HomeMy WebLinkAbout02/28/2023 - Regular - PacketMayor:
Rob Putaansuu
Administrative Official
Councilmembers:
MarkTrenary (Mayor Pro-Tempore)
E/D & Tourism Committee, Chair
Utilities/Sewer Advisory Committee
Transportation Committee
KRCC-alt
Shawn Cucciardi
Finance Committee
E/D & Tourism Committee
Lodging Tax, Chair
Fred Chang
Economic Development & Tourism Committee
Land Use Committee
Transportation Committee
Jay Rosa pepe
Finance Committee,
Land Use Committee
KRCC, PSRC-alt, PSRCTranspol-alt, KRCCTranspol
alt, KRCC Planpol-alt,
John Clauson
Finance Committee, Chair
Utilities/Sewer Advisory Committee
Kitsap Public Health District-alt
Cindy Lucarelli
Festival of Chimes & Lights Committee, Chair
Utilities/Sewer Advisory Committee, Chair
Kitsap Economic Development Alliance
Scott Diener
Land Use Committee, Chair
Transportation Committee
Department Directors:
Nicholas Bond, AICP
Development Director
Tony Lang
Public Works Director
Tim Drury
Municipal Court Judge
Noah Crocker, M.B.A.
Finance Director
Matt Brown
Police Chief
Brandy Wallace, MMC, CPRO
City Clerk
Meeting Location:
Council Chambers, V Floor
216 Prospect Street
Port Orchard, WA 98366
Contact us:
(360) 876-4407
cityhall@portorchardwa.gov
City of Port Orchard Council Meeting Agenda
February 28, 2023
6:30 p.m.
Pursuant to the Open Public Meetings Act, the City Council is conducting its public
meeting in the Council Chambers at City Hall. Members of the public may view and
provide public comment during the meeting in person at City Hall, via the online
platform zoom (link below), or via telephone (number below). The public may also view
the meeting live on the City's YouTube channel.
Remote access only
Link: https://us02web.zoom.us/J/86450605897
Zoom Webinar ID: 864 5060 5897
Zoom Call -In: 1 253 215 8782
Guiding Principles
• Are we raising the bar?
• Are we honoring the past, but not living in the past?
• Are we building connections with outside partners?
• Is the decision -making process positively impacting diversity, equity, and
inclusion?
1. CALL TO ORDER
A. Pledge of Allegiance
2. APPROVAL OF AGENDA
3. CITIZENS COMMENTS
(Please limit your comments to 3 minutes for items listed on the Agenda and that are not for a
Public Hearing. Please keep your comments respectful and no personal attacks. This is a
comment period and not a question -and -answer session. When recognized by the Mayor, please
state your name for the official record. If you are attending remotely via telephone, enter *9
from your keypad to raise your hand.
4. CONSENT AGENDA
(Approval of Consent Agenda passes all routine items listed below, which have been distributed
to each Councilmember for reading and study. Consent Agenda items are not considered
separately unless a Councilmember so requests. In the event of such a request, the item is
returned to Business Items.)
A. Approval of Vouchers and Electronic Payments
B. Approval of Payroll and Direct Deposits
C. Adoption of a Resolution Approving an Intergovernmental Cooperative
Purchasing Agreement with National Purchasing Cooperative
(BuyBoard) (Lang) Page 4
D. Approval of Amendment No. 5 to Contract No. 028-21 with
Transportation Solutions for On -Call Transportation/Traffic Engineering
Services (Lang) Page 13
E. Approval of the February 14, 2023, City Council Meeting Minutes
F. Excusal of Councilmember Cucciardi due to Work Obligation Page 35
5. PRESENTATION
6. PUBLIC HEARING
7. EXECUTIVE SESSION: Pursuant to RCW 42.30.110, the City Council may hold an executive session. The topic(s) and the
session duration will be announced prior to the executive session.
8. BUSINESS ITEMS
A. Approval of Amendment No. 1 to Contract No. 075-22 with Ceccanti, Inc. for the McCormick Village
Park Splash Pad Treatment Facility Installation Protect (Lang) Page 40
B. Adoption of a Resolution Approving a Contract with CONSOR North America, Inc. for Construction
Support and Management Services for the McCormick Village Park Splash Pad Construction Project
(Lang) Page 68
C. Adoption of a Resolution Amending Policies and Procedures for the City's Annual Spring Clean-up
Program (Lang) Page 94
D. Adoption of a Resolution Establishing an Employee Inclusion Commission to Focus on the City's Efforts
Related to Diversity, Equity, and Inclusion Amount City Employees (Lund) Page 115
E. Adoption of a Resolution Approving a Contract with KPFF Consulting Engineers for the Bay Street
Pathway West -Situational Study (Lang) Page 118
F. Adoption of a Resolution Accepting Transportation Improvement Program Project #1.5C, Documenting
Certified Construction Costs and Maximum Transportation Impact Fee Credits Granted Pursuant to
Contract No. 035-21 (Lang) Page 198
G. Approval of a Letter of Intent with Kitsap Public Facilities District to Fund Future Construction Costs for
the Community Events Center (Bond) Page 270
H. Approval of Amendment No. 9 to Contract No. 066-20 with Rice Fergus Miller, Inc. for the Design
Development and Construction Drawings of the Port Orchard Community Events Center-LEED
Feasibility (Bond) Page 273
9. DISCUSSION ITEMS (No Action to be Taken)
A. Council Choice of RMSA Required Course for 2023 (Lund) Page 306
10. REPORTS OF COUNCIL COMMITTEES
11. REPORT OF MAYOR
12. REPORT OF DEPARTMENT HEADS
13. CITIZEN COMMENTS
(Please limit your comments to 3 minutes for any items not up for Public Hearing. When recognized by the Mayor, please state
your name for the official record. If you are attending remotely via telephone, enter *9 from your keypad to raise your hand.)
14. CITY COUNCIL GOOD OF THE ORDER
15. ADJOURNMENT
COMMITTEE MEETINGS
Economic Development and Tourism
Utilities
Date & Time
Location
March 20, 2023: 9:30am Remote Access
------------
March 28, 2023; S:00pm Remote Access
Please turn off cell phones during meeting and hold your questions for staff until the meeting has been adjourned.
The Council may consider other ordinances and matters not listed on the agenda, unless specific notification period is required.
February 28, 2023, Meeting Agenda Page 2 of 3
Finance
Transportation
Festival of Chimes & Lights
Land Use
Lodging Tax Advisory
-- .. -
Sewer Advisory
Council Retreat
Outside Agency Committees
TBD; 5:00pm
March 14, 2023; 4:30pm
February 27, 2023; 3:30pm
March 15, 2023; 4:30pm
TBD, 2023
------------------------
March 22, 2023; S:00pm
March 10, 2023; 9:00am
Varies
Remote Access
Remote Access
Remote Access
Remote Access
Remote Access
Remote Access
Council Chambers
Varies
Please turn off cell phones during meeting and hold your questions for staff until the meeting has been adjourned.
The Council may consider other ordinances and matters not listed on the agenda, unless specific notification period is required.
February 28, 2023, Meeting Agenda Page 3 of 3
Back to Agenda
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Aeenda Staff Resort
Agenda Item No.: Consent Agenda 4C Meeting Date:
Subject: Adoption of a Resolution Approving an Prepared by:
Intergovernmental Cooperative Purchasing
Agreement with National Purchasing Atty Routing No.:
Cooperative (BuyBoard) Atty Review Date:
February 28, 2023
Tony Lang
Public Works Director
366922-001
February 17, 2023
Summary: National Purchasing Cooperative (BuyBoard) is a purchasing cooperative to assist public agencies
across the country in reducing the cost of purchased goods and services through pooling the purchasing
power of public agencies nationwide. Members of BuyBoard include the City of Poulsbo and many other
Washington Cities, School Districts and Fire Districts.
Pursuant to the provisions of RCW 39.34, the City of Port Orchard may enter into intergovernmental
cooperative purchasing agreements with other public agencies to cooperatively purchase or acquire supplies,
equipment, material, and services. Public Works staff conducted research and confirmed that BuyBoard
meets the needs of the City and meets the requirements of both RCW 39.34 and the parallel procurement
regulations in the host state of Maryland.
Entering into an intergovernmental agreement with the BuyBoard will allow the Public Works Department
and other City Departments to achieve better pricing on products equipment and services.
This is a no -cost agreement that will be automatically renewed annually until terminated by either party.
Recommendation: Staff recommends that the City Council adopt a Resolution authorizing the City of Port
Orchard to enter into an Interlocal Purchasing Agreement with the National Purchasing Cooperative
(BuyBoard).
Relationship to Comprehensive Plan: N/A.
Motion for consideration: I move to adopt a Resolution authorizing the City of Port Orchard to enter into
an Interlocal Purchasing Agreement with the National Purchasing Cooperative (BuyBoard).
Fiscal Impact: None (all associated purchases will follow the City's adopted procurement policies and
procedures).
Alternatives: Do not authorize the Resolution and provide further guidance.
Attachments: Resolution 019-23
National Purchasing Cooperative (BuyBoard) Interlocal Agreement
Page 4 of 307
Back to Agenda
RESOLUTION NO. 019-23
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING
AN INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENT BETWEEN
THE NATIONAL PURCHASING COOPERATIVE (BUYBOARD) AND THE CITY OF
PORT ORCHARD, PURSUANT TO CHAPTER 39.34 RCW.
WHEREAS, pursuant to the provisions of RCW 39.34, the City of Port Orchard may enter into
intergovernmental cooperative purchasing agreements with other public agencies in order to cooperatively
purchase or acquire supplies, equipment, materials, and services; and
WHEREAS, The National Purchasing Cooperative (BuyBoard) is a political subdivision created in
accordance with Maryland state statutes; and
WHEREAS, BuyBoard's purpose is to obtain the benefits and efficiencies that can accrue to
members of a cooperative, to comply with state bidding requirements, and to identify qualified vendors of
commodities, goods, and services, and to achieve better pricing on products, equipment, and services; and
WHEREAS, RCW 39.34 authorizes cooperative purchasing for public procurement units including
agencies that are outside of Washington; and
WHEREAS, consistent with Chapter 39.34 RCW, the Interlocal Cooperation Act, the City of Port
Orchard desires to enter into an Interlocal Purchasing Agreement with National Purchasing Cooperative
(BuyBoard); and
WHEREAS, this is a no cost agreement that will be automatically renewed annually until terminated
by either party; and
WHEREAS, the City Council deems it to be in the best interest of the City and its residents to enter
into the Agreement with BuyBoard, attached hereto as Exhibit A and incorporated herein by this reference;
now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS
FOLLOWS:
THAT: It is the intent of the Port Orchard City Council that the recitals set forth above are hereby
adopted and incorporated as findings in support of this Resolution.
THAT: The City Council approves of and authorizes the Mayor to execute the Intergovernmental
Cooperative Purchasing Agreement with National Purchasing Cooperative (BuyBoard), attached
hereto as Exhibit A and incorporated herein by this reference.
Page 5 of 307
Back to Agenda
Resolution No. 019-23
Page 2 of 2
THAT: The Resolution shall take full force and effect upon passage and signatures hereon.
THAT: Pursuant to RCW 39.34.030, once this Agreement has been executed by both Port
Orchard and BuyBoard, the City Clerk is directed to post a copy of this Agreement on the City's
website.
PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the
City Clerk in authentication of such passage this 281" day of February 2023.
ATTEST:
Brandy Wallace, MMC, City Clerk
Robert Putaansuu, Mayor
Page 6 of 307
AVtionall Purchasing Cooperative
NATIONAL PURCHASING COOPERATIVE
INTERLOCAL PARTICIPATION AGREEMENT
This Interlocal Participation Agreement ("Agreement") is made and entered into on the date indicated
below by and between The National Purchasing Cooperative ("Cooperative"), an administrative agency of
cooperating local governments, acting on its own behalf and the behalf of all participating local governments,
and the undersigned local government ("Cooperative Member").
I. RECITALS
WHEREAS, the National Purchasing Cooperative was formed on May 26, 2010, pursuant to Mn. CODE
ANN., STATE FiN. & Pxoc. § 13-110 (West 2009), and R.I.GEN.LAws § 16-2-9.2 (2009); and
WHEREAS, the purpose of this Agreement is to facilitate compliance with state procurement
requirements, to identify qualified vendors of commodities, goods and services, to relieve the burdens of the
governmental purchasing function, and to realize the various potential economies, including administrative cost
savings, for Cooperative Members;
NOW THEREFORE, in consideration of the mutual covenants, promises and obligations contained
herein, the undersigned Cooperative Member and the Cooperative agree as follows.
II. TERMS AND CONDITIONS
1. Adopt Organizational Interlocal Cooperation Agreement. The Cooperative Member by the execution
or acceptance of this Agreement hereby adopts and approves the Organizational Interlocal Agreement
dated May 26, 2010, which agreement is incorporated herein by reference (and is available from the
Cooperative upon request). The Organizational Interlocal Agreement established the Cooperative as an
administrative agency of its collective participants, and Cooperative Member agrees to become a
participant or additional party to that Organizational Interlocal Agreement.
2. Term. The initial term of this Agreement shall commence on the date it is executed by both parties and
shall automatically renew for successive one-year terms unless sooner terminated in accordance with the
provisions of this Agreement.
3. Termination.
(a) By the Cooperative Member. This Agreement may be terminated by the Cooperative Member
at any time by thirty (30) days prior written notice to the Cooperative, provided any amounts
owed to any vendor have been fully paid.
Page 1 of 6
(Revised by the Cooperative Board of'Trustees on March 10, 2016).
Page 7 of 307
(b) By the Cooperative. The Cooperative may terminate this Agreement by:
(1) Giving ten (10) days notice by certified mail to the Cooperative Member if the Cooperative
Member breaches this Agreement; or
(2) Giving thirty (30) days notice by certified mail to the Cooperative Member with or without
cause.
(c) Termination Procedure. If the Cooperative Member terminates its participation under this
Agreement or breaches this Agreement, or if the Cooperative terminates participation of the
Cooperative Member, the Cooperative Member shall bear the full financial responsibility for all
of its purchases made from vendors under or through this Agreement. The Cooperative may seek
the whole amount due, if any, from the terminated Cooperative Member. In addition, the
Cooperative Member agrees it will not be entitled to a distribution which may occur after the
Cooperative Member terminates from the Cooperative.
4. Payments by Cooperative Member. The Cooperative Member will make timely payments to the vendor
for the goods, materials and services received in accordance with the terms and conditions of the bid
invitation, instructions, and all other applicable procurement documents. Payment for goods, materials
and services and inspections and acceptance of goods, materials and services ordered by the procuring
Cooperative Member shall be the exclusive obligation of the procuring Cooperative Member, and not the
Cooperative. Furthermore, the Cooperative Member is solely responsible for negotiating and securing
ancillary agreements from the vendor on such other terms and conditions, including provisions relating to
insurance or bonding, that the Cooperative Member deems necessary or desirable under federal, state or
local law, local policy or rule, or within its business judgment.
5. Payments by Vendors. The parties agree that the Cooperative will require payment from vendors which
are selected to provide goods, materials or services to Cooperative Members. Such payment (hereafter
"Vendor Fees") may be up to two percent (2%) of the purchase price paid by Cooperative Members or a
flat fee amount that may be set from time to time by the Cooperative Board of Directors. Cooperative
Member agrees that these Vendor Fees fairly compensate the Cooperative for the services and functions
performed under this Agreement and that these Vendor Fees enable the Cooperative to pay the
administrative, endorsement, licensing, marketing, and other expenses involved in successfully operating a
program of electronic commerce for the Cooperative Members. Further, Cooperative Member
affirmatively disclaims any rights to such Vendor Fees, acknowledging all such fees are the property of
the Cooperative. Similarly, in no event shall a Cooperative Member be responsible for payment of
Vendor Fees.
6. Distribution. From time to time, and at the sole discretion of the Cooperative Board of Directors, the
Cooperative may issue a distribution to Cooperative Members under a plan developed by the Cooperative
Board of Directors. The Cooperative Member acknowledges that a distribution is never guaranteed and
will depend on the overall financial condition of the Cooperative at the time of the distribution and the
purchases made by the Cooperative Member.
7. Administration. The Cooperative may enter into contracts with others, including non-profit associations,
for the administration, operation and sponsorship of the purchasing program provided by this Agreement.
The Cooperative will provide reports, at least annually, to the Cooperative Member electronically or by
Page 2 of 6
(Revised by the Cooperative Board of'Trustees on March 10, 2016).
Page 8 of 307
mail. Cooperative Member will report purchase orders generated under this Agreement to the Cooperative
or its designee, in accordance with instructions of the Cooperative.
8. BuyBoard®. Cooperative Member will have a non-exclusive license to use the BuyBoard electronic
purchasing application (BuyBoard) during the term of this Agreement. Cooperative Member
acknowledges and agrees that the BuyBoard electronic application and trade name are owned by the Texas
Association of School Boards, Inc., and that neither the Cooperative nor the Cooperative Member has any
proprietary rights in the BuyBoard electronic application or trade name. The Cooperative Member will
not attempt to resell, rent, or otherwise distribute any part of BuyBoard to any other party; nor will it
attempt to modify the BuyBoard programs on the server or acquire the programming code. The
Cooperative Member may not attempt to modify, adapt, translate, distribute, reverse engineer, decompile,
or disassemble any component of the application. The Cooperative Member will use BuyBoard in
accordance with instructions from the Cooperative (or its designee) and will discontinue use upon
termination of participation in the Cooperative. The Cooperative Member will maintain equipment,
software and conduct testing to operate the BuyBoard system at its own expense.
III. GENERAL PROVISIONS
1. Amendment by Notice. The Board may amend this Agreement, provided that prior written notice is sent
to the Cooperative Member at least 60 days prior to the effective date of any change described in such
amendment and provided that the Cooperative Member does not terminate its participation in the
Cooperative before the expiration of said 60 days.
2. Authorization to Participate and Compliance with Local Policies. Each Cooperative Member
represents that its governing body has duly authorized its participation in the Cooperative and that the
Cooperative Member will comply with all state and local laws and policies pertaining to purchasing of
goods and services through its membership in the Cooperative.
3. Bylaws. The Cooperative Member agrees to abide by the Bylaws of the Cooperative, as they may be
amended, and any and all written policies and procedures established by the Cooperative. Notwithstanding
the foregoing, the Cooperative shall provide written notice to the Cooperative Member of any amendment
to the Bylaws of the Cooperative and any written policy or procedure of the Cooperative that is intended to
be binding on the Cooperative Member. The Cooperative shall promptly notify all Cooperative Members
in writing of any Bylaw amendment, policy or procedure change.
4. Cooperation and Access. The Cooperative Member agrees that it will cooperate in compliance with any
reasonable requests for information and/or records made by the Cooperative. The Cooperative reserves the
right to audit the relevant records of any Cooperative Member. Any breach of this provision shall be
considered material and shall make the Agreement subject to termination on ten (10) days written notice to
the Cooperative Member.
5. Coordinator. The Cooperative Member agrees to appoint a program coordinator who shall have express
authority to represent and bind the Cooperative Member, and the Cooperative will not be required to
contact any other individual regarding program matters. Any notice to or any agreements with the
coordinator shall be binding upon the Cooperative Member. The Cooperative Member reserves the right to
change the coordinator as needed by giving written notice to the Cooperative. Such notice is not effective
until actually received by the Cooperative.
Page 3 of 6
(Revised by the Cooperative Board of Trustees on March 10, 2016).
Page 9 of 307
Back to Agenda
6. Current Revenue. The Cooperative Member hereby represents that all payments, fees, and
disbursements required of it hereunder shall be made from current revenues budgeted and available to the
Cooperative Member.
7. Defense and Prosecution of Claims. The Cooperative Member authorizes the Cooperative to regulate the
commencement, defense, intervention, or participation in a judicial, administrative, or other governmental
proceeding or in an arbitration, mediation, or any other form of alternative dispute resolution, or other
appearances of the Cooperative in any litigation, claim or dispute which arises from the services provided
by the Cooperative on behalf of its members, collectively or individually. Neither this provision nor any
other provision in this Agreement will create a legal duty for the Cooperative to provide a defense or
prosecute a claim; rather, the Cooperative may exercise this right in its sole discretion and to the extent
permitted or authorized by law. The Cooperative Member shall reasonably cooperate and supply any
information necessary or helpful in such prosecution or defense. Subject to specific revocation, the
Cooperative Member hereby designates the Cooperative to act as a class representative on its behalf in
matters arising out of this Agreement.
