Loading...
004-13 - Pacific Air Control, Inc. - Supplement / Change Order 1-20181i CITY OF PORT ORCHARD Authorization for Change Order No. 1-2018- Date: January 91h 2018 Project: HVAC Maintenance Contract / Job # C004-13 — 2018 Extension Contractor: Pacific Air Control, Inc. 1916 2201h Street SE, M#101 Bothell. WA 98021 THIS CHANGE ORDER AUTHORIZES THE REPAIRS RECOMMENDED BY SERVICE TECHNICIAN (SEE ATTACHED PROPOSALS FROM CONTRACTOR) FOR PROPER FUNCTION OF HVAC SYSTEM. *This Change Order has been updated to reflect scrivener's error. Pacific Air's proposal listed two options for fixing the AH- 3 serving the 3`d floor — one during business hours and one after business hours/weekend. We inadvertently added both options versus the one chosen. Change Order i — 2018 amount has been decreased by $3883.67. Contract History Amount Sales Tax Total Date Appvd b 110riginal Contract $7,616.07 $685.45 $8,301.52 11-Dec-12 COUNCIL Contract Amendment $9,110.00 $819.90 $9,929.90 26-Se -17 COUNCIL Change Order 1- 2018 $6,586.00 $592.74 $7,178.74 09-Jan-18 COUNCIL Total Contract for 2018 1 $23,312.071 $2,098.091 $25,410.16 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. ,Z Contractor Apfroval Signature Printed Name & Title P is Wo irector/City Engi er MARK R. DORSEY, P.E. Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor Change Orders over $100,000 or exceed a total of 10% require Council Action. U 1ENGINEERING�CITY FACILITIESMVAC120 1 &Change Order 1-2018_PACIFIC AIR.doc Page 1 City Clerk `✓ V1� Council Approval 6ate pacific air control, inc. PCra I Air Conditioning, Heating, Controls, Sales, Service, Installation November 27, 2017 City of Port Orchard Attn: Mark Dorsey & Thomas Hunter 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard, City Hall While performing the regularly scheduled maintenance, our technician noted the following: AH-1 sin 042A serving the Vt Floor The cold water inlet actuator on this unit has failed. We recommend replacing the cold water inlet actuator for proper operation of this unit. Cost of the above: $ 1,386.00 plus tax B-2 sin 7-99W serving the Entire Building The exhaust stack on this unit drips water. We recommend sealing the exhaust stack with high temperature caulking and extend the drain port to the floor drain with tubing. Cost of the above: $ 617.00 plus tax Once the above work has been completed, the units will be tested for proper operation. If further repairs are necessary, we will contact you. Thank you for the opportunity to work with you on this project. If you have any questions regarding this report, or if you would like to schedule the above -mentioned work, please feel free to give us a call. Cathy Mansen Accepted by PO# Date Customer Service Representative Cc: Ben Chadwick, Service Manager 1117073 Price quoted is valid for 30 days. Proposal # 1117073 Contractors License #PACIFAC230P8 1916 22V` Street SF, Suite r41101, Bothell, WA 98021 Ph: (206) 682-6393 1 ax: (206) 340-2270 pacific air control, inc. P=2 Air Conditioning, Heating, Controls, Sales, Service, Installation December 29, 2017 City of Port Orchard Attn: Mark Dorsey & Thomas Hunter 216 Prospect Street Port Orchard, WA 98366 Re: City of Port Orchard, City Hall During a recent service call, our technician noted the following: AH-3, Serial # Al BX, Serving the 3nd Floor The three way water mixing valve on this unit has failed. We recommend replacing the valve, actuator, and copper fittings for proper operation of this unit. 'Please note there will be welding involved with this repair. Cost of the above: $3,663.00 plus tax Normal Business Hours AH-3, Serial # AIBX, Serving the V Floor The three way water mixing valve on this unit has failed. We recommend replacing the valve, actuator, and copper fittings for proper operation of this unit. Please note there will be welding Involved with this repair. Cost of the above: $4,683.00 plus tax After hours or Saturday Once the above work has been completed, the units will be tested for proper operation. If further repairs are necessary, we will contact you. Thank you for the opportunity to work with you on this project. If you have any questions regarding this report, or if you would like to schedule the above -mentioned work, please feel free to give us a call. Accepted by PO# Date Cc: Ben Chadwick, Service Manager 1217050 Price quoted is valid for 30 days. Proposal # 1217060 Contractors License #PACIFAC230P8 1916 220 Street SE, Suite M 101, Bothell, WA 98021 Ph: (206) 682-6393 Fax: (206) 340-2270 7(pndra JYefson Customer Service Representative