006-06 - WSDOT - ContractWashington State
i3Jepartment of Transpup._don M)LON 100211
LoL.t Agency Agreement
Agency City of Port Orchard
Address 216 Prospect Street
Port Orchard, WA 98366
CFDA No. 20.205
(Catalog of Federal Domestic Assistance)
Project No.2E— 01(o(cCOoB�
Agreement No. LA" 616 5
The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the
regulations issued pursuant thereto, (3) Office of Management and Budget Circulars A-102, A-87 and A-133, (4) the policies and procedures
promulgated by the Washington State Department of Transportation, and (5) the federal aid project agreement entered into between the State and
Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on
the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column
3, without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal
Government shall be the responsibility of the Local Agency,
Project Description
Name Bay Street Enhancement
Length approx. one mile
Termini SR 166/Frederick Avenue, Port Orchard
Description of Work
The project consists of the construction of a curb, sidewalk, bike lane (nd guard rail) of at least 6.5 feet In width
along an approximately mile long stretch of Bay Street (from SR166/Frederick Avenue to Arnold Avenue). This sidewalk will facilitate non -motorized
transportation to the downtown city center. As an Identified gateway to downtown, historic Port Orchard, this stretch of Bay Street is greatly In need of
enhancement. These enhancements would correct current serious safety Issues, provide an adequate avenue for non -motorized transportation to the
downtown historical and economic center and also take advantage of the picture -postcard nature featured along beautiful Sinclair Inlet.
Type of Work
Estimate of Funding
Estimated Total
Project Funds
(2)
Estimated Agency
Funds
(3>
Estimated
Federal Funds
PE a.Agency
295,000.00
295,000.00
100 % b.Other
c. Other
Federal Ald d. State
Parkolpatlon
5,000.00
5,000.00
Rego for PE .e. Total PE Cost Estimate a+b+c+d
300,000.00
300,000.00
Right of Way f, Agency
Other
It. Other
Federal Ald i. State
Participation
Ratio for RW 1. Total R1W Cost Estimate f+ +h+I
Construction k. Contract
(.Other
m. Other
n. Other
% o. Agency
Federal Ald P. State
Participation
Ratio for CN a. Total CN Cost Estimate k+l+m+n+o+
r. Total Project Cost Estimate (e+j+q)
300 000.00
300 000.00
Agency Official
By rn f . ./tW
Title M/ay 0-r 7 L
DOT Form 140-039 EF
Revised 0112004
Washington Stet Department of Transportation
_ J
By
Assistant Secretary for Highways and Local Programs
Date Executed
JUL 2 7 2006