047-22 - Resolution - Contract with Stripe Rite, Inc. for Road StripingDocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
RESOLUTION NO. 047-22
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, APPROVING
SMALL WORKS CONTRACT NO. C059-22 WITH STRIPE RITE, INC. FOR THE 2022
CITY OF PORT ORCHARD ROAD STRIPING PROJECT AND DOCUMENTING THE
SMALL PUBLIC WORKS PROCUREMENT PROCEDURES.
WHEREAS, the City updates road striping throughout the City on an annual basis and
identified the need for the 2022 City of Port Orchard Road Striping project (the "Project"); and
WHEREAS, the City is a member of the Municipal Research and Services Center of
Washington (MRSC) Small Public Works Roster program, and MRSC solicited on behalf of
participating local government agencies, including the City, within Washington State (including
the City of Port Orchard) for the 2022 MRSC Small Public Works Roster; and
WHEREAS, on April 1, 2022, pursuant to RCW 39.04.155 and the City's Procurement
Policies, adopted as Resolution No. 042-20, the City's Public Works Department established a
roster of qualified contractors from the 2022 MRSC Small Works Roster, for the Main Category
— Roadway Construction, Repair & Maintenance, and Sub -Category — Asphalt Pavement
Grinding, Planing and Pulverization, Pavement Markings (Exhibit A); and
WHEREAS, on April 15, 2022, the City's Public Works Department issued an Invitation to
Bid for the Project to five (5) qualified contractors on the selected roster; and
WHEREAS, on April 29, 2022, the City's Public Works Department received two (2) bids
by the 2:00pm deadline, and staff determined that Stripe Rite, Inc. submitted the apparent
lowest, qualified bid for the Project; and
WHEREAS, on May 5, 2022, the City's Public Works Department completed the MRSC
Mandatory Bidder Responsibility Checklist and confirmed Stripe Rite, Inc. as the lowest,
responsive and responsible qualified bidder; and
WHEREAS, the Port Orchard City Council, at the 2015 recommendation of the State
Auditor's Office, wishes to document their selection/procurement process as described above
for this particular contract by Resolution; now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES
AS FOLLOWS:
THAT: It is the intent of the Port Orchard City Council that the recitals set forth above
are hereby adopted and incorporated as findings in support of this Resolution.
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Resolution No. 047-22
Page 2 of 39
THAT: The City Council authorizes the Mayor to execute Contract No. 059-22 with
Stripe Rite, Inc. for the 2022 City of Port Orchard Road Striping Project, a copy of which
is attached hereto as Exhibit B and incorporated herein by this reference.
THAT: The Resolution shall take full force and effect upon passage and signatures
hereon.
PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and
attested by the City Clerk in authentication of such passage on this 24t" day of May 2022.
DocuSigned by:
jea�t,v� P4M&SWs .
E9eR&E)e 74E ...
Robert Putaansuu, Mayor
ATTEST:
F�DOCUSIgned by:
(PAULSE
���oapORgr.
ALo
Brandy Wallace, MMC, City Clerk
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
ExhibitA
Public Agency Name:
Roster Type:
Date:
Time:
Main Category:
Sub -Category:
A&W Paving, Inc
A.C.E. Improvements
A.C. Moate Industries, Inc
AA Asphalting LLC
AAA Sweeping LLC
Action Services Corporation
�/ Active Construction Inc.
Agate Asphalt
all serviceasphalt LLC
Altus Traffic Management LLC dba Statewide Safety Systems
American Electrical Construction tic
Apply -A -Line, LLC.
Arrow Concrete & Asphalt Specialties, Inc.
Asphalt Patch Systems Inc
Axum General Construction, Inc.
Barcott Construction LLC
Becker Blacktop LLC
Beisley Enterprises LLC
Black Hills Excavating Inc.
Boomtown Services, LLC
BP Dirt Works, LLC.
C. Denney Construction
Cascade Sealing Company
City of Port Orchard
Small Works Roster
04/01/2022
07:53 am
Roadway Construction, Repair, and Maintenance
Asphalt Pavement Grinding, Planing and Pulverization,
Pavement Markings
Ceccanti, Inc.
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Central Paving LLC
Clarity Construction Inc.
Clark And Sons Excavating INC
Coatings Northwest LLC
Columbia Pacific Construction, LLC
CR Contracting
D & G Backhoe, Inc.
dba Parker Pacific Excavation
Emerald Paving, Inc.
Evergreen Asphalt and Concrete Inc.
EVERSON ASPHALT PAVING INC
Extreme Excavation
FORMA Construction Company
Freedom Boring & Excavating Inc.
G.A. Jorgensen Company Inc.
GEC NW, Inc.
GeoTest Services, Inc.
Global Contractors LLC
Granite Construction Company
Granite Construction Company
Ground Up Road Construction, Inc.
Hanson Excavation
HCP Development
Hicks Striping & Curbing, Inc.
Huber General Contractors Inc
HUIZENGA ENTERPRISES LLC
Inland Company
Intermountain Slurry Seal, Inc.
Interwest Construction Inc.
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Iron Creek Construction LLC
J. Linder Painting, LLC
James Lynch Construction
J A Morris Construction
Julies Construction And Striping LLC
Key Peninsula Construction, LLC
I<issler Enterprises Environmental Products, Inc.
KKLA Contractors, LLC
Lakeridge Paving Co., LLC
Lakeside Industries - Port Ludlow & Port Angeles
Lakeside Industries Inc. - Kent
Legionary Handyman, LLC
Looker Asphalt Inc
Matt Rychel
Maverick Construction and Demo
McCann Construction Enterprises, Inc.
Michael Green Construction, Inc.
MidMountain Contractors Inc
Mills General LLC
Mr. Asphalt and Sons LLC
Nordland Construction Nw
Nordvind Company
Northern Asphalt LLC
North Fork Excavating Inc.
Northwest Striping & Sealing LLC
Northwest Traffic, Inc.
NOVA Contracting, Inc
N P M Construction Co.
Nys Enterprises
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Oceanside Construction, Inc.
Pacific Surveying and Engineering Services
Pacific Tech Construction
Paintmaster Services Inc.
Pape & Sons Construction, Inc.
Pavement Surface Control
PHD, LLC
Pony Up Parking Lots, Inc
Precision Striping
Premier Paving and Sealcoat, LLC
PR Systems LLC
Puget Paving & Construction, Inc.
Purcell P & C, LLC
Quality Coating Enterprises
Quality Painting NW LLC
RailWorks Track Systems
Rainbow Sweepers, Inc. "RSI"
Rainier Asphalt and Concrete
Rains Contracting Inc
Ram Construction General Contractors, LLC
Raptor Excavating and Contracting LLC
RAZZ Construction, Inc.
R C Walsh & Company LLC
RC Zeigler Company Inc
Redtail
Reece Construction Company
Reign City Services LLC
Reliant Construction Services LLC
Rhizorspainting [lc
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Road Construction Northwest, Inc.
Road Products, Inc
ROGNLINS INC.
Roland Construction Company, LLC
SEALTECH ASPHALT, INC.
Signature General Construction Inc.
Simmons and Sons Contracting Inc
Simple Solutions
Sound Excavation, Inc.
Specialized Pavement Marking, LLC
Stanley Patrick Striping
STATEWIDE PARKING LOT SERVICE INC
Stripe -A -Lot
4 f Stripe Rite Inc
Stumpy Tree Service
Superior Asphalt Maintenance Inc.
Surface Prep & Maintenance
Swofford Excavating
Talakai Construction,LLC
The Westsound Company LLC
Tiger Construction, LTD
TKK,LLC
Tony Lind Paving
Traffic Safety Supply
Transblue
TRICO Companies, LLC
Trinity Contractors Inc.
Tucci & Sons, Inc.
Tunista Construction, LLC.
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
UTILIGI Communications
Valdez Construction, Inc
Vet Industrial, Inc.
We Can Dig It
Welwest Construction Inc.
