041-20 - American West Construction, LLC - Supplement / Change Order 3CITY OF PORT ORCHARD
Authorization for Change Order No. 3
Date: August 7, 2020
Project: 2020 Library Water Damage
And Roof Repair
Contract / Job # C041-20
Contractor: American West Construction, LLC
25228 Baker St. #287
Black Diamond, WA 99010
This Change Order authorizes the structural repair reflecting the labor and materials to repair the
Library's three (3) walls that was required outside the original scope of work in the contract.
Contract History
Amount Sales Tax Total hate Appnd b
Original Contract
$56 837.34
$5,115.36
$61952.70
28-A r-20
COUNCIL
Change Order 1
$0.00
$0.00
$0.00
03-Jun-20
PW Director
Change Order 2
0.00
$0.00
$0.00
30-Jun-20
PW Director
Change Order 3
$1822.38
$164.01
$1986.39
24-Au -20
PW Director
Total Contract $58 659.72 $5 279.37 $63 939.09
I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and
costs are true and accurate.
ctdr Approval
Signat re
I Name & Title
�r
r
6.
i_
Public W ks Director/City E ineer
A e'4y) /( MARK R. DORSEY, P.E.
Printed Name
Change Orders that do not exceed 10%, with a maximum of
$50,000, of either legally authorized budget limit or contract Approved:
amount established by City Council can be approved by the Public
Works Director.
Change Orders that do not exceed 10%, with a maximum of Attest:
$100,000, of either legally authorized budget limit or contract
amount established by City Council are to be approved by the
Mayor.
Change Orders over $100,000 or exceed a total of 10% require
Council Action.
Page 1
Mayor
City Clerk