8. Governance. The Board of Directors (Board) will govern the Cooperative in accordance with the Bylaws.
9. Legal Authority. The Cooperative Member represents to the Cooperative the following:
a) The Cooperative Member has conferred with legal counsel and determined it is duly authorized by
the laws of the jurisdiction in which the Cooperative Member lies to participate in cooperative
purchasing, and specifically, the National Purchasing Cooperative.
b) The Cooperative Member possesses the legal authority to enter into this Agreement and can allow
this Agreement to automatically renew without subsequent action of its governing body.
c) Purchases made under this Agreement will satisfy all procedural procurement requirements that the
Cooperative Member must meet under all applicable local policy, regulation, or state law.
d) All requirements —local or state —for a third party to approve, record or authorize the Agreement
have been met.
10. Disclaimer. THE COOPERATIVE, ITS ENDORSERS, SPONSORS AND SERVICING
CONTRACTORS, INCLUDING THE NATIONAL SCHOOL BOARDS ASSOCIATION (NSBA) AND
THE TEXAS ASSOCIATION OF SCHOOL BOARDS, INC. (TASB), DO NOT WARRANT THAT THE
OPERATION OR USE OF COOPERATIVE SERVICES WILL BE UNINTERRUPTED OR ERROR
FREE.
THE COOPERATIVE, ITS ENDORSERS, SPONSORS AND SERVICING CONTRACTORS, HEREBY
DISCLAIM ANY AND ALL WARRANTIES, EXPRESS OR IMPLIED, IN REGARD TO ANY
INFORMATION, PRODUCT OR SERVICE FURNISHED UNDER THIS AGREEMENT, INCLUDING
WITHOUT LIMITATION, ANY AND ALL IMPLIED WARRANTIES OF MERCHANTABILITY OR
FITNESS FOR A PARTICULAR PURPOSE.
11. Limitation of Liability. Without waiver of the disclaimer or other limitation of liability in this
Agreement, the parties agree that:
(a) Neither party waives any immunity from liability afforded under law;
Page 4 of 6
(Revised by the Cooperative Board of Trustees on March 10, 2016).
Page 10 of 307
(b) In regard to any lawsuit or formal adjudication arising out of or relating to this Agreement, neither
party shall be liable to the other under any circumstance for special, incidental, consequential, or
exemplary damages;
(c) The maximum amount of damages recoverable will be limited to the amount of fees which the
Cooperative received as a direct result of the Cooperative Member's purchase activity, within 12
months of when the lawsuit or action was filed; and
(d) In the event of a lawsuit or formal adjudication the prevailing party will be entitled to recover
reasonable attorney's fees.
Without waiver of the disclaimer or other limitation of liability in this Agreement, the parties further agree
to limit the liability of the Cooperative's Endorsers, Sponsors and Servicing Contractors (defined in
Paragraph 11, above) up to the maximum amount each received from or through the Cooperative, as a
direct result of the undersigned Cooperative Member's purchase activity, within 12 months of the filing of
any lawsuit or action.
12. Limitation of Rights. Except as otherwise expressly provided in this Agreement, nothing in this
Agreement is intended to confer upon any person, other than the parties hereto, any benefits, rights, or
remedies under or by reason of this Agreement.
13. Merger/Entirety. This Agreement, together with the Cooperative's Bylaws and Organizational Interlocal
Agreement, represents the complete understanding of the Cooperative and Cooperative Member. To the
extent there exists any conflict between the terms of this Agreement and that of prior agreements, the terms
of this Agreement shall control and take precedence over all prior participation agreements.
14. Notice. Any written notice to the Cooperative may be given by e-mail to NSBA at BuyBoard@nsba.org;
by U.S. mail, postage prepaid, and delivered to the National Purchasing Cooperative, 1680 Duke Street
FL2, Alexandria, VA, 22314; or other mode of delivery typically used in commerce and accessible to the
intended recipient. Notices to Cooperative Member may be given by e-mail to the Cooperative Member's
Coordinator or other e-mail address of record provided by the Cooperative Member; by U.S. mail, postage
prepaid, and delivered to the Cooperative Member's Coordinator or chief executive officer (e.g.,
superintendent, city manager, county judge or mayor); or other mode of delivery typically used in
commerce and accessible to the intended recipient.
15. Severability. If any portion of this Agreement shall be declared illegal or held unenforceable for any
reason, the remaining portions shall continue in full force and effect.
16. Signatures/Counterparts. The failure of a party to provide an original, manually executed signature to
the other party will not affect the validity, enforceability or binding effect of this Agreement because
either party may rely upon an electronic or facsimile signature as if it were an original. Furthermore, this
Agreement may be executed in several separate counterparts, each of which shall be an original and all of
which shall constitute one and the same instrument.
17. Authority. By the execution and delivery of this Agreement, each undersigned individual represents that
he or she is authorized to bind the entity that is a party to this Agreement.
Page 5 of 6
(Revised by the Cooperative Board of Trustees on March 10, 2016).
Page 11 of 307
IN WITNESS WHEREOF, the parties, acting through their duly authorized representatives, accept this
Agreement.
TO BE COMPLETED BY THE NATIONAL PURCHASING COOPERATIVE:
Lo
Date:
Signature of authorized representative
Printed name of person signing
Administrator's Representative for the National Purchasing Cooperative
TO BE COMPLETED BY COOPERATIVE MEMBER:
[Signature required unless accepted as an Amendment by Notice as described in the Agreement.]
Lo
(Name of Local Government)
Signature of authorized representative of Cooperative Member
Date:
Printed name and title of authorized representative
Coordinator for the
Cooperative Member is: Heidi Draper
Name
Procurement Specialist
Title
216 Prospect Street
Mailing Address
Port Orchard
City
WA 98366
State Zip Code
360 876-7028
Telephone
360 876-4980
Fax
publicworks@portorchardwa.gov
Email
Page 6 of 6
(Revised by the Cooperative Board of Trustees on March 10, 2016).
Page 12 of 307
Back to Agenda
fP_. City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
del i' (360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Agenda Item No.: Consent Agenda 4D
Subject: Approval of Amendment No. 5 to
Contract No. 028-21 with Transportation
Solutions for On -Call Transportation/
Traffic Engineering Services
Meeting Date: February 28, 2023
Prepared by: Tony Lang
Public Works Director
Atty Routing No.
Atty Review Date
366922-006
February 17, 2023
Summary: On February 9, 2021, following a procurement process consistent with Ch. 39.80 RCW, the
City executed Contract No. CO28-21 with Transportation Solutions, Inc. for On -Call Transportation/Traffic
Engineering Services (the "Contract"). Amendments 1, 2 & 3 were approved by Council, increasing the
Underlying Agreement's "not to exceed" amount to a total not to exceed amount of $65,000 and
extending the Underlying Agreement's termination date to February 12, 2023. Amendment No. 4
extended the duration of the Agreement to December 31, 2024. Additional On -Call
Transportation/Traffic Engineering Services are required by the City for the years 2023 and 2024 that will
exceed the current value of the Underlying Agreement. Before the Council for approval is Amendment
No. 5 to the Agreement, which would increase the contract amount by an additional $70,000 (The 2023-
2024 Budget includes $35,000 each year for 2023 and 2024) for a "not to exceed" total of $135,000,
inclusive of all compensation paid after execution of the Contract and Amendments 1 through 4 but prior
to this Amendment.
Recommendation: Staff recommends the Council authorize the Mayor to execute Amendment No. 5 to
Contract No. CO28-21 with Transportation Solutions, Inc for On -Call Transportation/Traffic Engineering
Services to increase the total contract amount by $70,000.00, for a total not to exceed amount of
$135,000.
Relationship to Comprehensive Plan: Ch 8- Transportation
Motion for Consideration: I move to authorize the Mayor to execute Amendment No. 5 to Contract No.
CO28-21 with Transportation Solutions, Inc for On -Call Transportation/Traffic Engineering Services.
Fiscal Impact: The 2023-2024 Biennial Budget includes $35,000 in 2023 and $35,000 in 2024.
Budgeted under GL Code 002.05.543.30.40.
Alternatives: Do not approve and provide alternative guidance.
Attachments: Amendment No. 5
Amendment Authorization
Courtesy Copy of CO28-21
Page 13 of 307
Back to Agenda
CITY OF PORT ORCHARD
Authorization for Amendment No. 5
Date: February 28, 2023
Project: On -Call Transportation /
Traffic Engineering Services
Contract / Job # CO28-21
Contractor: Transportation Solutions, Inc
16392 Woodinville Redmond Rd NW,
Suite A206, Woodinville, WA 98072
THIS AMENDMENT AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT: Section 4 Compensation -
Time and Materials Not to Exceed. Compensation for these services shall not exceed $135,000 (inclusive of all
amounts paid prior to the execution of Amendment No. 5 to this Agreement), without written authorization and
will be based on the list of billing rates and reimbursable expenses attached hereto as Exhibit B.
Transportation modeling, analysis, and traffic related consulting requires ongoing On -Call Transportation/Traffic
Engineering Services. Funds are budgeted in the 2023-2024 budget.
In all other respects the Underlying Agreement between the parties shall remain in full force and effect, amended
as set forth herein, but only as set forth herein.
Contract History
Amount Sales Tax Total Date Appvcl b
Original Contract
$20,000.00
$0.00
$20,000.00
09-Feb-21
Council
Amendment 1
$5,000.00
$0.00
$5,000.00
08-Feb-22
Council
Amendment 2
$15,000.00
$0.00
$15,000.00
12-Ma -22
council
Amendment 3
$25,000.00
$0.00
$25,000.00
13-Se -22
Council
Amendment 4
$0.001
$0.00
$0.00
03-Feb-23
PW Director
Amendment 5
$70,000.001
$0.001
$70,000.00
28-Feb-23
I Council
Total Contract $135,000.00 $0.00 $135,000.00
I have reviewed the Amendment information above and certify that to the best of my knowledge
descriptions nd costs are true and accurate.
Cons Rant Approval Signature
Printed Name & Title
(mac,--, —7—
Public Works Director
Tony Lang
Printed Name
Change Orders that do not exceed 10%, with a maximum of Approved:
$50,000, of either legally authorized budget limit or contract
amount established by City Council can be approved by the Public
Works Director.
Attest:
Mayor
Change Orders that do not exceed 10%, with a maximum of City Clerk
$100,000, of either legally authorized budget limit or contract
amount established by City Council are to be approved by the
Mayor.
Council Approval Date
Change Orders over $100,000 or exceed a total of 10% require
Council Action.
Page 14 of 307
Amendment No. 5 to Contract No. 028-21
CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH
TRANSPORTATION SOLUTIONS, INC.
THIS AMENDMENT No. 5 to Contract No. 028-21 ("Amendment") is entered into between the City of Port
Orchard, a Washington municipal corporation ("City" or "Port Orchard") and Transportation Solutions, Inc., a
Washington corporation ("Consultant"). City and Consultant are each a "Party" and together "Parties" to this
Amendment.
RECITALS:
WHEREAS, on the 9th day of February 2021, the City executed a Professional Services Agreement for On
Call Transportation/Traffic Engineering Services with the Consultant ("Underlying Agreement"); and
WHEREAS, Amendments 1, 2 & 3 were approved by Council, extending the Underlying Agreement's
termination date to February 12, 2023, and increasingthe Underlying Agreement's "not to exceed" amount
to a total not to exceed amount of $65,000; and
WHEREAS, Amendment No. 4 extended the duration of the Agreement to December 31, 2024; and
WHEREAS, additional On Call Transportation/Traffic Engineering Services are required by the City in 2023
and 2024 that will exceed the current value of the Underlying Agreement, as amended; and
WHEREAS, the Consultant and the City have conferred and agreed to increase the amount of the contract
by $70,000 in anticipation of additional work in 2023 and 2024; and
WHEREAS, the parties wish to memorialize their agreement and so extend the Underlying Agreement;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by and between the parties
thereto as follows:
FIFTH AMENDMENT TO AGREEMENT:
1. Amendment. Section 4 of the Agreement is hereby amended to read as follows:
Time and Materials Not to Exceed. Compensation for these services shall not exceed $135,000 (inclusive
of all amounts paid prior to the execution of Amendment No. 5 to this Agreement), without written
authorization and will be based on the list of billing rates and reimbursable expenses attached hereto as
Exhibit B.
2. Severability. The provisions of this Amendment are declared to be severable. If any provision
of this Amendment is, for any reason, held to be invalid or unconstitutional by a court of competent jurisdiction,
such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other provision.
Amendment No. 5 to Agreement between City of Port Orchard and Transportation Solutions, Inc.
Contract No. CO28-21
Page 1
Updated 4/2022 IBDR
Page 15 of 307
Back to Agenda
3. Entire Agreement. The written provisions and terms of this Amendment shall supersede all
prior verbal statements of any officer or other representative of the parties, and such statements shall not
be effective or be construed as entering into or forming a part of or altering in any manner whatsoever, this
Amendment. The entire agreement between the Parties with respect to the subject matter hereunder is
contained in the Agreement and exhibits thereto, any prior executed amendments and this Amendment.
Should any language in any of the Exhibits to the Agreement or prior amendments conflict with any
language contained in this Amendment, then this Amendment shall prevail. Except as modified by this
Amendment, all other provisions of the original Agreement and any amendments thereto not inconsistent
with this Amendment shall remain in full force and effect.
4. Effective date. This Amendment shall be effective as of February 28, 2023.
DATED this 28th day of February 2023.
CITY OF PORT ORCHARD, WASHINGTON
Robert Putaansuu, Mayor
ATTEST/AUTH E NTI CATE D:
Brandy Wallace, MMC, City Clerk
APPROVED AS TO FORM:
Charlotte A. Archer, City Attorney
CONSULTANT
qV -
gnat re
Pre 4 i
Printed Name and Title
Amendment No. 5 to Agreement between City of Port Orchard and Transportation Solutions, Inc.
Contract No. CO28-21
Page 2
Updated 4/2022 IBDR
Page 16 of 307
, ^Transportation Sol.ut o s Scope Of Services
INN.PVA.TIVP, .I P10.4 1C.AL ► G.QQIM111,6
January 20, 2021
TO: K. Chris Hammer, PE, PMP
City of Port Orchard
FROM: Andrew Bratilen, PE
SUBJECT: On -Call Transportation Analysis Scope of Services
This memorandum documents the scope of services for on -call transportation modeling, analysis, and
traffic -related consulting for the City of Port Orchard,
SCOPE OF SERVICES
Each item of work under this Agreement will be provided by task assignment. Each assignment will be
Individually negotiated with the Consultant. The amount established for each assignment will be the
maximum amount payable for that assignment unless modified in writing by Port Orchard. Port Orchard
is not obligated to assign any specific number of tasks to the Consultant, and Port Orchard's and the
Consultant's obligations hereunder are limited to tasks assigned in writing,
Task assignments made by Port Orchard shall be issued in writing by a Task Order Document similar in
format to Attachment 1, Task assignments using Federal Funding wiil require a full Local Agency
Standard Consultant Agreement as outlined in the Washington State Department of Transportation
Local Agency Guidelines,
An assignment shall become effective when a Task Order is signed by the Consultant and Port Orchard,
except that emergency actions requiring a 24-hour or less response can be handled by an oral
authorization. Such oral authorizations shall be followed up with a Task Order Document within four
working days, and any billing rates agreed to orally (for Individuals, subconsultants, or organizations
whose rates were not previously established in the Agreement) shall be provisional and subject to final
negotiation and acceptance by Port Orchard.
BILLING RATES
Services will be billed on a time and material basis according to the billing rates provided in Attachment
2. Transportation Solutions will provide a not -to -exceed fee estimate with each submitted Task Order.
SCHEDULE
Transportation Solutions will propose a schedule in each submitted Task Order.
Attachment 1. Task Order Document
Attachment 2, Transportation Solutions Inc. Staff Billing Rates
16932 Woodinville -Redmond Road I Suite A206 I Woodinville, WA 98072 1 A25-883.4134
Page 17 of 307
CITY OF FORT ORCHA,RI) TASK ORDER:
216 Prospect Street
m Port Orchard, WA 98366 ON -CALL SERVICES
g (36o) 874-5533
CITY'S PROPOSAL
City Task order No.: pate: ��,m,
City Information,
City Contact.:
Department:
Phone Number: '
Email:
Consultant Information:
Contract Number:
.
Company Name;.
Contact Name:
Phone Number: Email:
On Call Services project:
Task Name:
Site Address Location:
Related Permit Number:
Company Name:
Company Contact Name:
Contact Email Address:
Task Order description J Scope of Work:
The scope of work Is described below:
City of port Orchard Task Order for On -Call Services
Page 18 of 307
CONSULTANT'S RESPONSE
Consultant's Project Number:
Work Tasks
Labor, Materials, Sullies Equipment, Incidentals.
Estimated
Hoursot,_
Estimated
1.
2.
,3
4
5.
6.
90
1a.
11.
12.
w
._._.
14.
_
15.
16.
17,
18.
...
20,
21.
.
Anticipated Completion Date:
_ Total Estimated Budget.'
; p
APPROVALS
a of work tasks time and budget estimates
Approved by Consultant:
Authorization to Proceed • City of Port Orchard:
By:
By:
Signature:
Title:
Signature:
Title;
Date:
Date, .��..._
_.. .
8111 to • Clty of port Orchard, Accounts Payable, 216 Prospect St., Port Orchard, WA 98366
ap @ cityof partorchord, us
Clty of Port Orchard Task order for On -Call Services
Page 2 of 2
Page 19 of 307
w Transportation Solutions
INNOVATIVE I PRACTICAL I EQUITABLE
Transportation Solutions, Inc.
2021
HOURLY BILLINGS DATES
Name Title Classification Hourly
Billing Rate
Victor L. Salemann President Engineer Vill
Kirk Harris Principal Engineer Vlll $235.00
David R_Markley
Principal Engineer
Engineer VII
$235.00
Jeffrey P.K.Hee
Sr. Trans Engineer
Engineer V
$168,50
Andrew 1. i3rall'ien
Sr. Trans Engineer
Engineer V
$168.50
Mich.elle.L. Mach
Sr. Trans Engineer
Englneer V
$180.00
Mike Schaefer
Sr. Engineering Tech
_. Drafting Technician 3
$255.00
Sam Garcia
Engineer II
Engineer II
$105.00
Daniel Hodun
Engineer I
Engineer 1
$100 00
Phil McDonald
Sr, Engineering Tech
Drafting Technician 3
$145.00
Jennifer Salemann
Planner Ill
Trans. Planning Specialist 3
$105,00
Jill Berberich
Office Maner
Administrative Assistant 5
$115.00
EXPENSES
Reimbursable Expenses No Markup
Sub -consultant invoices ANo Markup
Billing rates are subject to change during the year to reflect staff changes.
Page 20 of 307
Back to Agenda
CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT
THIS Agreement is made effective as of the 9th day of February 2021, by and between the City of
Port Orchard, a municipal corporation, organized under the laws of the State of Washington, whose address
is:
CITY OF PORT ORCHARD, WASHINGTON (hereinafter the "CITY")
216 Prospect Street
Port Orchard, Washington 98366
Contact: Mayor Robert Putaansuu Phone: 360,876.4407 Fax: 360.895.9029
And Transportation Solutions, a corporation, organized under the laws of the State of Washington,
doing business at:
16392 Woodinville Redmond Rd NE, Suite A206 (hereinafter the "CONSULTANT")
Woodinville, WA 98072
Contact: Andrew Bratlien, PE Phone:425-833-4134 Fax:425-867-0898
for professional services in connection with the following Project:
On Call transportation/traffic engineering ,services.
TERMS AND CONDITIONS
1. Services by Consultant,
A. The Consultant shall perform the on -call professional services described in the Scope of
Work attached to this Agreement as Exhibit A. The services performed by the Consultant shall be on an
on -call, task order basis, and shall not exceed the Scope of Work without prior written authorization from
the City. In performing such services, the Consultant shall at all times comply with all Federal, State, and
local laws and regulations applicable to the performance of such services. The Consultant shall perform
the services diligently and completely in accordance with professional standards of conduct and
performance for Consultant's profession,
B. The City may from time to time require changes or modifications in the Scope of Work.
Such changes, including any decrease or increase in the amount of compensation, shall be agreed to by the
parties and incorporated in written amendments to the Agreement. The services must meet the approval of
the City and shall be subject to the City's general right of inspection to secure the satisfactory completion
thereof.
2. Schedule of Work.
A. The Consultant shall perform the services described in the Scope of Work in accordance
with task orders issued by the City, utilizing the task order form at Exhibit "A", and in accordance with the
procedures set out in Exhibit A and the terms of this Agreement, provided that if the terms of the Agreement
conflict with the terms of Exhibit A, the Agreement shall control. If delays beyond the Consultant's
City of Port Orchard and Transportation Solutions Inc.
