Loading...
067-21 - Ordinance - Comp Plan AmendmentsORDINANCE NO. 067-21 AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON, RELATING TO THE PORT ORCHARD COMPREHENSIVE PLAN ADOPTED UNDER THE STATE OF WASHINGTON'S GROWTH MANAGEMENT ACT, CHAPTER 36.70A RCW; ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES AND UTILITIES ELEMENTS OF THE COMPREHENSIVE PLAN; ADOPTING AN AMENDMENT TO THE CITY'S SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM; ADOPTING AN AMENDMENT TO APPENDIX B OF THE PORT ORCHARD COMPREHENSIVE PLAN; ADOPTING AN AMENDMENT TO THE CITY'S COMPREHENSIVE PLAN LAND USE MAP; ADOPTING AN AMENDMENT TO THE CITY ZONING MAP; PROVIDING FOR SEVERABILITY AND PUBLICATION; AND SETTING AN EFFECTIVE DATE. WHEREAS, with the passage of the Washington State Growth Management Act in 1990 (GMA), Chapter 36.70A RCW, local governments are required to adopt a comprehensive plan that outlines strategies to accommodate the needs of a growing population; and WHEREAS, in June 1995, the City Council adopted a Comprehensive Plan for the City of Port Orchard and its urban growth area pursuant to the requirements set forth in the GMA; and WHEREAS, the City of Port Orchard completed its most recent periodic update of its comprehensive plan in June 2016, as required by the GMA; and WHEREAS, the City may annually adopt amendments to the City's Comprehensive Plan pursuant to RCW 36.70A.470 and 36.70A.106; and WHEREAS, the City initiated and received submittals for Comprehensive Plan amendments by the required deadline date of January 31, 2021; and WHEREAS, the amendment submittal proposes revisions and updates to the City's transportation improvement program (TIP), Capital Facilities and Utilities Elements of the Comprehensive Plan, Appendix B of the Comprehensive Plan, the Comprehensive Plan Land Use Map, and the City Zoning Map; and WHEREAS, on July 13, 2021, notice of the proposed amendments to the City's Comprehensive Plan was sent to the Washington State Department of Commerce at least sixty days before the amendments were adopted, in accordance with RCW 36.70A.106; and WHEREAS, on October 20, 2021, a SEPA Determination of Non -Significance was issued, and provided to the public, agencies and other interested parties in accordance with the requirements of POMC Chapter 20.04.080, and published in the newspaper and on the City website, and emailed to the Washington Department of Ecology; and WHEREAS, on November 29, 2021, a Notice of Hearing was published in the City's newspaper of record advertising a public hearing to be held by the Planning Commission on the Ordinance No. 067-21 Page 2 of 40 proposed 2021 Comprehensive Plan amendments, and the notice was provided to the public, agencies and other interested parties in accordance with the requirements of POMC Chapter 20.04.080; and WHEREAS, on November 16, 2021, the City Council held a public work-study meeting to review the 2020 Comprehensive Plan amendments and consider the recommendation of the Planning Commission; and WHEREAS, on December 7, 2021, the Planning Commission held a public hearing on the 2021 Comprehensive Plan amendments, and voted unanimously to recommended approval of the amendments to City Council; and WHEREAS, on December 21, 2021, the City Council held a Regular Meeting and considered the Planning Commission's recommendation and find it in the public interest to adopt the proposed amendments to the City's Comprehensive Plan; now, therefore THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION 1. The City Council hereby adopts the above recitals as findings in support of this Ordinance. SECTION 2. The City Council finds that the amendments adopted by this Ordinance are consistent with the goals and policies of the City's adopted 2016 Comprehensive Plan, and are consistent with the state Growth Management Act and other applicable law. SECTION 3. The City Council finds that the amendments adopted by this Ordinance will not, individually or cumulatively, result in adverse effects to the public health, safety or welfare. SECTION 4. The City Council finds that no adverse impacts to the environment are anticipated to result from the amendments adopted by this Ordinance. SECTION S. The City Council finds that the amendments adopted by this Ordinance are consistent with the land uses and growth projects which were the basis of the adopted Comprehensive Plan, are compatible with neighboring land uses and surrounding neighborhoods, and are not anticipated to cause adverse impacts to public services or facilities. SECTION 6. Adoption of Amendments to Comprehensive Plan. In accordance with the above -described Findings and Conclusions, the City Council hereby amends the Port Orchard Comprehensive Plan by approving and adopting the 2021 amendments to the Port Orchard Comprehensive Plan. Such amendments are attached to this Ordinance as Exhibit 1 and incorporated herein by this reference as if set forth in full. The amendments include revisions to the following sections and elements: Capital Facilities Element; Utilities Element; Six -Year Ordinance No. 067-21 Page 3 of 40 Transportation Improvement Program (TIP); Appendix B to the Comprehensive Plan; and the Comprehensive Plan Land Use Map. SECTION 7. Adoption of Amended City of Port Orchard Zoning Map. The City of Port Orchard Zoning Map is hereby amended and adopted as set forth in Exhibit 2, which is attached hereto and incorporated herein by this reference as if set forth in full. SECTION 8. Severability. If any sentence, section, provision, or clause of this Ordinance or its application to any person, entity or circumstance is for any reason held invalid or unconstitutional, the remainder of the Ordinance, or the application of the provision to other persons, entities, or circumstances is not affected. SECTION 9. Corrections. Upon the approval of the city attorney, the city clerk and/or code publisher is authorized to make any necessary technical corrections to this Ordinance, including but not limited to the correction of scrivener's/clerical errors, references, Ordinance numbering, section/subsection numbers, and any reference thereto. SECTION 10. Publication and Effective Date. This Ordinance shall be in full force and effect five (5) days after posting and publication as required by law. A summary of this Ordinance may be published in lieu of the entire Ordinance, as authorized by state law. PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and attested by the Clerk in authentication of such passage this 21s' day of December 2021. ATTeT'- �f Brandy Rinearson, MMC, City Clerk APPROVED AS TO FORM: Charlotte A. Archer, City Attorney PUBLISHED: December 26, 2021 EFFECTIVE DATE: December 31, 2021 Robert Putaansuu, Mayor SPONSOR: ner, Councilmember `` ca Ordinance No. 067-21 Page 4 of 40 ATTACHMENTS: Exhibit 1: 2021 Amendments to the Comprehensive Plan including: 1. Capital Facilities Element 2. Utilities Element 3. Appendix B 4. Land Use Map 5. TIP Exhibit 2: 2021 Amended City Zoning Map Chapter 9: Capital Facilities Chapter 9. Capital Facilities 9.1. Introduction This Capital Facilities Element of the 2016 Comprehensive Plan provides information about the City's existing public facilities, and the need for future facilities to address the requirements of a growing population. The Capital Facilities Element, in conjunction with the City's Capital Facilities Plan (CFP) and Capital Improvements Program (CIP), provide guidance for the City to achieve its goals of providing the appropriate public facilities and desirable levels of public services to its residents and businesses. Capital Facilities Vision Provide outstanding community facilities that serve the needs of a growing and changing city. Maintain existing community facilities and develop additional facilities to address the city'sgrowth and evolving needs. New facilities should address multiple objectives, such as creating new open space and enhancing neighborhood Ensuring that public facilities are available when growth occurs is critical to the quality of life for Port Orchard's residents. The implementation of the Capital Facilities Element and related plans will help realize the community's vision for outstanding community facilities, as well as the vision and goals of the Land Use Element. This Element also functions in coordination with the Comprehensive Plan's Utilities, Parks and Transportation elements and functional system plans for water, wastewater and stormwater. These are discussed in more detail in Section 9.3. character, even as they serve basic The state requires the City to demonstrate that all functional requirements. capital facilities serving its population have been considered and that planning is done in a coordinated and comprehensive fashion. The Public Facilities and Services Goal of the Growth Management Act (GMA) requires that the level of service ("LOS") of public facilities and services necessary to support development shall be adequate to serve the development at the time the development is available for occupancy and use, without decreasing current service levels below locally established minimum standards ("the concurrency requirement"). Kitsap County's Countywide Planning Policies also require the City to ensure that its growth plans are consistent with the CIP and that adequate public facilities and services are or will be available to serve the City's population allocation through the planning period. If limited funding or other circumstances would prevent the city from providing adequate facilities and services, the Growth Management Act requires the city to re-evaluate the Land Use Element and make sure that capital facilities plans and land use plans are consistent. The City of Port Orchard owns and manages a variety of capital facilities, including roads, parks, utility systems, police facilities, and administrative buildings. In addition to the facilities owned and managed by the City, there are publicly -owned capital facilities managed by other entities which meet some of Port Orchard's capital facility needs. These include, but are not limited to, schools, library, sewage treatment, and public transit. Privately owned utilities (electrical, natural gas, and telecommunications) conduct their own planning processes and maintain their own system plans. The City influences private system Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities planning through its authority to regulate land uses and its obligation to develop and maintain a Comprehensive Plan. The City uses its capital facilities and functional plans, with guidance from the Comprehensive Plan, to make planning and budgetary decisions about the need and timing for construction of new facilities, improvements to existing facilities, the levels of service provided by those facilities, and how to fund and maintain these needs. Planning decisions should also address the evolving and adaptive role of technology in the provision of capital facilities. The complete list of capital facility improvements planned in the next seven years is provided in the City's Capital Improvements Program (CIP), which is described in Section 9.3. The CIP and the functional plans provide a complete facility inventory, as well as needs, projected costs, and funding sources. 