Loading...
003-23 - Resolution - Contract with KPFF for Bay St Pedestrian Pathway WestDocuSign Envelope ID: C3943A6B-6979-4 D33-87E3-OAC FOB FEBODD RESOLUTION NO.003-23 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING THE MAYOR TO EXECUTE CONTRACT NO. C010-23 WITH KPFF CONSULTING ENGINEERS FOR ARCHITECTUAL AND ENGINEERING SERVICES FOR THE BAY STREET PEDESTRIAN PATHWAY WEST — SITUATIONAL STUDY AND DOCUMENTING PROCUREMENT PROCEDURES. WHEREAS, On May 10, 2022, the Port Orchard City Council approved Contract C044-22 (WSDOT- LA 10296) accepting a grant from Washington State Department of Transportation; and WHEREAS the funding is part of the Transportation Improvement Program for the 2019- 2022 Federal Funding Cycle and was awarded to the City for the Bay Street Pathway West — Situational Study (the "Project"); and WHEREAS, the City has identified a need for professional architecture and engineering services with expertise in Civil Engineering, Structural Engineering, Coastal Engineering, Geotechnical Engineering, Landscape Architecture, and Environmental Permitting for the "Project"; and WHEREAS, on August 26, 2022, and September 2, 2022, the City of Port Orchard Public Works Department advertised a Request for Qualifications (RFQ) for Architectural and Engineering Services for the Bay Street Pathway West — Situational Study, and by the September 16, 2022, deadline, the Public Works Department received one (1) Statement of Qualifications (SOQ) from a qualified firm.; and WHEREAS, after reviewing the SOQ received, and based upon the overall qualifications of the submitting firm, the Public Works Department determined KPFF Consulting Engineers met the requirements and criteria as described in the RFQ and was a responsible and responsive consultant to provide the Architectural and Engineering services for the Project.; and WHEREAS, on January 4, 2023, Public Works Staff met with KPFF Consulting Engineers to discuss, clarify, and develop the project understanding and the associated contract terms; and WHEREAS, on January 11, 2023, the City received a defined scope of work, budget, and fees from KPFF Consulting Engineers; and WHEREAS, the Port Orchard City Council believes KPFF Consulting Engineers to be a highly qualified consulting firm for this Project; and WHEREAS, the Port Orchard City Council, at the 2015 recommendation of the State Auditor's Office, wishes to document their consultant selection process as described above for this particular contract by Resolution; now, therefore, DocuSign Envelope ID: C3943A6B-6979-4 D33-87E3-OAC FOB FEBODD Resolution No. 003-23 Page 2 of 2 THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: It is the intent of the Port Orchard City Council that the recitals set forth above are hereby adopted and incorporated as findings in support of this Resolution. THAT: The City Council approves and authorizes the Mayor to sign Contract No. C010- 23 with KPFF Consulting Engineers for the Bay Street Pathway West — Situational Study in a form acceptable to the City Attorney. THAT: The Resolution shall take full force and effect upon passage and signatures hereon. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 28t" day of February 2023. DLO.Signed by: �b PlM"is�A-A SWA, RRQRdq,FRFSRd7f1 Robert Putaansuu, Mayor ATTEST: DocuSigned by: QRT O+6:Ci� rvain Fa.,it c, • _ E Brandy Wallace, MMC, City Clerk � AI,, �`''� OF by+A`�;N�``��