Western United Civil Group LLC
Westwood Company LLC
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
CITY OF PORT ORCHARD SMALL WORKS OVER $35K
CONSTRUCTION CONTRACT NO. C059-22
PUBLIC WORKS PROJECT NO. PW2022-010
THIS Agreement is made effective as of the 24th day of May 2022, by and between
CITY OF PORT ORCHARD, WASHINGTON (°CITY")
216 Prospect Street
Port Orchard, Washington 98366
Contact: Mayor Robert Putaansuu Phone: 360.876.4407 Fax: 360.895.9029
and
Stripe Rite Inc. ("CONTRACTOR"), a Washington
corporation located at:
1813 1371h Ave E
Sumner, WA 98380-9645
Contact: Steven Bateman Phone: 253.863.2987 Email: kathyAstriperite.com
for the following Project:
2022 City of Port Orchard Road Striping (`PROJECT")
The City and Contractor agree as follows:
1. Contract Documents. The Contractor shall complete the Work described in the Contract
Documents for the Project. The following documents are collectively referred to as the
"Contract Documents":
a. This Agreement signed by the City and the Contractor;
b. Division 1 of WSDOT Standard Specifications for Road, Bridge and Municipal
Construction, 2022 edition, together with APWA Supplement (1-99), subject to specific
provisions contained within the Public Works Terms and Conditions;
c. The attached Special Provisions, Plans and Specifications;
d. 2018 International Building Code (IBC) and 2018 Energy Code Compliance;
e. Written change orders or orders for minor changes in the Work issued after execution of
this Agreement;
f. Public Works Terms and Conditions;
g. Insurance and Bonding Requirements;
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-0I0 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:,6_SlrccisT_Rcpair&MaintcnancelPavemcnlMorkingslS1riping\2022 StripinglCon ma\C659-22- Stripe Rite. Inc.doca
Page I of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
h. The Invitation to Bid, and bid proposal submitted by the Contractor, except when
inconsistent with Contract Documents a-g;
i. 2019 Public Works Engineering Standards; and
j. Appendix A: Nan -Discrimination Statutes and Authorities.
k. IF A GRANT APPLIES TO THIS AGREEMENT, THE GRANT AGREEMENT
BETWEEN THE CITY AND THE FUNDING AGENCY WILL BE MADE PART OF
THE CONTRACT DOCUMENTS.
All of the above listed Contract Documents are each made exhibits to this Agreement and are
incorporated into the Agreement as if set forth in full. The intent of the Contract Documents is to
include all items necessary for the proper execution and completion of the Work by the Contractor.
These Contract Documents complement each other in describing a complete work. Any
requirement in one document binds as if stated in all. The Contractor shall provide any work or
materials clearly implied in the Contract even if the Contract does not mention it specifically.
2. Date of Commencement and Substantial Completion Date. The date of commencement
shall be August 151" 2022. The Contractor shall substantially complete the Work not later
than September 16'" 2022 subject to adjustment by change order.
3. The Contractor shall do all work and furnish all tools, materials, and equipment in accordance
with the above described Construction Contract Documents. The Contractor shall provide
and bear the expense of all equipment, work, and labor of any sort whatsoever that may be
required for the transfer of materials and for constructing and completing of the work
provided for in these Construction Contract Documents, except those items mentioned
therein to be furnished by the City. Contractor represents that the services furnished under
this Agreement will be performed in accordance with generally accepted professional
practices in effect at the time such services are performed.
4. Subject to additions and deductions by change order, the construction maximum payment is
the base bid amount of $69,935.36 (including applicable sales tax) (hereinafter "Contract
Sum"). The construction Contract Sum shall include all items and services necessary for the
proper execution and completion of the work. The City hereby promises and agrees with the
Contractor to employ and does employ the Contractor to provide the materials and to do and
cause to be done the work described in the Construction Contract Documents and to complete
and finish the same according to the plans and specifications and the terms and conditions
herein contained; and hereby contracts to pay for the same at the time and in the manner and
upon the conditions provided for in this Contract.
5. The Contractor agrees to comply with all state and federal laws relating to the employment
of labor and wage rates to be paid. The Contractor agrees to furnish insurance of the types
and in the amounts set forth in the Construction Contract Documents. The Contractor
warrants that it is licensed and authorized to do business under the laws of the State of
Washington and has not been suspended or debarred in the past three (3) years.
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No, C059-22
U:16-StrccrsT_RepaimMaintcnanccTavcmcntMarkings,Stripins',2022 StripingWontroc00054.22- Stripe Rite, [nc.docs
Page 2 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
6. The Contractor agrees to repair and replace all property of the City and all property of others
damaged by Contractor, Contractor's employees, sub -contractors.
7. The Contractor does hereby agree to the full performance of all the covenants herein upon
the part of the Contractor. Such agreement shall be binding upon Contractor's heirs,
executors, administrators, successors, and assigns.
8. It is further provided that no liability shall attach to the City of Port Orchard by reason of
entering into this Construction Contract, except as expressly provided herein.
9. Title VI. The City of Port Orchard, in accordance with Title VI of the Civil Rights Act of
1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations,
Department of Transportation subtitle A, Office of the Secretary, Part 21, nondiscrimination in
federally assisted programs of the Department of Transportation issued pursuant to such Act, must
affirmatively insure that its contracts comply with these regulations.
Also, in accordance with Title V1, the City is required to include the following clauses in every
contract subject to Title VI and its related regulations.
Therefore, during the performance of this Agreement, the Contractor, for itself, its assignees, and
successors in interest agrees as follows:
a) Compliance with Regulations: The Contractor will comply with the Acts and the
Regulations relative to Nondiscrimination in Federally -assisted programs of the U.S.
Department of Transportation, Federal Highway Administration (FHWA), as they may be
amended from time to time, which are herein incorporated by reference and made a part of
this Agreement.
b) Nondiscrimination: The Contractor, with regard to the work performed by it during this
Agreement, will not discriminate on the grounds of race, color, national origin, sex, age,
disability, income -level, or LEP in the selection and retention of subcontractors, including
procurements of materials and leases of equipment. The Contractor will not participate
directly or indirectly in the discrimination prohibited by the Acts and the Regulations as
set forth in Appendix A, attached hereto and incorporated herein by this reference,
including employment practices when this Agreement covers any activity, project, or
program set forth in Appendix B of 49 C.F.R. part 21.
c) Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all
solicitations, either by competitive bidding, or negotiation made by the Contractor for work
to be performed under a subcontract, including procurements of materials, or leases of
equipment, each potential subcontractor or supplier will be notified by the Contractor of
the Contractor's obligations under this Agreement and the Acts and the Regulations
relative to Non-discrimination on the grounds of race, color, national origin, sex, age,
disability, income -level, or LEP.
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:\G_SlrcctstF_Rcpair&Maintenance,Paven=cntMarking.,\Striping12022 StripirtgTonlraci%C059-22-Stripe Rite. Ine.dmx
Page 3 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
d) Information and Reports: The Contractor will provide all information and reports required
by the Acts, the Regulations and directives issued pursuant thereto and will permit access
to its books, records, accounts, other sources of information, and its facilities as may be
determined by the City or the FHWA to be pertinent to ascertain compliance with such
Acts, Regulations, and instructions. Where any information required of the Contractor is
in the exclusive possession of another who fails or refuses to furnish the information, the
Contractor will so certify to the City or the FHWA, as appropriate, and will set forth what
efforts it has made to obtain the information.
c) Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the
Non-discrimination provisions of this Agreement, the City will impose such contract
sanctions as it or the FHWA may determine to be appropriate, including, but not Iimited
to:
1. withholding payments to the Contractor under the Agreement until the contractor
complies; and/or
2. cancelling, terminating, or suspending the Agreement, in whole or in part.
f) Incorporation of Provisions: The Contractor will include the provisions of paragraphs 9.a
through 9.f in every subcontract, including procurements of materials and leases of
equipment, unless exempt by the Acts, the Regulations and directives issued pursuant
thereto. The Contractor will take action with respect to any subcontract or procurement as
the City or the FHWA may direct as a means of enforcing such provisions including
sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is
threatened with litigation by a subcontractor, or supplier because of such direction, the
Contractor may request the City to enter into any litigation to protect the interests of the
City. In addition, the Contractor may request the United States to enter into the litigation
to protect the interests of the United States.
10. Public Records Act Chapter 42.56 RCW. Contractor understands that her/his bid
response documents, and any contract documents may be subject to release under the Public
Records Act Chapter 42.56 RCW and the City may be required to disclose such documents upon
a request. Contractor acknowledges that s/he has been advised to mark any records believed to be
trade secrets or confidential in nature as "confidential." If records marked as "confidential" are
found to be responsive to the request for records, the City as a courtesy to the Contractor, may
elect to give notice to Contractor of the request so as to allow Contractor to seek a protective order
from a Court. Contractor acknowledges and agrees that any records deemed responsive to a public
records request may be released at the sole discretion of, and without notice by, the City.
