091-22 - K & K Construction, LLC - Contract Amendment 2CITY OF PORT ORCHARD Authorization for Change Order No. 2 Date: October 31, 2022 DCD Building Repairs South Project: Face Contract / Job # C091-22, PW2022-016 THIS CHANGE ORDER AUTHORIZES (add description). Consultant: K&K Construction, LLC 6696 Richards Ave SE Port Orchard, WA 98367 Additional Work- To prep and paint the metal chimney cap located at the north face of the building. Paint to match existing color. See attached Cost Estimate Sheet for breakdown. Contract History Amount Sales Tax Total Date Appvd b Original Contract $21,685.00 $1,995.02 $23,680.02 09-Aug-22 Council Amendment #1 $0.00 $0.00 $0.00 22-Sep-22 Interim Public Works Director Change Order 2 $500.00 $46.00 $546.00 31-Oct-22 PW Director I i i i i Total Contract $22,185.00 $2,041.02 $24,226.02 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Y)a;1100bees 4 Contractor Approval Signature Public Works Director Daniel Roberts Owner operator "fit z440 Printed Name & Title Printed NarKe Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date U:\4—Facilities\C._DCD Building(720_Prospect)\2022\DCD Building Repairs South Face\1.0 Financial Administration\1.6 Change Orders\Change Order No. 2\C091-22- CO 2 K&K Const.doc Page 1 DCD Building South Face Building Repairs Cost Est. (Paint Metal Chimney Cap/Flashing) Prep masking/protection 1 day, 1 hour $75 Prime 1 day, 1 hour $75 Finish Coat 2 day, 1.5 hour $113 Paint, Masking, Clean Up (Materials) $125 Total $388 Overhead and Profit 30% $503.8 Total w/ Markup $503.8 Sales Tax (9.2%) On Materials $35.65 Total w/ WSST $539.40