Loading...
022-21 - WSDOT - Contract Local Agency AgreementWashington State T! Department of Transportation Agency City of Port Orchard Address Attn. K. Chris Hammer, PE - Assistant City Engineer 216 Prospect Street Port Orchard, WA 98366 Local Agency Agreement CFDA No. 20.205 (Catalog or Federal Domestic Assistance) Project No. Agreement No. For OSC WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) 2 CFR Part 180 — certifying that the local agency is not excluded from receiving Federal funds by a Federal suspension or debarment, (5) the policies and procedures promulgated by the Washington State Department of Transportation, and (6) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name City-wide Street Lighting Study Termini City limits Description of Work Length N/A The project includes, lighting level data, validate and amend data, develop GIS model for analysis and study, and develop a report to identify and prioritize improvements to address deficiencies. Project Agreement End Date September 30, 2021 Proposed Advertisement Date N/A Claiming Indirect Cost Rate ✓ Yes [:]No Estimate of Funding (2) (3) Type of Work tj Estimated Total Estimated Agency Estimated Federal Project Funds Funds Funds PE a�Agency 10,000.00 0.00 10,000.00 b. Other Consultant 40,000.00 0.00 40,000.00 Federal Aid c Other 0.00 5,000.00 IParticipation AState 5,000.00 (Ratio for PE e. Total PE Cost Estimate a+b+c«d 55,000.00 0.00 55,000.00 Right of Way f. Agency % g. Other Federal Aid h Other Participation Ratio for RW i•-State 0.00 0.00 0.00 '. TotaLRM Cost Estimate r +h+ Construction k Contract (.Other m._Other (Federal Aid n. 0 ther Participation o.Agency (Ratio for CN p. State 0.00 0.00 g. Total CN Cost Estimate It +m+n+o 0.00 r. Total Project Cost Estimate fe'+Q)55,000.00 0.00 55,000.00 Agency Official By Title Mayor Washington State Department of Transportation By Director, Local Program Date Executed DOT Form 140-039 Page 1 Revised 1212020