11. Warranty. Upon acceptance of the contract work, Contractor must provide the City a
two-year warranty bond in the amou of twenty percent (20%) of the contract price a form and
amount acceptable to the City. The ntractor shall correct all defects in workmanship and
materials within two I}'rr)lyear% fro date of the City's acceptance of the Contract work,
including replacing vegetation t ils to thrive. In the event any parts are repaired or replaced,
only original replacement parts shall be used —rebuilt or used parts will not be acceptable. When
defects are corrected, the warranty for that portion of the work shall extend for one (1)
additional year from the date such correction is completed and accepted by the City. The
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:,6_StmetsVF_RCpair&Maintenancc%PovcmentMarkingslStripingQ022 SlripinglConlrnct%C059-22- Stripe Rite. Inc.docx
Page 4 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of
notice from the City of the defect. If the Contractor does not accomplish the corrections within a
reasonable time as determined by the City, the City may complete the corrections and the
Contractor shall pay all costs incurred by the City in order to accomplish the correction.
12. Indemnification. Contractor shall defend, indemnify, and hold the City, its officers,
officials, employees, agents, and volunteers harmless from any and all claims, injuries, damages,
losses or suits, including all legal costs and attorney fees, arising out of or in connection with the
Contractor's performance of this Agreement, except for that portion of the injuries and damages
caused by the sole negligence of the City.
The City's inspection or acceptance of any of Contractor's work when completed shall not be
grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the City, its officers, officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S
WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY
FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER
ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this agreement.
13. Miscellaneous Provisions.
a) Non -Waiver of Breach. The failure of the City to insist upon strict performance of any of
the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a
waiver or relinquishment of those covenants, agreements or options, and the same shall
be and remain in full force and effect.
b) Resolution of'Disputes and Governing Law. This Agreement shall be governed by and
construed in accordance with the laws of the State of Washington. If the parties are unable
to settle any dispute, difference or claim arising from the parties' performance of this
Agreement, the exclusive means of resolving that dispute, difference or claim, shall only
be by filing suit exclusively under the venue, rules and jurisdiction of the Kitsap County
Superior Court, Kitsap County, Washington, unless the parties agree in writing to an
alternative dispute resolution process. In any claim or lawsuit for damages arising from
the parties' performance of this Agreement, each party shall pay all its legal costs and
attorney's fees incurred in defending or bringing such claim or lawsuit, including all
appeals, in addition to any other recovery or award provided by law; provided, however,
City of Pori Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev. 113DR 4-2022
Small Works Contract No. C059-22
U:lb_Stm tslF_Repair&MaintcnnncclPavententMarkingslStripingIO22 StripingTvnlrect1C059-22- Stripe Ritc. lne.docx
Page 5 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
nothing in this paragraph shall be construed to limit the City's right to indemnification
under Section XII of this Agreement.
c) Written Notice. All communications regarding this Agreement shall be sent to the parties
at the addresses listed on the signature page of the Agreement, unless notified to the
contrary. Any written notice hereunder shall become effective three (3) business days after
the date of mailing by registered or certified mail, and shall be deemed sufficiently given
if sent to the addressee at the address stated in this Agreement or such other address as may
be hereafter specified in writing.
d) Assignment. Any assignment of this Agreement by either party without the written consent
of the non -assigning party shall be void. If the non -assigning party gives its consent to any
assignment, the terms of this Agreement shall continue in full force and effect and no
further assignment shall be made without additional written consent.
e) Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized
representative of the City and Contractor.
f) Entire Agreement. The written provisions and terms of this Agreement, together with any
Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other
representative of the City, and such statements shall not be effective or be construed as
entering into or forming a part of or altering in any manner this Agreement. All of the
above documents are hereby made a part of this Agreement. However, should any
language in any of the Exhibits to this Agreement conflict with any language contained in
this Agreement, the terms of this Agreement shall prevail.
g) Compliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become
applicable to Contractor's business, equipment, and personnel engaged in operations
covered by this Agreement or accruing out of the performance of those operations.
h) Counterparts. This Agreement may be executed in any number of counterparts, each of
which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS WHEREOF, the parties hereto have caused this contract to be duly executed
on the date first written above.
CITY OF PORT ORCHARD
Docu Signed by:
}°ob v Naav Slug.
74EF.
Ro ert utaansuu, Mayor
CONTRACTOR
Stripe Rite,
,�'`
City oj'Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010
Small Works Contract No. C059-22
U:16_Sncels1F_Repair&MaintenanceTavemenlMarking%lSlriping12022 SlripingTommaT059-22- Stripe Rile, [nc.docx
Page 6 of 30
Rev. 1BDR 4-2022
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
ATTEST/AUTHENTICATE:
DocuSigned by:
Bran y Wa ace, MMC, City Clerk
APPROVED AS TO FORM:
DocuSigned by:
Char, otWe . Archer, City Attorney
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010
Small Works Contract No. C059-22
U:',h_StrectalF_Rcpair&MaintenancclpavementMarking.% Stripingt022 Stripin9\Con1m&C059-22- Stripe Rite. wc.duca
Page 7 of 30
Rev. 1BDR 4-2022
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
CERTIFICATE AS TO CORPORATE PRINCIPAL
I, Justin Williams (Car orate Officer (Nat C t t S'
certify that I am the _
corporation named
Steven Bateman
p on rac tgner))
Public Works Estimator (Corporate Title) of the
as the
of the Contractor, was then
Contractor in the Agreement attached hereto; that
(Contract Signer) who signed said Agreement on behalf
President (Corporate Title) of said corporation;
that said Agreement was duly signed for and in behalf of said corporation by authority of its
governing body, and is within the scope of its corporate powers.
Corporate
Corp. officer signature (not contract signer)
Justin Williams
Printed
Public Works Estimator
Title
State of WA.
ss
County of PIERCE
Justin Williams , (corporate officer (Mot contract signer)) being
duly sworn, deposes and says that he/she is Public Works Estimator (Corporate Title)
of Stripe Rite , Inc. (Name of Corporation)
Subscribed and sworn to before me this 11 th day of May , 2022
Notary P lic ignature)
Kathryn Arrowood Van Court
Notary Public (Print)
My commission expires 10/29/2024
Ciry of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010
Small Works Contract No. C059-22
U:%6_S1rcctsT_RcpnirRMaintcnancc',PavcmcntMarkings'Striping12022 Slripink,Conlm&C059-22- Stripc Rite, Inc.tlocx
Page 8 of 30
Rev. IBDR 4-2022
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
CITY OF PORT ORCHARD
PUBLIC WORK PROJECT TERMS AND CONDITIONS
The following terms and conditions shall be used in conjunction with the Standard Specifications
for Road, Bridge and Municipal Construction, 2022 edition, together with the APWA Supplement
(Section 1-99), as issued by the Washington State Department of Transportation and American
Public Works Association, Washington State Chapter, hereinafter referred to as the "standard
specifications". The standard specifications, except as they may be modified or superseded by
these provisions, shall govern all phases of work under this Contract, and they are by reference
made an integral part of these specifications and Contract as if herein fully set forth.
When the provisions of the standard specification conflict with the terms and conditions as
contained herein, the terms and conditions shall prevail.
L BID PRICE: The bid price(s) shall include all necessary permits, fees and items of labor,
material, equipment, tools, overhead and compensation, supplies, taxes, utilities, and other
incidentals necessary to complete the work in a fully functional and operational state. All prices
including bid prices are in US funds.
2. DEFINITIONS: The term "City" means fort Orchard, Washington, "successful bidder" means
the apparent lowest and best responsible bidder to whom an award is made, and "Contractor"
means the successful bidder who has satisfied the requirements for the award and who receives a
contract executed by the City. "Bidder" means the person, firm or corporation that has made an
offer in response to the invitation to bid. "Work" means the construction and services required by
the Contract Documents, whether completed or partially completed, and includes all other labor,
materials, equipment, and services provided or to be provided by the Contractor to fulfill the
Contractor's obligations.
3. LICENSING AND REGISTRATION: The Contractor must have a Washington State certificate
of registration per chapter 18.27 RCW; a current state unified business identifier number; and if
applicable, industrial insurance coverage for the bidder's employees working in Washington, an
Employment Security Department number, and a state excise tax registration number. In addition,
the bidder must not be disqualified from bidding on any public works contracts under RCW
39.06.010 or 39.12.065(3).
4. PUBLIC WORK REQUIREMENTS: This project constitutes a public work under state law.
Bidders are warned to take into consideration statutory legal requirements, particularly, the
payment of prevailing wages and fringe benefits, payment and performance bonds and sales tax
implications in making their bids. It is the sole responsibility of the bidder to insure that the
appropriate labor classification(s) are identified and that the applicable wage and benefit rates are
taken into consideration when preparing their bid according to these specifications. The Contractor
shall complete and file State of Washington, Department of Labor & Industries, Statement of Intent
to Pay Prevailing Wages and Affidavit of Wages Paid forms and shall familiarize itself with their
requirements. The Contractor shall also be responsible for and pay all costs pertaining to the
processing of these forms.