Professional Service Agreement Contract No. CO28-21
1 of 10
Page 21 of 307
Back to Agenda
reasonable control occur, the parties will negotiate in good faith to determijne whether an extension is
appropriate.
B. The Consultant is authorized to proceed with services upon receipt of a written Notice to
Proceed. t
3. Terms. This Agreement shall commence on February 9, 2021 ("Commencement Date") and shall
terminate February 12, 2022, unless extended or terminated in writing as provided herein. The
City reserves the right to offer two (2) one-year extensions prior to contract expiration to
retain the selected company's services.
4. Compensation.
1-1 LUMP SUM. Compensation for these services shall be a Lump Sum of $
X TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed
$20,000.00 without advance written authorization, and will be based on the list of billing rates and
reimbursable expenses attached hereto as Exhibit "B."
TIME AND MATERIALS. Compensation for these services shall be on a time and materials basis
according to the list of billing rates and reimbursable expenses attached hereto as Exhibit
OTHER.
5. Payment.
A. The Consultant shall maintain time and expense records and provide them to the City
monihiy after services have been performed, along With monthly invoices in a format acceptable to the City -
for work performed to the date of the invoice.
B. All invoices shall be paid by City warrant within thirty (30) days of receipt of a proper
invoice. If the City objects to all or any portion of any invoice, it shall so notify the Consultant of the same
within fifteen (15) days from the date of receipt and shall pay that portion of the invoice not in dispute, and
the parties shall immediately make every effort to settle the disputed portion.
C. The Consultant shall keep cost records and accounts pertaining to this Agreement available
for inspection by City representatives for three (3) years after final payment unless a longer period is
required by a third -party agreement. Copies shall be made available on request.
D. On the effective date of this Agreement (or shortly thereafter), the Consultant shall comply
with all federal and state laws applicable to independent contractors, including, but not limited to, the
maintenance of a separate set of books and records that reflect all items of income and expenses of the
Consultant's business, pursuant to Revised Code of Washington (RCW) 51.08.195, as required by law, to
show that the services performed by the Consultant under this Agreement shall not give rise to an employer -
employee relationship between the parties, which is subject to Title 51 RCW, Industrial Insurance.
E. If the services rendered do not meet the requirements of the Agreement, the Consultant will
correct or modify the work to comply with the Agreement. The City may withhold payment for such work
until the work meets the requirements of the Agreement.
City of Port Orchard and Transportation Solutions Inc,
Professional Service Agreement Contract No. CO28-21
2of10
Page 22 of 307
Back to Agenda
6. Discrimination and Compliance with Laws
A. The Consultant agrees not to discriminate against any employee or applicant for
employment or any other person in the performance of this Agreement because of race, creed, color,
national origin, marital status, sex, age, disability, or other circumstance prohibited by federal, state, or
local law or ordinance, except for a bona fide occupational qualification.
B. Even though the Consultant is an independent contractor with the authority to control and
direct the performance and details of the work authorized under this Agreement, the work must meet the
approval of the City and shall be subject to the City's general right of inspection to secure the satisfactory
completion thereof. The Consultant agrees to comply with all federal, state and municipal laws, rules and
regulations that are now effective or become applicable within the term(s) of this Agreement to the
Consultant's business, equipment and personnel engaged in operations covered by this Agreement or
accruing out of the performance of such operations.
C. The Consultant shall obtain a City of Port Orchard business license prior to commencing
work pursuant to a written Notice to Proceed.
D. Violation of this Paragraph 6 shall be a material breach of this Agreement and grounds for
cancellation, termination, or suspension of the Agreement by the City, in whole or in part, and may result
in ineligibility for further work for the City.
7. Relationship of Parties. The parties intend that an independent contractor -client relationship will
be created by this Agreement. As the Consultant is customarily engaged in an independently established
trade which encompasses the specific service provided to the City hereunder, no agent, employee,
representative or sub -consultant of the Consultant shall be or shall be deemed to be the employee, agent,
representative or sub -consultant of the City. In the performance of the work, the Consultant is an
independent contractor with the ability to control and direct the performance and details of the work, the
City being interested only in the results obtained under this Agreement. None of the benefits provided by
the City to its employees, including but not limited to compensation, insurance, and unemployment
insurance, are available from the City to the employees, agents, representatives or sub -consultants of the
Consultant. Tlie Consultant will be solely and entirely responsible for its acts and for the acts of its agents,
employees, representatives and sub -consultants during the performance of this Agreement. The City may,
during the term of this Agreement, engage other independent contractors to perform the same or similar
work that the Consultant performs hereunder.
8. Suspension and Termination of Agreement
A. Termination without cause: This Agreement may be terminated by the City at any time for
public convenience, for the Consultant's insolvency or bankruptcy, or the Consultant's assignment for the
benefit of creditors.
B. ' Termination with cause. This Agreement may be terminated upon the default of the
Consultant and the failure of the Consultant to cure such default within a reasonable time after receiving
written notice of the default.
C. X:tg1t )on Termination.
City of Port Orchard and Transportation Solutions Inc.
Professional Service Agreement Contract No, CO28-21
3of10
Page 23 of 307
1. With or Without Cause. Upon termination forairy reason, all finished or unfinished
documents, reports, or other material or work of the Consultant pursuant to this Agreement shall
be submitted to the City, and the Consultant shall be entitled to just and equitable compensation for
any satisfactory work completed prior to the date of termination, not to exceed the total
compensation set forth herein. The Consultant shall not be entitled to any reallocation of cost,
profit or overhead. The Consultant shall not in any event be entitled to anticipated profit on work
not performed because of such termination. The Consultant shall use its best efforts to minimize
the compensation payable under this Agreement in the event of such termination. Upon
termination, the City may take over the work and prosecute the same to completion, by contract or
otherwise.
2. Default. If the Agreement is terminated for default, the Consultant shall not be
entitled to receive any further payments under the Agreement until all work called for has been
fully performed. Any extra cost or damage to the City resulting from such default(s) shall be
deducted from any money due or coming due to the Consultant. The Consultant shall bear any extra
expenses incurred by the City in completing the work, including all increased costs for completing
the work, and all damage sustained, or which may be sustained, by the City by reason of such
default.
D. Sustiension. The City may suspend this Agreement, at its sole discretion. Any
reimbursement for expenses incurred due to the suspension shall be limited to the Consultant's reasonable
expenses, and shall be subject to verification. The Consultant shall resume performance of services under
this Agreement without delay when the suspension period ends.
E. Notico ofTermination or Suspension. If delivered to the Consultant in person, termination
shall be effective immediately upon the Consultant's receipt of the City's written notice or such date as
stated in the City's notice of termination, whichever is later. Notice of suspension shall be given to the
Consultant in writing upon one week's advance notice to the Consultant. Such notice shall indicate the
anticipated period of suspension. Notice may also be delivered to the Consultant at the address set forth in
Section 15 herein.
9. Standard of Care. The Consultant represents and warrants that it has the requisite training, skill
and experience necessary to provide the services under this Agreement and is appropriately accredited and
licensed by all applicable agencies and governmental entities. Services provided by the Consultant under
this Agreement will be performed in a manner consistent with that degree of care and skill ordinarily
exercised by members of the same profession currently practicing in similar circumstances.
10. Ownership of Work Product.
A. All data, materials, reports, memoranda, and other documents developed under this
Agreement whether finished or not shall become the property of the City, shall be forwarded to the City at
its request and may be used by the City as it sees fit. Upon termination of this Agreement pursuant to
paragraph 8 above, all finished or unfinished documents, reports, or other material or work of the Consultant
pursuant to this Agreement shall be submitted to the City. Any reuse or modification of such documents,
reports or other material or work of the Consultant for purposes other than those intended by the Consultant
in its scope of services under this Agreement shall be at the City's risk.
B. All written information submitted by the City to the Consultant in connection with the
services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at
least the same extent as the Consultant safeguards like information relating to its own business. If such
information is publicly available or is already in the Consultant's possession or known to it, or is rightfully
City of Port Orchard and Transportation Solutions Inc.
Professional Service Agreement Contract No. CO28-21
4of10
Page 24 of 307
Back to Agenda
obtained by the Consultant from third parties, the Consultant shall bear no responsibility for its disclosure,
inadvertent or otherwise. The Consultant is permitted to disclose any such information only to the extent
required by law, subpoena or other court order.
It. Work Performed at the Consultant's Risk. The Consultant shall take all precautions necessary
and shall be responsible for the safety of its employees, agents and sub -consultants in the performance of
the work hereunder, and shall utilize all protection necessary for that purpose. All work shall be done at
the Consultant's own risk, and the Consultant shall be responsible for any loss of or damage to materials,
tools, or other articles used or held by the Consultant for use in connection with the work.
12. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials,
employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits,
including all legal costs and attorneys' fees, arising out of or resulting from the acts, errors or omissions of
the Consultant in performance of this Agreement, except for injuries or damages caused by the sole
negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then,
in the event of liability for damages arising out of bodily injury to persons or damages to property caused
by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials,
employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the
Consultant's negligence. The provisions of this section shall survive the expiration or termination of this
Agreement.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES
OF THIS INDEMNIFICATION. THE PARTIES FURTHER. ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
13. Insurance. The Consultant shall procure and maintain for the duration of this Agreement,
insurance against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Consultant, its agents, representatives, or
employees.
A. Minimum Scope of Insurance
Consultant shall obtain insurance of the types described below:
1. Au_(9i obHq. Liability! insurance covering all owned, non -owned, hired and leased
vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01
or a substitute form providing equivalent liability coverage. If necessary, the policy
shall be endorsed to provide contractual liability coverage.
2. Commercial mercial Ciencral Liability insurance shall be written on ISO occurrence form CG
00 01 or a substitute form providing equivalent liability coverage and shall cover
liability arising from premises, operations, independent contractors and personal injury
and advertising injury. The City shall be named by endorsement as an additional
insured under the Consultant's Commercial General Liability insurance policy with
respect to the work performed for the City.
City of Port Orchard and Transportation Solutions Inc.
Professional Service Agreement Contract No. C:028-21
5of10
Page 25 of 307
Back to Agenda
3. ' or�kers' Cu_mp ati(M coverage as required by the Industriai Insurance laws of the
State of Washington.
4. grofessiona Liability insurance appropriate to the Consultant's profession.
13. Minimum Amounts of Insurance
Consultant shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident.
2. Commercial General Liability insurance shall be written with limits no less than
$1,000,000 each occurrence, $2,000,000 general aggregate.
3. Worke1j' ,�Ir_p r t on Employer's Liability each accident $1,000,000, Employer's
Liability Disease each employee $1,000,000, and Employer's Liability Disease —
Policy Limit $1,000,000.
4. l�irgfessional Liabilityy, insurance shall be written with limits no less than $1,000,000
per claim and $1,000,000 policy aggregate limit.
C. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions for
Automobile Liability, Professional Liability and Commercial General Liability insurance:
I, The Consultant's insurance coverage shall be primary insurance as respect the City.
Any insurance, self-insurance, or insurance pool coverage maintained by the City shall
be excess of the Consultant's insurance and shall not contribute with it.
2. The Consultant shall provide the City with written notice of any policy cancellation,
within two business days of their receipt of such notice.
3. The City will not waive its right to subrogation against the Consultant. The
Consultant's insurance shall be endorsed acknowledging that the City will not waive
their right to subrogation. The Consultant's insurance shall be endorsed to waive the
right of subrogation against the City, or any self-insurance, or insurance pool coverage
maintained by the City.
4. If any coverage is written on a "claims made" basis, then a minimum of a three (3) year
extended reporting period shall be included with the claims made policy, and proof of
this extended reporting period provided to the City.
D. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII.
E. Verification of Coverage
City of Port Orchard and Transportation Solutions Inc.
Professional Service Agreement Contract No. CO28-21
6of10
Page 26 of 307
Back to Agenda
The Consultant shall furnish the City with original certificates and a copy of the amendatory
endorsements, including but not necessarily limited to the additional insured endorsement,
evidencing the insurance requirements of the Consultant before commencement of the work.
14, Assigning or Subcontracting. The Consultant shall not assign, transfer, subcontract or encumber
any rights, duties, or interests accruing from this Agreement without the express prior written consent of
the City, which consent may be withheld in the sole discretion of the City.
15. Notice. Any notices required to be given by the City to the Consultant or by the Consultant to the City
shall be in writing and delivered to the parties at the following addresses:
Robert Putaansuu
Mayor
216 Prospect Street
Port Orchard, WA 98366
Phone: 360.876.4407
Fax: 360.895.9029
Victor Salemann, PE - Principle
Transportation Solutions, Inc.
16932 Woodinville Redmond Rd. NE, Suite
A206, Woodinville, WA 98072
Phone; 425-833-4134
Fax: 425-867-0898
16. Resolution of Disputes and Governing Law.
A. Should any dispute, misunderstanding or conflict arise as to the terms and conditions
contained in this Agreement, the matter shall first be referred to the Mayor, who shall determine the term
or provision's true intent or meaning. The Mayor shall also decide all questions which may arise between
the parties relative to the actual services provided or to the sufficiency of the performance hereunder.
B. If any dispute arises between the City and the Consultant under any of the provisions of
this Agreement which cannot be resolved by the Mayor's determination in a reasonable time, or if the
Consultant does not agree with the Mayor's decision on a disputed matter, jurisdiction of any resulting
litigation shall be filed in Kitsap County Superior Court, Kitsap County, Washington.
C. This Agreement shall be governed by and construed in accordance with the laws of the
State of Washington. In any suit or action instituted to enforce any right granted in this Agreement, the
substantially prevailing party shall be entitled to recover its costs, disbursements, and reasonable attorneys'
fees from the other party.
17. General Provisions.
A. Non -waiver of Breach. The failure of either party to insist upon strict performance of any
of the covenants and agreements contained herein, or to exercise any option herein contained in one or more
instances, shall not be construed to be a waiver or relinquishment of said covenants, agreements, or options,
and the same shall be in full force and effect.
B. Modification. No waiver, alteration, modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and
the Consultant.
City of Port Orchard and Transportation Solutions Inc.
Professional Service Agreement Contract No, CO28-21
7of10
Page 27 of 307
Back to Agenda
C. Suverttbiljj)�. The provisions of this Agreement are declared to be severable. If any
provision of this Agreement is for any reason held by a coma of competent jurisdiction to be invalid or
unconstitutional, such invalidity or unconstitutionality shall not affect the validity or constitutionality of
any other provision.
D. Entire Agreement, The written provisions of this Agreement, together with any Exhibits
attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City,
and such statements shall not be effective or be construed as entering into or forming a part of or altering
in any manner whatsoever, the Agreement or the Agreement documents. The entire agreement between
the parties with respect to the subject matter hereunder is contained in this Agreement and the Exhibits
attached hereto, which may or may not have been dated prior to the execution of this Agreement. All of
the above documents are hereby made a part of this Agreement and form the Agreement document as fully
as if the same were set forth herein. Should any language in any of the Exhibits to this Agreement conflict
with any language contained in this Agreement, then this Agreement shall prevail.
18. Title VI
The City of Port Orchard, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252,
42 U,S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation
subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the
Department of Transportation issued pursuant to such Act, must affirmatively insure that its contracts
comply with these regulations.
Therefore, during the performance of this Agreement, the Consultant, for itself, its assignees, and
successors in interest agrees as follows:
1. Compliance with Regulations: The Consultant will comply with the Acts and the Regulations
relative to Nondiscrimination in Federally -assisted programs of the U.S. Department of
Transportation, Federal Highway Administration (FHWA), as they may be amended from time to
time, which are herein incorporated by reference and made a part of this Agreement.
2. Nondiscrimination: The Consultant, with regard to the work performed by it during this
Agreement, will not discriminate on the grounds of race, color, national origin, sex, age,
disability, income -level, or LEP in the selection and retention of subcontractors, including
procurements of materials and leases of equipment. The Consultant will not participate directly or
indirectly in the discrimination prohibited by the Acts and the Regulations as set forth in
Appendix A, attached hereto and incorporated herein by this reference, including employment
practices when this Agreement covers any activity, project, or program set forth in Appendix B of
49 C.F.R. part 21.
Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all
solicitations, either by competitive bidding, or negotiation made by the Consultant for work to be
performed under a subcontract, including procurements of materials, or leases of equipment, each
potential subcontractor or supplier will be notified by the Consultant of the Consultant's
obligations under this Agreement and the Acts and the Regulations relative to Non-discrimination
on the grounds of race, color, national origin, sex, age, disability, income -level, or LEP.
4. Information and Reports: The Consultant will provide all information and reports required by
the Acts, the Regulations and directives issued pursuant thereto and will permit access to its
books, records, accounts, other sources of information, and its facilities as may be determined by
City of Port Orchard and Transportation Solutions Inc,
Professional Service Agreement Contract No, CO28-21
8of10
Page 28 of 307
Back to Agenda
the City or the FHWA to be pertinent to ascertain compliance with such Acts, Regulations, and
instructions. Where any information required of the Consultant is in the exclusive possession of
another who fails or refuses to furnish the information, the Consultant will so certify to the City'
or the FHWA, as appropriate, and will set forth what efforts it has made to obtain the information.
S. Sanctions for Noncompliance: In the event of the Consultant's noncompliance with the Non-
discrimination provisions of this Agreement, the City will impose such contract sanctions as it or
the FHWA may determine to be appropriate, including, but not limited to:
1, withholding payments to the Consultant under the Agreement until the contractor
complies; and/or
2. cancelling, terminating, or suspending the Agreement, in whole or in part.
Incorporation of Provisions: The Consultant will include the provisions of paragraphs one
through six in every subcontract, including procurements of materials and leases of equipment,
unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The Consultant
will take action with respect to any subcontract or procurement as the City or the FHWA may
direct as a means of enforcing such provisions including sanctions for noncompliance. Provided,
that if the Consultant becomes involved in, or is threatened with litigation by a subcontractor, or
supplier because of such direction, the Consultant may request the City to enter into any litigation
to protect the interests of the City. In addition, the Consultant may request the United States to
enter into the litigation to protect the interests of the United States.
IN WITNESS WHEREOF, the parties have executed this Agreement on the day and year set forth
above.
CITY OF PORT ORCHARD,
WASI I3NGTON
By:
Robert Putaimu , Mayor
ATTEST/AU ATE:
By:
niearson, MMC
City Clerk
APPROVED AS TO FORM:
By; -
Charlotte A. Archer', 0t1 Cq��f�f f�
O •' p�P o R,q'T�o
U�
SEAL=
City of Port Orchard and Transportation Solutions Inc,
Professional Service Agreement Contract No. CO28-21
CONSULTANT
By; --- "'
Name: Victor Salemann. PE
Title: Principle
9of10
Page 29 of 307
Back to Agenda
APPENDIX A
During the performance of this Agreement, the Consultant, for itself, its assignees, and successors in
interest agrees to comply with the following non-discrimination statutes and authorities; including but not
limited to:
Pertinent Non -Discrimination Authorities:
Title VI of the Civil Rights Act of 1964 (42 U S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 C.F.R. Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42
U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been
acquired because of Federal or Federal -aid programs and projects);
+ Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the
basis of sex);
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq,), as amended, (prohibits
discrimination on the basis of disability); and 49 C.F.R. Part 27;
• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits
discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 USC§ 471, Section 4 7123), as amended,
(prohibits discrimination based on race, creed, color, national origin, or sex);
• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs
or activities" to include all of the programs or activities of the Federal -aid recipients, sub -
recipients and contractors, whether such programs or activities are Federally Ainded or not);
• Titles 11 and III of the Americans with Disabilities Act, which prohibit discrimination on the basis
of disability in the operation of public entities, public and private transportation systems, places
of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as
implemented by Department of Transportation regulations at 49 C.P.R, parts 37 and 38;
• The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits
discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low -Income Populations, which ensures discrimination against minority
populations by discouraging programs, policies, and activities with disproportionately high and
adverse human health or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English
Proficiency, and resulting agency guidance, national origin discrimination includes discrimination
because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take
reasonable steps to -ensure that LEP persons have meaningful access to your programs (70 Fed.
Reg. at 74087 to 74100);
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from
discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).
City of Port Orchard and Transportation Solutions Inc.
