036-21 - Active Construction, Inc. - Supplement / Change Order 1I CITY OF PORT ORCHARD Authorization for Change Order No. 1 Date: November 4, 2021 Project: Sidney Sewer and Road Repair Contract / Job # C036-21 Contractor: Active Construction, Inc THIS CHANGE ORDER AUTHORIZES (add description). Unit quantity adjustments. See attached. Amount Sales Tax Total Date Appvd b Original Contract $344 996.33 $13,361.67 $358,358.00 Council Change Order #1 $2 693.35 -$289.41 $2,403.94 PWD Total Contract $347 889.68 $13,072.26 $360,761.94 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. 041W6y sgned by Tyler Ceccenli ON: (--US. E="YIArr. NNeeS5netruc6. CN-T, Tyler Ceccanti n=• .e on. WC Mn Inc. N=Tye ONO:�2021 11 O4 15:16:15-0T00' Contractor Approval Signature Printed Name & Title Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of $100,01DO, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 101Y. require Council Action. s — *%, '4 Z�7\ - Pub ' ctor City Engineer MCA MARK R. DORSEY, P.E. Printed Name Approved: Mayor Attest: ity Clerk 1 I/A Council Approval Date U:13_Capital Improvement ProgramlB ActiveProjeclsk8swerUtilitylSiileyAveSewerRepaiAI 0 Finemal Administrationll 6 Change OrderslChangeOrder#11ChangeOrder1 doc Page 1 # Bid Item Adj Quantity Cost Adj Tax total 8 Removal Conc. Pave -30 SY $ (1,140.00) -102.60 $ (1,242.60) 9 Gravel Borrow -362.02 TN $ (4,344.24) -390.98 $ (4,735.22) 13 Replace Conc. Panel -30 SY $ (3,750.00) -337.50 $ (4,087.50) 14 HMA 13 TN $ 9,750.00 877.50 $ 10,627.50 23 Inlet Pro 3 EA $ 300.00 27.00 $ 327.00 24 Conc. Drivway 5.22 SY $ 704.70 63.42 $ 768.12 26 Plastic Stop 12 SY $ 360.00 32.40 $ 392.40 27 Minor change -5096.17 DOL $ (5,096.17) -458.66 $ (5,554.83) 32 Removal Curb and G 168 SY $ 2,520.00 0 $ 2,520.00 33 Removal Sidewalk & D 34 SY $ 1,020.00 0 $ 1,020.00 35 Removal Conc. Pave 46 SY $ 1,955.00 0 $ 1,955.00 37 CSTC -64 TN $ (2,880.00) 0 $ (2,880.00) 38 Repalce Conc. Panel 46 SY $ 5,750.00 0 $ 5,750.00 39 HMA -99.27 TN $ (14,394.15) 0 $ (14,394.15) 43 Conc. Curb and Gutter 128 LF $ 6,690.56 0 $ 6,690.56 44 Conc. Sidewalk 62.25 SY $ 5,291.25 0 $ 5,291.25 47 Minor Change -43.95 DOL $ (43.95) 0 $ (43.95) Total $ 2,693.00-289.41 $ 2,403.59 347689.68 344996.33 2693.35 City of Port Orchard Sidney Sewer and Road Repair Project Contractor: Active Construction Inc. Address: 0 CONTRACT SUMMARY Contract No.: C036-21 Estimate No.: 1 Payment Period Ending: 10/20/2021 Original Contract Amount Previous Approval This Estimate Total To Date Original Contract $ 344,996.33 $ 347,689.68 $ 347,689.68 Contract Totals 1 $ SALES TAX (9.0%) $ TOTAL $ 344.996.33 f $ 347.689.68 $ 13,072.26 $ $ 13,072.26 $ 358,068.59 $ $ 360,761.94 $ LESS RETAINAGE $ 17,384.48 TOTAL CONTRACT PAYMENT DUE THIS ESTIMATE $ 343,377.45 Percent of Contract Complete: 100.8% CONTRACTOR AGREES TO THE ABOVE