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:16_Strccts\F-Rcpeir&MainLcnancepnvcmcntMurkings'wStriping12022 StripinglContma\C059-22- Stripe Rite, Inc.dmx
Page 9 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
5. PREVAILING WAGES: The Contractor shall pay prevailing wages as required and shall comply
with Chapters 39.12 and 49.28 RCW. Prior to beginning work under this Contract, the Contractor
shall submit -- on behalf of itself and each and every Sub -Contractor — a "Statement of Intent to Pay
Prevailing Wages," which must be approved by the Department of Labor and Industries (See link
below.) Following the final acceptance of the project, the Contractor must submit -- on behalf of itself
and every Sub -Contractor -- an "Affidavit of Wages Paid" for final payment. Final payments shall
be made in accordance with the requirements of Chapter 39.12 RCW.
Refer to http://www.Ini.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp for
Washington State Prevailing Wage rates.
6. INSURANCE REQUIREMENT: The successful bidder will furnish insurance as stipulated in
the Attachment entitled "Insurance Requirements."
7. RECEIPT OF ADDENDA: All official clarifications or interpretations of the bid documents
will be by written addenda only.
8. PROJECT COMPLIANCE: In compliance with the request for quotation, Bidder hereby
proposes to perform all work for this project in strict accordance with the Contract Documents, at
the Contract Sum, and within the time set forth herein with the understanding that time is of the
essence in the performance of this Contract.
9. TAXES: Proposals shall include all applicable taxes except sales tax, which is a separate bid
item. It shall be the Bidder's responsibility to furnish Federal Excise Tax Exemption Certificate,
when applicable.
10. ERROR IN EXTENSION: Unit price, when used, shall govern in case of extension error. If a
discrepancy between the numerical unit price and the written (words) unit price is found, the
written (words) unit price shall control.
11. PERMITS AND FEES: The Contractor shall furnish all permits, inspection fees, and fees
required in the performance of this Contract, including those charged under RCW 39.12.070 by
the Department of Labor and Industries for the approval of statements of intent to pay prevailing
wages and the certification of affidavits of wages paid, etc. The Department may also charge fees
to persons or organizations requesting the arbitration of disputes under RCW 39.12.060. The
Contractor is responsible for all fees resulting from these statutes.
12. CONTRACT: The Contract Documents ("Contract"), when properly signed, will be the only
form that will be recognized by the City as an award. The executed Contract supersedes all
previous communications and negotiations, except as referenced herein, and constitutes the entire
agreement between the City and Contractor (parties), except as provided herein. The Contractor
shall not make any changes, alterations, or variations in the terms of the Contract without the
written consent of the City. No terms stated by the Bidder in its proposal shall be binding on the
City unless accepted in writing by the City. The successful bidder may not assign the Contract
resulting from this invitation to bid without the City's prior written consent. No waiver by the City
of a breach of any provision of the terms and conditions outlined in the invitation to bid shall
constitute a waiver of any other breach of such provision or of any other provisions.
City of Port Orchard and Stripe Rite, Inc.
Puhlic Works Project No. PW2022-010 Rev. 1BDR 4-2022
Small Works Contract No. C059-22
U:%6_StrCC1Sip_Rcpair&Maintcnance',PavcmcnlMarRingsl.Siriping'Q022 5triping\Cuntmct1C059-22- Siripc RiLC, Inc.docK
Page 10 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
13. CHANGES: The City may issue a written change order for any change in the Contract work
during the performance of this Agreement. If the Contractor determines, for any reason, that a
change order is necessary, Contractor must submit a written change order request to the person
listed in the Notice provision section of this Agreement, within fourteen (14) calendar days of the
date Contractor knew or should have known of the facts and events giving rise to the requested
change. if the City determines that the change increases or decreases the Contractor's costs or time
for performance, the City will make an equitable adjustment. The City will attempt, in good faith,
to reach agreement with the Contractor on all equitable adjustments. However, if the parties are
unable to agree, the City will determine the equitable adjustment as it deems appropriate. The
Contractor shall proceed with the change order work upon receiving either a written change order
from the City or an oral order from the City before actually receiving the written change order. If
the Contractor fails to require a change order within the time specified in this paragraph, the
Contractor waives its right to make any claim or submit subsequent change order requests for that
portion of the contract work. If the Contractor disagrees with the equitable adjustment, the
Contractor must complete the change order work; however, the Contractor may elect to protest the
adjustment as provided in subsections A through E of Section 13 entitled, "Claims," below.
The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a
separate acceptance, or (3) not protesting in the way this section provides. A change order that is
accepted by Contractor as provided in this section shall constitute full payment and final settlement
of all claims for contract time and for direct, indirect, and consequential costs, including costs of
delays related to any work, either covered or affected by the change.
14. CLAIMS: If the Contractor disagrees with anything required by a change order, another
written order, or an oral order from the City, including any direction, instruction, interpretation, or
determination by the City, the Contractor may file a claim as provided in this section. The
Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of
the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the
date the Contractor knew or should have known of the facts or events giving rise to the claim,
whichever occurs first. Any claim for damages, additional payment for any reason, or extension
of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been
waived by the Contractor unless a timely written claim is made in strict accordance with the
applicable provisions of this Agreement.
At a minimum, a Contractor's written claim shall include the information set forth in subsections
A, items 1 through 5 below.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY
CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING
THAT CLAIM OR CAUSED BY THAT DELAY.
A. Notice of Claim. Provide a signed written notice of claim that provides the
following information:
1. The date of the Contractor's claim;
2. The nature and circumstances that caused the claim;
3. The provisions in this Agreement that support the claim;
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. 1BDR 4-2022
Small Works Contract No. C059-22
U:lfi_Str tilF_Repair&MaintenancclpavcmmntMarkings\Striping12022 StripingTontmo\C059-22-Stripc Rite, lnc.doca
Page I I of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
4. The estimated dollar cost, if any, of the claimed work and how that estimate was
determined; and
5. An analysis of the progress schedule showing the schedule change or disruption if
the Contractor is asserting a schedule change or disruption.
B. Records. The Contractor shall keep complete records of extra costs and time
incurred as a result of the asserted events giving rise to the claim. The City shall have access to
any of the Contractor's records needed for evaluating the protest.
The City will evaluate all claims, provided the procedures in this section are followed. If the City
determines that a claim is valid, the City will adjust payment for work or time by an equitable
adjustment. No adjustment will be made for an invalid protest.
C. Contractor's Duty to Complete Protested Work. In spite of any claim, the
Contractor shall proceed promptly to provide the goods, materials and services required by the
City under this Agreement.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides,
the Contractor also waives any additional entitlement and accepts from the City any written or oral
order (including directions, instructions, interpretations, and determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the
procedures of this section, the Contractor completely waives any claims for protested work and
accepts from the City any written or oral order (including directions, instructions, interpretations,
and determination).
15. LIMITATION OF ACTIONS: CONTRACTOR MUST, IN ANY EVENT, FILE ANY
LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120
CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR
CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER
BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY
LIMITATIONS PERIOD.
16. WORK PERFORMED AT CONTRACTOR'S RISK: Contractor shall take all necessary
precautions and shall be responsible for the safety of its employees, agents, and subcontractors in
the performance of the contract work and shall utilize all protection necessary for that purpose.
All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss
of or damage to materials, tools, or other articles used or held for use in connection with the work.
17. COMPLIANCE WITH LAWS AND REGULATIONS: The Contractor warrants full
compliance with all applicable local, state, or federal laws and regulations and agrees to indemnify
and defend the City against any loss, cost, liability, or damage, including reasonable attorney's
fees, by reason of successful bidder's violation of this paragraph.
18. EMPLOYMENT OF STATE RETIREES: The City is a "DRS-covered employer" which is
an organization that employs one or more members of any retirement system administered by the
Washington State Department of Retirement Systems (DRS). Pursuant to RCW 41.50.139(1) and
WAC 415-02-325(1), the City is required to elicit on a written form if any of the Contractor's
employees providing services to the City retired using the 2008 Early Retirement Factors (ERFs),
City oj'Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev, 1BDR 4-2022
Small Works Contract No, C059-22
U:16-StroctslF_Rcpair&MaimcnancelPavcmcmMark ings5Slriping12022 StripingTonlracW09-22-Stripc Rim, Inc.docn
Page 12 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
or if the Contractor is owned by an individual who retired using the 2008 ERFs, and whether the
nature of the service and compensation would result in a retirement benefit being suspended.
Failure to make this determination exposes the City to significant Iiability for pension
overpayments. As a result, before commencing work under this Agreement, Contractor shall
determine whether any of its employees providing services to the City or any of the Contractor's
owners retired using the 2008 ERFs, and shall immediately notify the City and shall promptly
complete the form provided by the City after this notification is made. This notification to DRS
could impact the payment of retirement benefits to employees and owners of Contractor.