Professional Service Agreement Contract No. CO28-21
10 of 10
Page 30 of 307
Back to Agenda
OR
, �Transportation Solutions Scope of Services
INNOVATIVE I PRACUCAL I CQUlYi1NX
January 20, 2021
TO: K. Chris Hammer, PE, PMP
City of Port Orchard
FROM: Andrew Bratlien, PE
SUBJECT: On -Call Transportation Analysis Scope of Services
This memorandum documents the scope of services for on -call transportation modeling, analysis, and
traffic -related consulting for the City of Port Orchard,
SCOPE OF SERVICES
Each item of work under this Agreement will be provided by task assignment. Each assignment will be
individually negotiated with the Consultant. The amount established for each assignment will be the
maximum amount payable for that assignment unless modified in writing by Port Orchard. Port Orchard
is not obligated to assign any specific number of tasks to the Consultant, and Port Orchard's and the
Consultant's obligations hereunder are limited to tasks assigned in writing.
Task assignments made by Port Orchard shall be issued in writing by a Task Order Document similar in
format to Attachment 1. Task assignments using Federal Funding will require a full Local Agency
Standard Consultant Agreement as outlined in the Washington State Department of Transportation
Local Agency Guidelines.
An assignment shall become effective when a Task Order is signed by the Consultant and Port Orchard,
except that emergency actions requiring a 24-hour or less response can be handled by an oral
authorization. Such oral authorizations shall be followed up with a Task Order Document within four
working days, and any billing rates agreed to orally (for individuals, subconsultants, or organizations
whose rates were not previously established in the Agreement) shall be provisional and subject to final
negotiation and acceptance by Port Orchard.
BILLING RATES
Services will be billed on a time and material basis according to the billing rates provided in Attachment
2. Transportation Solutions will provide a not -to -exceed fee estimate with each submitted Task Order.
SCHEDULE
Transportation Solutions will propose a schedule in each submitted Task Order.
Attachment 1. Task Order Document
Attachment 2. Transportation Solutions Inc. Staff Billing Rates
16932 Woodinville -Redmond Road I Suite A206 I Woodinville, WA 98072 1 425-883-4134
Page 31 of 307
Back to Agenda
CITY OF FORT ORCHARD
216 Prospect Street
m Port Orchard, WA 98366
(36o) 874-5533
CITY'S PROPOSAL
City Task Order No.: Date:
City Information:
City Contact:
Department:
Phone Number: Email.
Consultant Information:
Contract Number:
m.�
Company Name
Contact Name:��
Phone Number: Email.
__
On -Call Services Project:
Task Name:
Site Address / Location:
Related Permit Number:
Company Name:
Company Contact Name:
Contact Email Address:.
Task Order Description / Scope of Work:
The scope of work is described below:
City of Port Orchard Task Order for On -Call Services
TASK ORDER:
ON -CALL SERVICES
Page 32 of 307
Back to Agenda
CONSULTANT'S RESPONSE
Consultant's Project Number:
Work Tasks Estimated Estimated
Labor, Materials, Supplies, Equipment, Incidentals Hours _Bud et
L _
2.
3.
4• -
5• --
_m
6.
8.
9*
10.
11. _
12.
13.
15.
16.
17.
18.
_,»
19.
zo«
21.
Anticipated Completion Date:
Total Estimated Budget:
_
APPROVALSLS
Scope of work tasks, time and budget estimates
Approved by Consultant: Authorization to Proceed - City of Port Orchard:
By: By;
Signature: Signature:
Title: Title:
Date: Date:
Bill to: City of Port Orchard, Accounts Payable, 216 Prospect St., Port Orchard, WA 98366
ap@cityofportorchard.us
City of Port Orchard Task Order for On -Call Services
Page 2 of 2
Page 33 of 307
Transportation Solutions
INNOVATIVE I PRACTICAL I EQUITABLE
Transportation Solutions, Inc.
2021
HOURLY BILLING RATES
Name
Title
_
Classification
Hourly
Billing Rate
Victor L. Salemann
President
Engineer Vlll
$235.00
Kirk Harris
Principal
Engineer VIII
$235.00
David D. Markley
Principal Engineer
Engineer VII
$235.00
Jeffrey P.K. Hee
Sr. Trans Engineer
Engineer V
$168.50
Andrew L. Bratlien
Sr. Trans Engineer
Engineer V
$168.56
Michelle L. Mach
Sr. Trans Engineer
Engineer .V.
$180.00
Mike Schaefer
Sr. Engineering Tech
Drafting Technician 3
$155.00
Sam Garcia
Engineer II
Engineer II
$105.00
Daniel Hodun
Engineer I
Engineer 1
$100.00
Phil McDonald
Sr. Engineering Tech
Drafting Technician 3
$145.00
Jennifer Salemann
Planner III
Trans. Planning Specialist 3
$105.00
Jill Berberich
Office Manager
Administrative Assistant 5
$115.00
EXPENSES
Reimbursable Expenses No Markup
Sub -consultant invoices No Markup
Billing rates are subject to change during the year to reflect staff changes.
Page 34 of 307
Back to Agenda
City of Port Orchard
Council Meeting Minutes
Regular Meeting of February 14, 2023
1. CALL TO ORDER AND ROLL CALL
Mayor Pro-Tem Trenary called the meeting to order at 6:30 p.m.
Roll call was taken by the City Clerk as follows:
Mayor Pro-Tem Trenary
Present
Councilmember Chang
Present
Councilmember Clauson
Present
Councilmember Cucciardi
Present
Councilmember Diener
Present
Councilmember Lucarelli
Present
Councilmember Rosapepe
Present
Mayor Putaansuu
Absent
Staff present: Public Works Director Lang, Finance Director Crocker, City Attorney Archer, Police Chief
Brown, HR Manager Lund, City Clerk Wallace, and Deputy City Clerk Floyd.
The meeting streamed live on YouTube.
A. PLEDGE OF ALLEGIANCE (Time Stamp 00:28)
Mayor Pro-Tem Trenary led the audience and Council in the Pledge of Allegiance.
2. APPROVAL OF AGENDA (Time Stamp: 00:51)
MOTION: By Councilmember Cucciardi, seconded by Councilmember Lucarelli, to approve the
agenda as presented.
The motion carried.
3. CITIZENS COMMENTS (Time Stamp: 1:19)
There were no citizen comments.
4. CONSENT AGENDA (Time Stamp: 01:36)
A. Approval of Voucher Nos. 85484 through 85504 and 85513 through 85566 including bank drafts
in the amount of $337,139.65 and EFT's in the amount of $797,551.99 totaling $1,134,691.64.
Page 35 of 307
Back to Agenda
Minutes of February 14, 2023
PaRe2of5
B. Approval of Payroll Check Nos. 85505 through 85512 including bank drafts and EFT's in the
amount of $238,360.65 and Direct Deposits in the amount of $227,854.77 totaling $466,215.42.
C. Adoption of a Resolution Approving the Purchase of a Skid Steer Compact Track Loader for the
Equipment Rental Revolving Fund 500 (Resolution No. 015-23, Purchase Order No. 013-23)
D. Adoption of a Resolution Approving an Intergovernmental Cooperative Purchasing Agreement
with Purchasing Cooperative of America (Resolution No. 017-23, Contract No. 021-23)
E. Adoption of a Resolution Approving the Purchase of Equipment for the Equipment Rental
Revolving Fund 500 (Resolution No. 018-23, Purchase Order No. 014-23)
F. Approval of an Agreement with Compulink and CDI to Purchase Laserfiche Annual Support,
Updates and Additional Licenses (Contract No. 024-23, Purchase Order No. 008-23)
G. Approval of Amendment No. 2 to Contract No. 018-20 with Coastal Custodial for Janitorial
Services (Lang)
H. Approval of the January 24, 2023, City Council Meeting Minutes
MOTION: By Councilmember Clauson, seconded by Councilmember Diener, to approve the Consent
Agenda as published.
The motion carried.
5. PRESENTATION
There were no presentations.
6. PUBLIC HEARING
There were no public hearings.
7. BUSINESS ITEMS
A. Adoption of an Ordinance Establishing a Low -Income Discount Utility Program (Time Stamp
02:18)
MOTION: By Councilmember Rosapepe, seconded by Councilmember Clauson, to adopt an
ordinance establishing a Low -Income Utility Discount program.
The motion carried.
(Ordinance No. 001-23)
B. Adoption of an Ordinance Amending Port Orchard Municipal Code Section 10.12.400 to Extend
Payment Deadline for Parking Infractions (Time Stamp: 04:30)
MOTION: By Councilmember Lucarelli, seconded by Councilmember Diener, to adopt an ordinance
amending POMC 10.12.400 in response to changes in state law.
Page 36 of 307
Back to Agenda
Minutes of February 14, 2023
Paee 3 of 5
The motion moved.
(Ordinance No. 002-23)
C. Adoption of an Ordinance Adopting Port Orchard Municipal Code Chapter 1.32, Setting the
City's Compost Procurement Policy Consistent with HB 1799 (Time Stamp 06:14)
MOTION: By Councilmember Chang, seconded by Councilmember Diener, to adopt an ordinance
adopting Port Orchard Municipal Code Chapter 1.32, establishing the City's Compost Procurement
Policy.
The motion carried.
(Ordinance No. 003-23)
D. Approval of the 2023 Comprehensive Plan Amendment Docket (Time Stamp 11:28)
MOTION: By Councilmember Diener, seconded by Councilmember Lucarelli, to approve the 2023
Comprehensive Plan amendment agenda pursuant to POMC 20.04.060, as presented.
The motion carried.
8. DISCUSSION ITEMS
A. City Policy Requiring New Employees to be Vaccinated Against the COVID-19 Virus (Time Stamp
15:09)
HR Manager Lund explained on October 26, 2021, the Council considered and passed a policy revision
to require all employees to provide proof of having at least one dose of the COVID-19 vaccination
prior to employment, and as a condition of continued employment receive the second dose with 30
days, unless approved for a medical or religious exemption. The City no longer tracks vaccination
status of current employees.
The Police Department has expressed a concern that the vaccination requirement may be negatively
impacting the recruitment for police officers, in particular lateral police officers. All department
directors discussed the vaccination requirement at a recent meeting, none were opposed to
removing the vaccination requirement.
Additionally, in accordance with the council's guiding principle related to diversity, equity and
inclusion, it is worth noting that there remains a vaccination equity gap relative to some populations
with American Indian/Alaskan Native, Asian, Native Hawaiian and Other Pacific Islander and those of
multiple races falling behind white, non -Hispanic people living in the United States.
Page 37 of 307
Back to Agenda
Minutes of February 14, 2023
Page 4 of 5
Discussion was held between Council and staff. Councilmembers Rosapepe and Chang voiced their
concerns with removing the vaccination requirement and Councilmembers Diener, Cucciardi,
Lucarelli and Clauson voiced their approval of removing the vaccination requirement.
MOTION: By Councilmember Clauson, seconded by Councilmember Diener, to eliminate 2.04(B)
New Hire COVID-19 Vaccination Requirement (effective November 1, 2021) from the City's Personnel
Policies.
The motion passed, with 2 dissenting votes. Councilmembers Rosapepe and Chang.
9. REPORTS OF COUNCIL COMMITTEES (Time Stamp: 31:54)
Councilmember Lucarelli said she would like to give the report on the February 141" Utilities
Committee meeting when more people in attendance.
10. REPORT OF MAYOR
There was no report of the Mayor.
11. REPORT OF DEPARTMENT HEADS (Time Stamp 32:30)
Finance Director Crocker explained the February 21s' Finance Committee agenda is very light and the
meeting may be cancelled.
City Attorney Archer reported there will be a robust conversation on the salary commission and
Trespass Policy next month.
Police Chief Brown reported Sergeant Main received the 2022 Best Police Officer award, and gave an
update on several police officers and police outreach.
In response to Councilmember Rosapepe, he briefly discussed what is currently going on in Olympia
regarding pursuit laws.
12. CITIZEN COMMENTS (Time Stamp 38:16)
There were no citizen comments.
There was no executive session.
14. GOOD OF THE ORDER (Time Stamp 38:32)
Page 38 of 307
Back to Agenda
Minutes of February 14, 2023
Page 5 of 5
Councilmember Clauson complimented Mayor Pro -Tern Trenary on chairing the meeting.
Councilmember Rosapepe thanked Council for their dignity and respect towards each other during
controversial conversations.
15. ADJOURNMENT
The meeting adjourned at 7:08 p.m. No other action was taken. Audio/Visual was successful.
Brandy Wallace, MMC, City Clerk Mark Trenary, Mayor Pro-Tem
Page 39 of 307
Back to Agenda
Agenda Item No.
Subject
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Business Item 8A
Approval of Amendment No. 1 to Contract No.
Meeting Date: February 28, 2023
Prepared by: Tony Lang
C075-22 with Ceccanti, Inc. for the
McCormick Village Park Splash Pad Atty Routing No:
Treatment Facility Installation project Atty Review Date:
Public Works Director
366922-0009
February 16, 2023
Summary: The City owns and operates a splash pad at the McCormick Village Park for its residents and
desires to modify the existing flow -through system to a recirculating system. This will be accomplished
through the McCormick Village Park Splash Pad Treatment Facility Installation and Retrofitting project
(the "Project"). On July 26, 2022, following a procurement process consistent with the City's Procurement
Policies adopted by Resolution 036-22, the City executed Contract No. C075-22 with Ceccanti Inc. for the
Project (the "Contract"). Additional modifications are needed beyond the original contracted scope of
work for C075-22. These modifications are required based on the Department of Health's regulations,
review, and approval of the designs for the Project, due to additional and unforeseen DOH requirements
for the use of recirculated water at the splash pad. An increase to the Washington State Sales Tax rate
effective January 1, 2023, also affects the total contract price and is reflected in this amendment. These
items will increase the existing contract by $139,136.33 for a new total contract price of $729,522.85. Due
to the Department of Health's regulations and time for review, the duration of the contract has been
extended to December 31, 2023.
Recommendation: Staff recommends that the City Council authorize the Mayor to execute Change
Order No. 1 to Contract C075-22 with Ceccanti, Inc for the McCormick Village Park Splash Pad Treatment
Facility Installation project.
Relationship to Comprehensive Plan: Chapter 4: Parks
Motion for Consideration: I move to authorize the Mayor to execute Change Order No. 1 to Contract No.
C075-22 with Ceccanti, Inc. for the McCormick Village Park Splash Pad Treatment Facility Installation
project.
Fiscal Impact: The 2023-2024 biennial budget includes $590,400 for this project from Park Impact Fees.
A Budget amendment will be required to provide the additional funding from Park Impact Fees. The
expenses for this project are budgeted in GL Code 302.05.594.76.60
Alternatives: Do not authorize and provide alternative guidance.
Attachments: Change Order No.1, Attachment A, Courtesy Copy of Contract C075-22
Page 40 of 307
Back to Agenda
CITY OF PORT ORCHARD
Authorization for Change Order No. 1
Date: February 28, 2023
Project: McCormick Village Park
Splash Pad Treatment
Contract / Job #
Facility Installation
C075-22
Contractor: Ceccanti, Inc
4116 Brookdale Road East
Tacoma, WA 98446
THIS CHANGE ORDER AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT:
• Sales Tax Increase: January 1, 2023, the Washington State Sales Tax rate increased in the City of
Port Orchard from 9.2% to 9.3% increasing the original contract by $540.65.
• Additional modifications based on Department of Health regulations (see Attachment A).
$126,803 plus WSST $11,792.68 = $138,595.68
• Contract Start Date: Due to delays with Department of Health reviews the duration of the
contract is extended thru December 31, 2023.
In all other respects the Underlying agreement between the parties shall remain in full force and effect,
amended as set forth herein, but only as set forth herein.
Contract History
Amount Sales Tax Total Date Appvd b
Original Contract
$540,647.00
$49,739.52
$590,386.52
26-Jul-22
Council
Change Order 1
$126,803.00
$12,333.33
$139,136.33
28-Feb-23
Council
Total Contract $667,450.00 $62,072.85 $729,522.85
I have reviewed the Change Order information above and certify that to the best of my knowledge
descriptions and costs are true and accurate.
Contractor Approval Signature
Printed Name & Title
Change Orders that do not exceed 10%, with a maximum of
$50,000, of either legally authorized budget limit or contract
amount established by City Council can be approved by the Public
Works Director.
Change Orders that do not exceed 10%, with a maximum of
$100,000, of either legally authorized budget limit or contract
amount established by City Council are to be approved by the
Mayor.
Change Orders over $100,000 or exceed a total of 10% require
Council Action.
Public Works Director/City Engineer
Tony Lang
Printed Name
Approved:
Mayor
Attest: City Clerk
Council Approval Date
Page 41 of 307
Back to Agenda
Attachment
CECCANT!
February 16, 2023
Attn: Chris Hammer
City of Port Orchard, Wa
216 Prospect Street
Port Orchard, WA 98366
Re: Change Order Request
McCormick Woods Splash Pad
Treatment Equipment Installation
Contract No. C075-22
Serial Letter 01
Ceccanti, Inc. has received revisions to the drawings and equipment
specifications for the McCormick Village Park Splash Pad Retrofit project. These
drawings were received via email for download on January 11, 2023 and change
the work and equipment from what was originally proposed. Ceccanti, Inc. would
like to request a change order be issued to cover the additional charges
associated with these changes. A listing of the noted changes are shown below.
The installed pricing below does not include interior lining for the vaults.
• Additional Clearing - $2,500
• Basket Strainer Vault with Internals - $14,000
• Duplex pumps location moved to overflow vault — no charge $0
• Overflow vault added (less cost of pumps) - $11,000
• Added 4" field valves - $3,500
• Water Reservoir Vault with pump and mechanicals - $41,000
• Underground piping between bldg/overfow vault/water reservoir - $18,000
• Floor Drain in building — connect to overflow vault - $2,800
• Second Pump in building - $9,000
• (2) eyewash stations - $1,500
• Misc. for additional piping in building (mounting/misc. fittings) - $9,800
• 3" Flow Meter - $1,900
• Indicating Pressure Transmitter - $2,800
• Additional 3" valves (ball/pressure relief/back pressure) - $7,000
• Credit (6) vessels and piping - <$18,000>
CICCANTI INC GINIRAI CONSTRUCTION 4110 OROOMDA11 RD,1, TACOMA WA 0844012531531.2000 FAX 12531531.0043
Page 42 of 307
Back to Agenda
CECCANTI
• Add Conduit and Wire for one starter and pressure transmitter in pump
room. One starter, high and low water cutoff floats, and power for reservoir
pump (pumps and floats supplied by others). Conduit and wire for Chorine
analyzer (Analyzer supplied by others). Conduit and wire for backwash
(control panel assumed to be integral to backwash and supplied by
others). - $17,860 w/ 12% markup = $20,003
• Supply pre -manufactured spray park control panel (Budget only) - $5,000
w/ 12% markup = $5,600
• Supply engineered custom fabricated spray park control panel (Budget
only) - $25,000 w/ 12% markup = $28,000
Total request this change order = $126,803
Total request including contingency = $160,403
Please do not hesitate to contact me with any questions regarding this request.
Respectfully,
Brian De pp
Ceccanti, Inc.
Ph. 253-377-7358
brian@ceccantiinc.com
CECCANTI INC GENERAL CONSTRUCTION 4110 OROOMDALE RD. E. TACOMA WA 08440 (253) 537.2000 FAX (2531537.0043
Page 43 of 307
Back to Agenda
CONTRACT
CITY OF PORT ORCHARD
McCormick Village Park Splash Pad Treatment Facility Installation
CONTRACT NO. C075-22
THIS CONTRACT ("Contract") is made and entered into this 26th day of July, 2022, by and
between the City of Port Orchard, a municipality incorporated and existing under the laws of the
State of Washington, hereinafter called the "City," and Ceccanti, Inc., hereinafter called the
"Contractor."
WITNESSETH:
I. General Provisions.
A. Description of Work.
The Contractor, in consideration of the covenants, agreements and payments to be performed
and made by the City, hereby covenants and agrees to furnish all labor, tools, materials,
equipment and supplies required for, and to execute, construct and finish in full compliance with
the Contract Documents, McCormick Village Park Splash Pad Treatment Facility Installation. The
Contractor further agrees to perform all such work for the Contract Price stated in the
Contractor's Bid Proposal dated June 24, 2022, attached hereto and incorporated herein by this
reference as if set forth in full. Contractor further represents that the services furnished under
this Agreement will be performed in accordance with and as described in the attached plans and
specifications and with the Port Orchard Municipal Code, the City's Public Works Standards,
which includes (but is not limited to) the 2021 edition of the WSDOT Standard Specifications for
Road, Bridge, and Municipal Construction (which shall apply except where noted otherwise). All
of these standards are by this reference incorporated herein and made a part hereof. Contractor
further represents that the services furnished under this Agreement will be performed in
accordance with generally accepted professional practices within the Puget Sound region in
effect at the time such services are performed.
The Contract Documents include:
Exhibit A -a confirmed copy of the Proposal made by the Contractor on June 24, 2022,
together with the Instructions to Bidders.