9.2. Inventory and Identified Needs 9.2.1 Administration and Service Facilities Facility Location Size (sq ft) City Hall (includes Police Station and Municipal Court) 216 Prospect Street 28,370 Public Works Shop 1535 Vivian Court 6,000 South Shed 2051 Sidney Avenue 3,811 Active Club 1026 Tacoma Avenue 7,500 Police Shooting Range 1278 Lloyd Parkway N/A Library 87 Sidney Avenue 8,586 Community Development Department Building 720 Prospect Street 2,925 The City's Capital Facilities Plan provides a detailed description and analysis of the City's current capital facilities, as summarized below: A City Hall The primary municipal building is the City Hall, which was built in 1999. It contains all of the City's 1,i•i ^I IIIIII_ I 1/off ➢ departments and staff, except for the Public Works Em crew. AL _ ;:...,2i The CFP established the level of service for administrative space (including police and courts) at 2,408 sq ft per 1,000 residents. The state's Office of Financial Management estimated the City's 2015 population at 9,950. The City's 2036 target population Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities allocation is 20,558. City Hall also requires some maintenance and improvements, as identified in the CFP. In 2016, the City contracted with Rice Fergus Miller, Inc to prepare a facilities space analysis for the City Hall. This analysis, which has been included in Appendix B of the City's Comprehensive Plan (Plans Adopted by Reference), found that the Port Orchard City Hall's net usable area was approximately 64% of the area provided in the city halls for Gig Harbor and Poulsbo, which are smaller cities. The analysis recommended that approximately 10,592 gross square feet be added to City Hall through 2025, based on the City's projected population growth, in order to maintain and improve work space and customer service. Parking should also be provided for an expansion. The Police Department currently occupies approximately 5,500 sq ft on the ground floor of City Hall. The Police Department has indicated that it requires approximately 10,000-15,000 additional square feet of office space with 3,000-5,000 sq ft of storage to meet its needs for the next 20 years. The City should review options for providing the additional space needed to maintain an appropriate level of police services. Public Works — Shop and South Shed The Public Works shop houses this department's foreman and crew and a majority of the City's maintenance vehicles and equipment. The shop has sufficient capacity to support staff throughout the capital facilities planning period. There is a current level of service for enclosed maintenance facilities of 833 sq ft per 1,000 residents. However, there is not enough covered parking for City vehicles and equipment, and the City has identified the need for a second four -bay carport to cover and protect City vehicles and equipment from the elements. The south shed is anticipated to continue being used as a storage facility and staging area through the planning period. No construction, remodeling or expansion need is anticipated. Active Club The Active Club is the only community recreational building owned by the City. It provides space for a number of recreational, sports and civic organizations to conduct activities. Police Shooting Range The police shooting range provides a convenient and safe location for officers to train and practice with firearms. Library The library building is owned by the City and houses the local branch of the Kitsap Public Library. 9.2.2 Parks and Recreational Facilities Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities The City has a number of parks and recreational facilities, listed below. Current Parks Facilities Park Name Size Facilities Van Zee 8.3 Acres Picnic Areas and shelters, trails, two baseball diamonds, playground, sports field, lighted tennis courts, horseshoe court, restroom Clayton Park 1.4 Acres Picnic tables, playground, sports field, basketball court, picnic shelter Givens Field 6.7 Acres 2 Baseball Diamonds (under lease, not available for public use), lighted tennis courts, lighted horseshoe courts, restrooms, picnic area, playground, Active Club Lundberg Park 4.8 Acres Not open to the public, no facilities Paul Powers, Jr. 3.75 Acres Field, playground, basketball court Park Boat Ramp 0.3 Acres Municipal boat ramp, restroom, parking DeKalb 4.1 Acres 169 feet of pier, 359 feet of floats, picnic tables Pedestrian Pier Etta Turner Park 0.6 Acres Gazebo, benches, view of Sinclair Inlet, trail connection McCormick 28.6 Acres Trails, restrooms Village Park Seattle Ave 1.88 Acres Trail connection Waterway *tidelands Property included Waterfront Park 1.9 Acres Sidewalks, picnic table, bench, viewing platform Westbay N/A Trail connection, beach access Easements Bethel South 5.3 Acres Not open to the public, no facilities; a portion planned for Property construction of dog park In addition to the properties in the above table, which are owned and operated by the City, Port Orchard residents also have a number of non -City parks and private facilities that are available for public recreational use. The City's Parks Plan provides a comparison of current recreational facilities and services within the City against the recommended levels of service used by the state's Interagency Council for Outdoor Recreation and by Kitsap County. This comparison is used to establish the LOS for recreational needs of the City's existing and future population. City -owned, non -City publicly owned, and private recreational facilities are all considered by the City when determining levels of service. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities In general, the City has adequate park and recreational facilities to serve the population during the planning period, with existing deficits in bike paths, boat launches and pedestrian trails, and projected deficits in community and neighborhood parks. Additional information on the City's parks and more detailed planning strategies can be found in the City's Parks Plan and in the Parks Element of this Comprehensive Plan. 9.2.3 Utilities and Transportation The City owns, maintains and manages its water system and wastewater collection system. It is also responsible for City roads and other aspects of the City's transportation system. More information on these facilities is provided in the City's functional plans and other Elements of the Comprehensive Plan (Utilities, Transportation). 9.3. Planning and Policy Connections A complete list of capital facility improvements planned in the next seven years is included in the city's Capital Improvements Program (CIP), which is described in this section. The CIP and the functional plans listed in the following table identify facility inventories, needs, projected costs, and funding sources. Capital improvement recommendations are drawn primarily from functional plans specific to each capital facility or City department. Utilities such as water, sewer, and stormwater have specific requirements according to state and federal law. Each City department forecasts needed improvements for at least a twenty-year. Each plan contains an inventory of the system and a forecast of system demand and capacity based on population and regulatory mandates. The functional plans identify capital investments required to meet future demand and to replace or maintain existing facilities for continued service. The plans also define the customer service level for each facility provide and system -specific operating policies The CIP uses many revenue sources to fund the capital improvement projects identified in the plan, including sales tax, business and occupation tax, utility rates, state revenues, bonds, and grants. Impact feesl and other specific revenues allowed under the Growth Management Act also offer potential funding sources. Coordinating City Functional Plans and Capital Improvements Program Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities Capital Improvements Program Funding: plan updated biennially. This is the city's seven-year financing and implementation plan in which needed capital improvements to the city's public facilities and infrastructure are identified and prioritized. Water System Plan Functional Plan: updated on a 6-10 year cycle, as This plan provides a basis for capital improvement needed. planning for six years and forecasts anticipated needs to a 20-year planning horizon. Wastewater System Plan Functional Plan: updated on a 6-10 year cycle, as This plan addresses aging infrastructure, system needed. expansion to accommodate development, revised policies and practices, data, finances, revised growth forecasting, and recommended improvements. Storm and Surface Water System Plan Functional Plan: updated on a 6-10 year cycle, as This plan establishes the city's storm and surface water needed. policy. Parks Plan Functional Plan: updated on a 6-10 year cycle, as This plan is the primary tool to guide the long-term needed. growth and development of Bellevue's parks and open space system. The core of the plan is a set of 20-year capital project recommendations, which are reviewed and updated approximately every six years. Transportation Plan Functional Plan: updated every two years. This six -year plan indicates needs for maintenance and improvement of the City's transportation network. 9.4. Future Needs A key feature of the capital facilities planning process is asset management, which continually monitors the condition of existing facilities and infrastructure, identifies the levels of maintenance needed, and determines when facilities need to be replaced. The city's capital facilities policies ensure that the city plans in advance for maintenance and infrastructure replacement to maintain levels of service. These policies also tie capital facilities planning to land use, making sure that assumptions about future growth are consistent. The City of Port Orchard owns, operates, and maintains over $3.5 billion of infrastructure to provide drinking water, wastewater, and stormwater and surface water services to its residents and businesses. Continued investment in this infrastructure is necessary for continued delivery of utility services that are critical for human health and safety, economic development, as well as supporting a sustainable, healthy environment. Capital facility investment helps to ensure that the City can continue to deliver the high quality municipal utility services customers expect. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities The City of Port Orchard has a rapidly growing population. To provide adequate capital facilities, the City is working to address substandard infrastructure and comply with new regulations. While there are unique challenges to specific capital facility services, several issues apply broadly to Port Orchard: Accommodating Increased Demand. Increased demand will require investment for building and maintaining facilities for services like water, wastewater, stormwater, parks, fire, police, transportation, and municipal buildings. Non -city providers, such as school districts, libraries and solid waste processors, will also experience increased demand for services and will need to plan for new or improved facilities. Aging Infrastructure. Some of Port Orchard's capital facilities are aging or inadequate for current service needs, and will require repairs and replacement over the next twenty years. The costs of replacing utility infrastructure and roads are substantial and take years for planning and implementation. Likewise, facilities such as parks and municipal buildings require ongoing maintenance, improvements, or replacement. City departments maintain plans and strategies for funding and building necessary improvements, which are scheduled and assigned funding in the city's seven-year CIP. Compliance with New Laws and Regulations. Changing state and federal mandates governing capital facilities systems require the city to monitor and review its systems to ensure compliance. For example, compliance with the city's National Pollutant Discharge Elimination System Municipal Stormwater Permit (NPDES), a Federal Clean Water Act mandate that affects programs citywide, will have significant long-term impacts on the way the city does business, on city expenses, and on private development costs. In February 2010, stormwater regulations were significantly expanded under the NPDES Phase II permit. These new regulations, along with associated stormwater requirements that must be incorporated into City code by 2017, places significant additional requirements on the City's planning and regulatory functions. The City of Port Orchard benefits from its proximity to centers for recreation, open space, and sports fields outside City Limits and/or held by other agencies or groups, such as the South Kitsap School District and Kitsap County. Creating and strengthening regional partnerships will enable Port Orchard and its partners to provide greater facilities and opportunities than would be possible alone. The City of Port Orchard is already working with Kitsap County and other nearby jurisdiction to create and expand a regional water trail including shoreline access with launch points, rest areas, parking facilities. 9.5. Goals and Policies Goal I. Provide an efficient distribution and mixture of public facilities, including parks, parking areas, non -motorized transportation connections, and other facilities and services. Policy CF-1 The City should explore opportunities for acquisition of surface parking areas within the downtown core to serve the general public and municipal purposes. Policy CF-2 The City should consider development of multi -use facilities that can serve more than one public need. The City should coordinate with other jurisdictions and agencies that also provide public facilities, such as Kitsap County, Kitsap Transit and the Port of Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities Bremerton, to encourage cooperative planning of future facilities and reduce redundancy. The City should also explore opportunities for public/private partnerships and funding sources that could provide a mix of public facilities and other uses such as commercial and residential within the same development, where appropriate. Policy CF-3 Encourage public awareness and consider public input when considering the need for and proposed locations of new public facilities. Develop public facilities according to the specific needs, locations and levels of service identified in the City's functional plans and capital improvements program. Policy CF-4 Encourage thejoint use of utility corridors for open space and non -motorized pathways and trails, provided that such joint use is consistent with limitations prescribed by applicable law and prudent utility practice. Policy CF-5 Encourage private property owners and developers to donate public trail access and parcels for park development in areas identified for future municipal parks and trail connections. Goal 2. The City shall establish minimum levels of service for provision of urban services (i.e. fire, police, garbage disposal, parks, library, and other appropriate services). Policy CF-6 It is the City's intent that adequate school facilities be provided for the community. Individual school levels of service should be maintained as adopted and funded by the South Kitsap School District School Board. Goal 3. Ensure that infrastructure, facilities, and services are adequate to serve new projects at the time buildings are available for occupancy and use, without decreasing service levels below locally established minimum standards. Policy CF-7 Require that urban level facilities and services are provided priorto or concurrent with development. These services include, but are not limited to, transportation infrastructure, parks, potable water supply, sewage disposal, stormwater and surface water management, and solid waste management. Policy CF-8 Facilitate adequate planning for services and facilities by coordinating with utility providers on annual updates of population, employment and development projections. Policy CF-9 Regularly monitor and update LOS standards for public facilities to reflect community preferences for quality of service delivery. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities Policy CF-10 Encourage providers to improve accessibilityto public services by making information available, convenient and complete. Policy CF-11 Maintain an inventory of existing capital facilities owned by public entities. Policy CF-12 The City should acquire property sufficient to provide capital facility services at established levels of service, according to the identified deficiencies and future needs for such services as provided in the City's functional plans. Goal 4. Ensure that the provision of capital facilities meets the needs of the present without compromising the ability of future generations to meet their own needs. Policy CF-13 Provide public facilities and services conveniently and equitably throughout the community and do not unduly affect any one group of people or geographic area by the siting or expansion of essential public facilities. Policy CF-14 Ensure that the provision of capital facilities is environmentally sensitive, safe and reliable, aesthetically compatible with surrounding land uses, and economical to consumers. Policy CF-15 Ensure that new growth and development pay a fair, proportionate share of the cost of new facilities needed to serve such growth and development. Policy CF-16 Direct growth within the community where adequate public facilities exist or can be efficiently provided. Policy CF-17 Seek to reduce the per unit cost of public facilities and services by encouraging urban intensity development within the City and adjacent Urban Growth Areas. Policy CF-18 Coordinate the construction of public facility improvements such as utility and road improvements to help minimize project costs. Policy CF-19 Ensure the efficient and equitable siting of capital facilities through cooperative and coordinated planning. Policy CF-20 Coordinate and cooperate with other jurisdictions in the implementation of multijurisdictional utility facility expansions and improvements. Policy CF-21 Provide meaningful opportunities for community involvement in the planning of capital facilities. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities Goal 5: Support provision of adequate, timely and efficient fire protection and emergency medical service within the City. Policy CF-22 Coordinate with South Kitsap Fire and Rescue on planning for the location of new fire stations to ensure that they are dispersed throughout the City and located near areas of high population concentration. Policy CF-23 Encourage consolidation of duplicate services between Fire Districts to use resources more effectively. Goal 6: Reduce crime risks within the City. Policy CF-24 Design and locate capital facility improvements to optimize public safety through increased visibility at joint use facilities (e.g., streets, public buildings, etc.) Policy CF-25 Ensure that there are enough commissioned officers and support staff to support the established LOS in the City. Goal 7. Coordinate land use and school district capital facilities planning. Policy CF-26 Recognize that schools provide a unifying social and physical amenity that are key foci for successful neighborhoods. Encourage elementary schools to be located in or near neighborhood centers and middle schools, junior high schools and senior high schools to be located near community centers. Policy CF-27 Coordinate with the South Kitsap School District to develop strategies to ensure that students are not forced to attend a school outside their neighborhood. Policy CF-28 Coordinate with the South Kitsap School District to develop strategies to provide and enhance safe multi -modal access to the schools. Policy CF-29 Review and update school impact fees at least every 4 years. Policy CF-30 Explore opportunities to develop joint use facilities with the South Kitsap School District, such as recreational and community center facilities. Goal 8: Develop and maintain adequate and convenient parks, recreation, and open space areas and facilities for all age groups to serve both the existing and future population of Port Orchard and surrounding areas. Policy CF-31 M. Preserve open space considered scenic in value by : Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities a. enhancing and expanding park facilities. b. discouraging obstructions of scenic views. Policy CF-32 Increase the size and number of parks and open spaces by: a. establishing partnerships with other agencies to jointly utilize public facilities. b. promoting through public and private investments, the acquisition of open space facilities and assuring proper maintenance thereof. c. providing for public input when developing plans for public parks. d. providing for a mixture of active and passive open spaces within residential and commercial areas with consideration of nearby public facilities. e. providing input on development plans for public parks within Port Orchard's Urban Growth Boundary. Policy CF-33 Monitor and maintain the LOS for park facilities as established in the City's comprehensive Parks Plan. Policy CF-34 The Active Club should continue to be maintained and improved. Policy CF-35 Reevaluate the City's established park impact fee at least every four years to ensure that the fee is appropriate based on the City's LOS for parks acquisition, improvement and maintenance. Policy CF-36 Correct LOS deficiencies in park facilities through capital improvements. Policy CF-37 Collaborate with Kitsap Countyto explore formation of a Municipal Parks District to help fund and develop community and neighborhood scale parks throughout the city and the Urban Growth Area. Policy CF-38 Develop neighborhood parks adjacent to school sites whenever possible in order to promote facility sharing. Facilities on the neighborhood park site should supplement uses that the school does not provide such as trails, open space, picnic areas, playground equipment, and multi -purpose paved sport courts. Policy CF-39 Encourage implementation of the County's Greenways Plan that outlines a citywide system of trails that will serve park, recreation, and open space needs. Link a system of trails between neighborhoods and parks, school sites, and other public property. Utilize public lands and existing rights -of -way for trail purposes whenever feasible. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities Policy CF-40 Place interpretive signs along trails to encourage community, historical, and environmental awareness and place distance markers along the trail for walkers and runners. Policy CF-41 The City should maximize the use of state and federal grants for future parks improvements whenever possible. Policy CF-42 Create new parks in recently annexed areas or update existing parks within newly annexed portions of the City. Policy CF-43 In conjunction with partners, develop the South Kitsap Community Events Center as a recreational and civic amenities hub for Port Orchard and the South Kitsap region. Goal 9. Ensure that an adequate water supply is available to support the level of population growth and land development projected within the City. Policy CF-44 Maintain drinking water quality in accordance with State and Federal standards to ensure the quality of drinking water delivered to customers of the water system. Policy CF-45 Provide high quality domestic and fire protection service to all areas within the retail service area. Policy CF-46 Utilize City -owned and operated sources of supply to maximize efficiency and cost effectiveness of the water system. Policy CF-47 Maintain water system facilities to ensure a high level of service is provided to all customers and maximize the life of facilities to protect the investment of ratepayers. Policy CF-48 Construct new facilities as required to serve the existing and future populations of the established water service area and South Kitsap Urban Growth Area. Policy CF-49 Interconnect the City's main water system with the independent facilities serving the City's 580 and 660 Pressure Zones (McCormick Woods System). This will allow for combining the two existing systems under one water system identification number. Policy CF-50 Implement and maintain water use efficiency and conservation programs to discourage water waste, promote the prudent use of water resources and support protection of habitat and the environment. Policy CF-51 Work with neighboring water utilities, participate in regional water planning efforts to establish common goals of uniform water system standards and facilitate coordination of efforts toward the adequate provision of water service throughout the region. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities Policy CF-52 Conduct water system operations in a manner that insures high quality service in accordance with all applicable rules and regulations, at the lowest reasonable cost. Policy CF-53 Encourage land uses and programs that promote water conservation. Policy CF-54 Revise water service boundaries in cases where the designated water service provider cannot provide timely or reasonable service. Policy CF-55 Ensure that land uses permitted in aquifer recharge areas do not lead to contamination of water resources. Policy CF-56 Encourage new developments adjacent to properties with private wells or existing septic systems to connect to the City's water system or, if not feasible, ensure that adverse impacts to existing wells or septic systems from new development is avoided or mitigated. Goal 10. Provide safe, reliable and timely sewer service to consumers at a fair and reasonable price. Policy CF-57 Coordinate construction of sewage improvements with other utilities. The City shall require all new development to connect to public sewer and water systems, unless physically or financially infeasible. Goal 11. Ensure that all utility infrastructure expansion provides an adequate level of public service to support new development consistent with the City's policies, criteria, and standards. In addition, utility expansion should also be consistent with current land use plans and development regulations of the State of Washington, Kitsap County, and appropriate local planning agencies. Policy CF-58 Utilize best construction methods and practices and innovative techniques in the design and construction of utilities. Policy CF-59 Whenever possible, utility construction should be scheduled to minimize disruption of access to area residences and businesses. Policy CF-60 Schedule utility construction activities to avoid sensitive times in the lifecycle offish and wildlife, such as spawning, nesting, and migration. Goal 12. Minimize development related impacts to existing hydrologic conditions and functions, and strive to correct current deficiencies Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 9: Capital Facilities resulting from past development practices such as stormwater-related flooding. Policy CF-61 Identify areas within and adjacent to the City and its UGA which are highly sensitive to changes in hydrologic conditions and functions. Within these highly sensitive areas, establish standards that provide for near zero change in hydraulic and hydrologic function on a property, such as no net increase in the peakflow orvolume of runoff or erosion products leaving a site post- development. Policy CF-62 Ensure development regulations adequately prevent new development from increasing flooding and minimize the possibility of damage from flooding events. Policy CF-63 Encourage Low Impact Development (LID) strategies for stormwater management through incentives and flexibility in application of regulatory requirements. Policy CF-64 Utilize new inventories of flood hazard -prone properties in the decision making process to prioritize stormwater system improvements. Policy CF-65 Coordinate the basin planning process with the community planning process to address surface water runoff and flooding issues. Policy CF-66 Integrate public regional stormwater detention and retention facilities into the natural environment. Policy CF-67 Recognize that regional facilities can provide aesthetics, recreation, and fish and wildlife habitat in a community park -like or open space setting. Policy CF-68 Implement planned activities and continue current activities in the 2014 Stormwater Management Plan. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 21, 2021 Chapter 7: Utilities Chapter 7. Utilities 7.1. Introduction This Utilities Element of the 2016 Comprehensive Plan provides direction and guidance, based on consultant research and analysis in collaboration with City staff, to improve and maintain the City's existing utility system and develop additional utility infrastructure and capacity to meet the City's growth needs. This Element is based on 2015 data, facilities, population and projected growth patterns, with the planning horizon projected to 2036. Utilities Vision Develop and maintain public and private utilities to meet the needs of a growing population and a 215t century economy. Services are efficiently provided and available to the entire community. Utilities are sited, designed and operated in a manner that is consistent with surrounding land uses and maintains community character. The state Growth Management Act (GMA) requires that comprehensive plans include a utilities element that indicates the general location of existing facilities, the proposed location of future facilities, and capacity of all existing and proposed utilities. The GMA also requires that public utilities shall be adequate to serve development at the time the development is available for occupancy and use, without decreasing current service levels below locally - established minimum standards. Over the next twenty years, the City expects that utilities will need to be provided to approximately 24,000 residents of the incorporated City and urban growth area (UGA). Public and private utility providers must plan for the necessary infrastructure to rehabilitate aging systems, respond to growth, and adapt the changing technology and consumer behavior. Although the City does not control non -City managed utilities, such as telecommunications, natural gas and electrical service, it does regulate how private utilities are developed and managed within Port Orchard. The Utilities Element, in conjunction with the City's functional plans for water, sewer and storm water management, is the guiding or strategy document that the City will use to achieve its goals of providing utilities at the appropriate levels of service to the City's existing and future residents and businesses. The Utilities Element serves as a policy guide for general maintenance and improvement of the utility system, and the City's functional plans include more detailed inventory and analysis, and specific recommendations for utility maintenance, improvement and future development. The City's regulatory and non -regulatory decisions and programs, as well as budget decisions related to utilities, should be consistent with this Element and with the City's functional plans. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities Additionally, this element works in tandem with the Land Use Element and the Capital Facilities Element to ensure that Port Orchard will have adequate utilities available for projected growth, concurrent with the impacts of growth and development. Policies in this Element also address environmental impacts, facilities sitting and construction, economics, and design aesthetics. 7.2. City -Managed Utilities Sewer The City of Port Orchard owns, operates and maintains wastewater collection and conveyance facilities that take wastewater to the South Kitsap Water Reclamation Facility (SKWRF). The City has an interlocal agreement for wastewater treatment with the West Sound Utility District (WSUD), which operates the SKWRF. WSUD also provides sewer collection and conveyance to the eastern portion of the City and the City's UGA. There are approximately 70 miles of sewer lines ranging from 2 to 24 inches in diameter. These lines include approximately 49 miles of gravity sewers, 8 miles of force mains, and 14 miles of septic tank effluent pumping (STEP) mains. There are 16 pump stations within the system. The City also maintains a telemetry system to monitor the operating conditions of system components. The City's current service area is approximately 2,100 acres, with a population of about 11,550. Over the next twenty years, the City's sewer service area is expected to grow to approximately 5,700 acres to serve the estimated population of about 24,000. Water The City provides drinking water within the city limits and selected adjacent areas, supplied primarily by six active wells. There are two interties with the City of Bremerton's water system and an emergency intertie with the WSUD. Eight reservoirs provide 4.8 million gallons of storage. There are three booster pump stations, and over 300,000 feet of pipe ranging from 4 to 18 inches in diameter. Other water suppliers within the City include Berry Lake Manors, which serves a 30-unit mobile home park, and the WSUD, which serves selected areas on the eastern boundary of the City and are outside the City water service area. Stormwater Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities The City manages stormwater conveyance facilities that collect runoff, and provides treatment and discharge in accordance with federal and state requirements for water quality protection. Much of the City's stormwater system discharges to Sinclair Inlet through a system of more than 50 outfalls along the waterfront that vary from 12 to 24 inches in diameter. The piped and ditched portions of the system are primarily within the older, more commercial areas of the city, while the outlying, more residential areas are largely composed of the remaining elements of the region's original natural drainage system (i.e., lakes, streams and wetlands) and are supported by a widely distributed system of culverts, ditches, pipes and ponds. 