Contractor shall indemnify, defend, and hold harmless the City from any and all claims, damages,
or other liability, including attorneys' fees and costs, relating to a claim by DRS of a pension
overpayment caused by or resulting from Contractor's failure to comply with the terms of this
provision. This provision shall survive termination of this Agreement.
19. TERMINATION: This Contract may be terminated in whole or in part, without penalty, under
the following conditions: 1) by mutual written agreement; 2) by the City for breach by the
Contractor of any of the obligations or requirements set forth in the Contract Documents which
would, at the option of the City, require the Contractor to assume Iiability for any and all damages,
including the excess of re -procuring similar products or services; 3) for convenience of the City;
or 4) by the City for non -appropriation of funds.
a) Termination for Cause. The City may, upon 7 days written notice to Contractor and to its
surety, terminate (without prejudice to any right or remedy of the City) the contract, or any
part of it, for cause upon the occurrence of any one or more of the following events: Contractor
fails to complete the work or any portion thereof with sufficient diligence to ensure substantial
completion of the work within the contract time; Contractor is adjudged bankrupt, makes a
general assignment for the benefit of its creditors, or a receiver is appointed on account of its
insolvency; Contractor fails in a material way to replace or correct work not in conformance
with the Contract Documents, Contractor repeatedly fails to supply skilled workers or proper
materials or equipment; Contractor materially disregards or fails to comply with laws,
ordinances, rules, regulations, or orders of any public authority having jurisdiction; or
Contractor is otherwise in material breach of any provision of the contract. Upon termination,
the City may, at its option, take possession of or use all documents, materials, equipment, tools,
and construction equipment and machinery thereon owned by Contractor to maintain the
orderly progress of, and to finish, the work, and finish the work by whatever other reasonable
method it deems expedient.
b) Termination for Convenience. The City may, upon written notice, terminate (without prejudice
to any right or remedy of the City) the contract, or any part of it, for the convenience of the
City.
c) Settlement of Costs. If the City terminates for convenience, Contractor shall be entitled to make
a request for an equitable adjustment for its reasonable direct costs incurred prior to the
effective date of the termination, plus a reasonable allowance for overhead and profit on work
performed prior to termination, plus the reasonable administrative costs of the termination, but
shall not be entitled to any other costs or damages, whatsoever, provided however, the total
sum payable upon termination shall not exceed the Contract Sum reduced by prior payments.
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. [BDR 4-2022
Small Works Conti -act No. C059-22
U:�6_Streci.,\ Rcpair&MaintenancelPavcmenlMarkingslStriping'@022 StripinglContmcl%CO59 22- Stripe Rite, Inc.docn
Page 13 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
20. COMPLIANCE WITH TERMS: The City may at any time insist upon strict compliance with
these terms and conditions, notwithstanding any previous custom, practice, or course of dealing to
the contrary.
21. PAYMENT: Contractor shall maintain time and expense records and provide them to the City
along with monthly invoices in a format acceptable to the City for work performed to the date of
the invoice. All invoices shall be paid by the City within 45 days of receipt of a proper invoice. If
the services rendered to not meet the requirements of the Contract, Contractor will correct or
modify the work to comply with the Contract. City may withhold payment for such work until the
work meets the requirements of the Contract.
22. DISPUTE RESOLUTION: In the event there is a dispute between the parties, the parties
agree to resolve that dispute in the following manner: (a) The parties shall attempt in good faith to
resolve any dispute promptly through negotiation. Either party may give the other party written
notice that a dispute exists (a "Notice of Dispute"). The Notice of Dispute shall include a statement
of such party's position. Within ten (10) days of the delivery of the Notice of Dispute, the parties
shall meet at a mutually acceptable time and place and attempt to resolve the dispute; (b) If the
parties are unable to resolve the dispute, they may elect to submit the dispute to mediation. The
cost of the mediation shall be borne equally by the parties. The mediator shall be selected by the
mutual agreement of the parties; (c) If the mediation does not result in a settlement of the dispute,
the dispute shall be settled by binding arbitration by the Judicial Arbitration and Mediation
Services ("JAMS") in accordance with the then operative construction rules of JAMS. The parties
may select an arbitrator by mutual agreement, or if unable to agree, the arbitrator will be selected
pursuant to the rules of JAMS. The parties shall be bound by the decision of such arbitrator. The
arbitration shall be conducted in Kitsap County, Washington; provided, if JAMS is unable to
conduct the arbitration in Kitsap County, then the arbitration shall be held in such location as the
parties may agree after consulting with JAMS.
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:%6_Strects,F_Rcpair&Maintenance',PavcmcnIM3rkings',Slripingl2022 StripinglCnnlrac15C059.22- Stripe RIIC, Inc.dacx
Page 14 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Attachment
CITY OF PORT ORCHARD
INSURANCE REQUIREMENTS
Insurance Term. The Contractor shall procure and maintain for the duration of the Contract with
the City, insurance against claims for injuries to persons or damage to property which may arise
from or in connection with the performance of the work hereunder by the Contractor, their agents,
representatives, employees and subcontractors.
No Limitation. The Contractor's maintenance of insurance, its scope of coverage and limits as
required herein shall not be construed to limit the liability of the Contractor to the coverage
provided by such insurance, or otherwise limit the City's recourse to any remedy available at law
or in equity.
Minimum Scope of Insurance. The Contractor shall obtain insurance of the types described below:
Automobile Liability insurance covering all owned, non -owned, hired and leased vehicles.
Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute
form providing equivalent liability coverage. If necessary, the policy shall be endorsed to
provide contractual liability coverage.
Commercial General Liability insurance shall be written on ISO occurrence form CG 00
01 and shall cover liability arising from premises, operations, stop gap liability,
independent contractors, products -completed operations, personal injury and advertising
injury, and liability assumed under an insured contract. The Commercial General Liability
insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form
CG 25 03 1185. There shall be no endorsement or modification of the Commercial General
Liability insurance for liability arising from explosion, collapse, or underground property
damage. The City shall be named as an insured under the Contractor's Commercial General
Liability insurance policy with respect to the work performed for the City using ISO
Additional Insured endorsement CG 20 10•-161-0�_ and Additional Insured -Completed
Operations endorsement CG 20 37 -t @ 0 or su itute endorsements providing equivalent
coverage. 113
Workers' Compensation coverage as required by the Industrial Insurance laws of the State
of Washington.
Builders Risk insurance covering interests of the City, the Contractor, Subcontractors, and
Sub -subcontractors in the work. Builders Risk insurance shall be on an all-risk policy form
and shall insure against the perils of fire and extended coverage and physical loss or
damage including flood, earthquake, theft, vandalism, malicious mischief, collapse,
temporary buildings, and debris removal. The Builders Risk insurance covering the work
will have a deductible of $5,000 for each occurrence, which will be the responsibility of
the Contractor. Higher deductibles for flood and earthquake perils may be accepted by the
City upon written request by the Contractor and written acceptance by the City. Any
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-0I0 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:16_Strc ts\F _Repair&Maintcnancc\Pavement MarkingslStripingl2022 StripinglCantract1C059-22- Stripe Ritc. Inc,dncx
Page 15 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
increased deductibles accepted by the City will remain the responsibility of the Contractor.
The Builders Risk insurance shall be maintained until final acceptance of the work by the
City.
Employer's Liability insurance limit of $1,000,000 each accident, Employer's Liability
Disease each employee $1,000,000 and Employer's Liability Disease — Policy limit
$1, 000.000.
Minimum Amounts of Insurance. The Contractor shall maintain the following insurance limits:
• Automobile Liability insurance with a minimum combined single limit for bodily injury
and property damage of $1,000.000 per accident.
+ Commercial General Liability insurance shall be written with limits no less than
$1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products -
completed operations aggregate limit.
• Builders Risk insurance shall be written in the amount of the completed value of the project
with no coinsurance provisions.
• Workers' Compensation insurance as required by the State of Washington.
+ Employer's Liability insurance with Washington Stop Gap Employers' Liability minimum
limits of $1,000,000 each accident, $1,000,000 disease - each employee, $1,000,000
disease - policy limit.
The City will not be responsible for payment of industrial insurance premiums or for any other
claim or benefit for this Contractor or any sub -Contractor or employee of the Contractor which
might arise under the industrial insurance laws during the performance of duties and services under
this contract. If the Department of Labor and Industries, upon audit, determines that industrial
insurance payments are due and owing as a result of work performed under this contract, those
payments shall be made by the Contractor; the Contractor shall indemnify the City and guarantee
payment of such amounts.
