Loading...
086-20 - Bremerton Backflow Services - Contract Amendment 2CITY OF PORT ORCHARD Public Works Director 216 Prospect Street, Port Orchard, WA 98366 Voice: (36o) 876-4991 • Fax: (36o) 876-4980 mdorsey@cityofportorchard.us www.cityofportorchard.us August 3, 2022 Bremerton Backflow Services Attn: Jeff Mihulka PO Box 3071 Bremerton, WA 98310 RE: City -owned Backflow Device Testing Dear Jeff, Pursuant to Terms and Conditions Section IC of the Purchased Services Agreement No. 086-20 (2020 Contract), please be advised that the City wishes to extend the duration of said Contract to September 30, 2023. As mutual agreement is required to extend the contract duration pursuant to the current rates established within Exhibit A, please affirm your concurrence by signing below. Also, per Section 12 of the contract, please submit a current copy of the Certificate of Liability insurance with endorsements that show the City listed as additional insured. Should you have any additional questions regarding this matter, please do not hesitate to contact me at my office using the number above. Sincerely, K/hi Interim Public Works Director/City Engineer CC: Brandy Rinearson — File i Ali& U '� T o Date U:\kYVoter Utiity\E Inspeciion&Testing\Cross Connectian Program\Cross Connection Testing City Owned\2021\Coniraci\Extension_2021 Bremerton Backfiow_C086-20.doc CITY OF PORT ORCHARD Authorization for Amendment No. 2 Date: 8/3/2022 Contractor: Bremerton Backflow Services Project: PW2020-017 PO Box 3071 Contract / Job # C086-20 Bremerton, WA 98310 Pursuant to the Terms and Conditions of Section 1C of the Purchased Service Agreement C086-20, the city wishes to extend the termination date of C086-20 to September 30, 2023, to retain the services of the contractor for an additional year at the rates established in the Exhibit A of the original contract. The contract dollars will be increased for work done through September 30, 2023, by $1878.24. Contract History _ Amount Sales Tax Total Date A vd b Original Contract $1,720.00 $154.80 $1,874.80 10-Nov-20 Mayor Amendment 1 $1,720.00 $154.80 $1,874.80 02-Sep-21 PW Director Amendment 2 $1,720.00 $158.24 $1,878.24 03-Aug-22 Interim PW Director I L otal Contract $5,160.00 $467.84 $5,627.84 I have reviewed the Am costs are true -and acorfr, ctor Approval Signature Ot information above and certify that to the best of my knowledge descriptions and lnte6rr0q6lirWorks Director/City Engineer - W K. Chris Hammer, PE, PMP Printed Name & Title Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date SCHEDULE OF COfi1'II`RACC`Ii` PRICES CITY -OWNED BACKFLOW DEVICE TESTING If a discrepancy between the numerical unit price and the written (words) unit price is found, the written (words) unit price shall control. Item Estimated No. Quantity Description of Item Unit Price Amount TESTING 3. 1 EA. Testing per device $ $ —ly' COST PER DEVNCCIEa 'i (?TriL Br111' CiR 6 iEV"S SUB -TOTAL BID (COST PER DEVICE X 43 DEVIICCIES)e 9% SALES TAX O1\\J SUB -TOTAL BID: TOTAL BID FOR TESTING ING 43 DEVICES: $ � � � � �� SALES TAX In accordance with Section 1-07.2(2) State Sales Tax: The Contractor shall collect from the Contracting Agency retail sales tax on the full contract price.