Loading...
053-22 - Stripe Rite, Inc. - Supplement / Change Order 1CITY OF PORT ORCHARD Authorization for Change Order No. 1 Date: September 12,2022 2022 Thermoplastic Project: Application Contract / lob # C053-22/PW2022-009 Contractor: Stripe Rite, Inc 1813137" Ave E Sumner WA 98390 Description of reason for Change Order: This Change Order authorizes a time extension only change to Contract C053-22 due to a missed item from Schedule B that was not completed. The "Yield" message was not removed and recentered on S. Kitsap Blvd as indicated on Exhibit B. The extension to complete the work shall be extended to October 14, 2022 Contrad History v, lirih n*_ Sales Tax Total Oaie Original Contract $63,165.00 NA $63,165.00 14-Jun-22 Council Amendment #1 $0.00 $0.00 $0.00 12-Se -22 interim PW Director Total Contract $63,165.00 $0.00 $63,165.00 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accu te. Contractor Approval Signature Steve Bateman, President Printed Name & Title Int im Ic Works Director/City Engineer K. Chris Hammer, P.E., PMP Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date