Loading...
045-10 - City of Bremerton - ContractReturn Address: City Clerk City of Bremerton 345 Sixth Street, Suite 600 Bremerton, WA 98337 AUDITORIRECORDER'S INDEXING FORM Document Tlae(s): I. Water Reservoir Easement Reference Numbers) of Documents assigned or released: N/A I Grantor(s): 1. City of Port Orchard [J Additional names on page of document. Grantee(s): 1, The City of Bremerton Additional names on page _ of document Legal Description: Portion of the NE '/,, NE ''A of Sec. 7 and N W '/. , N W '/. of Sec 8, all of T. 23N., RA E., (abbreviated) W,M, situate in Kitsap County, WA. ❑ Additional legal is on page 4 of document. Assessor's Property Tax Parcel/Account Number: 072301-1-006-2003 and 082301-2-001-2005 ! Project Name: Future W-580 Zone Reservoirs WATER RESERVOIR EASEMENT (Corporate) THIS INSTRUMENT made this 1 l day of Ar� Earl , 206)o , by and between CITY OF PORT' ORCHARD (hereinafter "Grantor") and the CITY OF BREMERTON, a Washington municipal corporation of Kitsap County, State of Washington (hereinafter "Grantee"). WITNESSETH that Grantor for and in consideration of mutual benefits derived and/or other valuable consideration, receipt of which is hereby acknowledged by Grantor, do by these presents grant, bargain, sell, convey, and confirm forever unto Grantee, its successors and/or assigns, a utility easement for water reservoirs, sewer, water, stormwater and/or other municipal utilities, with necessary appurtenances, over, through, actress and upon the following described property situated in Kitsap County, Washington, more particularly described as follows: WATER RESERVOIR EASEMENT (Corporate) - Page 1 of 4 SEE EXHIBIT "A" ATTACHED Grantee shall have the right, without prior institution of suit or proceeding at law, at times as may be necessary, to enter upon the above -referenced property and immediately adjacent incidental areas with the necessary equipment for the purposes of altering, installing, operating, maintaining, extending, constructing, repairing, and reconstructing the utility/utilities, or making connections to that system; provided, however, that the private improvements existing within this easement area and the immediately adjacent incidental areas shall not be disturbed or destroyed, or in the event they are disturbed or destroyed, they will be replaced in as good a condition as they were immediately before the properties were entered upon by the Grantee. Grantor shall retain the right to access the surface of this easement, including the immediately adjacent incidental areas, so long as that access is not inconsistent with and does not interfere with the rights and uses granted to Grantee in this document. Under no circumstances shall Grantor place any cement, concrete, structure, trees, large shrubs or any other objects on the property described in this easement or the immediately adjacent incidental areas in a manner that would interfere with Grantee's use of the easement. This easement shall be a covenant running with the land, and shall bind Grantor's successors and assigns and all future owners of the real property affected by this easement. By:� Its:_ DATE: (Now), AcknmrleAgeiem Appears on Next Page) WATER RESERVOIR EASEMENT (Corporate) - Page 2 of 4 STATE OF WASHINGTON ) ) ss. COUNTY OF KITSAP ) On this _H day of _ 20fo , before me a Notary Public in and for the State of Washington, ersonal y appeared )-�C Ty CbD6iO)a to me known to be the C1 VZor of the City of Port Orchard, a municipality that executed the foregoing n, strument, and acknowledged it to be the free and voluntary act and deed of the municipality, for the uses and purposes mentioned in this instrument, and on oath stated that he/she/they was/were authorized to execute said instrument. -Notmy Seal Musl Appear Within This //B". IN WITNESS WHEREOF,1 I)aye hereunt het my Ijand and official seal the day and year first above written. / I /I I r NOTARY PUBLIC, in and of Washington, residing at, My appointment expires _ APPROVED AS TO FORM: *y�AA A. LUBO2V[CH Citttorney R:\LEGAL\Forms\Eascnwats\Ulilily Easement Form (Corpornte).doc