AMOUNTS AND CERTIFIES THAT PREVAILING WAGES HAVE BEEN PAID IN ACCORDANCE WITH RCW 39.12 AND THE STATEMENT OF INTENT TO PAY PREVAILING WAGES HAVE BEEN FILED BY THE CONTRACTOR AND ALL SUBCONTRACTORS. I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT ESTIMATE; THAT THE WORK WAS ACTUALLY PERFORMED AND MATERIAL FURNISHED; AND THAT THE AMOUNT IS JUST AND DUE ME. Tyler Ceccanti Nmr�r= By 2021,1-15.14,so, Date: it 4 L7� Active Construction Inc. Reviewed and recommended for payment: Approved for payment: City of Port ha By: Date: �� 4 ` �� 1 By: Date: t L_ Ci of Port Or ard, Project Manager Puhlis ❑ or I City Engi er 13,072.26 360:761.94 Contractor: Active Construction Inc. Project No. PW21- Contract No. C036-21 City of Port Orchard Request for Payment No. One (1) for Sidney Sewer and Road Repair Project Payment Data., RFP NUMBER: One (1) FROM: 7/12/2021 TO: 10/20/2021 ORIGINAL CONTRACT PREVIOUSLY APPROVED CURRENT REQUEST TOTAL TO DATE PERCENT COMPLETE ITEM NO. ITEM DESCRIPTION BID CITY UNITS UNIT PRICE BID AMOUNT CITY DOLLAR AMOUNT CITY DOLLAR AMOUNT J QTY DOLLAR AMOUNT 1 (MOBILIZATION 1 LS 20,000 00 $ 20,000.00 0% $ 100% S 20,000.00 100% 5 20,000.00 100.0% 2 Contractor Surveying 1 LS 1.500,00 $ 1,500.00 0% 5 - 100% S 1,500.00 lao% S 1,500.00 100.0% 3 SPCC Plan 1 LS 100.00 S 100.00 0% $ 100% $ 100.00 100% $ 100.00 100.0% 4 Temp Traffic Control 1 LS 15,000 00 $ 15,000.00 0% $ 100% $ 15,000.00 100% $ 15,000.00 100.0% 5 Removal of Struct and Obstruct 1 LS 2.500-00 $ 2,500.00 0% 5 100% S 2,500.00 100% S 2.500.00 100.0% 6 Removal of Conc. Sidewalk and Drive Entrance 24 SY 3000 S 720.00 0 S 24 $ 720.00 24 $ 720.00 100.0% 7 Removal of A halt Pavement 13 SY 2500 S 325.00 0 $ 13 $ 325.00 13 $ 325.00 100.0% 8 Removal Of Concrete Pavement 151 SY 38-00 $ 5,738.00 0 5 121 5 4,59800 121 S 4,598.00 80.1% 9 Gravel Borrow. Incl. Haul 600 TN 12-00 $ 7,200.00 0 5 237.98 S 2,855.76 237.98 S 2.855.76 39.7% 10 Structural Excavation Incl Haul 333 Cy 10-00 $ 3,330.00 0 $ - 333 S 3,331100 333 $ 3,330.00 100.0% 11 Shoring 660 5F 1.00 $ 660.00 0 $ - 660 $ 660.00 660 $ 660.00 100.0% 12 CSTC 42 TN 45-00 $ 1,890,00 0 S 42 S 1.890.00 42 5 1.,890.00 100.0% 13 Replace Conc Panel 151 SY 125.00 $ 19,875.00 0 S - 121 $ 15,125.00 121 $ 15;125.00 80.1% 14 HMA for Pavement Repair 2 TN 750-00 S 1,500.00 0 $ is $ 11,250.00 15 $ 11,250-00 750.0% 15 Ductile Iron Drain Pipe 20 OF 80.00 $ 1,600.00 0 $ 20 $ 1.600.00 20 $ 1,600,00 100.0% 16 Type 1 CB 1 EACH 1.650.00 $ 1,650.00 0 S - 1 $ 1,650.00 1 S 1,650.00 100.0% 17 Inlet 1 EACH 4,500.00 5 4,500.00 0 $ 1 $ 4,500.00 1 $ 4,500,00 100.0% 18 Manhole 1 EACH 9,750,00 $ 9,750.00 0 $ - 1 $ 9,750.00 1 $ 9,750.00 100.0% 19 Sewer Bi- ass Pumping 1 LS 5,000,00 $ 5,000.00 0 5 1 5 5.000.00 1 S 5,000.00 100.0% 20 PVC Sewer Pipe 35 LF 105.00 $ 3,675.00 0 S - 35 $ 3,675.00 35 5 3,675.00 100.0% 21 