Public Entity Full Availabilfty of Contractor Limits. If the Contractor maintains higher insurance
limits than the minimums shown above, the Public Entity shall be insured for the full available
limits of Commercial General and Excess or Umbrella liability maintained by the Contractor,
irrespective of whether such limits maintained by the Contractor are greater than those required by
this contract or whether any certificate of insurance furnished to the Public Entity evidences limits
of liability lower than those maintained by the Contractor.
Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the
following provisions for Automobile Liability, Commercial General Liability and Builders Risk
insurance:
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:\6_StrcclslF-Rcpair&MaintcnancelPavenrcntMarkings,5lripingl2022 1,tripin9lC0ntr3c1\C059-22- Stripe Rite, Inc,docx
Page 16 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
• The Contractor's insurance coverage shall be primary insurance as respect the City. Any
insurance, self-insurance, or insurance pool coverage maintained by the City shall be
excess of the Contractor's insurance and shall not contribute with it.
• If any coverage is written on a "claims made" basis, then a minimum of three (3) year
extended reporting period shall be included with the claims made policy, and proof of this
extended reporting period shall be provided to the City.
Contractor's Insurance for Other Losses The Contractor shall assume full responsibility for all
loss or damage from any cause whatsoever to any tools, Contractor's employee -owned tools,
machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's
agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective
fences.
Waiver of Subrogation. The Contractor waives all rights against the City, any of its
Subcontractors, Sub -subcontractors, agents, and employees, for damages caused by fire or other
perils to the extent covered by Builders Risk insurance or other property insurance obtained
pursuant to this Insurance Requirements Section of the Contract or other property insurance
applicable to the work. The Contractor's insurance shall be endorsed to waive the right of
subrogation against the City, or any self-insurance, or insurance pool coverage maintained by the
City. The City will not waive its right to subrogation against the Contractor. The Contractor's
insurance shall be endorsed acknowledging that the City will not waive its right to subrogation.
Acceptabilfty of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating
of not less than ANII.
Verification of Coverage. The Contractor shall furnish the City with original certificates and a
copy of the amendatory endorsements, including but not necessarily limited to the additional
insured endorsement, evidencing the Automobile Liability and Commercial General Liability
insurance of the Contractor before commencement of the work. Before any exposure to loss may
occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy that
includes all applicable conditions, exclusions, definitions, terms, and endorsements related to this
project.
Subcontractors. Contractor shall ensure that each subcontractor of every tier obtain at a minimum
the same insurance coverage and limits as stated herein for the Contractor (with the exception of
Builders Risk insurance). Upon request the City, the Contractor shall provide evidence of such
insurance. The Contractor shall ensure that the Public Entity is an additional insured on each and
every Subcontractor's Commercial General liability insurance policy using an endorsement as
least as broad as ISO CG 20 10 for ongoing operations and CG 20 37 for completed
operations. 04113 ,. ,/�
Notice of Cancellation. The Contractor's insurance shall be endorsed to state that coverage shall
not be canceled by either party, except after thirty (30) days prior written notice by certified mail,
return receipt requested, has been provided to the City. The Contractor shall provide the City and
all Additional Insureds for this work with written notice of any policy cancellation, within two
business days of their receipt of such notice.
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. IHDR 4-2022
Small Works Contract No. C059-22
UP,6_StrectslF_Repair&Maintenance,PavementMarkingelSlriping'3622 Striping'Contract\C059-22- Stripe Rite. Ine.doca
Page 17 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
Failure to Maintain Insurance. The insurance required by this Section will not be canceled,
materially changed or altered without forty-five (45) days prior written notice submitted to the
City. Failure on the part of the Contractor to maintain insurance as required shall constitute a
material breach of contract, upon which the City may, after giving five business days' notice to
the Contractor to correct the breach, immediately terminate the Contract, or, at its discretion,
procure or renew such insurance and pay any and all premiums in connection therewith, with any
sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset
against funds due the Contractor from the City.
City of Port Orchard and Stripe Rite, Inc.
Puhlic Works Project No. PW2022-010 Rev. [DDR 4-2022
Small Works Contract No. C059-22
U:16_Streets\F_Repair&MointenaRCe\PavamcntMarkingslStripingQD22 SlripingTontrnet\C059-22- Stripe Rite, Inc.docx
Page 18 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
CITY OF PORT ORCHARD
DECLARATION OF OPTION FOR PERFORMANCE
BOND OR ADDITIONAL RETAINAGE
(APPLICABLE TO CONTRACTS OF $150,000 OR LESS —RCW 39.08.010)
Note 1: This form must be submitted at the time the Contractor executes the Contract. The
Contractor shall designate the option desired by checking the appropriate space.
Note 2: Regardless of choice under Section 2 of this form, the Contractor will be required to
provide a warranty/maintenance bond effective at project close out prior to either release of the
performance bond or release of the 10% retainage.
1. The Contractor shall provide 5% retainage, pursuant to RCW 60.28.011(1)(a).
2. The Contractor elects to (select one):
(I) Furnish a performance bond in the amount of the total contract sum. An
executed performance bond on the required form is included with the executed contract
documents.
X (2) Have the City retain, in lieu of the performance and payment bonds, ten
percent (10%) of the total contract amount for a period of thirty days after date of final
acceptance, or until receipt of all necessary releases from the department of revenue and
the department of labor and industries and settlement of any liens filed under chapter 60.28
RCW, whichever is later. RCW 39.08.010.
In choosing option 2, the Contractor agrees that if the Contractor, its heirs, executors,
administrators, successors, or assigns, shall in all things stand to and abide by, and well
and truly keep and perform the covenants, conditions and agreements in the Contract, and
shall faithfully perform all the provisions of such Contract and shall also well and truly
perform and fulfill all the undertakings, covenants, terms, conditions and agreements of
any and all duly authorized modifications of the Contract that may hereafter be made, at
the time and in the manner therein specified, and shall pay all laborers, mechanics,
subcontractors, and materialmen, and all persons who shall supply such person or persons,
or subcontractors, with provisions and supplies for the carrying on of such work, on his or
her part, and shall defend, indemnify, and save harmless the City of Port Orchard,
Washington, its officers and agents from any claim for such payment, then the funds
retained in lieu of a performance bond shall be released at the time provided in said option
2; otherwise, the funds shall be retained until the Co ctor fu Is the said obligations.
Steven Bateman 1 President
Contractor Signature, Dale
Bond No.
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:16 StrectslF_Rcpair&Muintcnancc%PavemcntMarkingslStriping�2022 SlripinglContract1C059-22- Stripe Rite, rnc.doca
Page 19 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
PERFORMANCE AND PAYMENT BOND
CITY OF PORT ORCHARD
2022 CITY OF PORT ORCHARD ROAD STRIPING
CONTRACT NO. C059-22
Bond to City of Port Orchard, Washington
Bond No.
We, , and
(Principal) (Surety)
a Corporation, and as a surety corporation authorized to
become a surety upon Bonds of Contractors with municipal corporations in Washington State, are
jointly and severally bound to the City of Port Orchard, Washington ("Owner"), in the penal sum
of Dollars
($ , the payment of which sum, on demand, we bind ourselves and our
successors, heirs, administrators, executors, or personal representatives, as the case may be. This
Performance Bond is provided to secure the performance of Principal in connection with a contract
dated , 20, between Principal and Owner for a project entitled 2022 City of Port
Orchard Road Striping Contract No. C059-22 ("Contract"). The initial penal sum shall equal 100
percent of the Total Bid Price, including sales tax, as specified in the Proposal submitted by
Principal.
NOW, THEREFORE, this Performance and Payment Bond shall be satisfied and released only
upon the condition that Principal, its heirs, executors, administrators, successors, or assigns:
• Faithfully performs all provisions of the Contract and changes authorized by Owner in the
manner and within the time specified as may be extended under the Contract;
• Pays all laborers, mechanics, subcontractors, lower tier subcontractors, material persons,
and all other persons or agents who supply labor, equipment, or materials to the Project;
• Pays the taxes, increases and penalties incurred on the Project under Titles 50, 51 and 82
RCW on: (A) Projects referred to in RCW 60.28.011(1)(b); and/or (B) Projects for which
the bond is conditioned on the payment of such taxes, increases and penalties; and
• Posts a two-year warranty/maintenance bond to secure the project. Such bond shall be in
the amount of twenty percent (20%) of the project costs.
Provided, further that this bond shall remain in full force and effect until released in writing by the
City at the request of the Surety or Principal.