7.3. Non -City Managed Utilities The Washington Utilities and Transportation Commission (WUTC) regulates the services and defines the costs that a utility can recover, to ensure that the utility acts prudently and responsibly. Under the GMA, both the WUTC and the City of Port Orchard have jurisdiction over the activities of electric, gas and telephone utilities within the City. The City has the authority to regulate land use and, under the GMA, the requirement to consider the locations of existing and proposed utilities and potential utility corridors in land use planning and permit decisions. The Telecommunications Act of 1996 established the role and responsibilities of the Federal Communications Commission in licensing wireless communication providers. The licenses allow the right to use a block or blocks of the radio frequency spectrum to provide wireless services. The Act recognizes the authority of state and local governments over decisions regarding siting of wireless communication facilities, subject to — —1 certain limitations. * 4 Solid Waste and Recvclin Solid waste and recyclable materials collection is contracted to Waste Management Northwest. Electrical Service Puget Sound Energy (PSE) builds, operates and maintains the electrical system serving Port Orchard. Natural Gas Service Cascade Natural Gas builds, operates and maintains the natural gas distribution system that serves Port Orchard. Cascade has indicated that their service area covers all of the City and its UGA. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities Telecommunications Telecommunications is the transmission of information in the form of electronic signals or similar means. Telecommunications services generally include the following categories: • Landline telephone. CenturyLink provides landline telephone service to Port Orchard. • Wireless communications (cell towers or antennae). A variety of cellular communication and wireless data services are available in Port Orchard (Verizon, Sprint, etc). Currently, these services rely on ground -based antennae located on towers or buildings. • Cable television and broadband internet. There are several providers that serve Port Orchard, such as Wave Broadband, CenturyLink and DIRECTV. 7.4. Existing Conditions Sewer V The condition and capacity of the City's wastewater collection system, including gravity sewer lines and lift stations, was analyzed by the City's consultant in 2015. The conveyance system was analyzed using the InfoSWMM computer modeling platform. This hydraulic model simulated the performance of the major collection system components, including all pump stations and the major sewer mains within the City's collection system. The model indicated minor capacity issues under existing flow conditions at the Flower Meadows pump station, and in the gravity sewer in McCormick Woods Drive SW. Discussions with maintenance staff indicate some necessary upgrades at Bay Street Pump Station, Marina Pump Station, McCormick Woods #1 Pump Station, McCormick Woods #2 Pump Station, Eagle Crest Pump Station, and Albertsons Pump Station. These are included in the 6-year Capital Improvements Plan (CIP) and are described in more detail in the 2015 General Sewer Plan Update. \A/star The City's water supply and distribution system is examined on a regular basis, as required by State and Federal requirements. The current Water System Plan, which is in progress, indicates that the water system capably meets the City's domestic drinking water requirements. Water supply is reliant on a combination of both City wells and the low- pressure intertie with the City of Bremerton water supply. Additional wells will be necessary Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities for the City to become self-reliant, which would allow the higher -cost Bremerton supply to be used on a standby basis. The analysis also determined that continued treatment of current and future well supplies will be required, primarily for disinfection and removal of naturally occurring compounds. Larger size pipelines will be needed both to replace existing and aging water mains, primarily in older sections of the City, and to improve the flow of water during projected fire events. Stormwater The City is required to comply with the National Pollutant Discharge Elimination System (NPDES) Phase II permit, which is a federal Environmental Protection Agency permit program administered by the state Department of Ecology (Ecology). As part of compliance measures, the City is required to develop and administer a stormwater management program that reduces discharge of both point source and nonpoint source pollution carried by stormwater. One requirement of this program is that by January 1, 2017, the City must adopt the minimum stormwater design standards of Ecology's 2012 Stormwater Management Manual for Western Washington, and apply these standards to all new permit applications and to approved projects that have not started construction by January 1, 2017. The 2012 manual also requires use of Best Management Practices to reduce pollutant discharges and encourages low -impact development measures that minimize creation of impervious surfaces and disturbance of native vegetation and soils. For many years, the Sinclair/Dyes Inlet water bodies have had reduced water quality, partially due to longstanding discharges of industrial, agricultural and septic system discharges within the contributing watersheds. The City is required to monitor water quality for fecal coliform bacteria and respond to any illicit discharges, including accidental spills, illegal connections, and illegal dumping into the storm sewer system, with the long-term goal of eliminating these discharges and improving the overall health of these inlets of Puget Sound. 7.5 Relationship to Centers In accordance with VISION 2040 and the Countywide Planning Policies, several centers have been established within the City. Local centers serve important roles as sub -regional hubs and secondary concentrations of development, with a dense mix of housing and services such as stores, medical offices, and libraries. One purpose of centers is to enable the City to deliver services more cost -efficiently and equitably, within a development pattern that is environmentally and economically sound. Through subarea planning, the City will designate desired development types, locations and Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities patterns within each Center. Provision of utilities and improvements to utility services within Centers should be a City priority. 7.6 Future Needs Sewer Future needs for the City's sewer collection system primarily arise from a need to address deficiencies that have been identified in the City's existing wastewater system, generally due to aging and insufficient capacity. If not corrected, these deficiencies will be exacerbated as the City continues to grow. In addition, future needs include the provision of the needed infrastructure to accommodate future growth. In the near -term future (0-6 years), the focus of the CIP for the sewer collection system is the replacement and/or retrofitting of key components for several pump stations. Long-term improvements (7-20 years) will be required for conveyance pipelines throughout the City, including the McCormick Woods Drive SW, Bay Street and Port Orchard Boulevard gravity sewer lines. These issues are discussed in the City's sewer plan in greater detail. Table 7-1, which was prepared by the City's consultant, provides an overview of the near -term future improvements. Table 7-1 "Dependent on the scope of the upgrade City of Port Orchard Sewer System Capital Improvement Plan Project Description Cost Estimate % CFC Financing 1 Marina Pump Station 13,000,000 50 CFC / rates 2 Bay Street Pump Station 1,300,00 25 CFC/ rates 3 McCormick Pump Station 2 4,500,000 100 CFC 4 Eagle Crest Generator Set 300,00 0 rates 5 Albertson's Pump Station Upgrade 0 developer SA Bravo Terrace Lift Station and Force Main 5,000,000 75 CFC SB South Sidney Lift Station 2,500,00 100 CFC SC North Sidney Lift Station 2,500,000 100 CFC SD Sidney 2nd Force Main 1 1,600,001 100 1 CFC 6 McCormick Woods Pump Station 3 1 1,000,004 100 1 CFC Total C19 31,700,000 1 Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities U\/atar The initial planning and analysis efforts have identified a series of projects that will be required to maintain and strengthen the performance of the City's water supply system. To improve the water supply system reliability, the City intends to develop additional well supply(ies) to provide sufficient capacity for the City to become self-sufficient, thus using the Bremerton intertie as a standby/emergency source of drinking water rather than a continuous source of water supply. New pipelines will also be installed to improve the system's capability to move water throughout the system. In addition, new storage reservoir(s)will be needed to optimize system performance and provide water to meet operational and fire fighting capacity requirements. There are multiple projects required in the near -term future, as shown in Table 7-2. Table 7-2 CITY OF PORT ORCHARD Water System Capital Improvement Plan CIP No. Project Estimated Percent CFC CFC Future Improvements Project Cost 1 580 Zone Storage 2,850,000 100% 2 850 000 2 CIP No. 2 Combined 11,200,000 75% 8 400 000 2A Well 13 Development & Treatment n a 213 Maple Ave Improvements and Water Main n a Replacement 2C 390 to 260 Rezone PRVs JLeachl n a 3 Well 11 Development, Treatment and Booster $8,000,000 25% $2,000,000 Pum 4 580 Zone Transmission & Distribution Main 1 235 000 100% $1,235,000 5 390 Zone Storage $3000,000 100% $3,000,000 6 Telemetry Upgrades 100 000 25% 25 00 7 390 to 580 Zone Booster Station (Old Cliftonj 750,000 75% 562 500 8 580 to 390 Zone Transmission Main 580 390 PR 1,325,000 75% 122a,750 9 Well 12 Development, Treatment and Booster $7,000,000 100% $7,000,000 Pum —12 10 Melcher Pump Station Upgrade 500 000 25% 125 000 11 PRV Improvements per Hydraulic Model $350,000 50% 175 000 12 390 to 580 Zone Booster Station (Glenwood — 15t $900,000 725 000 0% $900,000 Lift 13 390 to 580 Zone Booster Station Glenwood — 2"d 100% LO Lift 14 390 to 580 Zone Transmission Main to Glenwood $2,750,000 75% $2,062,500 PS 15 580 to 660 Zone Booster Station 660 Zone Storage $750,000 100% 750 000 16 2 850 000 100% 2 850 000 Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities 17 Well 7 Treatment/Pump Station Upgrades 750 000 0% LO 18 Main Replacements per Hydraulic Model 2,000,000 25% 500 000 19 Annual Main Replacement Program U size 1"-4" $250,009 0% LO 20 Annual Valve Replacement Program 80 000 0% 0 21 Annual Hydrant Replacement Program $50,000 0% LO 22 Foster Pilot Mitigation Proigcts 1000 000 100% 1000 000 23 390 Zone Low Pressure Booster Pumps for $600,000 100% $600,000 Existing Water Services 24 Blackiack Creek Crossing at Kendall St $750,000, L 25 Well 10 Rehab, Activation, and Water Main $3,092,0001 1 $3,092,000 Total Six -Year Water Improvements: $52,857,000 $38,120,750 Stormwater The City's CIP identifies 14 capital projects for stormwater that are intended to address localized flooding, stabilize stream bank erosion, protect habitat and water quality, resolve conveyance capacity issues, and protect public and private roads and other infrastructure from flood damage. A new stormwater decant facility for processing and disposal of material removed from the City's catch basins during maintenance is also included. These planned improvements and priority rankings are accurate at the time of issuance of this plan, but may be revised as facility conditions and other situations change. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities Table 7-3 Planned Stormwater Facility Improvements CIP No. Project Opinion of Probable Project Cost ($Million) 1 Ruby Creek Crossing/Shoulder Stabilization $0.1 M 2 West Street/Port Orchard Boulevard $1.0 M 3 City Decant Facility Retrofit $0.5 M 4 Annapolis Creek Box Culvert $0.3 M 5 Perry Avenue Storm Drainage $0.3 M 6 Prospect Alley Drainage and Outfall $0.5 M 7 Sidney Parkway/Waterfront Parking Outfall $1.0 M 8 Downtown Port Street Drainage Improvement Pre- Design $0.5 M 9 High Point Shopping Center Drainage Improvement $0.8 M 10 Sidney Avenue Improvements $0.3 M 11 South Sidney Neighborhood Regional Drainage Improvement $5.0 M 12 Rockwell Avenue Improvements $0.1 M 13 Cline Avenue Improvements $0.4 M 14 Hull Avenue Improvements $0.3 M 15 Bethel Sedgwick Corridor Stormwater Improvements $5.1 M 16 Old Clifton Corridor Stormwater Improvements $1.0 M Non -city utility providers will experience increased demand for services as the City grows, and will need to plan for new or improved facilities. As new technologies for Internet, wireless telephone, and other telecommunications systems are implemented, these improvements will further the City's goal of economic growth and competitiveness. Through its land use regulation and permitting authority, the City should ensure that these utilities are broadly available to residents and businesses throughout the City, and that there are not excessive visual impacts within existing neighborhoods and local centers. 7.5. Goals and Policies Goal 1. Ensure utilities are provided in a timely manner to meet the needs of Port Orchard's future population. Policy UT-1 Facilitate planning for utility improvements by providing utility purveyors with population and employment projections on a regular basis. Policy UT-2 Improvements and additions to utility facilities shall be planned and constructed so that utility services are sufficient to serve anticipated growth. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities Policy UT-3 Encourage the designation and development of utility corridors and facilities in a manner consistent with the needs and resources of the City. Policy UT-4 Coordinate provision of utilities with future development by designating appropriate sites for utility facilities and ensuring their availability and consider future annexations in developing coordinated strategies for supplying future utilities to the city Policy UT-5 Coordinate provision of utility services with planned development by improving mechanisms to process development permits and approvals in a fair and timely manner. Policy UT-6 Consider impacts and timing of future phases of development when permitting large utility projects. Policy UT-7 Ensure that development regulations allow timely development of utility facility additions and improvements. Policy UT-8 The City shall establish capacity and levels of service for City managed utilities. Policy UT-9 The City shall not allow for the extension of municipal utilities outside City limits except within, or transmission to serve Urban Growth Boundaries, except extensions in those circumstances necessary to protect public health and safety and the environment and when they are financially supportable at rural densities and do not permit urban development. Policy UT-10 The City shall prioritize the provision of utilities and improvements to existing utilities within designated centers of local importance. Ensure utility services are provided in an efficient and coordinated manner. Policy UT-11 City decisions regarding utility corridors and facilities should consider regional utility needs as well as City interests. Policy UT-12 Enhance efficiency of planning for utilities by facilitating coordination between the City of Port Orchard, WUTC and utilities regulated by the WUTC during development of comprehensive utility plans. Policy UT-13 Coordinate collection, integration and maintenance of Geographic Information System (GIS) utility data among utility providers to ensure consistent and up-to-date information on facility locations and capacities. Policy UT-14 Enhance efficiency by coordinating the implementation of utility facility additions and improvements affecting multiple jurisdictions. Policy UT-15 Coordinate land use, transportation and utility planning and development. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities Policy UT-16 Ensure that utility policies and regulations are consistent with, and complementary to, utility public service obligations. Policy UT-17 Ensure that utilities are provided consistent with applicable rules, regulations, and prudent utility practice. Policy UT-18 Ensure all chapters of the Port Orchard Comprehensive Plan (and implementing development regulations) are consistent with, and do not otherwise impair the fulfillment of, public service obligations imposed upon the utility provider by federal and state law. Goal 2. Maintain and enhance utility service quality. Policy UT-19 Encourage utility providers to protect and enhance the performance, reliability and stability of their utility systems. Policy UT-20 Encourage utilities to incorporate new and improved technologies to enhance the quality and cost effectiveness of their services consistent with the provider's public service obligations. Goal 3. Minimize environmental and aesthetic impacts of utility facilities. Policy UT-21 Place utility facilities along public rights - of -way and encourage underground distribution lines in accordance with state rules and regulations. Policy UT-22 Encourage siting of large, above ground utilities (e.g. antennas, towers) in industrial or commercial areas or along appropriate transportation and utility corridors. Policy UT-23 Minimize the visual impact of utility facilities on view corridors, vistas and adjacent properties by developing design guidelines for cellular towers, antennas and other types of utility facilities. Policy UT-24 For new development, retrofitting and major remodels, including upgrades to site utilities, the City shall require the undergrounding of future or existing utility lines including gas, cable television, electric distribution lines, and telephone as appropriate during the design review process and in accordance with local, regional and state rules, regulations and tariffs. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities Goal 4. Support and promote energy conservation. Policy UT-25 Encourage and support development of renewable energy projects and technologies. Policy UT-26 Support renewable energy incentives to businesses and groups for comprehensive renewable energy effort. Policy UT-27 Establish incentives to lessen use of resources. Policy UT-28 Encourage programs to educate utility users on the benefits and means of conservation. Goal S. Support the extension of fiber optic cable in the City of Port Orchard. Policy UT-29 Recognize broadband's influence and importance to economic diversification in Port Orchard. Policy UT-30 Encourage installation of broadband infrastructure in all new residential subdivisions, economic development projects, and arterial improvements. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities ,. Ei. imPort Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities P o� IDz y a d Ar J S O C 0 _ 1 i 1� r r.- — ............................ 11 So � as 'a pey� ak aatlea?F t��€bX�tT iWEPort Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities 4 �1 i• let .,�i 1 / s 1 In _ 5in�lair 1 I' 1 1 I — 1 N 1,500 3,000 -- A0 � Feet — 1-- City Boundary ► Pipe Wellands (Culvert — Water Courses —•••Ditch 92 Outfalls <24" —•••— Stream ® Outfalls — 24" March, 2014 1111!1§2`5 i I v 1 LIN L 1 160 r—r— h-- m, Figure 4 - PORT ORCHARD STORMWATER MANAGEMENT PLAN HYDROLOGIC and STORMWATER CONVEYANCE FEATURES, NORTH P:IP121t2479.00 Port Orchard St—ater ProgmmlGISWaps%PortOmhardSWMP8x11_Fig4_Norfh.mxd Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities � m N J� oI p � 4 5 �Q QV � J� LL SW OLD CL'IFTOI N A 0 1,250 2,500 Feet C1 City Boundary Pipe Figure 5 -PORT ORCHARD wetlands �(cuwert STORMWATER MANAGEMENT PLAN — —••��►Cov Water Courses - HYDROLOGIC and STORMWATER OEoutfans < 24" —•• — stream �^ CONVEYANCE FEATURES SOUTH ® Outfalls— 24" March, 2014 P:1PM2479.p0 Port Orchard Slormwaler Program\GIS1MapslPortOrchardSWMPBxll_Fg5_South.mxd Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Chapter 7: Utilities P1P1Z12479.00 Port Orchard Stormwater ProgramlGIS\MdpsIPOMOmhardSWMP0x11_CIP.mxd Port Orchard Comprehensive Plan Adopted: June 2016 Revised: July 2018, July 2020, December 2021 Appendix B: Plans Adopted by Reference PLAN OR DOCUMENT South Kitsap School District 2014-2019 Capital Facilities Plan West Sound Utility District / Joint Wastewater Treatment Facility 2009 Capital Facilities Plan West Sound Utility District 2007 Sewer Plan West Sound Utility District 2013 Water Plan Kitsap County 2003 South Kitsap UGA/ULID#6 Sub -Area Plan & EIS Kitsap County 2012 Port Orchard/South Kitsap Sub -Area Plan 2016 Kitsap County Comprehensive Plan 10-Year Update Blackjack Creek Watershed Assessment and Protection & Restoration Plan (2017) City of Port Orchard 1994 Ross Creek Comprehensive Management Plan City of Port Orchard 2005 Economic Development Plan City of Port Orchard 2010 McCormick Village Park Plan City of Port Orchard 2012 Shoreline Master Program City of Port Orchard 2013 Public Art Program City of Port Orchard 2014 — 2021 Capital Facilities Plan City of Port Orchard 2020 Water System Plan City of Port Orchard 2020 Comprehensive Sanitary Sewer Plan Update City of Port Orchard 2016 Transportation Plan Update City of Port Orchard 2016 Comprehensive Parks Plan City of Port Orchard 2016 Transportation Impact Fee Project List City of Port Orchard 2022-2027/2028-2041— 6 Year/20 Year Transportation Improvement Plan City of Port Orchard Bethel/Sedgwick Corridor Plan and Appendices A-F City of Port Orchard 2016 City Hall Space Analysis Appendix B-1 Port Orchard Comprehensive Plan Adopted: June 2016 Revised: December 2021 City of Port Orchard Six -Year Transportation Improvement Program For 2022-2027 TIER 1 (Reasonably Constrained) Priority Road Name Total Federal State Numb Begin Termini Project Total Est. Spent Prior to Future Phase Funding Fund Fund er Project Title/Project Description End Termini Length Cost 2021 2021 Expenditures 2022 2023 2024 2025 2026 2027 Start Year Status Phase Code Federal Funds Code State Funds Local Funds Capital Projects 1.1 Bay Street Ped. Pathway ROW Phase PO Shoreline: Sidney Add 14-ft Multi -Modal (bikes & pedestrians) Ave. Foot Ferry to 1.2 2,220,000 1,140,000 540,000 540,000 540,000 0 0 0 0 0 2013 S ROW STP(U) 1,923,590 0 300,212 waterfront pathway & cantilevered retaining wall Annapolis Foot Ferry 500,000 250,000 250,000 250,000 0 0 0 0 0 2018 P ROW 0 581,000 following historic Mosquito Fleet trail and pedestrian bridge across Black Jack Creek. 