Loading...
004-13 - Pacific Air Control, Inc. - Supplement / Change Order 2CITY OF PORT ORCHARD Authorization for Change Order No. 2 Date: October 21, 2013 Contractor: Pacific Air Control, Inc. Project: HVAC Maint. Program 1916 220th Street SE, M#101 Contract / Job # C004-13 Bothell, WA 98021 Brief Description of Change Order work (Documentation to be attached): Repair of hot water loop to prevent damage to piping and boiler at City Hall. Original Contract $8,225.36 11-Dec-12 Council Change Order 1 $325.80 10-Jun-13 PWD Change Order 2 $628.79 21-Oct-13 Council Change Order 3 $0.00 Change Order 4 $0.00 Total Contract $9,179.95 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Submitted by: 771 Title: P orks Director/City Engine �Z Change Orders over $1,000 up to $15,000 are to be approved by the Mayor. Approved: Mayor Attest: City Clerk Change Orders over $15,000 (per project) require Council action. Council Approval Date Change Order 2 — Pacific Air Control, Inc. Page 1