bothell, WA 99021 Ph: (206)692.6393 Fax: (206) 340-2270 catryM Customer Service Representative