WATER RESERVOIR EASEMENT (Corporate) • Page 3 of 4 EXHIBIT "A" That portion of the northeast quarter of the northeast quarter of Section 7 and the northwest quarter of the northwest quarter of Section 8, all of Township 23 North, Range 1 East, Willamette Meridian, situate in Kitsap County, Washington more particularly described as: Beginning at the northeast corner of said Section 7, also being the northwest corner of said Section 8; thence southerly along the section line S 1 55'45"W 476.35 feet to the True Point of Beginning; thence leaving said section line S 45 10' 12" W 18.79 feet; thence parallel with the north line of the south half of the north half of the said northeast quarter of the northeast quarter, N 87 37'09" W 137.13 feet; thence N 1 55'45" E 160.01 feet to the said north line of the south half of the north half; thence N 87 37'09" W 250.01 feet along said north line; thence leaving said north line, S 1 55'45" W 190.01 feet; thence S 87 37'09" E 400.01 feet to the said section line; thence N 45 10' 12" E 138.32 feet; thence S 47 08'23" E 140.10 feet to the northerly right of way margin of Old Clifton Road; thence along said northerly right of way, N 42 5l'37" E 35.00 feet; thence leaving said northerly right of way, N 47 08'23" W 168.71 feet; thence S 45 10' l2" W 140.24 feet to the True Point of Beginning. WATER RESERVOIR EASEMENT (Corporate) - Page 4 of 4 z z Li w w 0 Q U $ J N F [IfN/n2 .......... r L Ld a?` W O � �����• •�aq �.,, Oaf '.. n/ �o" w Q � 3rzp J z N I \ O Fn W 3 W GM ^^ \\1J '' L. XZA N LS'8Sl \ z W s" 3,40,9S.lON i" 0 . M � N ry 3 w vm' YIS Z O I ' 1 N /WN� O O i 2 Q 2 J I_L_ m i O no U ^ g LI Z i O yy o LL li; 9L'99L h o M,46,LS.lOS (If O Os IL n 0o r � U �j U DATE SUBMITTED: March 3, 2010 AGENDA BILL CITY OF BREMERTON CITY COUNCIL ...................................................................................... a. SUBJECT: Acceptance of Easement for Committee Meeting Date: March 10, 2010 W580 Zone Reservoir from the City of Port COUNCIL MEETING Date: March 17, 2010 Orchard. Department: PW&U Engineering Presenter: Michael Mecham Phone: 473-5288 SUMMARY: Several years ago, the City of Bremerton and the City of Port Orchard entered into an agreement for joint water use in the Anderson Hill and McCormick Woods area. The intent of the agreement was as development occurs in that area both water systems would become independent, but until that time it was felt that it was prudent to have a joint use agreement. As part of that agreement, the City of Port Orchard was to give the City of Bremerton an easement to construct a 580 pressure zone reservoir. This agenda bill is to accept the conveyance of an easement to build a W580 reservoir. Although the construction of the new W580 reservoir will not happen for a few years, it sets the stage for the reservoir to be built. ATTACHMENTS: 1. Council Summary; and 2. Water Reservoir Easement FISCAL IMPACTS (Include Budgeted Amount): None. APPROVALS: DEPARTMENT DIRECTOI CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: COMMITTEE CHAIR COUNCIL PRESIDENT: CONSENT AGENDA GENERAL BUSINESS ❑ PUBLIC HEARING ❑ RECOMMENDED MOTION: Move to approve the Easement for W580 Zone Reservoir and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Q Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action COUNCIL SUMMARY EASEMENT FOR 580 RESERVOIRS Several years ago, the City of Bremerton and the City of Port Orchard entered into an agreement for joint water use in the Anderson Hill and McCormick Woods area. The intent of the agreement was as development occurs in that area both water systems would become independent, but until that time it was felt that it was prudent to have a joint use agreement. As part of that agreement, the City of Port Orchard was to give the City of Bremerton an easement to construct a 580 pressure zone reservoir. This agenda bill is to accept the conveyance of an easement to build a W580 reservoir. Although the construction of the new W580 reservoir will not happen for a few years, it sets the stage for the reservoir to be built. March 2010 Council Summary