Loading...
075-22 - Ceccanti, Inc. - Supplement / Change Order 1CITY OF PORT ORCHARD Authorization for Change Order No. 1 Date: February 28, 2023 Project: McCormick Village Park Splash Pad Treatment Facility Installation Contract / Job # C075-22 Contractor: Ceccanti, Inc 4116 Brookdale Road East Tacoma, WA 98446 THIS CHANGE ORDER AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT: • Sales Tax Increase: January 1, 2023, the Washington State Sales Tax rate increased in the City of Port Orchard from 9.2% to 9.3% increasing the original contract by $540.65. • Additional modifications based on Department of Health regulations (see Attachment A). $126,803 plus WSST $11,792.68 = $138,595.68 • Contract Start Date: Due to delays with Department of Health reviews the duration of the contract is extended thru December 31, 2023. In all other respects the Underlying agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. Contract History Amount Sales Tax: Total Date Appvd by Original Contract 1 $540,647.001 $49,739.521 $590,386.52 26-Jul-22 Council Change Order 1 1 5126,803.001 $12,333.331 $139,136.33 28-Feb-23 Council otal Contract $667,450.00 $62,072.85 $729,522.85 I have reviewed the Change Order i -,formation above and certify that to the best of my knowledge description and sts are true and ccurate. Contractor Approval Signature Public Works Director/City Engineer Mn"McNand. CorpOrate SeC►etery Printed Name & Title Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Tony Lang Printed ame Approved: Mayor Attest: y Clerk Council Approval Date Attachment A CECCA.NTI February 16, 2023 Attn: Chris Hammer City of Port Orchard, Wa 216 Prospect Street Port Orchard, WA 98366 Re: Change Order Request McCormick Woods Splash Pad Treatment Equipment Installation Contract No. C075-22 Mr. Hammer: Serial Letter 01 Ceccanti, Inc. has received revisions to the drawings and equipment specifications for the McCormick Village Park Splash Pad Retrofit project. These drawings were received via email for download on January 11, 2023 and change the work and equipment from what was originally proposed. Ceccanti, Inc. would like to request a change order be issued to cover the additional charges associated with these changes. A listing of the -noted changes are shown below. The installed pricing below does not include interior lining for the vaults. • Additional Clearing - $2,500 • Basket Strainer Vault with Internals - $14,000 Duplex pumps location moved to overflow vault — no charge $0 ■ Overflow vault added (less cost of pumps) - $11,000 ■ Added 4" field valves - $3,500 ■ Water Reservoir Vault with pump and mechanicals - $41,000 Underground piping between bldg/overflow vault/water reservoir - $18,000 Floor Drain in building — connect to overflow vault - $2,800 Second Pump in building - $9,000 • (2) eyewash stations - $1,500 ■ Misc. for additional piping in building (mounting/misc. fittings) - $9,800 ■ 3" Flow Meter - $1,900 ■ Indicating Pressure Transmitter - $2,800 • Additional 3" valves (ball/pressure relief/back pressure) - $7,000 ■ Credit (6) vessels and piping - <$18,000> CICCANTI INC GINIRAI CONSTRUCTION 4110 RROOKDA11 RD.1. TACOMA WA 08440 (253) 537.2000 FAX (253) 537.8043 CECCAN-Ti _M Add Conduit and Wire for one starter and pressure transmitter in pump room. One starter, high and low water cutoff floats, and power for reservoir pump (pumps and floats supplied by others). Conduit and wire for Chorine analyzer (Analyzer supplied by others). Conduit and wire for backwash (control panel assumed to be integral to backwash and supplied by others). - $17,860 w/ 12% markup = $20,003 Supply pre -manufactured spray park control panel (Budget only) - $5,000 w/ 12% markup = $5,600 Supply engineered custom fabricated spray park control panel (Budget only) - $25,000 w/ 12% markup = $28,000 Total request this change order = $126,803 Total request including contingency = $160,403 Please do not hesitate to contact me with any questions regarding this request. Respectfully, Brian DeCapp Ceccanti, Inc. Ph. 253-377-7358 brian@ceccantiinc.com CECCANTI INC GENERA[ CONSTRUCTION 4110 BROOKOA[E RD, E. TACOMA WA 08440 (253) 537-2000 FAX (2531531.8043