004-13 - Pacific Air Control, Inc. - Supplement / Change Order 2-201711 CITY OF PORT ORCHARD Authorization for Change Order No. 2-2027 Date: November 14ih 2017 Contractor: PACIFIC AIR CONTROL Project: HVAC MAINTENANCE Contract / Job # C004-13 — 2017 EXTENSION 1916 220TN STREET SE, M#101 BOTHELL, WA98021 THIS CHANGE ORDER AUTHORIZES THE FLUSHING AND RETREATING WITH A DIFFERENT CORROSION INHIBITION PRODUCT DUE TO CHILLED LOOP'S POOR CONDITION (SEE ATTACHED SERVICE REPORT). Amount Contract History Sales Tax Total Date A vd b Original Contract $7 616.07 $685.45 $8 301.52 11-Dec-12 CouNCIL COMMCr ANNUALRENMW M/0112017-12/31/2017. TOTALCONTRAUAMOUNr DIFFERS FROM ORIGINAL DUE TO INCREASE IN SAISTAM FROM 8%T09%. Contract Amendment e - COUNCIL New Contract Amount 1 1 $18 231.42 Chan a Order 1-2017 $4 573.00 $411.57 $4 984.57 26-Se -17 COUNCIL Chan a Order 2-2017 51.437.001 $129.331 $1 566.33 14-Nov-17 COUNCIL Total Contract $22,736.07 $2 046.25 $24 782.32 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. 7 Contractor Approval Signature Pu orks Dir or City Engineer MARK R. DORSEY, P.E. Printed Nam & Title Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Myer Cit ler IkIILA 1Z)11 CouncillApprov5l Date pacific air control, inc. PCAir Conditioning, Heating, Controls, Sales, Service, Installation October 19, 2017 City of Port Orchard Attn: Mark Dorsey, Thomas Hunter & Cindy Palmer 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard, City Hall While on site, our technician noted the following: Chilled Loop The chilled loop is in poor condition. We recommend running a flush back to raw water quality, then retreating with a different corrosion inhibition product (molybdate based instead of nitrite based). Cost of the above: $1,437.00 plus tax Please Note: This quote is based upon the assumption that the chilled loop is no larger than 1,000 gallons. If loop is larger than 1000 gallons additional chemical will need to be purchased Once the above work has been completed, the units will be tested for proper operation. If further repairs are necessary, we will contact you. Thank you for the opportunity to work with you on this project. If you have any questions regarding this report, or if you would like to schedule the above -mentioned work, please feel free to give us a call. Accepted by PO# Date Cc: Ben Chadwick, Service Manager Price quoted is valid for 30 days. Proposal # 1017031 Contractors License #PACIFAC230P8 1916 220" Street SE, Suite M 101, Bothell, WA 98021 Ph: (206) 682-6393 Fm: (206) 340-2270 Tod Ottan Customer Service Representative Port Orchard City Hall Prospect St 216 Prospect St, Port Orchard WA 98366 (360)525-2237 Service Report Friday, August 18, 2017 1:30 PM PDT Report Number. 194329 Recorded By: Jacob Lampe (609)981-5522 )lmpe@ch2o.com City Hall - Systems Test Chill Loop Hot Loop pH Limb 11.75 9.63 a-111.6 Conductivity (as umhos) uma 2216 5700 40do rm Nitrite (ppm as NaNO2) um� 225 3400 Iron (ppm as Fe) LImU 0.49 0.05 1 Runt 1 MM Opening Comments Onsite chemical corrosion inhibitor product is: Sound Water Treatment Corrblox CLI-35N. Approximately 2 gallons remain. Chill Loop Online Loop is in poor order and in a potentially corrosive state. Nitrite levels are low and pH is high. I recommend either completely flushing the loop and retreating with t gallon of the corrosion inhibitor onsite or ordering colorguard to buffer the pH into range before adding 1 gallon of corrosion inhibitor. Note: No measureable glycol was present. Hot Loop Online Loop was found to be in poor condition as nitrite and conductivity levels were far above range. Loop was bled until conductivity had dropped below 4000 uS. No further adjustments are necessary at this time. Closing Comments Several puddles were found on the mechanical room floor but they are believed to be due to condensation. Page 1 of 1