Exhibit B — The Project Manual for the McCormick Village Park Splash Pad Treatment Facility
Installation.
Exhibit C — Retainage Options
All Exhibits to this Contract are by this reference incorporated herein and made a part hereof as
if set forth in full.
Rev 3118122
City of Port Orchard and Ceccanti, Inc.
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract #C075-22
Page 1 of 30
Page 44 of 307
Back to Agenda
B. Time of Completion.
Time is of the essence of this Contract. It is agreed that the Preconstruction Phase work covered
by this Contract shall start within 14 calendar days after Notice to Proceed is issued and that
Construction Phase shall begin after September 12, 2022. Construction shall be complete not
later than March 31, 2023.
C. Liquidated Damages.
It is further agreed that the City will suffer damage and be put to additional expense in the event
that the Contractor shall not have the specified portions of the work completed in all its parts in
the time specified, and as it may be difficult to accurately compute the amount of such damage,
the Contractor expressly covenants and agrees to pay to the City liquidated damages, the sum as
calculated by the equation shown in Section 1-08.9 of the WSDOT Standard Specifications, for
each and every working day said work is not complete beyond the time shown in the Proposal.
II. Non -Discrimination.
During the performance of this Contract, the Contractor, for itself, its assignees, and successors
in interest agrees to comply with the following non-discrimination statutes and authorities;
including but not limited to compliance with the following Pertinent Non -Discrimination
Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 C.F.R. Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970,
(42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property
has been acquired because of Federal or Federal -aid programs and projects);
Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on
the basis of sex);
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended,
(prohibits discrimination on the basis of disability); and 49 C.F.R. Part 27;
The Age Discrimination Act of 1975, as amended, (42 U S.C. § 6101 et seq.), (prohibits
discrimination on the basis of age);
A Airport and Airway Improvement Act of 1982, (49 USC§ 471, Section 4 7123), as
amended, (prohibits discrimination based on race, creed, color, national origin, or sex);
The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage
and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of
1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of
the terms "programs or activities" to include all of the programs or activities of the
Federal -aid recipients, sub- recipients and contractors, whether such programs or
activities are Federally funded or not);
Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on
the basis of disability in the operation of public entities, public and private
Rev 3118122
City of Port Orchard and Ceccanh, Inc.
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract #C075-22
Page 2 of 30
Page 45 of 307
Back to Agenda
transportation systems, places of public accommodation, and certain testing entities (42
U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at
49 C.P.R. parts 37 and 38;
The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123)
(prohibits discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low-income Populations, which ensures discrimination against minority
populations by discouraging programs, policies, and activities with disproportionately
high and adverse human health or environmental effects on minority and low-income
populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English
Proficiency, and resulting agency guidance, national origin discrimination includes
discrimination because of limited English proficiency (LEP). To ensure compliance with
Title VI, you must take reasonable steps to -ensure that LEP persons have meaningful
access to your programs (70 Fed. Reg. at 74087 to 74100);
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from
discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).
Title VI of the Civil Rights Act of 1964
The City of Port Orchard, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252,
42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of
Transportation subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted
programs of the Department of Transportation issued pursuant to such Act, must affirmatively
ensure that its contracts comply with these regulations.
Also, in accordance with Title VI, the City is required to include the following clauses in every
contract subject to Title VI and its related regulations.
Therefore, during the performance of this Contract, the Contractor, for itself, its assignees, and
successors in interest agrees as follows:
1. Compliance with Regulations: The Contractor will comply with the Acts and the
regulations relative to Nondiscrimination in Federally -assisted programs of the U.S.
Department of Transportation, Federal Highway Administration (FHWA), as they may be
amended from time to time, which are herein incorporated by reference and made a part
of this Contract.
2. Nondiscrimination: The Contractor, with regard to the work performed by it during this
Contract, will not discriminate on the grounds of race, color, national origin, sex, age,
disability, income -level, or LEP in the selection and retention of subcontractors, including
procurements of materials and leases of equipment. The Contractor will not participate
directly or indirectly in the discrimination prohibited by the Acts and the Regulations as
set forth in Appendix A, attached hereto and incorporated herein by this reference,
Rev 3118122
City of Port Orchard and Ceccanli, Inc
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract 4CO75-22
Page 3 of 30
Page 46 of 307
Back to Agenda
including employment practices when this Contract covers any activity, project, or
program set forth in Appendix B of 49 C.F.R. part 21.
3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In
all solicitations, either by competitive bidding, or negotiation made by the Contractor for
work to be performed under a subcontract, including procurements of materials, or
leases of equipment, each potential subcontractor or supplier will be notified by the
Contractor of the Contractor's obligations under this Contract and the Acts and the
Regulations relative to Non-discrimination on the grounds of race, color, national origin,
sex, age, disability, income -level, or LEP.
4. Information and Reports: The Contractor will provide all information and reports
required by the Acts, the Regulations and directives issued pursuant thereto and will
permit access to its books, records, accounts, other sources of information, and its
facilities as may be determined by the City or the FHWA to be pertinent to ascertain
compliance with such Acts, Regulations, and instructions. Where any information
required of the Contractor is in the exclusive possession of another who fails or refuses
to furnish the information, the Contractor will so certify to the City or the FHWA, as
appropriate, and will set forth what efforts it has made to obtain the information.
5. Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the
Non-discrimination provisions of this Contract, the City will impose such contract
sanctions as it or the FHWA may determine to be appropriate, including, but not limited
to:
1. withholding payments to the Contractor under the Contract until the Contractor
complies; and/or
2. cancelling, terminating, or suspending the Contract, in whole or in part.
6. Incorporation of Provisions: The Contractor will include the provisions of paragraphs one
through six in every subcontract, including procurements of materials and leases of
equipment, unless exempt by the Acts, the Regulations and directives issued pursuant
thereto. The Contractor will take action with respect to any subcontract or procurement
as the City or the FHWA may direct as a means of enforcing such provisions including
sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is
threatened with litigation by a subcontractor, or supplier because of such direction, the
Contractor may request the City to enter into any litigation to protect the interests of the
City. In addition, the Contractor may request the United States to enter into the litigation
to protect the interests of the United States.
III. Public Records Act Chapter 42.56 RCW
Contractor understands that her/his bid response documents, and any contract documents may
be subject to release under the Public Records Act Chapter 42.56 RCW and the City may be
required to disclose such documents upon a request. Contractor acknowledges that s/he has
Rev 3118122
City of Port Orchard and Ceccanti, Inc
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract #C075-22
Page 4 of 30
Page 47 of 307
Back to Agenda
been advised to mark any records believed to be trade secrets or confidential in nature as
"confidential." If records marked as "confidential' are found to be responsive to the request for
records, the City as a courtesy to the Contractor, may elect to give notice to Contractor of the
request so as to allow Contractor to seek a protective order from a Court. Contractor
acknowledges and agrees that any records deemed responsive to a public records request may
be released at the sole discretion of, and without notice by, the City.
IV. Termination
The City may terminate this contract for cause or for convenience.
1. Termination for Cause. The City may, upon 7 days written notice to Contractor and to
its surety, terminate (without prejudice to any right or remedy of the City) the contract,
or any part of it, for cause upon the occurrence of any one or more of the following
events: Contractor fails to complete the work or any portion thereof with sufficient
diligence to ensure substantial completion of the work within the contract time;
Contractor is adjudged bankrupt, makes a general assignment for the benefit of its
creditors, or a receiver is appointed on account of its insolvency; Contractor fails in a
material way to replace or correct work not in conformance with the Contract
Documents, Contractor repeatedly fails to supply skilled workers or proper materials or
equipment; Contractor materially disregards or fails to comply with laws, ordinances,
rules, regulations, or orders of any public authority having jurisdiction; or Contractor is
otherwise in material breach of any provision of the contract. Upon termination, the City
may, at its option, take possession of or use all documents, materials, equipment, tools,
and construction equipment and machinery thereon owned by Contractor to maintain
the orderly progress of, and to finish, the work, and finish the work by whatever other
reasonable method it deems expedient.
2. Termination for Convenience. The City may, upon written notice, terminate (without
prejudice to any right or remedy of the City) the contract, or any part of it, for the
convenience of the City.
3. Settlement of Costs. If the City terminates for convenience, Contractor shall be entitled
to make a request for an equitable adjustment for its reasonable direct costs incurred
prior to the effective date of the termination, plus a reasonable allowance for overhead
and profit on work performed prior to termination, plus the reasonable administrative
costs of the termination, but shall not be entitled to any other costs or damages,
whatsoever, provided however, the total sum payable upon termination shall not exceed
the Contract Sum reduced by prior payments.
Rev 3118122
City of Port Orchard and Ceccanti, Inc.
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract 9C075-22
Page 5 of 30
Page 48 of 307
Back to Agenda
V. Corporate Surety Bond
With this Contract, Contractor is furnishing a Corporate Surety Bond in the amount of
1 vc hwr d,rerA u %" -1-...v%w c TN.«e,
1 *.arm► Ek1;m A xw% ' fr,Nu ,x(=l ollars
as Surety, to ensure full compliance, execution and performance of this Contract by the
Contractor in accordance with all its terms and provisions.
VI. Independent Contractor.
The parties intend that an Independent Contractor -Employer Relationship will be created by this
Agreement and that the Contractor has the ability to control and direct the performance and
details of its work, the City being interested only in the results obtained under this Agreement.
VII. Employment of State Retirees.
The City is a "DRS-covered employer" which is an organization that employs one or more
members of any retirement system administered by the Washington State Department of
Retirement Systems (DRS). Pursuant to RCW 41.50.139(1) and WAC 415-02-325(1), the City is
required to elicit on a written form if any of the Contractor's employees providing services to the
City retired using the 2008 Early Retirement Factors (ERFs), or if the Contractor is owned by an
individual who retired using the 2008 ERFs, and whether the nature of the service and
compensation would result in a retirement benefit being suspended. Failure to make this
determination exposes the City to significant liability for pension overpayments. As a result,
before commencing work under this Agreement, Contractor shall determine whether any of its
employees providing services to the City or any of the Contractor's owners retired using the 2008
ERFs, and shall immediately notify the City and shall promptly complete the form provided by the
City after this notification is made. This notification to DRS could impact the payment of
retirement benefits to employees and owners of Contractor. Contractor shall indemnify, defend,
and hold harmless the City from any and all claims, damages, or other liability, including
attorneys' fees and costs, relating to a claim by DRS of a pension overpayment caused by or
resulting from Contractor's failure to comply with the terms of this provision. This provision shall
survive termination of this Agreement.
Rev 3118122
City of Port Orchard and Ceccanti, Inc.
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract 9C075-22
Page 6 of 30
Page 49 of 307
Back to Agenda
Vill. Changes.
The City may issue a written change order for any change in the Contract work during the
performance of this Agreement. If the Contractor determines, for any reason, that a change
order is necessary, Contractor must submit a written change order request to the person listed
in the Notice provision section of this Agreement, within fourteen (14) calendar days of the date
Contractor knew or should have known of the facts and events giving rise to the requested
change. If the City determines that the change increases or decreases the Contractor's costs or
time for performance, the City will make an equitable adjustment. The City will attempt, in good
faith, to reach agreement with the Contractor on all equitable adjustments. However, if the
parties are unable to agree, the City will determine the equitable adjustment as it deems
appropriate. The Contractor shall proceed with the change order work upon receiving either a
written change order from the City or an oral order from the City before actually receiving the
written change order. If the Contractor fails to require a change order within the time specified
in this paragraph, the Contractor waives its right to make any claim or submit subsequent change
order requests for that portion of the contract work. If the Contractor disagrees with the
equitable adjustment, the Contractor must complete the change order work; however, the
Contractor may elect to protest the adjustment as provided in subsections A through E of Section
IX entitled, "Claims," below.
The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a
separate acceptance, or (3) not protesting in the way this section provides. A change order that
is accepted by Contractor as provided in this section shall constitute full payment and final
settlement of all claims for contract time and for direct, indirect and consequential costs,
including costs of delays related to any work, either covered or affected by the change.
IX. Claims. If the Contractor disagrees with anything required by a change order, another
written order, or an oral order from the City, including any direction, instruction, interpretation,
or determination by the City, the Contractor may file a claim as provided in this section. The
Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of
the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of
the date the Contractor knew or should have known of the facts or events giving rise to the claim,
whichever occurs first. Any claim for damages, additional payment for any reason, or extension
of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been
waived by the Contractor unless a timely written claim is made in strict accordance with the
applicable provisions of this Agreement.
At a minimum, a Contractor's written claim shall include the information set forth in subsections
A, items 1 through 5 below.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME
ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE
FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY.
Rev 3118122
City of Port Orchard and Ceccanti, Inc
McCormick village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract 4CO75-22
Page 7 of 30
Page 50 of 307
Back to Agenda
A. Notice of Claim. Provide a signed written notice of claim that provides the following
information:
1. The date of the Contractor's claim;
2. The nature and circumstances that caused the claim;
3. The provisions in this Agreement that support the claim;
4. The estimated dollar cost, if any, of the claimed work and how that estimate was
determined; and
5. An analysis of the progress schedule showing the schedule change or disruption if
the Contractor is asserting a schedule change or disruption.
B. Records. The Contractor shall keep complete records of extra costs and time incurred as
a result of the asserted events giving rise to the claim. The City shall have access to any of the
Contractor's records needed for evaluating the protest.
The City will evaluate all claims, provided the procedures in this section are followed. If the City
determines that a claim is valid, the City will adjust payment for work or time by an equitable
adjustment. No adjustment will be made for an invalid protest.
C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall
proceed promptly to provide the goods, materials and services required by the City under this
Agreement.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the
Contractor also waives any additional entitlement and accepts from the City any written or oral
order (including directions, instructions, interpretations, and determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of
this section, the Contractor completely waives any claims for protested work and accepts from
the City any written or oral order (including directions, instructions, interpretations, and
determination).
X. Limitation Of Actions.
CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH
THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS
COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED.
THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD.
Rev 3118122
City of Port Orchard and Ceccanti, Inc.
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract 9C075-22
Page 8 of 30
Page 51 of 307
Back to Agenda
XI. Warranty.
Upon acceptance of the contract work, Contractor must provide the City a two-year warranty
bond in the amount of twenty percent (20%) of the contract price a form and amount acceptable
to the City. The Contractor shall correct all defects in workmanship and materials within two (2)
years from the date of the City's acceptance of the Contract work, including replacing vegetation
that fails to thrive. In the event any parts are repaired or replaced, only original replacement
parts shall be used —rebuilt or used parts will not be acceptable. When defects are corrected,
the warranty for that portion of the work shall extend for one (1) additional year from the date
such correction is completed and accepted by the City. The Contractor shall begin to correct any
defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the
Contractor does not accomplish the corrections within a reasonable time as determined by the
City, the City may complete the corrections and the Contractor shall pay all costs incurred by the
City in order to accomplish the correction.
XII. Indemnification.
Contractor shall defend, indemnify, and hold the City, its officers, officials, employees, agents
and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all
legal costs and attorney fees, arising out of or in connection with the Contractor's performance
of this Agreement, except for that portion of the injuries and damages caused by the sole
negligence of the City.
The City's inspection or acceptance of any of Contractor's work when completed shall not be
grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor
and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
It is further specifically and expressly understood that the indemnification provided herein
constitutes the contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely
for the purposes of this indemnification. The parties further acknowledge that they have
mutually negotiated this waiver.
THE PROVISIONS OF THIS SECTION SHALL SURVIVE THE EXPIRATION OR TERMINATION OF THIS
AGREEMENT.
XIII. Insurance.
The Contractor shall procure and maintain for the duration of the Agreement, insurance against
claims for injuries to persons or damage to property which may arise from or in connection with
Rev 3118122
City of Port Orchard and Ceccanti, Inc.
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract #C075-22
Page 9 of 30
Page 52 of 307
Back to Agenda
the performance of the work hereunder by the Contractor, its agents, representative, employees
or subcontractors.
No Limitation. Contractor's maintenance of insurance as required by the agreement shall not be
construed to limit the liability of the Contractor to the coverage provided by such insurance, or
otherwise limit the City's recourse to any remedy available at law or in equity.
A. Minimum Scope of Insurance. Contractor shall obtain insurance of the types described
below:
1. Automobile Liability insurance covering all owned, non -owned, hired and leased
vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a
substitute form providing equivalent liability coverage. If necessary, the policy shall be
endorsed to provide contractual liability coverage.
2. Commercial General Liability insurance shall be written on ISO occurrence form
CG 00 01 and shall cover liability arising from premises, operations, stop gap liability,
independent contractors, products -completed operations, personal injury and
advertising injury, and liability assumed under an insured contract. The Commercial
General Liability insurance shall be endorsed to provide the Aggregate Per Project
Endorsement ISO form CG 25 03 1185. There shall be no endorsement or modification of
the Commercial General Liability insurance for liability arising from explosion, collapse or
underground property damage. The City shall be named as an insured under the
Contractor's Commercial General Liability insurance policy with respect to the work
performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and
Additional Insured -Completed Operations endorsement CG 20 37 10 01 or substitute
endorsements providing equivalent coverage.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of
the State of Washington.
4. Builders Risk insurance covering interests of the City, the Contractor,
Subcontractors, and Sub -subcontractors in the work. Builders Risk insurance shall be on
a all-risk policy form and shall insure against the perils of fire and extended coverage and
physical loss or damage including flood and earthquake, theft, vandalism, malicious
mischief, collapse, temporary buildings and debris removal. This Builders Risk insurance
covering the work will have a deductible of $5,000 for each occurrence, which will be the
responsibility of the Contractor. Higher deductibles for flood and earthquake perils may
be accepted by the City upon written request by the Contractor and written acceptance
by the City. Any increased deductibles accepted by the City will remain the responsibility
of the Contractor. The Builders Risk insurance shall be maintained until final acceptance
of the work by the City.
Rev 3118122
City of Port Orchard and Ceccanti, Ina
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract #C075-22
Page 10 of 30
Page 53 of 307
Back to Agenda
B. Minimum Amounts of Insurance. Contractor shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident.
2. Commercial General Liability insurance shall be written with limits no less than
$1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products -
completed operations aggregate limit.
3. Builders Risk insurance shall be written in the amount of the completed value of
the project with no coinsurance provisions.
C. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to
contain, the following provisions for Automobile Liability, Commercial General Liability and
Builders Risk insurance:
1. The Contractor's insurance coverage shall be primary insurance as respect the
City. Any insurance, self-insurance, or insurance pool coverage maintained by the City
shall be excess of the Contractor's insurance and shall not contribute with it.
2. The Contractor's insurance shall be endorsed to state that coverage shall not be
cancelled by either party, except after thirty (30) days prior written notice by certified
mail, return receipt requested, has been given to the City.
D. Contractor's Insurance for Other Losses. The Contractor shall assume full responsibility
for all loss or damage from any cause whatsoever to any tools, Contractor's employee -owned
tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the
Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding
and protective fences.
E. Waiver of Subrogation. The Contractor and the City waive all rights against each other
any of their Subcontractors, Sub -subcontractors, agents and employees, each of the other, for
damages caused by fire or other perils to the extend covered by Builders Risk insurance or other
property insurance obtained pursuant to the Insurance Requirements Section of this Contract or
other property insurance applicable to the work. The policies shall provide such waivers by
endorsement or otherwise.
F. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best
rating of not less than ANIL
G. Verification of Coverage. Contractor shall furnish the City with original certificates and a
copy of the amendatory endorsements, including but not necessarily limited to the additional
insured endorsement, evidencing the Automobile Liability and Commercial General Liability
insurance of the Contractor before commencement of the work. Before any exposure to loss may
occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy that
Rev 3118122
City of Port Orchard and Ceccanti, Inc
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract #C075-22
Page 11 of 30
Page 54 of 307
Back to Agenda
includes all applicable conditions, exclusions, definitions, terms and endorsements related to this
Project.
H. Subcontractors. Contractor shall ensure that each subcontractor of every tier obtain at a
minimum the same insurance coverage and limits as stated herein for the Contractor (with the
exception of Builders Risk insurance). Upon request the City, the Contractor shall provide
evidence of such insurance.
XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary
precautions and shall be responsible for the safety of its employees, agents, and subcontractors
in the performance of the contract work and shall utilize all protection necessary for that
purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for
any loss of or damage to materials, tools, or other articles used or held for use in connection with
the work.
XV. Miscellaneous Provisions.
A. Non -Waiver of Breach. The failure of the City to insist upon strict performance of any of
the covenants and agreements contained in this Agreement, or to exercise any option conferred
by this Agreement in one or more instances shall not be construed to be a waiver or
relinquishment of those covenants, agreements or options, and the same shall be and remain in
full force and effect.