The surety shall indemnify, defend, and protect the Owner against any claim of direct or indirect
loss resulting from the failure:
• Of the Principal (or any of the employees, subcontractors, or lower tier subcontractors of
the Principal) to faithfully perform the contract, or
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:16_Strcctslf_Rcpair&MainlcnancclPavententMarking&\Striping12022 StripingTonimce C054-22-Stripc Ritc, Inc.doca
Page 20 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
• Of the Principal (or any subcontractor or lower tier subcontractor of the Principal) to pay
all laborers, mechanics, subcontractors, lower tier subcontractors, material person, or any
other person who provides supplies or provisions for carrying out the work.
The liability of Surety shall be limited to the penal sum of this Performance and Payment Bond.
Principle and Surety agree that if the Owner is required to engage the services of an attorney in
connection with enforcement of this bond each shall pay the Owner reasonable attorney's fees,
whether or not suit is commenced, in addition to the penal sum.
No change, extension of time, alteration, or addition to the terms of the Contract or to the Work to
be performed under the Contract shall in any way affect Surety's obligation on the Performance
Bond. Surety hereby waives notice of any change, extension of time, alteration, or addition to the
terms of the Contract or the Work, with the exception that Surety shall be notified if the Contract
time is extended by more than twenty percent (20%).
If any modification or change increases the total amount to be paid under the Contract, Surety's
obligation under this Performance and Payment Bond shall automatically increase in a like
amount. Any such increase shall not exceed twenty-five percent (25%) of the original amount of
the Performance and Payment Bond without the prior written consent of Surety.
This Performance and Payment Bond shall be governed and construed by the laws of the State of
Washington, and venue shall be in Kitsap County, Washington.
IN WITNESS WHEREOF, the parties have executed this instrument in two (2) identical
counterparts this day of , 20
Principal
Signature of Authorized Official
By
Printed Name and Title
Name and address of local office of
Agent and/or Surety Company:
Surety
Signature of Authorized Official
By
Attorney in Fact (Attach Power of Attorney)
Surety companies executing bonds must appear on the current Authorized Insurance List in the
State of Washington per Section 1-02.7 of the Standard Specifications,
City of Port Orchard and Stripe Rite, Inc.
Puhlic Works Project No. PW2022-010
Small Works Contract No. C059-22
U[�6_StreclslF_Rcpoir&Mainlcnancc;PavenienlMorkings\Slriping\2022 StripinglContrsc8C059-22- Stripe Rite, Inc.docx
Page 21 of 30
Rev. 113DR 4-2022
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
ACKNOWLEDGEMENT
Corporation, Partnership, or Individual
STATE OF Washington }
)SS.
COUNTY OF Pierce }
On this 11th day of May , 2022 , before me, the undersigned, a Notary Public in and
for the State of Washington, duly commissioned and sworn, personally
appeared Steven Bateman , to me known to be the (check one of the following boxes):
0 President
corporation,
partnership,
❑ individual,
of —Stripe Rite, Inc. , the
of
the
that executed the foregoing instrument to be the free and voluntary act and deed of said 2
corporation, ❑ partnership, ❑ individual for the uses and purposes therein mentioned, and on
oath stated that ® he ❑ she was authorized to execute said instrument.
WITNESS my hand and official seal hereto affixed the day and year first above written.
ARR0[y�`
q 136
m GBLIG = Y
I !!
0h,� 29_2A`�, '
l tttt; IVASHINAG
Dated: 5/11 /22
Kathryn Arrowood Van Court
Print or type name
NOTARY PUBLIC,
in and for the State of Washington
Residing at: Sumner, Wa.
LNotary Seal with Ink Stamp My Commission expires -
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010
Small Works Contract No. C059-22
U:%6—Strccis,P Repair&Maintenance\PavcmeniMarkings\Striping52022 Striping'ContractW059-22- Stripe Rite, Irtc.do x
Page 22 of 30
10/29/2024
Rev, IBDR 4-2022
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
SURETY ACKNOWLEDGEMENT
STATE OF
)Ss.
COUNTY OF
On this day of , 20 , before me, the undersigned, a Notary Public
in and for the State of Washington, duly commissioned and sworn, personally
appeared to me known to be the
of , the corporation that executed the foregoing instrument,
and acknowledged the said instrument to be the free and voluntary act and deed of said corporation,
for the uses and purposes therein mentioned, and on oath stated that ❑ he ❑ she was authorized
to execute said instrument.
WITNESS my hand and official seal hereto affixed the day and year first above written.
Dated:
Print or type name
NOTARY PUBLIC,
in and for the State of Washington
Residing
at:
Notary Seal with Ink Stamp
My Commission expires:
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-0I0 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:\6_Strects%F_.Repair&Mnintenaace%PavemcnlMarkingslStriping'Q022 StripingTontractlC059-22- Stripe Rite, Inc.docx
Page 23 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
CITY OF PORT ORCHARD
MAINTENANCE/WARRANTY BOND ---WA I V E D
(Note: Before the Performance Bond (or the 10 percent Retainage if selected by Contractor)
can be released, the City must receive the two years Maintenance/Warranty Bond)
PROJECT #, PERMIT PW2022-010
CONTRACT # C059-22
SURETY BOND #:
DATE POSTED:
EXPIRATION
DATE:
RE: Project Name: 2022 City Road Striping
Owner/Developer/Contractor:
Project Address: City of Port Orchard streets
KNOW ALL PERSONS BY THESE PRESENTS: That we,
(hereinafter called the "Principal"), and , a corporation organized under
the laws of the State of , and authorized to transact surety business in
the State of Washington (hereinafter called the "Surety"), are held and firmly bound unto the City of
Port Orchard, Washington, in the sum of
dollars ($ ) 20% Total Contract Amount, lawful money of the United States of America,
for the payment of which sum we and each of us bind ourselves, our heirs, executors, administrators,
successors and assigns, jointly and severally, by these presents. THE CONDITIONS of the above
obligation are such that:
WHEREAS, the above named Principal has constructed and installed certain improvements
on public property in connection with a project as described above within the City of Port Orchard;
and
WHEREAS, the Principal is required to post a bond for the twenty-four (24) months following
written and final acceptance of the project in order to provide security for the obligation of the
Principal to repair and/or replace said improvements against defects in workmanship, materials or
installation during the twenty-four (24) months after written and final approval/acceptance of the
same by the City;
NOW, THEREFORE, this Maintenance Bond has been secured and is hereby submitted to
the City. It is understood and agreed that this obligation shall continue in effect until released in
writing by the City, but only after the Principal has performed and satisfied the following conditions:
A. The work or improvements installed by the Principal and subject to the terms and conditions
of this Bond are as follows: (insert complete description of work here)
City of'Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:16-Streets\F_Rcpair&Maintenance)PovemcntMorkingsStriping12022 Slriping"ContmaT059.22- Stripe Rite. Inc docx
Page 24 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
B. The Principal and Surety agree that the work and improvements installed in the above -
referenced project shall remain free from defects in material, workmanship and installation (or, in the
case of landscaping, shall survive,) for a period of twenty-four (24) months after written and final
acceptance of the same and approval by the City. Maintenance is defined as acts carried out to prevent
a decline, lapse or cessation of the state of the project or improvements as accepted by the City during
the twenty-four (24) month period after final and written acceptance, and includes, but is not limited
to, repair or replacement of defective workmanship, materials or installations.
C. The Principal shall, at its sole cost and expense, carefully replace and/or repair any damage
or defects in workmanship, materials or installation to the City -owned real property on which
improvements have been installed, and shall leave the same in as good condition as it was before
commencement of the work.
D. The Principal and the Surety agree that in the event any of the improvements or restoration
work installed or completed by the Principal as described herein, fail to remain free from defects in
materials, workmanship or installation (or in the case of landscaping, fail to survive), for a period of
twentyy- (24) months from the date of approval/acceptance of the work by the City, the Principal
shall repair and/replace the same within ten (10) days of demand by the City, and if the Principal
should fail to do so, then the Surety shall:
Within twenty (20) days of demand of the City, make written commitment to the
City that it will either:
a). remedy the default itself with reasonable diligence pursuant to a time schedule
acceptable to the City; or
b). tender to the City within an additional ten (10) days the amount necessary, as
determined by the City, for the City to remedy the default, up to the total bond
amount.
Upon completion of the Surety's duties under either of the options above, the Surety
shall then have fulfilled its obligations under this bond. If the Surety elects to fulfill
its obligation pursuant to the requirements of subsection 1)(1)(b), the City shall notify
the Surety of the actual cost of the remedy, upon completion of the remedy. The City
shall return, without interest, any overpayment made by the Surety, and the Surety
shall pay to the City any actual costs which exceeded the City estimate, limited to the
bond amount.
