004-13 - Pacific Air Control, Inc. - Supplement / Change Order 1CITY OF PORT ORCHARD Authorization for Change Order No. 1 Date: JUNE 19TH 2O17 Project: HVAC MAINTENANCE Contract / Job # C004-13 — 2017 EXTENSION Contractor: PACIFIC AIR CONTROL 1916 220TH STREET SE, M#101 BOTHELL, WA 98021 THIS CHANGE ORDER AUTHORIZES THE REPLACEMENT OF INDOOR BLOWIN. (Q191ARINGS AND WIRE FROM VFD TO MOTOR FOR PROPER OPERATION. ALSO AUTH ZE$ T�E,APQITION OF OIL TO THE CHILLERS AS LEVELS ARE NOT UP TO FACTORY STANDARDS. CITY OF PORT ORCHAP.D Contract History Amount Sales Tax Total Date Appvd b Original Contract I $7,616.07 $685.451 $8,301.52 11-Dec-12 I COUNCIL CONTRACT ANNUAL RENEWAL 01/01/2017-12/31/2017. TOTAL CONTRACT AMOUNT DIFFERS FROM ORIGINAL DUE TO INCREASE IN SALES TAX FROM 8%TO 9%. Change Order 1 $4,573.00 $411.57 $4,984.57 19-Jun-17 PW DIRECTOR Total Contract $13,286.09 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Contractor Approval Signature Printed Name & Title Change Orders that do not exceed 10% or a maximum of $50,000 can be approved by the Public Works Director. Change Orders that do not exceed 10% or a maximum of $100,000 are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. rector/City Engineer Printed Name Approved: Mayor Attest: City Clerk Council Approval Date U:\ENGINEERING\CITY FACILITIES\HVAC\2017\ADMIN\Change Order 1.doc Page 1 Mpacific air control, inc. Air Conditioning, Heating, Controls, Sales, Service, Installation June 15, 2017 City of Port Orchard Attn: Mark Dorsey & Thomas Hunter 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard, City Hall While on site, our technician noted the following: AH-1 s/n 042A serving the Ist floor The indoor blower fan motor on this unit is failing. We recommend replacing the indoor blower motor and bearings (2), and add wire from the VFD to the motor for proper operation of this unit. Cost of the above: $3,302.00 plus tax CH-1 s/n 3807 serving the whole building The oil level for the chiller circuits #1 and #2 are not up to factory standards. We recommend adding oil to both circuits. Cost of the above: $1,271.00 plus tax Once the above work has been completed, the units will be tested for proper operation. If further repairs are necessary, we will contact you. Thank you for the opportunity to work with you on this project. If you have any questions regarding this report, or if you would like to schedule the above -mentioned work, please feel free to give us a call. Tod ottan Accepted by PO# Date Customer Service Representative Cc: Ben Chadwick, Service Manager Price quoted is valid for 30 days. Proposal # 617040 Contractors License #PACIFAC230P8 1916 2201h Street SE, Suite M 101, Bothell, WA 98021 Ph: (206) 682-6393 Fax: (206) 340-2270