B. Resolution of Disputes and Governing Law. This Agreement shall be governed by and
construed in accordance with the laws of the State of Washington. If the parties are unable to
settle any dispute, difference or claim arising from the parties' performance of this Agreement,
the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit
exclusively under the venue, rules and jurisdiction of the Kitsap County Superior Court, Kitsap
County, Washington, unless the parties agree in writing to an alternative dispute resolution
process. In any claim or lawsuit for damages arising from the parties' performance of this
Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award
provided by law; provided, however, nothing in this paragraph shall be construed to limit the
City's right to indemnification under Section XII of this Agreement.
C. Written Notice. All communications regarding this Agreement shall be sent to the parties
at the addresses listed on the signature page of the Agreement, unless notified to the contrary.
Any written notice hereunder shall become effective three (3) business days after the date of
mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the
addressee at the address stated in this Agreement or such other address as may be hereafter
specified in writing.
D. Assignment. Any assignment of this Agreement by either party without the written
consent of the non -assigning party shall be void. If the non -assigning party gives its consent to
Rev 3118122
City of Port Orchard and Ceccanti, Inc.
McCormick Village Park Splash Pad Treatment Facility Installation Project # PW2022-008 Contract 4CO75-22
Page 12 of 30
Page 55 of 307
Back to Agenda
DocuSign Envelope ID: B2579A07-6DDC-43BA-A76F-7604D5420902
any assignment, the terms of this Agreement shall continue in full force and effect and no further
assignment shall be made without additional written consent.
E. Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of
the City and Contractor.
F. Entire Agreement. The written provisions and terms of this Agreement, together with
any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other
representative of the City, and such statements shall not be effective or be construed as entering
into or forming a part of or altering in any manner this Agreement. All of the above documents
are hereby made a part of this Agreement. However, should any language in any of the Exhibits
to this Agreement conflict with any language contained in this Agreement, the terms of this
Agreement shall prevail.
G. Compliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable
to Contractor's business, equipment, and personnel engaged in operations covered by this
Agreement or accruing out of the performance of those operations.
H. Counterparts. This Agreement may be executed in any number of counterparts, each of
which shall constitute an original, and all of which will together constitute this one Agreement.IN
WITNESS WHEREOF the parties hereto have caused these presents to be duly executed.
CITY OF PORT ORCHARD C.
4.op,po�gr �p
By: Fned by: �p
rZ Naaw Smt = SEAL
Robert Putaansuu, Mayor f ;:
r.,qT • . �eF, .
CONTRACTOR
r
By:
seder Ciriend
Title: ,n..�:.�...,
Address: L} k P�rn�l�da�a. 1�aQd, EaS�
TALUMC% U-,a
A u$fgned by:
i ''JU
Brandy Wallace, MMC, City Clerk
Rev 3 18 22
0(11 of f'or( Orchard and Coccuw(i, ha•
McCormick Village Purk JjYlash Peed Trcunnciw Feledi(v lns(uFluhow Project r 111V202 -008 Cow) -act '( V-5-22
Pgee 13 0f30
Page 56 of 307
DocuSign Envelope ID: B2579A07-6DDC-,43BA-A76F-7604D5420902
Back to Agenda
APPROVED AS TO FORM:
❑ocuStgned by.
�• _ ..
Charlotte Archer, City Attorney
NOTICES TO BE SENT TO:
CONTRACTOR:
CITY
INSERT NAME C. or-\}•,VIL• City of Port Orchard Public Works Department
ADDRESS` Vp lhnn Ciwl�Rc► E 216 Prospect Street, Port Orchard, WA 98366
TELEPHONE (360) 876-4991
TELEPHDNE Q
FAX: 360 876-4980
Email (2 ti' ty-) Email: publicworks@cityofportorchard,u5
With a copy to the City Clerk at the same address
( Y{r ol'Porl Orelabel and Cec•c•ami, lnc
Vc('onnlck I'Mage Pau•k,tijeler.clr Pad )-robnew lvacllar ha.elollolfoil Prolru a 11II'20224MS ('onrrarl .('0
Pugs la of 30
Page 57 of 307
Exhibit A
Back to Agenda
PROPOSAL
CITY OF PORT ORCHARD
MCCORMICK VILLAGE PARK SPLASH PAD TREATMENT FACILITY INSTALLATION
CONTRACT NO.0046-22
To: Mayor and City Council
City of Port Orchard, Washington
Contractor: C�\ �_-
State License No.: QF-CLgI*a 7� ck�
Date: `D � I aj4� o Q;L9,
Month/Day/Year
Bidder's Declaration and Understanding
The Bidder declares that s/he has carefully examined the Contract Documents for the
construction of the project, that s/he has personally inspected the site, that s/he has satisfied
her/himself as to the quantities involved, including materials and equipment, and conditions of
work involved, including the fact that the description of the quantities of work and materials, as
included herein, is brief and is intended only to indicate the general nature of the work and to
identify the said quantities with the detailed requirements of the Contract Documents, and that
this Proposal is made according the provisions and under the terms of the Contract Documents,
which Documents are hereby made a part of this Proposal. The Bidder further declares that s/he
has exercised her/his own judgment regarding the interpretation, of subsurface information and
has utilized all data, which s/he believes pertinent from City and other sources and has made
such independent investigations asthe Bidder deems necessary in arriving at her/his conclusions.
Bidder understands that any bid response documents may be subject to release underthe Public
Records Act Chapter 42.56 RCW and the City may be required to disclose bid responses upon a
request. Bidder acknowledges that s/he has been advised to mark any records believed to be
trade secrets or confidential in nature as "confidential." If records marked as "confidential" are
found to be responsive to the request for records, the City as a courtesy to the Bidder may elect
to give notice to Bidder of the request so as to allow Bidder to seek a protective order from a
Court. Bidder acknowledges and agrees that any records deemed responsive to a public records
request may be released at the sole discretion of, and without notice by, the City.
Contract Execution
The Bidder agrees that if this Proposal is accepted, s/he will, within fourteen (14) calendar days after
Notice of Award, complete and sign the Contract in the form annexed hereto, and will at that time
deliver to the City executed copies of the Performance Bond, Labor and Material Payment bond, the
Certificate of Insurance, and other documentation required by the Contract Documents, and will, to
the extent of her/his Proposal, furnish all machinery, tools, apparatus and other means of
construction and do the work and furnish all the materials or services necessary to complete all work
as specified or indicated in the Contract Documents.
Rev 1129118 by SEC
City of Part Orchard
McCormick 1 illage Park Splash Pad Treatment Facility Installation, Project # PTV2022-008, Contract #C075-22
LD-13
Bid Documents
Page 58 of 307
Back to Agenda
Start of Construction and Contract Completion
The Bidder further agrees that within fourteen (14) calendar days of CONTRACT START DATE,
s/he will meet with engineering personnel and begin Preconstruction Phase work no later than
five (5) days after the CONTRACT START DATE, and complete the construction within sixty (60)
working days of the Construction Phase START DATE that shall begin after September 12, 2022.
Lump Sum and Unit Price Work
The Bidder further proposes to accept as full payment for the work proposed herein the amounts
computed under the provisions of the Contract Documents and based on lump sum and unit price
amounts, it being expressly understood that the unit prices are independent of the exact
quantities involved. The Bidder agrees that the lump sum prices, and the unit prices represent a
true measure of the labor, services, and materials required to perform the work, including all
allowances for overhead and profit for each type and unit of work called for in these Contract
Documents.
If any material, item, or service required by the Contract Documents has not been mentioned
specifically, the same shall be furnished and placed with the understanding that the full cost to
the City has been merged with prices named in the proposal.
Rev 1129118 by SEC
Cily of Port Orchard
McCormick Village Park Splash Pad Treatment Facility Installation, Project # PYV2022-008, Contract #C075-22
LD-14
Bid Documents
Page 59 of 307
Back to Agenda
SCHEDULE OF CONTRACT PRICES
MCCORMICK VILLAGE PARK SPLASH PAD TREATMENT FACILITY INSTALLATION
NOTE: Unit prices for all items and the total amount bid must be shown. The Project must be bid
in its entirety, including all bid items as specifically listed in the Proposal, in orderto be considered
a responsive bid. Where conflict occurs between the unit price and the total amount named for
any items, the unit price typed or printed and entered in ink shall prevail. The Contracting Agency
reserves the right to award all work bid accordingto the lowest qualified responsive bid tendered,
available funds, and as it best serves the interest of the Contracting Agency. All work awarded
will be made to the same Contractor/bidder.
Item Estimated SP or Unit
No. Quantity Description of Items priceTAmounSTDt
1 1 STD Mobilization ?JP �OW
$ LS $ i3a
Mobilization consists of preconstruction expenses and the costs of preparatory
Work and operations performed by the Contractor which occur before 10
percent of the total original Contract amount is earned from other Contract
items. Items which are not to be included in the item of Mobilization include but
are not limited to: any portion of the Work covered by the specific Contract
item or incidental Work which is to be included in a Contract item or items;
profit, interest on borrowed money, overhead, or management costs; any costs
of mobilizing equipment for force account Work. Based on the lump sum
Contract price for "Mobilization", partial payments will be made as follows:
when 5 percent of the total original Contract amount is earned from other
Contract items, excluding amounts paid for materials on hand, 50 percent of the
amount Bid for mobilization, or 5 percent of the total original Contract amount,
whichever is the least, will be paid. 2; when 10 percent of the total original
Contract amount is earned from other Contract items, excluding amounts paid
for materials on hand, 100 percent of the amount Bid for mobilization, or 10
percent of the total original Contract amount, whichever is the least, will be
paid; when the Substantial Completion Date has been established for the
project, payment of any amount Bid for mobilization in excess of 10 percent of
the total original Contract amount will be paid. (1-09) Per Lump Sum
Al 1 SP Demolition and Removals
$ vu' v LS 011�
Demolition and Removals ump sum will be full payment for all Work
associated with the preparation for and implementation of demolition
and removal, as indicated on the plans, except included in or incidental to
other bid items (See Drawings)
A2 1 1 STD I Erosion Control
, 6V 1 LS I$
Rev 1129118 b v SEC
Cih° ofAortOrchard
McCormick Tillage Park Splash Pad Treatment Facility Installation, Project 4 PYV2022-008, Contract #C075-22
LD-1 5
BidDocnments
Page 60 of 307
Back to Agenda
Item Estimated SP or Unit
Description of Items Amount
No. Quantity STD Price
Erosion control lump sum shall be full payment for the work, materials,
tools, labor, and equipment required to install, maintain, and remove all
erosion control measures, except Stabilized Construction Entrance (Bid
Item A3) or Temporary Fence (Bid Item A4), (See Drawings)
A3 1 STD Construction Entrance
$ , (] o
EA
$
Stabilized construction entrances will be measured by each entrance
constructed. The unit price will include all work, materials, tools, labor,
and equipment required to install, maintain, and remove the
Construction Entrance. (See Drawings)
STD Temporary Fence
A4
1
$ LS $
Temporary Fence wilf be measured by linear foot of completed fence.
The unit price for temporary fence shall include all work, materials, tools,
labor, and equipment required to install, maintain, and remove
Temporary Fence. (See Drawings)
SP Excavation Export Excess Materials
A5
1
Full payment for all Work associated
with transport of excess materials. (See
SP
Drawings)
Gravel 7-Inch
Per Lump Sum
A6
551
$ SF
The unit price per square foot shall include hauling, furnishing, placing,
and compacting base rock as shown on the Plans and specified in the
Contract Documents. The unit price shall also include the removal and
proper disposal of material being replaced by the gravel. No additional or
separate payment shall be made for sub -grade preparation. (See
Drawings) �/17
A7
315
STD Base Rock 4-Inch ,tom
Tic
The unit price per ton shall include hauling, furnishing, placing, a d
compacting base rock as shown on the
Plans and specified in the Contract Documents. The unit price shall also
include the removal and proper disposal of material being replaced by
Rev 1129118 by SEC
City of Port Orchard
McCormick Pillage Park Splash Pcrd Ti-eatmentFacility Installation, Project 4 PTV2022-008, Contract #C075-22
LD-16
Bid Documents
�94s.w
- gyp:71
Page 61 of 307
Back to Agenda
Item
No.
Estimated SIP or
Quantity STD
Description of Items
Unit
Price
Amount
the base rock. No additional or separate payment shall be made for sub -
grade preparation. (See Drawings)
A8
10
STD
Concrete
$
CY
$
Cement co ncretd pavement will be measured by the cubic yard for the
completed pavement. The volume will be determined from measurements
taken as listed: the width measurement will be the width of the pavement
shown on the typical cross-section in the Plans, additional widening where
called for, or as otherwise specified in writing by the Engineer; the length will be
measured along the center of each Roadway or ramp; the depth shall be
determined by magnetic pulse induction thickness testing. The depth utilized to
calculate the volume shall not exceed the Plan depth plus 0.04 feet. The unit
Contract price per cubic yard for "Cement Conc. Pavement" shall be full
compensation for all costs incurred to carry out the Work. All costs associated
with performing the magnetic pulse induction thickness testing shall be included
in the unit Contract price per cubic yard for "Cement Conc. Pavement" (See
Drawings) n
STD Asphalt Paving 3-inch
A9
236
$ �L).CO n
The unit price per ton shall include all work, materials, tools, labor, and
equipment required for installation of temporary and permanent asphalt
as shown on the Plans and specified in the Contract Documents. The unit
price shall also include sawcutting existing asphalt, removal and proper
disposal of subgrade and all existing asphalt being replaced by the new
asphalt, preparing the sub -grade for paving; cleaning of existing asphalt;
joint sealing; grinding at transitions; placing tack coat; furnishing, hauling,
placing, and compacting the temporary and permanent asphalt
pavement; adjusting all utility covers and monument case covers to the
new grade as necessary; replacing all disturbed pavement striping and
markings; and all other incidental work to complete the asphalt
pavement. No pay factors will be used for temporary or permanent
asphalt pavement. The Contractor is hereby advised that existing asphalt
pavement varies by depth and material and no additional compensation
shall be made for these variances. The unit price per ton shall include all
work, materials, tools, labor, and equipment required for installation of
temporary and permanent asphalt trench patch, as shown on the Plans,
including but not limited to, subgrade preparation, cleaning of existing
asphalt, joint sealing, placing tack coat, furnishing, hauling, placing, and
compacting the temporary and permanent asphalt pavement, adjusting
utility covers and monument case covers to the new grade as necessary,
Rev 1129118 by SEC
Cib, of Port orchard
McConnick Village Park Splash Pad Treatment Facility Installation, Project # PYV2022-008, Contract HC075-22
LD-17
Bid Documents
Page 62 of 307
Back to Agenda
Item
Estimated
SP or Unit
No.
Quantity
STD Description of Items Price
Amount
and replacing disturbed pavement striping and markings. The amount of
asphalt is determined by the surface area shown on the drawings. (See
1
Drawings)
A10
SP
Landscaping
$ODD . PV
LS
_
The Landscaping lump sum a I work, materials, tools, labor, and
equipment required to complete landscaping activities as determined in
the Contract Drawings, including but not limited to seeding, mulching,
planting, and tree pruning (See Drawings)
A11
466
SP
Overexcavation
$ J
CY
$
(Words) (See Drawings)
Per Cubic Yard
Al2
1
STD
Pre -Cast Structure
$
FA
$ D
The unit cost for each Pre -Cast Structure shall include all work, materials,
tools, labor, and equipment required for installation of the pre -cast
structure. (See Drawings)
A13
1
STD
I Site Piping
Is 13d, M.
LS
$TV,. D
The site piping lump sum for site pipe of the kind and size specified in the
contract drawings shall be full pay for furnishing, hauling, and assembling
in place the completed installation including all wyes, tees, special
fittings, joint materials, and bedding and backfill material for the
completion of the installation to the required lines and grades (See
Drawings) per°
B1
252
STD
New Building $A
$
SF l
New building will be measured per square foot for the completed
building. The unit price per square foot shall include all work, materials,
tools, labor, and equipment required for installation of the new building,
as shown in the Contract Drawings, except as included in Building
Foundation.(See Drawings)
C1
3
STD
Building Foundation
$
Cy I
$
Building Foundation will be measured by the cubic yard for the
completed building foundation. The unit price per cubic yard of building
foundation shall be full payment for all costs to perform the Work in
Rev 1129118 by SEC
Cih, ofporl Orchard
McCormick Village Park Splash Pad Treatment Facility Installation, Project # PYV2022-008, Contract #C075-22
LD-18
BidDocnmenls
r3n
Page 63 of 307
Back to Agenda
Item
No.
Estimated
Quantity
SP or
STD
Description of Items
Unit
Price
Amount
connection with constructing building foundation. (Words) (See
Drawings)
D1
1
SP
Grinder Pump Package
$ . 0 U LS
$
The Grinder Pump Package lump sum price shall include all wor
material, tools, labor, and equipment required for installation, testing,
and final set up of Grinder Pump Package. (See Drawings)
SP Media Filter
D2
1
$
LS
$
The Media Filter lump sum price shall include all work, materials, tools,
labor, and equipment required to furnish and install the media filter. (See
Drawings)
SP Chemical Feed Tanks 7•n �$,cx-�O P.
D3
1
_ $ 1 �7� 000_ LS i4�R
The Chemical Feed tanks lump sum price shall include all work, materials,
tools, labor, and equipment required to furnish and install the chemical
feed tanks. (See Drawings)
D4
1
SP
Chemical Feed Pumps
$
LS
The Chemical Feed Pumps lump sum price shall include all work,
materials, tools, labor, and equipment required to furnish and install the
chemical feed pumps. (See Drawings)
D5
1
SP
Miscellaneous Chemical Equipment
0
LS
The Miscellaneous Chemical Equipment lump sum price shall include all
work, materials, tools, labor, and equipment required to furnish and
install the miscellaneous chemical equipment as indicated on the
Contract Drawings. (See Drawings)
D6
1
SP
Interior Mechanic I Piping
$ 4h 02, 00 LS
$
The interior mechanical piping lump sum for kind and size pipe specified
in the contract drawings shall be full pay for furnishing, hauling, and
assembling in place the completed installation including all wyes, tees,
special fittings, joint materials, and appurtenances for the completion of
the installation as indicated on the Contract Drawings. (See Drawings)
E1
1
SP
HVAC Equipment
$ 60 ZU lj -- ---
- LS $ -
Rev 1129118 b y SEC
ON of Port Orcha rd
McCormick Village Park Splash Pad Treatment Facility Installation, Pi oject # PYV2022-008, Contract #C075-22
LD-19
BidDocimenis
V
R, o
Page 64 of 307
Back to Agenda
Item
Estimated
SP or
Unit
No.
Quantity
STD
Description of Items
Price
Amount
The HVAC Equipment lump sum price shall include all work, materials,
tools, labor, and equipment required to furnish and install the HVAC
equipment as indicated on the Contract Drawings (See Drawings)
F1
1
SP 200 Amp Breaker Sub Panel
$
LS
00
The 200 Amp Breaker Sub Panel lump sum price shall include al work,
materials, tools, labor, and equipment required to furnish and install the
200 amp breaker sub panel as indicated on the Contract Drawings(See
Drawings)
Sub -Total $ 'S�-Xjo &i1
Washington State Sales Tax (9.2%) $ Llq ,39 . Sa
TOTAL $ , 5-2-
SALES TAX
Retailing/Retail Sales Tax Rule WAC 458-20-170: Washington State Retail sales tax added as percent (%)
in addition to contract bid price; sales tax shown as separate line item.
Rev 1129118 by SEC
Cih° of Port Orchard
McCormick Village Park Splash Pad Treatment Facility Installation, Pi oject # PVV2022-008, Contract NC075-22
LD-20
Bid Documents
Page 65 of 307
Back to Agenda
The undersigned Bidder hereby agrees to start construction on this project, if awarded, no later
than fourteen (14) calendar days after Notice to Proceed and to complete the project within the
time stipulated in the Contract. By signing below, Bidder acknowledges receipt of the following
Addenda to the Bid Documents:
CITY OF PORT ORCHARD
MCCORMICK VILLAGE PARK SPLASH PAD TREATMENT FACILITY INSTALLATION
J* CONTRACT NO. C075-22
6
Addendum No. Date i
_50
1�1_2_ _
ipt Addendum No
W
Addendum No. Datelof Receipt Addendum No
Date of Receipt
Date of Receipt
NOTE: Failure to acknowledge receipt of Addenda may be considered as an irregularity in the Bid
Proposal and Owner reserves the right to determine whether the bid will be disqualified.
