Loading...
004-13 - Pacific Air Control, Inc. - Supplement / Change Order 1(2017)CITY OF PORT ORCHARD Authorization for Change Order No. 1(2017) Date: September 21-2017 Contractor: PACIFIC AIR CONTROL Project: HVAC MAINTENANCE 1916 220T" STREET SE, M#101 Contract / Job # 0004-13-2017 EXTENSION BOTHELL, WA 98021 THIS CHANGE ORDER AUTHORIZES THE REPLACEMENT OF INDOOR BLOWING MOTOR & BEARINGS AND WIRE FROM VFD TO MOTOR FOR PROPER OPERATION AND AUTHORIZES THE ADDITION OF OIL TO THE CHILLERS AS LEVELS ARE NOT UP TO FACTORY STANDARDS. Amount Contract History Sales Tax Total Date vd b Original Contract 1 $7,616.071 $685.451 $8,301.52 I11-Dec 12 CouNCIL CONTRACT ANNl1AL RENEWAL a1)nl/2017-11/31/2017. TOTAL IITPACE AMWNT OIFFERS FROM OR6 NAL ONE TO INCREASE IN SALES 1AY FROM x%i05% Change Order 1 $4,573.00 $411.57 $4,984. 7 26-Se -17 COUNCIL Total Contract $4,573.00 $1,097.02 $13,ZB6.09 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accura e. Contract pproval Signature Pub i Work ' ec or/City En 'Weer "el G s� Ssrr'rr 9 �/ P ted Name & Title Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director, Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. `—L Mayor City Cier �1�r�(kl%iLl� Council Approval Date GIENGINEERINGTITy FACIUTIESIHVACI20I7V DMINICnenpe Omer t aac Page 1