Repair Sewer Pipe Connection 1 LS 2.500-00 S 2,500.00 0 $ 1 $ 2,500.00 1 $ 2.500.00 100.0% 22 CIPP 310 LF 92.50 $ 28,675.00 0 $ - 310 $ 28,675.00 310 $ 28,675.00 100.0% 23 Inlet Pro 9 EACH 100.00 $ 900.00 0 S 12 $ 1,200.00 12 S 1,200.00 133.3% 24 Cement Conc. Driveway Entrance 17 SY 135.00 $ 2,295.00 0 $ - 22.22 $ 2,999.70 22.22 5 2,999,70 130.7% 25 Paint Line 40 LF 25.00 S 1,000.00 0 $ 40 $ 1,000.00 40 $ 1,000.00 100.0% 26 Plastic Stop Bar 36 SF 30.00 $ 1,08a00 0 $ 48 $ 1,440.00 48 $ 1,440.00 13-13% 27 Minor Change 8005, BOOB 6,500 DOL 1,00 $ 6,500-00 0% S - 1403.83 S 1,403.93 21.6% S 1,403.83 21.6% 28 Moblization 1 LS 48,200.83 S 48,200.83 0% $ - 100% $ 48,200,83 100% $ 48,200.83 100.0% 29 Contractor Surveying 1 LS 1,500-00 $ 1,500.00 0% $ 100% S 1,500-00 100•9A S 1,500-00 100-0% 30 SPCC Plan 1 LS 10000 $ 10000 0% S - 100% S 100.130 100% S 100.00 100.0% 31 Temp Traffic Control 1 L5 25.000 00 S 25,000.00 0% $ 100% $ 25,000,00 100% $ 25,000.00 100.0% 32 Removal of Curb and Gutter 180 LF 1500 $ 2,700.00 0 $ 348 $ 5,220,00 348 $ 5,220.00 193.3% 33 Removal of Conc. Sidewalk and Drive Entrance 49 SY 30.00 $ 1,470.00 0 5 - 83 S 2,490.00 83 5 2,490.00 169.4% 34 Removal of Asphalt Pavement 593 SY 15.00 5 8,895.00 0 S - 593 S 8,895.00 593 $ 8,995.00 100.0% 35 Removal of Concrete Pavement 123 SY 42-50 S 5,227.50 0 $ - 169 $ 7.1n50 169 $ 7,182.50 137.4% 36 Roadway Excavation and Haul 30 CY 25.00 $ 750.00 0 $ - 30 $ 750.00 30 $ 750.00 100.0% 37 CSTC 98 TN 45.00 $ 4,410.00 0 S - 34 S 1,530.00 34 S 1,530.00 34.7% 38 Replace Conc Panel 123 123 125.00 $ 15,375.00 0 $ 169 $ 21,125.00 169 $ 2L125.00 137.4% 39 HMA for Pavement Repair 225 225 145-00 S 32,625.00 0 $ - 125.73 $ 18,230.85 125.73 $ 18,230-85 55.9% 40 Concrete Drain Pipe Repair 1 LS 2,500.00 $ 2,500.00 0 $ i 5 2.500.00 1 S 2,500.00 100.0% 41 Adjust CB removed rather than adusted 1 EACH 650.00 $ 650.00 0 S 1 $ 650.00 1 S 650,00 1000% 42 Adjust Man Hole 1 EACH 1,000,00 S 1,000.00 0 S 1 $ 1,OOa00 1 $ 1,000.00 100.0% 43 Cement Conc. Curb and Gutter 220 LF 52.27 S 11,500.00 0 $ - 348 $ 18,19a91 348 $ 18,190.91 158.2% 44 Cement Conc- Sidewalk 78 SY 85.00 $ 6,630.00 0 $ 140.25 S 11,921.25 140.25 S 11,92125 179.8% 45 Cement Conc. Curb Ram COB( 5 EACH 3,500.00 $ 17,500-00 0 5 5 $ 17,500.00 5 S 17,500.00 100.0% 46 Cement Conc- Curb Ram WSDOT) 2 EACH 3.500.00 $ 7,000.00 0 $ 2 $ 7,000.00 2 $ 7,000.00 100.0% 47 Minor Change (8011) 3,500 DOL 1.00 $ 3,500.00 0% $ - 3456.05 $ 3,456.05 98.7% $ 3,456.05 987% cc Change Order #1 $ 145,247.29 $ 145,247.29 PAY ESTIMATE TOTALS CONTRACTTOTAL S 344.996.33 TOTAL AMOUNT THIS ESTIMATE $ - S 347,689.68 $ 347;689.68 1008% WASHINGTON STATE SALES TAX (9.0%) $ 13,361.67 $ - $ 13,072.26 $ 13,072.26 RETAINAGE 1 $ 17.394.48 S 17,384.48 TOTAL PAYMENT DUE THIS ESTIMATE S 343,377.45 $ 343,377.45 Pay Notes 11/4/2021 Pay Estimate - 1