By signing below, Bidder certifies that s/he has reviewed the insurance provisions of the Bid
Documents and will provide the required coverage.
The undersigned Bidder hereby certifies that, within the three-year period immediately
preceding the bid solicitation date for this Project, the Bidder is not a "willful" violator, as defined
in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a
final and binding citation and notice of assessment issued by the Department of Labor and
Industries or through a civil judgment entered by a court of limited or general jurisdiction.
OFFICIAL AUTHORIZED TO SIGN FOR BIDDER:
"I certify (or declare) under penalty of perjury under the laws of the State of Washington that
the foregoing is true and correct,"
Signature;
Prim Name d Title:
e)eJ
Business Addfess: v
WUL bf00L� Q.� Gas}-
TLJOW10- w\A
Date:
Ula�laoaa
Location or Place Executed (City, State):
fV4. k G1-0 o__, v�
Business Telephone:
C,gs5:) —a°no
NOTES: If the Bidder is a co -partnership, give firm name under which business is transacted;
proposal must be executed by a partner. If the Bidder is a corporation, proposal must be executed
in the corporate name by the president or vice-president (or any other corporate officer
accompanied by evidence of authority to sign).
Rev 1.29/1 S by SEC
Cily of Port Orchard
McCormici; Tillage Park Splash Pad TreahnentFacihld Installation, Project # MV2022-008, Conh•act 9CO75-22
LD-21
BidDocnments
Page 66 of 307
Back to Agenda
STATE OF
)ss.
COUNTY OF
I certify that I know or have satisfactory evidence that av\ Vaigned
this proposal, on oath stated that h&/she was authorized to execute the proposal and
acknowledged it as the \fLLt PfCfpk1ef*-- (title) of
_ �CCc0.�\nc-- (name of party on behalf of whom proposal was
executed) and acknowledged it to be his/her free and voluntary act for the uses and purposes
mentioned in this proposal.
Dated this day of -J-11_ML , 20aa.
Pig'CtE Rq✓ %,�
-�]t
���•`
d wy rs. ; •.. �'
' 100TAn 'w
Notary Public
— ' • '
C 4
YT , J� Qi 1\�
PUBLIC ;
y,,a�:b' �,•'�
'',��''►►�w��►►►''`��,``
Printed Name
+rillllll+
M Commission Expires:
Y p
b �15- -
Rev 1129118 by SEC
City of Port Orchard
McCormick Tillage Park Splash Pad Treatment Facility Installation, Project # PYV2022-008, Contract 9C075-22
LD-22
Bid Documents
Page 67 of 307
Back to Agenda
aw a
Agenda Item No.:
Subject:
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Business Item 8B Meeting Date: February 28, 2023
Adoption of a Resolution Approving a Prepared by: Tony Lang
Contract with CONSOR North America, Public Works Director
Inc. for Construction Support and Atty Routing No.: 366922-0009 — PW
Management Services for the McCormick Atty Review Date: January 18, 2023
Village Park Splash Pad Construction
Project
Summary: The City Public Works Department has identified a need for construction support services to
support the construction of a Splash Pad at McCormick Village Park. On December 13, 2022, pursuant to
the City's Procurement Policies adopted as Resolution No. 036-22, as amended, the City's Public Works
Department established a list of qualified contractors from the 2022 MRSC Consultant Roster (Roster) for
the Main Category — Construction Management and Sub -Category — Project Management, Project
Management Oversight. On December 16, 2022, the City's Public Works Department selected three
qualified consultants from the Roster. On January 3, 2023, after staff reviewed, scored, and ranked the
qualifications of the three consultants selected from the Roster, the City's Public Works Department
identified the highest-ranking firm as Consor North America, Inc. On January 4, 2023, the City received a
defined Scope of Work, Budget and Project Timeline for the Project from Consor, in an amount not to
exceed $57,475.00.
Recommendation: Staff recommends adoption of Resolution No. 001-23, approving Contract No. C005-
23 with Consor North America, Inc. for Construction Support and Management Services for the
McCormick Village Park Splash Pad Construction Project in an amount not to exceed $57,475.00 and
documenting the Professional Services procurement procedures.
Relationship to Comprehensive Plan: Chapter 4: Parks
Motion for Consideration: I move to adopt Resolution No. 001-23, thereby approving Contract No. C005-
23 with Consor North America, Inc. for Construction Support and Management Services for the
McCormick Village Park Splash Pad Construction Project in an amount not to exceed $57,475.00.
Fiscal Impact: A Budget amendment is required. (GL Code 302.05.594.76.60).
Alternative: Do not authorize and provide alternate guidance.
Attachments: Resolution No. 001-23
Contract No. C005-23
Consultant's Proposal (dated 01/04/2023)
Page 68 of 307
Back to Agenda
RESOLUTION NO.001-23
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING
THE MAYOR TO EXECUTE CONTRACT NO. C005-23 WITH CONSOR NORTH
AMERICA, INC. FOR CONSTRUCTION SUPPORT AND MANAGEMENT SERVICES
FOR THE MCCORMICK VILLAGE PARK SPLASH PAD PROJECT AND
DOCUMENTING PROFESSIONAL SERVICES PROCUREMENT PROCEDURES.
WHEREAS, the City has identified a need for construction support services to support
construction of a Splash Pad at McCormick Village Park; and
WHEREAS, the City desires the assistance of a consultant with expertise in Construction
Project Management and Project Management Oversight; and
WHEREAS, on December 13, 2022, pursuant to the City's Procurement Policies adopted
as Resolution No. 036-22, as amended, the City's Public Works Department established a list of
qualified consultants for the project from the MRSC 2022 Consultant Roster for the Main
Category — Construction Management and Sub -Category — Project Management, Project
Management Oversight; and
WHEREAS, on December 16, 2022, the City's Public Works Department selected three
qualified consultants from the MRSC 2022 Consultant Roster; and
WHEREAS, on January 3, 2023, after reviewing the Statement of Qualifications and
scoring the consultants, based upon overall qualifications, the City's Public Works Department
selected Consor North America, Inc., as the responsible and responsive consultant for the
project; and
WHEREAS, on January 4, 2023, Consor North America, Inc. provided the City's Public
Works Department with a viable Proposal; and
WHEREAS, upon completion of the Bidder's Checklist on January 3, 2023, the City's
Public Works Department recommends the City Council approve Consor North America, Inc., to
provide Construction Support and Management Services for the McCormick Village Park Splash
Pad Construction Project; and
WHEREAS, the Port Orchard City Council, at the 2015 recommendation of the State
Auditor's Office, wishes to document their consultant selection process as described above for
this particular contract by Resolution; now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES
Page 69 of 307
Back to Agenda
Resolution No. 001-23
Page 2 of 2
THAT: It is the intent of the Port Orchard City Council that the recitals set forth above
are hereby adopted and incorporated as findings in support of this Resolution.
THAT: The City Council approves and authorizes the Mayor to sign Contract No. C005-
23 with Consor North America, Inc. to provide Construction Support and Management
Services for the McCormick Village Park Splash Pad Construction Project.
THAT: The Resolution shall take full force and effect upon passage and signatures
hereon.
PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested
by the Clerk in authentication of such passage this 2811 day of February 2023.
ATTEST:
Brandy Wallace, MMC, City Clerk
Robert Putaansuu, Mayor
Page 70 of 307
Page 1 of 23
Port Orchard Contract #: C005-23
Authorized Amount: $57,475
Date Start: January 24, 2023
Date End: July 31, 2023
CONSULTANT SERVICES AGREEMENT
McCormick Village Park Splash Pad Construction Support
THIS AGREEMENT is entered into by and between the City of Port Orchard,
Washington, a municipal corporation organized under the laws of the State of Washington ("City") and
Consor North America, Inc., ("Consultant") organized under the laws of the State of Oregon, located
and doing business at 600 University St, Ste 300 Seattle, WA 98101-4196 (hereinafter the "Consultant").
RECITALS:
WHEREAS, the City desires to have certain services performed for its residents; and
WHEREAS, the City has selected the Consultant to perform such services pursuant to certain
terms and conditions; and
NOW, THEREFORE, in consideration of the mutual benefits and conditions set forth below,
the parties agree as follows:
AGREEMENT:
1. Scope of Services to be Performed by Consultant.
The Consultant shall perform those services described on Exhibit "A," which is attached hereto and
incorporated herein by this reference as if set forth in full. In performing such services, the Consultant shall
at all times comply with all federal, state, and local statutes, rules and ordinances applicable to the
performance of such services and the handling of any funds used in connection therewith. The Consultant
shall perform the services diligently and completely and in accordance with professional standards of
conduct and performance. The Consultant shall request and obtain prior written approval from the City if
the scope or schedule is to be modified in any way.
If the services provided hereunder are funded in whole or in part under a Grant Funding Agreement,
then Consultant will comply with the terms of such Grant Funding Agreement to ensure that the City is able
to obtain the maximum funding under such Grant Funding Agreement. If this applies, the City will provide
the Consultant with a copy of the Grant Funding Agreement.
2. Compensation.
The City shall pay the Consultant for services rendered according to the rates and methods set forth
below.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 71 of 307
Back to Agenda
Page 2 of 23
❑ LUMP SUM. Compensation for these services set forth in Exhibit A shall be a Lump Sum
of $
❑x TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not
exceed $57,475 without written authorization and will be based on the list of billing rates and
reimbursable expenses attached hereto as Exhibit `B."
❑ TIME AND MATERIALS. Compensation for these services shall be on a time and
materials basis according to the list of billing rates and reimbursable expenses attached hereto as
Exhibit "B."
❑ OTHER
3. Payment.
A. The Consultant shall maintain time and expense records and provide them to the City
monthly after services have been performed, along with monthly invoices in a format acceptable to the
City for work performed to the date of the invoice.
B. All invoices shall be paid by City warrant within thirty (30) days of receipt of a proper
invoice. If the City objects to all or any portion of any invoice, it shall so notify the Consultant of the
same within fifteen (15) days from the date of receipt and shall pay that portion of the invoice not in
dispute, and the Parties shall immediately make every effort to settle the disputed portion.
C. The Consultant shall keep cost records and accounts pertaining to this Agreement
available for inspection by City representatives for three (3) years after final payment unless a longer
period is required by a third -party agreement. Copies shall be made available on request.
D. On the effective date of this Agreement (or shortly thereafter), the Consultant shall
comply with all federal and state laws applicable to independent contractors, including, but not limited
to, the maintenance of a separate set of books and records that reflect all items of income and expenses
of the Consultant's business, pursuant to Revised Code of Washington (RCW) 51.08.195, as required by
law, to show that the services performed by the Consultant under this Agreement shall not give rise to
an employer -employee relationship between the parties, which is subject to Title 51 RCW, Industrial
Insurance.
E. If the services rendered do not meet the requirements of the Agreement, the Consultant
will correct or modify the work to comply with the Agreement. The City may withhold payment for such
work until the work meets the requirements of the Agreement. The City shall pay the Consultant for
services rendered within ten (10) days after City Council voucher approval. However, if the City objects
to all or any portion of an invoice, it shall notify Consultant and reserves the option to only pay that
portion of the invoice not in dispute. In that event, the Parties will immediately make every effort to
settle the disputed portion.
F. The City reserves the right to direct the Consultant's compensated services before
reaching the maximum amount.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 72 of 307
Back to Agenda
Page 3 of 23
4. Duration of Agreement.
A. This Agreement shall be in full force and effect for a period commencing on January 24,
2023, and ending July 31, 2023, unless sooner terminated under the provisions of this Agreement. The
City reserves the right to offer two (2) one-year extensions prior to expiration of the Agreement to retain
the Consultant's services.
B. Time is of the essence of this Agreement in each and all of its provisions in which
performance is required. If delays beyond the Consultant's reasonable control occur, the Parties will
negotiate in good faith to determine whether an extension is appropriate.
C. The Consultant shall obtain a City of Port Orchard business license prior to commencing
work pursuant to a written Notice to Proceed.
D. The Consultant is authorized to proceed with services upon receipt of a written Notice to
Proceed.
5. Standard of Care.
The Consultant represents and warrants that it has the requisite training, skill, and experience necessary
to provide the services under this Agreement and is appropriately accredited and licensed by all
applicable agencies and governmental entities. Services provided by the Consultant under this
Agreement will be performed in a manner consistent with that degree of care and skill ordinarily
exercised by members of the same profession currently practicing in similar circumstances.
6. Ownership and Use of Documents.
A. Ownership. Any records, files, documents, drawings, specifications, data, or information,
regardless of form or format, and all other materials produced by the Consultant in connection with the
services provided to the City, shall be the property of the City whether the project for which they were
created is executed or not.
B. Records preservation. Consultant understands that this Agreement is with a government
agency and thus all records created or used in the course of Consultant's work for the City are considered
"public records" and are subject to disclosure by the City under the Public Records Act, Chapter 42.56
RCW ("the Act"). Consultant agrees to safeguard and preserve records in accordance with the Act. The
City may be required, upon request, to disclose the Agreement, and the documents and records submitted
to the City by Consultant, unless an exemption under the Public Records Act applies. If the City receives
a public records request and asks Consultant to search its files for responsive records, Consultant agrees
to make a prompt and thorough search through its files for responsive records and to promptly turn over
any responsive records to the City's public records officer at no cost to the City.
7. Relationship of the Parties; Independent Consultant.
The Parties intend that an independent contractor -client relationship will be created by this Agreement.
As the Consultant is customarily engaged in an independently established trade which encompasses the
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 73 of 307
Page 4 of 23
specific service provided to the City hereunder, no agent, employee, representative or sub -consultant of
the Consultant shall be or shall be deemed to be the employee, agent, representative or sub -consultant of
the City. In the performance of the work, the Consultant is an independent contractor with the ability to
control and direct the performance and details of the work, the City being interested only in the results
obtained under this Agreement. None of the benefits provided by the City to its employees, including,
but not limited to, compensation, insurance, and unemployment insurance are available from the City to
the employees, agents, representatives, or sub -consultants of the Consultant. The City shall not be
responsible for withholding or otherwise deducting federal income tax or social security or contributing to
the State Industrial Insurance Program, or otherwise assuming the duties of an employer with respect to the
Consultant, or any employee of the Consultant. The Consultant will be solely and entirely responsible for
its acts and for the acts of its agents, employees, representatives, and sub -consultants during the
performance of this Agreement. The City may, during the term of this Agreement, engage other
independent contractors to perform the same or similar work that the Consultant performs hereunder.
8. Indemnification.
Consultant shall defend, indemnify, and hold the City, its officers, officials, employees, agents, and
volunteers harmless from any and all claims, injuries, damages, losses or suits including attorneys' fees,
arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this
Agreement, except for injuries and damages caused by the sole negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115,
then, in the event of liability for damages arising out of bodily injury to persons or damages to property
caused by or resulting from the concurrent negligence of the Consultant and the City, its officers,
officials, employees, and volunteers, the Consultant's liability, including the duty and cost to defend,
hereunder shall be only to the extent of the Consultant's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE
PURPOSES OF THIS INDEMNIFICATION. THIS WAIVER HAS BEEN MUTUALLY
NEGOTIATED BY THE PARTIES.
The provisions of this section shall survive the expiration or termination of this Agreement.
9. Insurance.
The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims
for injuries to persons or damage to property which may arise from or in connection with the performance
of the work hereunder by the Consultant, its agents, representatives, or employees.
A. Minimum Scope of Insurance. Consultant shall obtain insurance of the types
described below:
i. Automobile Liability insurance covering all owned, non -owned, hired and leased
vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 74 of 307
Page 5 of 23
01 or a substitute form providing equivalent liability coverage. If necessary, the
policy shall be endorsed to provide contractual liability coverage.
ii. Commercial General Liability insurance shall be written on ISO occurrence form CG
00 01 and shall cover liability arising from premises, operations, independent
Consultants and personal injury and advertising injury. The City shall be named as
an insured under the Consultant's Commercial General Liability insurance policy
with respect to the work performed for the City.
iii. Workers' Compensation coverage as required by the Industrial Insurance laws of the
State of Washington.
iv. Professional Liability insurance appropriate to the Consultant's profession.
B. Minimum Amounts of Insurance. Consultant shall maintain the following insurance
limits:
i. Automobile Liability insurance with a minimum combined single limit for
bodily injury and property damage of $1,000,000 per accident.
ii. Commercial General Liability insurance shall be written with limits no less
than $1,000,000 each occurrence, $2,000,000 general aggregate.
iii. Professional Liability insurance shall be written with limits no less than
$1,000,000 per claim and $1,000,000 policy aggregate limit.
C. Other Insurance Provision. The Consultant's Automobile Liability, Commercial
General Liability, and Professional Liability insurance policies are to contain, or be endorsed to contain,
that they shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool
coverage maintained by the City shall be excess of the Consultant's insurance and shall not contribute
with it.
D. Acceptability of Insurers. Insurance is to be placed with insurers with a current
A.M. Best rating of not less than A-VII.
E. Verification of Coverage. The Consultant shall furnish the City with original
certificates and a copy of the amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of the Consultant before
commencement of the work.
F. Notice of Cancellation. The Consultant shall provide the City with written notice
of any policy cancellation, within two business days of their receipt of such notice.
G. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain
the insurance as required shall constitute a material breach of contract, upon which the City may, after
giving five business days' notice to the Consultant to correct the breach, immediately terminate the
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 75 of 307
Page 6 of 23
contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection
therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the
City, offset against funds due the Consultant from the City.
H. No Limitation. Consultant's maintenance of insurance as required by the
Agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such
insurance, or otherwise limit the City's recourse to any remedy available at law or in equity.
10. Record Keeping and Reporting.
A. The Consultant shall maintain accounts and records, including personnel,
property, financial, and programmatic records, which sufficiently and properly reflect all direct and
indirect costs of any nature expended and services performed pursuant to this Agreement. The
Consultant shall also maintain such other records as may be deemed necessary by the City to ensure
proper accounting of all funds contributed by the City to the performance of this Agreement.
B. The foregoing records shall be maintained for a period of seven (7) years after
termination of this Agreement unless permission to destroy them is granted by the Office of the Archivist
in accordance with Chapter 40.14 RCW and by the City.
11. City's Right of Inspection and Audit.
A. Even though the Consultant is an independent contractor with the authority to control and
direct the performance and details of the work authorized under this Agreement, the work must meet the
approval of the City and shall be subject to the City's general right of inspection to secure the satisfactory
completion thereof. The Consultant agrees to comply with all federal, state, and municipal laws, rules,
and regulations that are now effective or become applicable within the terms of this Agreement to the
Consultant's business, equipment, and personnel engaged in operations covered by this Agreement or
accruing out of the performance of such operations.
B. The records and documents with respect to all matters covered by this Agreement shall
be subject at all times to inspection, review or audit by the City during the performance of this
Agreement. All work products, data, studies, worksheets, models, reports, and other materials in support
of the performance of the service, work products, or outcomes fulfilling the contractual obligations are
the products of the City.
12. Work Performed at the Consultant's Risk.
The Consultant shall take all precautions necessary and shall be responsible for the safety of its
employees, agents, and sub -consultants in the performance of the work hereunder and shall utilize all
protection necessary for that purpose. All work shall be done at the Consultant's own risk, and the
Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or
held by the Consultant for use in connection with the work.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 76 of 307
Back to Agenda
Page 7 of 23
13. Termination.
A. Termination without cause. This Agreement may be terminated by the City at any time
for public convenience, for the Consultant's insolvency or bankruptcy, or the Consultant's assignment
for the benefit of creditors.
B. Termination with cause. This Agreement may be terminated upon the default of the
Consultant and the failure of the Consultant to cure such default within a reasonable time after receiving
written notice of the default.
C. Rights Upon Termination.
i. With or Without Cause. Upon termination for any reason, all finished or
unfinished documents, reports, or other material or work of the Consultant pursuant to this
Agreement shall be submitted to the City, and the Consultant shall be entitled to just and equitable
compensation for any satisfactory work completed prior to the date of termination, not to exceed
the total compensation set forth herein. The Consultant shall not be entitled to any reallocation
of cost, profit or overhead. The Consultant shall not in any event be entitled to anticipated profit
on work not performed because of such termination. The Consultant shall use its best efforts to
minimize the compensation payable under this Agreement in the event of such termination. Upon
termination, the City may take over the work and prosecute the same to completion, by contract
or otherwise.
ii. Default. If the Agreement is terminated for default, the Consultant shall
not be entitled to receive any further payments under the Agreement until all work called for has
been fully performed. Any extra cost or damage to the City resulting from such default(s) shall
be deducted from any money due or coming due to the Consultant. The Consultant shall bear any
extra expenses incurred by the City in completing the work, including all increased costs for
completing the work, and all damage sustained, or which may be sustained, by the City by reason
of such default.
