Loading...
011-05 - WSDOT - Supplement / Change Order 4Aft Washington State Depart rent of Transportation Local Agency Agreement Supplement Agency Supplement Number Port Orchard 4 Federal Aid Project Number Agreement Number CFDA No. 20.205 STPUS - 6610 004 LA 5855 (Catalon of Federal Domestic Assistance The Local Agency desires to supplement the agreement entered into and executed on February 28, 2005 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name Tremont Street Widening Length 0.65 miles Termini Port Orchard Boulevard to SR 16 Description of Work ® No Change Reason for Supplement Obligate funding. Does this change require additional Right of Way or Easements? ❑ Yes ® No Type of Work yp Estimate of Funding (1) Previous A reement/Su i. (2) Supplement (3) Estimated Total Project Funds (4) Estimated Agency Funds (5) Estimated Federal Funds PE a.Agengy 86.5 % b.Other Consultant 3,000.00 3,000.00 405.00 2,595.00 677,000.00 677,000.00 91,395.00 585,605.00 c. Other Federal Aid d. State Participation Ratio for PE e. Total PE Cost Estimate a+b+c+d 2,000.00 2,000.00 270.00 1,730.00 18,000.00 18,000.00 2,430.00 15,570.00 700 000.00 700,000.00 94,500.00 605,500.00 Right of Way f. AgencyAgengy 1,070,161.00 1,475,462.00 2.545.623.00 343,659.00 2,201,964.00 86.5 %Other50 000.00 50 000.00 6 750.00 43 250.00 Federal Aid h. Other Participation Ratio for RW i. State '. Total RM Cost Estimate f+ +h+i 10 000.00 10 000.00 20 000.00 2,700.00 17 300.00 Construction k. Contract I. Other m. Other n. Other % o. A enc Federal Aid Participation P. State Ratio for CN q. Total CN Cost Estimate k-i+m+n r. Total Pro ect Cost Estimate e The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the Federal fods obligated, rt epts and will comply with the applicable provisions. Agency Official Washington State Department of Transportation By Title By Director of Highways and Local Programs Date Executed DOT Form 140-041 EA T T E S T Revised 1/2007 , FatyiEfaar�. KIIi'kpatric City of Port C ''Yhard Public Works Department 216 Prospect Street, Port Orchard, WA 98366 Voice: (36o) 876-4991 • Fax: (36o)876-4980 Y y aarcher(@ciWobortorchard.us www cityofportorchard.us TO: Mr. Mark Brooks WSDOT Highways and Local Programs Olympic Region 5720 Capitol Blvd. SE Tumwater, WA 98501-6703 WE ARE SENDING YOU DATE: August 17, 2009 JOB NO.: RE: Tremont Street Widening STPUS-6610(004) ❑ Drawings ❑ Plans ❑ Samples ■ Other LA Agreement Supplement ❑ Copy of Letter ❑ Revised Plans ❑ Specifications COPIES JDATE NO. DESCRIPTION 2 08/11/09 Original Signed LA Agreement Supplement Number 4 THESE ARE TRANSMITTED AS CHECKED BELOW: 0 For Approval ❑Approved as submitted ❑ For your use ❑ As requested ❑ For review and comment ❑ Approved as noted ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Returned for corrections ❑ Return corrected prints REMARKS Please forward the two originals to headquarters for approval and return one original to me when complete. Thanks. COPY TO SIGNED Andrea Archer, P. ., Assistant City Engineer