1.2 Bay Street Pedestrian Pathway Construction (S#1, S#6-11) The CN phase for the 14-ft Multi -Modal (bike & ped) 1.2 650,000 0 2018 650,000 0 0 0 0 0 0 0 S CN waterfront pathway/cantilevered retailing wall 3,000,000 0 0 3,000,000 0 1,500,000 1500000 0 0 0 2021 S CN following the historic Mosquito Fleet trail. Includes the demolition/removal of (5) overwater structures. Includes See #3 Ad Ready Doc Prev. 1.3 Bay Street Pedestrian Pathway West Port Orchard Blvd and Bay St: Ft Ferry Situational study 1.5 566,474 0 0 566,474 0 566,474 0 0 0 0 2022 P PL 490,000 0 76,474 to Tremont 1.4 Old Clifton/ Anderson Hill Intersection Improvements Old Clifton Rd / Intersection Improvements (roundabout) as identified Anderson Hill Rd. 0 258,000 200,000 0 58,000 58,000 0 0 0 0 2016 S PE 0 258,000 in the McCormick Urban Village Trans Plan and Intersection 1,680,000 0 0 1,680,000 840,000 840,000 0 0 0 2021 P CN TIB 1,213,000 525,000 partially funded by Bayside Mit Funds. 1.5 Old Clifton Rd Design - 60% Old Clifton Road: Rodway Improvements identified in the McCormick Campus PKWY to 0.75 450,000 0 225,000 225,000 225,000 0 0 0 0 0 2021 P PE 0 450,000 Urban Village Trans Plan. Design to 60% level. Anderson Hill Rd. 2,000,000 2000000 2025 P CN STP(U), TIB/CS Includes RAB design at McC Woods Dr. intersection. RCO 1.7 Bethel/Sedgwick Phase 5a - Bethel/Lincoln RAB Bethel/Lincoln/Lunbe rg/ Mitchell Safety and capacity improvements to intersection and 0 4,000,000 0 800,000 2021 S PE 800,000 reconfiguration of approaches. 0 3,200,000 3200000 0 2022 S/P CN HSP 1,500,000 TIB UAP 1,100,000 700,000 1.8 Bethel/ Sedgwick Cooridor Phase la - Blueberry RAB Bethel Road: blueberry Intersection Phase 1a. Bethel/ Blueberry RAB 60% DN in 2022 0 2,746,000 0 0 570,000 420,000 150,000 2022 S PE 0 344,374 74,626 268,000 268,000 2023 S ROW 220,238 47,732 1,908,000 1908000 2025 P CN TIB/ 1,568,178 307,051 UAP/CS 1.9 Bete Sedgwick Corridor Phase 1 - Salmonberry RAB Bethel Road: Salmonberry intersection Phase 1b. Bethel/ Salmonberry RAB Round and roadway segment design from Blueberry to Salmonberry. 30% DN in 2022. 0 5,056,750 0 0 800,000 280,000 320,000 200,000 2025 P PE 0 328,058 57,893 1,328,450 1,328,450 2024 P ROW 1,129,183 199,238 2,928,300 2,928,300 2026 P CN TIB/UAP/ 2,489,055 439,245 CS 1.10 Vallair Ct Connector Bethel Road / Road extension and intersection improvements Walmart Drive 0.25 1,000,000 0 0 1,000,000 0 0 0 1000000 0 0 2024 P PE & ROW 0 0 1,000,000 previously included in the Bethel Road Corridor ROW Intersection 1,000,000 0 0 1,000,000 0 0 0 0 1000000 0 2025 P CN 0 TIB 0 1,000,000 & Construction project. 1.11 Sidney Road SW Design - 60% Sedgwick Rd. to Sidney Avenue is currently two lanes wide, it needs to Berry Lake Rd. 0.95 500,000 0 0 500,000 0 0 0 0 500,000 2027 P PL 0 0 500,000 be widened to three lanes (additional TWTL) including TIB bike lanes, sidewalks, traffic calming, and stormwater system improvements. (COMPLETE STREET). 10/27/2021 Page 1 of 2 S:\City Council\Committees Agendas Minutes and Audio Files\Land Use\2021\7_Oct 2021\7_Comp Plan\5_2022-2041 TIP.1042021 City of Port Orchard Six -Year Transportation Improvement Program For 2022-2027 TIER 1 (Reasonably Constrained) Road Name Priority Total Federal State Numb Begin Termini Project Total Est. Spent Prior to Future Phase Funding Fund Fund er Proiect Title/Project Description End Termini Length Cost 2021 2021 Expenditures 2022 2023 2024 2025 2026 2027 Start Year Status Phase Code Federal Funds Code State Funds Local Funds 1.12 Sedgwick Road West Study - 30% Design SR16 to Sidney Rd. Establish alignments and cross sections. Develop mitigation alternatives and identify right-of-way needs 300,000 0 0 300,000 0 300,000 2023 P Study for roadway and identify potential sites to accommodate stormwater run off and mitigation for filling wetlands. Include stormwater element for Sidney Rd. S. to 1.13 Lippert Sidewalk Retrofit and Pavement Repair Pottery ADA ramp and driveway retrofits, sidewalk reparis, 0.95 35,000 0 35,000 0 2021 P PE pavement repairs, stormwater retrofit. In house des 778,000 778,000 778,000 2022 P CN CDBP 100,000 678,000 with consulted survey & basemap Sunset Ln. to Clay Ln. 1.14 Pottery Avenue Sidewalk Improvements Address gap in sidewalk. Design in house. Survey and basemap by others. 0.95 35,000 0 0 35,000 35,000 2022 P PE 778,000 155,000 0 155,000 2024 P CN 250,000 SR16 to Lippert Dr. 1.15 Pottery Avenue Non Motorized Improvements Road diet and non -motorized Improvements. Safety 0.95 35,000 0 35,000 0 35,000 2024 P PE enhancement at Pottery Lippert Intersection. Safe 750,000 750,000 0 750,000 2025 P CN SRTS 648,750 101,250 Routes to Schools Grant application. 1.16 Bay Street Reconstruction - Study SR160 from Geiger to Frederick Raise street to address sea level rise and improve to current standard in accomdance with redevelopment 200,000 0 0 200,000 100,000 100,000 2022 S PE 9 plans IM - Total Capital Projects 23927224 1,990,000 1815000 22,122,224 4915000 3,852,474 3668450 5058000 4128300 500000 3,913,590 8,392,086 7,316,471 Maintenance Projects Total 2,021 Future Exp 2022 2023 2024 2025 2026 2027 1.51 Annual Pavement Maintenance Includes patching, crack -sealing, striping, and other 509,500 0 53,000 456,500 56,500 100,000 100,000 100,000 100,000 0 2020 S CN 456,500 activities 1.52 * Annual Sidewalk & ADA Upgrade Program Repair and replace concrete sidewalks and curb ramps 796,000 0 38,000 758,000 38,000 180,000 180,000 180,000 180,000 0 2020 S CN 758,000 as identified in the program 1.53 ** Annual Pavement Management System Paving Projects Pavement replacement projects as identified in the 2,335,000 0 300,000 2,035,000 535,000 0 500,000 500,000 500,000 0 2020 S CN 2,035,000 pavement management system program 1.55 Tremont Overlay Pavement resurfacing to complete the surfacing of Tremont St: Port 0.5 500,000 0 0 500,000 0 500,000 0 0 0 0 2021 P PE,CN 500,000 Tremont from SR-16 to the eastern city limits Orchard Blvd to Lund bridge Total Maintenance Projects 4,140,500 0 391,000 3,749,500 629,500 780,000 780,000 780,000 780,000 0 0 0 3,749,500 * Per 2016 ADA transition plan: $180,000 annually over 20 years to comply on arterial streets. ** Per 2016 Pavement Management Analysis Report: $1.45 million annually to maintain network condition (PCI of 70), $500k to keep network PCI above 65 after 5 years. 10/27/2021 Page 2 of 2 S:\City Council\Committees Agendas Minutes and Audio Files\Land Use\2021\7_Oct 2021\7_Comp Plan\5_2022-2041 TIP.1042021 City of Port Orchard Transportation Improvement Program (TIP) For 2026-2039 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2028-2033 2034-2041 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Capital Projects 2.01 Sidney Avenue (North of SR 16) Tremont Street to 1 3,750,000 3,750,000 0 2028 P PE/RW STP(U) 0 0 3,750,000 The design, permitting, right-of-way acquisition Fireweed 6,750,000 6,750,000 0 2030 P CN STP(U) 0 0 6,750,000 and construction for this project with bike lanes, storm drainage and sidewalks. (COMPLETE STREET) 2.02A Sedgwick Road West - Design, Permitting & ROW SR 16 Interchange to 0.4 462,428 462,428 0 2028 P PE STP(U) 400,000 0 62,428 The design, permitting and right-of-way Sidney Avenue 693,642 693,642 0 2029 P RW STP(U) 600,000 0 93,642 acquisition phase for this widening project with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) 2.0213 Sedgwick Road West - Construction SR 16 Interchange to 0.4 3,468,208 3,468,208 0 2030 P CN STP(U) 3,000,000 0 468,208 The construction phase for this widening project Sidney Avenue with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) Bethel/Sedgwick Corridor Phase 1- ROW Bethel Road: 2.04A.1 and Construction Salmonberry to ROW acquisition and construction of the first Blueberry. 0.75 2,056,000 2,056,000 0 2028 P RW 0 0 2,056,000 phase of the street improvements per the 9,124,000 9,124,000 0 2030 P CN 9,124,000 0 0 Bethel/Sedgwick Corridor Plan (2018). Includes improvements to Ramsey Road for detour per 2.04A.2 below. 2.04A.2 Ramsey Road Widening Sedgwick Road to Widen road to two travel lanes with bike lanes, Salmonberry Road 0.5 2,500,000 0 2,500,000 2028 P ALL 0 0 0 sidewalks and stormwater system improvements. Bethel/Sedgwick Corridor Phase 2 - Design, Sedgwick Road: SR-16 2.04E ROW and Construction interchange to Bethel 1,110,000 1,110,000 0 2030 P PE 0 0 1,110,000 Design, ROW acquisition and construction of the 0.7 2,802,000 2,802,000 0 2031 P RW 0 0 2,802,000 second phase of the street improvements per the 12,757,000 12,757,000 0 2032 P CN 12,725,000 0 0 Bethel/Sedgwick Corridor Plan (2018). Bethel/Sedgwick Corridor Phase 3 - Design, Bethel Road: Blueberry 2.04C ROW and Construction to Sedgwick 422,000 422,000 0 2032 P PE 0 0 422,000 Design, ROW acquisition and construction of the 0.25 541,000 541,000 0 2033 P RW 0 0 541,000 third phase of the street improvements per the 4,859,000 4,859,000 0 2034 P CN 4,859,000 0 0 Bethel/Sedgwick Corridor Plan (2018). 1/11/2022 Page 1 of 7 U:\Comp Plan\2021 Comp Plan\1_2021 Annual City Sponsored Text Amdts\TIP (by ref only)\2022-2041 TIP.10_4_2021 City of Port Orchard Transportation Improvement Program (TIP) For 2026-2039 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2028-2033 2034-2041 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Bethel/Sedgwick Corridor Phase 4 - Design, Bethel Road: Lund to 2.04D ROW and Construction Salmonberry 616,000 0 616,000 2034 P PE 0 0 616,000 Design, ROW acquisition and construction of the 0.5 1,041,000 0 1,041,000 2035 P RW 0 0 1,041,000 fourth phase of the street improvements per the 7,087,000 0 7,087,000 2036 P CN 7,087,000 0 0 Bethel/Sedgwick Corridor Plan (2018). Bethel/Sedgwick Corridor Phase 5 - Design, Bethel Road: Mile Hill 2.04E ROW and Construction Drive to Lund 720,000 0 720,000 2036 P PE 0 0 720,000 Design, ROW acquisition and construction of the 1.1 1,532,000 0 1,532,000 2037 P RW 0 0 1,532,000 fifth phase of the street improvements per the 8,283,000 0 8,283,000 2038 P CN 8,283,000 0 0 Bethel/Sedgwick Corridor Plan (2018). 1/11/2022 Page 2 of 7 U:\Comp Plan\2021 Comp Plan\1_2021 Annual City Sponsored Text Amdts\TIP (by ref only)\2022-2041 TIP.10_4_2021 City of Port Orchard Transportation Improvement Program (TIP) For 2026-2039 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2028-2033 2034-2041 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds 2.05 Sidney Road SW Widening Sidney Road SW: Sidney Avenue is currently two lanes wide, it SR 16 Overpass to 0.95 500,000 500,000 0 2028 P PE 0 0 500,000 needs to be widened to three lanes (additional Sedgwick Road 5,761,850 5,761,850 0 2029 P CN STP(U) 3,600,000 TIB 1,600,000 561,850 TWTL) including bike lanes, sidewalks, traffic calming, and stormwater system improvements. (COMPLETE STREET). 