2. In the event the Principal fails to make repairs or provide maintenance within the time
period requested by the City, then the City, its employees and agents shall have the
right at the City's sole election to enter onto said property described above for the
purpose of repairing or maintaining the improvements. This provision shall not be
construed as creating an obligation on the part of the City or its representatives to
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No, PW2022-010 Rev. [BDR 4-2022
Small Works Contract No. C059-22
Ur,6_Stn lslF_Rcpair&Maintcnancd,PavcmcnlMorkings\Slriping'�2022 StripinglContmct1C059-22- Siripc Rilc, Inc.doca
Page 25 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
repair or maintain such improvements.
E. Corrections. Any corrections required by the City shall be commenced within ten (l 0) days
of notification by the City and completed within thirty (30) days of the date of notification. If
the work is not performed in a timely manner, the City shall have the right, without recourse
to legal action, to take such action under this bond as described in Section D above.
F. Extensions and Changes. No change, extension of time, alteration or addition to the work to
be performed by the Principal shall affect the obligation of the Principal or Surety on this
bond, unless the City specifically agrees, in writing, to such alteration, addition, extension or
change. The Surety waives notice of any such change, extension, alteration or addition
thereunder.
G. Enforcement. It is specifically agreed by and between the parties that in the event any legal
action must be taken to enforce the provisions of this bond or to collect said bond, the
prevailing party shall be entitled to collect its costs and reasonable attorney fees as a part of
the reasonable costs of securing the obligation hereunder. In the event of settlement or
resolution of these issues prior to the filing of any suit, the actual costs incurred by the City,
including reasonable attorney fees, shall be considered a part of the obligation hereunder
secured. Said costs and reasonable legal fees shall be recoverable by the prevailing party, not
only from the proceeds of this bond, but also over and above said bond as a part of any
recovery (including recovery on the bond) in any judicial proceeding. The Surety hereby
agrees that this bond shall be governed by the laws of the State of Washington. Venue of any
litigation arising out of this bond shall be in Kitsap County Superior Court.
H. Bond Expiration. This bond shall remain in full force and effect until the obligations secured
hereby have been fully performed and until released in writing by the City at the request of
the Surety or Principal.
DATED this day of , 20 .
SURETY COMPANY DEVELOPER/OWNER
(Signature must be notarized) (Signature must be notarized)
By:
Its
Business Name:
Business Address:
City/State/Zip Code:
Telephone Number:
CITY OF PORT ORCHARD
By
Its
Business Name:
Business Address:
City/State/Zip Code:
Telephone Number:
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010
Small Works Contract No. C059-22
U;%-Sheets\F_Rcpair&MaintcnencclpnvenrcntMarhings?Striping12022 Striping%Comrect10059-22- Stripe Rite, Inc.docx
Page 26 of 30
Rev. IBDR 4-2022
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
LVA
Its Public Works Director/City Engineer
FORM P-1 / NOTARY
BLOCK
Date:,
CHECK FOR ATTACHED NOTARY SIGNATURE
Individual (Form P-!)
Corporation (Form P-2)
Surety Company (Form P-2)
(Use For Individual/Sole Proprietor Only)
STATE OF WASHINGTON )
) ss.
COUNTY OF KITSAP )
I certify that I know or have satisfactory evidence that is the person
who appeared before me, and said person acknowledged that (he/she) signed this instrument, and
acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the
instrument.
Dated:
(print or type name)
NOTARY PUBLIC in and for the
State of Washington, residing
at:
My Commission expires:
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010
Small Works Contract No. C059-22
U:%6_SvectslF,_Repair&Maintcnancc%PavcmentMarkingslStriping\2022 Striping%ConlractT059-22• Stripe Rite. lne.docx
Page 27 of 30
Rev. [BDR 4-2022
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
FORM P-2 / NOTARY BLOCK
(Use For Partnership or Corporation Only)
(Developer/Owner)
STATE OF WASHINGTON }
ss.
COUNTY OF )
I certify that I know or have satisfactory evidence that is the person
who appeared before me, and said person acknowledged as the
of that (he/she)
signed this instrument, on oath stated that (he/she) was authorized to execute the instrument and
acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the
instrument.
Dated:
(print or type name)
NOTARY PUBLIC in and for the
State of Washington, residing
at:
My Commission expires:
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U;16—StreelsiF_Rcpair&MaintenanceipavcmentMarkiggsiSlriping',2022 Striping,Conlm &C059-22-Stripc Rile. Inc.decx
Page 28 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
(Surety Company)
STATE OF WASHINGTON )
} ss.
COUNTY OF )
I certify that I know or have satisfactory evidence that is the person
who appeared before me, and said person acknowledged as the
of that (he/she)
signed this instrument, on oath stated that (he/she) was authorized to execute the instrument and
acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the
instrument.
Dated:
(print or type name)
NOTARY PUBLIC in and for the
State of Washington, residing
at:
My Commission expires:
City of Port Orchard and Stripe Rite, Inc
Public Works Project No. PW2022-010 Rev. IBDR 4-2022
Small Works Contract No. C059-22
U:\4_SlrcetslP_Rcpair&MainlcnanccSPavctncntMarkingsStriping12022 SlripinglConl acl1C059-22- Stripe Rile. Inc,tlocn
Page 29 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
APPENDIX A
During the performance of this Agreement, the Contractor, for itself, its assignees, and successors
in interest agrees to comply with the following non-discrimination statutes and authorities;
including but not limited to the following Pertinent Non -Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 C.F.R. Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970,
(42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has
been acquired because of Federal or Federal -aid programs and projects);
• Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on
the basis of sex);
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended,
(prohibits discrimination on the basis of disability); and 49 C.F.R. Part 27;
• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits
discrimination on the basis of age),
• Airport and Airway Improvement Act of 1982, (49 USC§ 471, Section 4 7123), as
amended, (prohibits discrimination based on race, creed, color, national origin, or sex);
• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage
and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act
of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of
the terms "programs or activities" to include all of the programs or activities of the Federal -
aid recipients, sub- recipients and contractors, whether such programs or activities are
Federally funded or not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on
the basis of disability in the operation of public entities, public and private transportation
systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-
12189) as implemented by Department of Transportation regulations at 49 C.P.R. parts 37
and 38,
• The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123)
(prohibits discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low -Income Populations, which ensures discrimination against minority
populations by discouraging programs, policies, and activities with disproportionately high
and adverse human health or environmental effects on minority and low-income
populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English
Proficiency, and resulting agency guidance, national origin discrimination includes
discrimination because of limited English proficiency (LEP). To ensure compliance with
Title VI, you must take reasonable steps to -ensure that LEP persons have meaningful
access to your programs (70 Fed. Reg. at 74087 to 74100);
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from
discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).
City of Port Orchard and Stripe Rite, Inc.
Public Works Project No. PW2022-010 Rev. [BDR 4-2022
Small Works Contract No. C059-22
U:16_Streets\F_Rcpair&MaintenancelPavcntenlMarkingslStriping52022 StripinglCamrae6C059-22- Siripc Rite, Inc.docx
Page 30 of 30
DocuSign Envelope ID: 8AE2F64A-82BE-4209-A46D-6862312A2F66
SCHEDULE OF CONTRACT PRICES
2022 CITY OF PORT ORCHARD ROAD STRIPING
NOTE: If a discrepancy between the numerical unit price and the written (words) unit price is found, the written
(words) unit price shall control.
Item # Description of Work
Estimated
Unit
Unit Bid Price
Total Item#t
Quantity
Amount
1 Mobilization
1
LS
1,500.00
1,500.00
2 SPCC Plan
1
LS
888.00
$88.00
3 Temporary Traffic Control
1
LS
3,450.00
3,450.00
4 4" Skip Stripe- White
24,847
LF
0.09
2,236.23
5 4" Road Edge- White
170,5 22
LF
0.14
23,875.88
6 8" Road Edge- White
31,843
LF
0.19
6,050.17
7 8" Turn Pocket- White
11,150
LF
0.19
2,118.50
8 4" Skip Stripe- Yellow
16,884
LF
0.09
1,519.56
9 4" Double Solid- Yellow
118,598
LF
0.15
17,789,70
10 4" Skip/Single Solid- Yellow
39,338
LF
0.14
5,507.32
11 Minor Change
5,000
LS
$1.00
$5,000.00
�]
Total
Bid:
$ 69,935.36
SALES TAX
In accordance with Section 1-07.2(1) and DOR Rule 171, State Sales Tax: Work performed on City, County, or
Federally -owned land, the Contractor shall include Washington State retail sales taxes IN the various unit bid prices or
other amounts. These retail sales taxes shall include those the Contractor pays on purchases of materials, equipment,
and supplies used or consumed in doing the work.