024-22 - Sascon, LLC - Supplement / Change Order 4DocuSign Envelope ID: D7D94FAA-5335-4B8C-875B-79B4A2525393 CITY OF PORT ORCHARD I Authorization for Change Order No. 4 Date: 1/3/2023 Lippert Dr. Pavement Repair Project: and Sidewalk Retrofit Contract / Job # CO24-22 Contractor: Sascon, LLC 20211 SE 210th St. Maple Valley, WA 98038 THIS CHANGE ORDER AUTHORIZES (add description). Additional work for Bid Items: A-9 (HMA Cl. 1/2 in PG58-22) FOR added additional area south of Becky Ave. and Lippert Dr. (see PV2 on the drawings). Elevations of curb and gutter set high on the east half of Lippert to reduce roadway %, existing road was S-6% slope from center line to flow line. A-10 (Planing Bitumous Pavement) Additional at Pottery Ave and Sidney Ave and irregularities in the existing asphalt at 128 W. Lippert Dr. Credit for Bid Items: A-12 (Extra Excavation and Backfill) subgrade was structurally acceptable in full depth milled areas. A- 2 (Minor Changes). See attached Cost Summary Sheet for break down. Contract History Amount Sales Tax Total Date Appvd b Original Contract $557,313.00 $0.00 $557,313.00 24-Ma -22 Council Change Order 1 $0.00 $0.00 $0.00 03-Oct-22 PW Director Change Order 2 $0.00 $0.00 $0.00 31-Oct-22 PW Director Change Order 3 $42,388.20 $0.00 $42,388.20 22-Nov-22 PW Director Change Order 4 1 $13,342.801 $0.001 $13,342.80 03-Jan-23 Ma -- Total Contract $613,044.00 $0.00 $613,044.00 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. a"AZ�� 3:2-d- Contractor Approval Signature Derrick Sas - Owner Printed Name & Title i L Public Works Director hY 1.19/1C; Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. FDocuSigned by: b �IMGIaA..IA,SIA.U. E'31'38ztT ... Mayor FDocuSigned by: � uJamt, City C'I'e'r` N/A Council Approval Date ll:\3_Capital Improvement Program\B_AcliveProjecls\Street\LippertPavementRepair&SidewalkRelrofil\1.0 Financial Administration\1.6 Change Orders\Change Order No. 4\Change Order No. 4.doc Page 1 DocuSign Envelope ID: D7D94FAA-5335-4B8C-875B-79B4A2525393 Cost Summary Sheet Chance Order 84 Additional ITEM NO. ITEM DESCRIPTION EST. CITY UNITS UNIT PRICE BID AMOUNT A-7 Roadway Ex.. Incl. Haul 220 CY 115.00 $ 25,300.00 A-8 Crushed Surfacing Top Course 140 TN 45.00 $ 6,300.00 A-9 HMA CI. 1/2 In. PG58-22 700 TN 145.00 $ 101,500.00 A-10 Planing Bitumous Pavements 1,390 SY 12.00 $ 16,680.00 B-4 Removing Cement Conc. Sidewalk 470 SY 18.00 $ 8,460.00 B-8 Crushed Surfacing Top Course 30 TN 57.00 $ 1,710.00 B-17 Cement Conc. Pedestrian Curb 145 SY 43.00 $ 6,235.00 B-18 Cement Conc. Traffic Curb and Gutter 1,500 LF 40.00 $ 60,000.00 B-20 Cement Conc. Rolled Curb and Gutter 20 LF 60.00 $ 1,200.00 B-24 Cement Conc. Driveway Enterance Type 2 40 1 Y 99.00 $ 3,960.00 B-27 Cement Conc. Sidewalk 575 SY 82.00 $ 47,150.00 B-28 Cement Conc. Bus Pad 61 SY 217.00 $ 1,302.00 FA Work Force Account Work- Redesigned Storm Line 0 Bid Total $ 279,797.00 Credit ITEM NO. ITEM DESCRIPTION EST. CITY UNITS UNIT PRICE BID AMOUNT A-2 Minor Changes 1 CALC 30,000.00 $ 10,000.00 A-12 Extra Excavtion and Backfll 1 FA 15,000.00 $ 15,000.00 B-6 Structural Excavation 180 CY 35.00 $ 6,300.00 B-7 Shoring Extra Excavation 1,330 SF 2.00 $ 2,660.00 B-10 I HDPE Pipe 12" 280 LF 95.00 $ 26,600.00 B-12 Catch Basin Type 1 3 1 EA 1,600.00 $ 4,800.00 B-14 Gravel Backfll for Pipe Zone Bedding 80 CY 30.00 $ 2,400.00 B-21 Cement Conc. Transition Curbs 10 LF 80.00 $ 800.00 B-22 Cement Conc. Driveway Enterance Type B 40 SY 99.00 $ 3,960.00 B-23 Cement Conc. Driveway Enterance Type 1 130 SY 99.00 $ 12,870.00 Bid Total $ 85,390.00 Total Contract $ 613,044.00 $ 6,900.00 $ 2,038.05 $ 29,788.80 $ 4,020.00 $ 540.00 $ 15,368.91 $ 3,010.00 $ 2,200.00 $ 690.00 $ 49.50 $ 3,450.56 $ 651.00 $ 18,903.16 87,609.98 Additional Total 1 $ 87,609.98 $5,466.00 $15,000.00 $313.88 $3,135.00 $1,600.00 $2,400.00 $31,135.58 $320.00 $722.70 $2,178.00 Credit Total I $31,878.98 Difference $ 55,731.00