2.06 Pottery Avenue Widening Pottery Avenue: Widen road to two travel lanes with bike lanes, Tremont Place to 0.22 1,600,000 1,600,000 0 2029 P ALL 0 0 1,600,000 sidewalks and stormwater system improvements. Melcher Street 2.07 Old Clifton Rd Shoulder & Pedestrian Improvements Old Clifton Road: Design and construction of shoulder widening, Anderson Hill to 1.35 2,700,000 2,700,000 0 2028 P CN 0 0 2,000,000 street lighting, watermain extension and grade- Westerly City Limits seperated Pedestrian Path as identified in the McCormick Urban Village Trans Plan. 2.08 O. Clifton Rd & McC. Woods Dr. Intersection Old Clifton Rd/ Design and construction of intersecion McCormick Woods Dr. 0 250,000 0 250,000 2032 P PE 0 0 250,000 (roundabout) improvements including street Intersection 750,000 0 750,000 2033 P CN 0 0 750,000 lighting, as identified in the McCormick Urban Village Trans Plan. 2.09 Melcher Street Widening Melcher Street West is currently a narrow two- Melcher Street: 0.4 600,000 0 600,000 2032 P ALL 0 0 750,000 lane road. The reconstruction would widen the Pottery Avenue to road to allow two safe travel lanes, bike lanes, Sherman Avenue sidewalks and a stormwater system. 2.10 Fireweed Road Widening Fireweed is currently a narrow two lane road. The Fireweed Road: 0.25 375,000 0 375,000 2035 P ALL 0 0 750,000 reconstruction would widen the road to allow for Sidney Avenue to safe travel lanes, bike lanes, sidewalks and a South Flower Avenue stormwater system. 2.11 Sherman Avenue Widening Sherman Avenue: Sherman Avenue is currently a narrow two-lane Fireweed Road to 0.35 525,000 0 525,000 2032 P ALL 0 0 750,000 road. The reconstruction would widen the road to Terminus at SR 16 allow two safe travel lanes, bike lanes, sidewalks and a stormwater system. 2.12 Tremont St Widening - Port Orchard Blvd (Ph. 2) Port Orchard Blvd. Construct roundabouts at Tremont Street/PO Tremont Street to 1.1 809,250 0 809,250 2033 P PE STP(U) 700,000 0 109,250 Blvd. and Bay Street (SR166)/PO Blvd. and curb, Bay Street (SR166) gutter, bike lanes, sidewalks, street lighting, storm 520,231 0 520,231 2035 P RW STP(U) 450,000 0 70,231 7,225,434 0 7,225,434 2037 P CN STP(U) 6,250,000 0 975,434 drainage and Schedule 74 Undergrounding. 2.13 Pottery Avenue Widening Tremont to SR16 Pottery Avenue 1/11/2022 Page 3 of 7 U:\Comp Plan\2021 Comp Plan\1_2021 Annual City Sponsored Text Amdts\TIP (by ref only)\2022-2041 TIP.10_4_2021 City of Port Orchard Transportation Improvement Program (TIP) For 2026-2039 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Number Project Title/Project Description End Termini Length Total Est. Cost 2028-2033 2034-2041 Year Status Pottery is currently a two-lane road, it needs to be Tremont Street 0.95 500,000 500,000 0 2030 P widened to a four -lane road, with sidewalks, SR 16 Overpass traffic calming and upgrades to the stormwater 750,000 750,000 0 2031 P system. 2,950,000 2,950,000 0 2033 P Federal State Fund Phase Fund Code Federal Funds Code PE STP(U) 432,500 RW STP(U) 648,750 CN STP(U) 2,292,250 State Funds 0 Local Funds 67,500 101,250 657,750 1/11/2022 Page 4 of 7 U:\Comp Plan\2021 Comp Plan\1_2021 Annual City Sponsored Text Amdts\TIP (by ref only)\2022-2041 TIP.10_4_2021 City of Port Orchard Transportation Improvement Program (TIP) For 2026-2039 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2028-2033 2034-2041 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds 2.14 Old Clifton Berry Lake Road Intersection 0 0 0 0 0 0 0 Intersection Improvement by Kitsap County 2.15 Blueberry Road Widening Geiger Road to Bethel Widen road to two travel lanes with bike lanes, Road 0.4 600,000 0 600,000 2036 P ALL 0 0 0 sidewalks and stormwater system improvements. 2.16 Geiger Road Widening Sedgwick Road to Widen road to two travel lanes with bike lanes, Blueberry Road 0.25 375,000 0 375,000 2034 P ALL 0 0 0 sidewalks and stormwater system improvements. 2.17 Salmonberry Road Widening Ramsey Road to Bethel Widen road to two travel lanes with bike lanes, Road 0.15 225,000 0 225,000 2028 P ALL 0 0 0 sidewalks and stormwater system improvements. 2.18 Piperberry Way Extention Geiger Road to Ramsey Provide an extetion of Piperberry from Ramsey to Road 0.25 575,000 0 575,000 2034 P ALL 0 0 0 Geiger and a new street connection to the proposed round about on Sedgwick. 2.19 Old Clifton & Feilgly Intersection Feigly intersection Complete streets improvemets indentified in the 0 2,800,000 0 2,800,000 2040 P ALL 0 0 0 McCormicks Urban Village Transportation Plan. Continuation of 1.5A 2.20 Bay Street Pathway - West Tremont to Footferry Continuation of project following study in 1.8 0 4,000,000 4,000,000 0 2030 P ALL 0 0 0 2.21 Walmart to Salmonberry Connector Salmonberry Complete roadway connnection 0 800,000 0 800,000 2040 P ALL 0 0 0 2.22 Downtown Bay Street Study Port Orchard Blvd to Study main street in downtown port orchard for Mile Hill Dr intersection 0 1,000,000 0 1,000,000 2033 P ALL 0 0 0 complete streets with bikelanes and streetscape with Bay Street. for pedestrians and storefronts. Study to address traffic cirulcation and raising streets for seal level rise and assocated stormwater and other utility -4-, 2.23 Bay Street Improvements Port Orchard Blvd to 1/11/2022 Page 5 of 7 U:\Comp Plan\2021 Comp Plan\1_2021 Annual City Sponsored Text Amdts\TIP (by ref only)\2022-2041 TIP.10_4_2021 City of Port Orchard Transportation Improvement Program (TIP) For 2026-2039 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2028-2033 2034-2041 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Complete Street and utlitiy improvements. Refer Mile Hill Dr intersection 0 10,000,000 0 10,000,000 2040 P ALL 0 0 0 to Study. with Bay Street. 2.24 Bay St. & Port Orchard Blvd Intersection Bay Street at Port Single Lane Round About to address safety and Orchard Bulivard 0 3,000,000 0 3,000,000 2040 P ALL 0 0 0 capacity. Bay Street Pathway crossing. Assumed creek is not impacted by project/ no major mitigation. 2.25 Bay St. & Kitsap Street Intersection Improvement Bay Street at Kitsap Re -align Kitsap intersection to addres safety and Street 0 2,000,000 0 2,000,000 2040 P ALL 0 0 0 capacity. Cline to end at Kitsap. Relocate flag pole. Signalized Intersection? 2.26 Bay St. & Mitchell and Wetzil Bay Street at Mitchell Reconfigure intersections to address safety and Avenue and Guy Wetzil 0 2,500,000 0 2,500,000 2040 P ALL 0 0 0 capacity. Rd. 2.27 Sidney Avenue Improvements Prospect St. to the Sidewalk and streetscape improvements. Waterfront 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Developer Imrpovements? 2.28 Harrison Avenue Improvements Bay Street to the Sidewalk and streetscape improvements. Signal Waterfront 0 1,000,000 0 1,000,000 2040 P ALL 0 0 0 replacement? Developer Project? 2.28 Fredrickson Ave Impr. Cline St. to Sidney Ave. Convert to two way street with angled parking. 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Provide sidewalk and streetscape impr. 2.29 New Waterfront Street Cline Street to Harrson Sidewalk and streetscape improvements. "Shared Avenue 0 2,500,000 0 2,500,000 2040 P ALL 0 0 0 Street" concept. Developer Improvement? 1/11/2022 Page 6 of 7 U:\Comp Plan\2021 Comp Plan\1_2021 Annual City Sponsored Text Amdts\TIP (by ref only)\2022-2041 TIP.10_4_2021 City of Port Orchard Transportation Improvement Program (TIP) For 2026-2039 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2028-2033 2034-2041 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Total Tier 2 Capital Projects 98,166,043 63,557,128 34,608,915 60,451,500 1,600,000 31,857,543 Maintenance Project 2.51 Cline Avenue Repairs Replace sidewalk and parking strip. Cline Avenue: 0.13 200,000 0 0 P ALL 200,000 Kitsap Street to Dwight Street Total Tier 2 Maintenance Projects 200,000 0 0 0 0 200,000 1/11/2022 Page 7 of 7 U:\Comp Plan\2021 Comp Plan\1_2021 Annual City Sponsored Text Amdts\TIP (by ref only)\2022-2041 TIP.10_4_2021 STATE HWY ON o w to LU S UNN FAO"O Sinclair Inlet —0 ' • IST CAMELLIA ■■ ' , ` , � , C 11K l ,: SAE, RIDE m— ROC� HWYN _ SISKIN /�, WARBL 9BRET LAZULI RI N L � 01ZF�ON 0 LU o w - tio� Mac Q� O F TENBY i P OZ4 W /� ° Q m a 1 1 1 1 1 1 I I 1 1 1 1 1 1 —-�✓Lt\HLCS o� �' ITT -, DWI cLU ° p000d GHT DIVIJION ° °DIVISION''-I� ' ;1� AN J �0000z � t U ADA - _ Is l 01 T� LO C TAY t z o O LOR d oo o0 vQ , SzITl1� L SMITH [ Lu K t ¢ win a L z 0��� r MELCHER DOC a a &MALTESE MINOR = Q Ln O- RADEY T GUTHRIE m �, w p FOREST PgRK O z Z a -I Q Cr_ LO W Z w O H J W In � o HOP IGSUP) O J O �� BECK N ° POPLA f LUI 1 � v U BOTgREEL J O ,Z,P Ov 4� z0 A OR�NDp RLANDO HORSTMAN, J V0 —I W w J HARRIET w O w L LOVELL J W W Ln Y = O MAPLE- U z pINE TREE Q Qy0= Y U LAUREL uNIp�R -= R- TgMgRqck R, HOLLY � 0 ASH � It n - i ILL J-1 M4RBE7-H L L �7TTfl� n m REDS% p �G �� iI- o rn JBRIAR oLJ CAMERON m - a LL CONIFER PARK RED FOX EMPRESS CITY OF PORT ORCHARD 2021 Zoning Map Ruby Creek Overlay District (See POMC 20.38.300) poo 000000 o ° McCormick Village Overlay District (See POMC 20.38.200) �000000�od Downtown Height Overlay District (See POMC 20.38.600) =00000=oo poo�00000L 0 o View Protection Overlay District (See POMC 20.38.800) ��00000=oa ---; Self Storage Overlay District (See POMC 20.38.700) Zoning Designation Greenbelt (GB) Residential 1 (R1) Residential 2 (R2) - Residential 3 (R3) - Residential 4 (R4) i Residential 6 (R6) p aLIPPg YORKSHIR010 GAAAT w LORILINDAKERRI N Neighborhood Mixed Use (NMU)G�LYMOUTHSUMMER r OOm POLAR STAR Q FOREST VILLA m TIBURKELBY �z w �Business Professional Mixed Use (BPMU) GAZEBO N ON ��� BERGER w O w w AZALEA J� w SERENADE o g BERGER PEZE04, Commercial Mixed Use (CMU) z DEAN- o ARIE Q o 9 RCIA o O J ELWOOD o q-" KL o �`° ti A FOX f- - w z J � w Downtown Mixed Use DMU � O w 0 O MUIR Q T- I=- a EW� ( ) I GLOVE z H LL o ° MOORE, _ O REWEED v \ rSAL /II - - � DUSTY m U J ( ) GatewayMixed Use GMU z � �//%F Q J 0° SALMONBERRY o Q O v ���� FORD `J OLUSA COLVEA V Commercial Corridor CC 1 - /,/. FAY CALAVERAS ( ) BELF ' � I Q t,-, MROc� oT��IERSON�LANCASTECommercial Heavy (CH) - - Ei L -:�- E'ERRY o �RA ----- � — z ' ■ w VAL OI GOLDMAUR TIFFANY Industrial Flex (IF) --�'IS _g �� Y VALE VILLA CP�M CARMAE Light Industrial LI g () 1 P m 1: .37 w CARMAE� w w . C O S � w 1 � v /. LL 3 c w �1 m COPPER ��, Civic and Institutional (CI) ,r..�- ��.� -------- d _ � m — Parks and Recreation (PR) Public Facilities (PF) Urban Growth Area Port Orchard UGA City of Port Orchard Department of Community Development 216 Prospect Street, Port Orchard, WA 98366 Phone: (360) 874-5533 Fax: (360) 876-4980 www.cityofportorchard.us This map was created from existing map sources, not from field surveys. While great care was taken in using the most current map sources available, no warranties of any sort, including accuracy, fitness, or merchantability accompany this product. The user of this map assumes responsibility for determining its suitability for its intended use. N This map is not a substitute for field survey. City of Port Orchard Official Zoning Map as adopted by Ordinance 0"-21 on ****, 2021. Robert Putaansuu, Mayor ATTEST: Brandy Rinearson, MMC, City Clerk APPROVED AS TO FORM:. Charlotte A. Archer, City Attorney-- -- Sponsored by: Scott Diener, Councilmember PUBLISHED: ***, 2021 EFFECTIVE DATE: ****, 2021 VAN S E The official signed Zoning Map may be viewed at the City Clerk's office. Date Saved: 1 2/27/202 1 2: 1 2: A 2 PM