D. Suspension. The City may suspend this Agreement, at its sole discretion. Any
reimbursement for expenses incurred due to the suspension shall be limited to the Consultant's
reasonable expenses, and shall be subject to verification. The Consultant shall resume performance of
services under this Agreement without delay when the suspension period ends.
E. Notice of Termination or Suspension. If delivered to the Consultant in person,
termination shall be effective immediately upon the Consultant's receipt of the City's written notice or
such date as stated in the City's notice of termination, whichever is later. Notice of suspension shall be
given to the Consultant in writing upon one week's advance notice to the Consultant. Such notice shall
indicate the anticipated period of suspension. Notice may also be delivered to the Consultant at the
address set forth in the "Notices" Section herein.
F. Nothing in this Subsection shall prevent the City from seeking any legal remedies it may
otherwise have for the violation or nonperformance of any provisions of this Agreement.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 77 of 307
Back to Agenda
Page 8 of 23
14. Discrimination Prohibited.
A. The Consultant agrees not to discriminate against any employee or applicant for
employment or any other person in the performance of this Agreement because of race, creed, color,
national origin, marital status, sex, age, disability, or other circumstance prohibited by federal, state, or
local law or ordinance, except for a bona fide occupational qualification.
B. Violation of this Section shall be a material breach of this Agreement and grounds for
cancellation, termination, or suspension of the Agreement by the City, in whole or in part, and may result
in ineligibility for further work for the City.
15. Force Majeure.
Notwithstanding anything to the contrary in this Agreement, any prevention, delay or stoppage due to
strikes, lockouts, labor disputes, acts of God, acts of war, terrorist acts, inability to obtain services, labor,
or materials or reasonable substitutes therefor, governmental actions, governmental laws, regulations or
restrictions, civil commotions, casualty, actual or threatened public health emergency (including, without
limitation, epidemic, pandemic, famine, disease, plague, quarantine, and other significant public health
risk), governmental edicts, actions, declarations or quarantines by a governmental entity or health
organization, breaches in cybersecurity, and other causes beyond the reasonable control of the Party
obligated to perform, regardless of whether such other causes are (i) foreseeable or unforeseeable or (ii)
related to the specifically enumerated events in this paragraph (collectively, a "Force Majeure"), shall
excuse the performance of such Party for a period equal to any such prevention, delay or stoppage. To
the extent this Agreement specifies a time period for performance of an obligation of either Party, that
time period shall be extended by the period of any delay in such Party's performance caused by a Force
Majeure. Provided however, that the current COVID-19 pandemic shall not be considered a Force
Majeure unless constraints on a Party's performance that result from the pandemic become substantially
more onerous after the effective date of this Agreement.
16. Assignment and Subcontract.
The Consultant shall not assign or subcontract any portion of the services contemplated by this
Agreement without the prior written consent of the City. Any assignment made without the prior
approval of the City is void.
17. Conflict of Interest.
The Consultant represents to the City that it has no conflict of interest in performing any of the services
set forth in Exhibit "A." In the event that the Consultant is asked to perform services for a project with
which it may have a conflict, Consultant will immediately disclose such conflict to the City.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 78 of 307
Back to Agenda
Page 9 of 23
18. Confidentiality.
All information regarding the City obtained by the Consultant in performance of this Agreement shall
be considered confidential. Breach of confidentiality by the Consultant shall be grounds for immediate
termination.
19. Non -Appropriation of Funds.
If sufficient funds are not appropriated or allocated for payment under this Agreement for any future
fiscal period, the City will so notify the Consultant and shall not be obligated to make payments for
services or amounts incurred after the end of the current fiscal period. This Agreement will terminate
upon the completion of all remaining services for which funds are allocated. No penalty or expense shall
accrue to the City in the event that the terms of the provision are effectuated.
20. Employment of State Retirees.
The City is a "DRS-covered employer" which is an organization that employs one or more members of
any retirement system administered by the Washington State Department of Retirement Systems (DRS).
Pursuant to RCW 41.50.139(1) and WAC 415-02-325(1), the City is required to elicit on a written form
if any of the Contractor's employees providing services to the City retired using the 2008 Early
Retirement Factors (ERFs), or if the Contractor is owned by an individual who retired using the 2008
ERFs, and whether the nature of the service and compensation would result in a retirement benefit being
suspended. Failure to make this determination exposes the City to significant liability for pension
overpayments. As a result, before commencing work under this Agreement, Contractor shall determine
whether any of its employees providing services to the City or any of the Contractor's owners retired
using the 2008 ERFs, and shall immediately notify the City and shall promptly complete the form
provided by the City after this notification is made. This notification to DRS could impact the payment
of retirement benefits to employees and owners of Contractor. Contractor shall indemnify, defend, and
hold harmless the City from any and all claims, damages, or other liability, including attorneys' fees and
costs, relating to a claim by DRS of a pension overpayment caused by or resulting from Contractor's
failure to comply with the terms of this provision. This provision shall survive termination of this
Agreement.
21. Entire Agreement.
This Agreement contains the entire agreement between the parties, and no other agreements, oral or
otherwise, regarding the subject matter of this Agreement shall be deemed to exist or bind either of the
parties. If there is a conflict between the terms and conditions of this Agreement and the attached
exhibits, then the terms and conditions of this Agreement shall prevail over the exhibits. Either party
may request changes to the Agreement. Changes which are mutually agreed upon shall be incorporated
by written amendments to this Agreement.
22. Non -waiver of Breach.
The failure of either party to insist upon strict performance of any of the covenants and agreements
contained herein, or to exercise any option herein contained in one or more instances, shall not be
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 79 of 307
Back to Agenda
Page 10 of 23
construed to be a waiver or relinquishment of said covenants, agreements, or options, and the same shall
be in full force and effect.
23. Modification.
No waiver, alteration, modification of any of the provisions of this Agreement shall be binding unless in
writing and signed by a duly authorized representative of the City and the Consultant.
24. Notices.
All notices or other communications required or permitted under this Agreement shall be in writing and
shall be (a) personally delivered, in which case the notice or communication shall be deemed given on
the date of receipt at the office of the addressee; (b) sent by registered or certified mail, postage prepaid,
return receipt requested, in which case the notice or communication shall be deemed given three (3)
business days after the date of deposit in the United States mail; or (c) sent by overnight delivery using
a nationally recognized overnight courier service, in which case the notice or communication shall be
deemed given one business day after the date of deposit with such courier. In addition, all notices shall
also be emailed, however, email does not substitute for an official notice. Notices shall be sent to the
following addresses:
Notices to the City of Port Orchard shall be sent to the following address:
City Clerk
City of Port Orchard
216 Prospect Street
Port Orchard, Washington 98366
Bwallace(c cityofportorchard.us
Phone:360.876.4407 Fax: 360.895.9029
Notices to the Consultant shall be sent to the following address:
Phone No.:
Email:
25. Resolution of Disputes; Governing Law.
A. Should any dispute, misunderstanding or conflict arise as to the terms and conditions
contained in this Agreement, the matter shall first be referred to the Mayor, who shall determine the term
or provision's true intent or meaning. The Mayor shall also decide all questions which may arise between
the parties relative to the actual services provided or to the sufficiency of the performance hereunder.
B. If any dispute arises between the City and the Consultant under any of the provisions of
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 80 of 307
Page 11 of 23
this Agreement which cannot be resolved by the Mayor's determination in a reasonable time, or if the
Consultant does not agree with the Mayor's decision on a disputed matter, jurisdiction of any resulting
litigation shall be filed in Kitsap County Superior Court, Kitsap County, Washington.
C. This Agreement shall be governed by and construed in accordance with the laws of the
State of Washington. In any suit or action instituted to enforce any right granted in this Agreement, the
substantially prevailing party shall be entitled to recover its costs, disbursements, and reasonable
attorneys' fees from the other Party.
26. Compliance with Laws.
The Consultant agrees to comply with all federal, state, and municipal laws, rules, and regulations that
are now effective or in the future become applicable to Consultant's business, equipment, and personnel
engaged in operations covered by this Agreement or accruing out of the performance of those operations.
27. Title VI.
The City of Port Orchard, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42
U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation
subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the
Department of Transportation issued pursuant to such Act, must affirmatively insure that its contracts
comply with these regulations.
Therefore, during the performance of this Agreement, the Consultant, for itself, its assignees, and
successors in interest agrees as follows:
A. Compliance with Regulations. The Consultant will comply with the Acts and the
Regulations relative to Nondiscrimination in Federally -assisted programs of the U.S. Department of
Transportation, Federal Highway Administration (FHWA), as they may be amended from time to time,
which are herein incorporated by reference and made a part of this Agreement.
B. Nondiscrimination. The Consultant, with regard to the work performed by it during this
Agreement, will not discriminate on the grounds of race, color, national origin, sex, age, disability,
income -level, or LEP in the selection and retention of subcontractors, including procurements of
materials and leases of equipment. The Consultant will not participate directly or indirectly in the
discrimination prohibited by the Acts and the Regulations as set forth in Appendix A, attached hereto
and incorporated herein by this reference, including employment practices when this Agreement covers
any activity, project, or program set forth in Appendix B of 49 C.F.R. part 21.
C. Solicitations for Subcontracts, Including Procurements of Materials and Equipment. In
all solicitations, either by competitive bidding, or negotiation made by the Consultant for work to be
performed under a subcontract, including procurements of materials, or leases of equipment, each
potential subcontractor or supplier will be notified by the Consultant of the Consultant's obligations
under this Agreement and the Acts and the Regulations relative to Non-discrimination on the grounds of
race, color, national origin, sex, age, disability, income -level, or LEP.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 81 of 307
Back to Agenda
Page 12 of 23
D. Information and Reports. The Consultant will provide all information and reports
required by the Acts, the Regulations and directives issued pursuant thereto and will permit access to its
books, records, accounts, other sources of information, and its facilities as may be determined by the
City, the Washington State Department of Transportation or the FHWA to be pertinent to ascertain
compliance with such Acts, Regulations, and instructions. Where any information required of the
Consultant is in the exclusive possession of another who fails or refuses to furnish the information, the
Consultant will so certify to the City, the Washington State Department of Transportation or the FHWA,
as appropriate, and will set forth what efforts it has made to obtain the information.
E. Sanctions for Noncompliance. In the event of the Consultant's noncompliance with the
non- discrimination provisions of this Agreement, the City will impose such contract sanctions as it, the
Washington State Department of Transportation or the FHWA may determine to be appropriate,
including, but not limited to:
i. withholding payments to the Consultant under the Agreement until the contractor
complies; and/or
ii. cancelling, terminating, or suspending the Agreement, in whole or in part.
F. Incorporation of Provisions. The Consultant will include the provisions of paragraphs
one through six in every subcontract, including procurements of materials and leases of equipment,
unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The Consultant will
take action with respect to any subcontract or procurement as the City or the FHWA may direct as a
means of enforcing such provisions including sanctions for noncompliance. Provided, that if the
Consultant becomes involved in, or is threatened with litigation by a subcontractor, or supplier because
of such direction, the Consultant may request the City to enter into any litigation to protect the interests
of the City. In addition, the Consultant may request the United States to enter into the litigation to protect
the interests of the United States.
28. Counterparts.
This Agreement may be executed in any number of counterparts, each of which shall constitute an
original, and all of which will together constitute this one Agreement.
29. Severability.
Any provision or part of this Agreement held to be void or unenforceable under any law or regulation
shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon the
City and the Consultant, who agree that the Agreement shall be reformed to replace such stricken
provision or part with a valid and enforceable provision that comes as close as reasonably possible to
expressing the intent of the stricken provision.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 82 of 307
Back to Agenda
Page 13 of 23
IN WITNESS WHEREOF, the City and the Consultant have executed this Agreement as of the
dates listed below.
CONSULTANT
Title:
CITY OF PORT ORCHARD
Robert Putaansuu, Mayor
Date: Date:
ATTEST/AUTHENTICATE
Brandy Wallace, MMC, City Clerk
APPROVED AS TO FORM
Port Orchard City Attorney's Office
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 83 of 307
Back to Agenda
Page 14 of 23
APPENDIX A
During the performance of this Agreement, the Consultant, for itself, its assignees, and successors in
interest agrees to comply with the following non-discrimination statutes and authorities; including but
not limited to:
Pertinent Non -Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 C.F.R. Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42
U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been
acquired because of Federal or Federal -aid programs and projects);
• Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the
basis of sex);
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits
discrimination on the basis of disability); and 49 C.F.R. Part 27;
• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits
discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 USC§ 471, Section 4 7123), as amended,
(prohibits discrimination based on race, creed, color, national origin, or sex);
• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975
and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms
"programs or activities" to include all of the programs or activities of the Federal -aid recipients,
sub- recipients and contractors, whether such programs or activities are Federally funded or
not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the
basis of disability in the operation of public entities, public and private transportation systems,
places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as
implemented by Department of Transportation regulations at 49 C.P.R. parts 37 and 38;
• The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123)
(prohibits discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low -Income Populations, which ensures discrimination against minority
populations by discouraging programs, policies, and activities with disproportionately high and
adverse human health or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English
Proficiency, and resulting agency guidance, national origin discrimination includes
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 84 of 307
Page 15 of 23
discrimination because of limited English proficiency (LEP). To ensure compliance with Title
VI, you must take reasonable steps to -ensure that LEP persons have meaningful access to your
programs (70 Fed. Reg. at 74087 to 74100);
Title IX of the Education Amendments of 1972, as amended, which prohibits you from
discriminating because of sex in education programs or activities (20 U.S.C. 1681 et sec).
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 85 of 307
Back to Agenda
Page 16 of 23
EXHIBIT A
Scope of Services to be Provided by Consultant. The Consultant shall furnish services including, but
not limited to, the following outlined here.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 86 of 307
Back to Agenda
Page 17 of 23
EXHIBIT A
SCOPE OF SERVICES
Splash Pad Engineering Services During Construction
(ESDC)
City of Port Orchard
Background
This Scope of Services includes engineering services during construction (ESDC) for the City of Port
Orchard's (City) Splash Pad project, which was designed by Consor North America, Inc. (Consor). The scope
and fee estimate have been developed based on Consor's understanding of the project needs.
Consor services are expected to commence in January 2023. ESDC as part of this contract are expected to
be completed by July 2023.
Scope of Services
The Scope of Services consists of the following major tasks.
➢ Task 1— Project Management and Coordination
➢ Task 2 — Engineering Services During Construction
➢ Task 3 — Contingency
A detailed breakdown of the tasks and subtasks that comprise the Scope of Services follows and aligns with
the tasks included in the Fee Estimate (Exhibit B).
Task 1 — Project Management and Coordination
Provide team guidance aligned with City objectives. Coordinate, monitor, and control the project resources
to meet the technical, communication, and contractual obligations required for providing the engineering
support service activities included in this contract.
Subtask 1.1 Coordination with City
Coordinate with City staff regarding construction work activities, project needs and issues through e-mails
and phone calls.
Subtask 1.2 Invoices and Budget Oversight
Prepare invoice and monthly progress reports that include work completed, costs incurred, budget status,
amendments, variances between planned and actual performance, tasks issues, approved out of scope
items and associated costs, and issues that may result in an increase in the total Consor contract price.
Page 87 of 307 Consor • January 2023 • City of Port Orchard
Splash Pad ESDC • 1
Back to Agenda
Page 18 of 23
Subtask 1.3 Pre -Construction Meeting
Attend the Pre -Construction Meeting with up to one (1) consultant team member in attendance. Provide
input on meeting notes following the meeting.
Assumptions
➢ Coordinate with the City via phone for up to ten (10), 30-minute coordination calls
➢ Contractor's schedule governs the work performed
➢ Anticipated construction notice -to -proceed is January 2023
➢ Up to seven (7) months of invoicing and progress reporting are included
➢ One (1) consultant staff member to attend Pre -Construction Meeting
➢ Pre -Construction Meeting will be up to three (3) hours in duration, including travel
Deliverables
➢ Monthly invoice with project status reports
➢ Correspondence, e-mails, and other documentation
➢ Pre -Construction Meeting Notes Review and Input
Task 2 — Engineering Services During Construction
Work under this task includes engineering services to support the construction phase of the project.
Subtask 2.1 Construction Meetings
Attend up to ten (10) virtual construction meetings when requested by the City's Construction
Management (CM) Representative.
Subtask 2.2 Design Modifications
Provide up to four (4) design modifications and accompanying plan changes to support required field
modifications to maintain design intent and functionality.
Subtask 2.3 Submittal Reviews
Review and comment on up to twenty (20) total submittals, shop drawings, and other technical submittals
from the Contractor for general conformance with the requirements of the Contract Documents.
Subtask 2.4 Requests for Information
Prepare responses for up to fifteen (15) Contractor requests for information (RFIs).
Subtask 2.5 Change Order Review
Provide review of up to four (4) Contractor proposed change orders.
Consor • January 2023 • City of Port Orchard
Splash Pad ESDC • 2 Page 88 of 307
G:\PDX_BD\Clients\PortOrchard\General\Splash Pad ESDC Scoping\Exhibit A- PortOrchard Splash Pad ESDC Scope_v3.docx
Back to Agenda
Page 19 of 23
Subtask 2.6 Construction Observation Site Visits
Attend up to six (6) construction observation site visits, as requested by the City's CM Representative.
Subtask 2.7 Review of As -Built Plans and Operations and Maintenance (O&M) Manuals
Provide review of as -built plans and 0&M Manuals.
Subtask 2.8 Commissioning Site Visit
Attend one (1) commissioning site visit with City operations staff.
Assumptions
➢ Meetings will be attended virtually by one (1) Consor staff member and will be up to one (1) hour
in duration
➢ Meeting notes will be produced by the City's CM Representative
➢ An average design modification is anticipated to require up to four (4) hours of effort for the project
engineer, with up to two hours of review for QA/QC.
➢ Not all submittals will require Consor review; submittals will be sent to Consor by the City's CM
Representative when design engineer input is desired.
➢ An average of four (4) hours of review time is assumed per submittal (three hours for first round
review, and one hour for resubmittal review). Up to one re -submittal is anticipated per submittal.
Submittals requiring more than one resubmittal review require additional effort beyond this scope
of services and will require additional budget.
➢ Submittal review comments will be submitted to the City's CM Representative.
➢ Not all RFIs will require Consor input; RFls will be sent to Consor by the City's CM Representative
when design engineer input is desired.
➢ An average of two (2) hours will be required to respond to each RFI
➢ RFI responses will be submitted to the City's CM Representative.
➢ Not all change orders will require Consor input; change orders will be sent to Consor by the City's
CM Representative when design engineer input is desired.
➢ An average of four (4) hours will be required per change order review
➢ Change order review comments will be submitted to the City's CM Representative.
➢ Each site visit will be up to three (3) hours in duration, including travel time
➢ Site visit observation report will be developed in Word or similar format and will be submitted to
the City's CM Representative.
➢ As -built plan review will take up to eight (8) hours in duration
➢ 0&M Manual review will take up to sixteen (16) hours in duration
Consor • January 2023 • City of Port Orchard
Page 89 of 307 Splash Pad ESDC • 3
G:\PDX_BD\Clients\Port Orchard\General\Splash Pad ESDC Scoping\Exh [bit A -Port Orchard Splash Pad ESDC Scope_v3.docx
Back to Agenda
Page 20 of 23
➢ Commissioning site visit will take up to 8 hours in duration, including travel time, and does not
include any commissioning services
Deliverables
➢ Design modification
➢ Design modifications will be stamped by a Professional Engineer licensed in the state of
Washington
➢ Submittal reviews
➢ RFI responses
➢ Change order reviews
➢ Site visit observation report documenting conditions, activities, and summary of discussions and
any issues noted.
➢ As -built plan markups, where needed
➢ O&M Manuals review
➢ Commissioning site visit report
Task 3 — Contingency
Project contingency includes budget for additional, unanticipated labor and/or expenses not specifically
identified in the scope of services defined above. Such work items will be undertaken only after written
authorization has been provided by the City's Project Manager.
Assumptions
To be determined.
Deliverables
To be determined.
Proposed Schedule
Work will begin upon receipt of a signed contract and notice to proceed, or other agreeable written
authorization. Work will proceed in a timely manner with an anticipated completion date seven (7) months
from notice to proceed. The project duration is based on timely input, information, City staff availability to
access assessed stations, and review comments from City staff.
Fee Estimate
The detailed fee estimate is provided as Exhibit B
Payment will be made at the Billing rates for personnel working directly on the project, which will be made
at the Consultant's Hourly Rates, plus Direct Expenses incurred. Subconsultants, when required by the
Consor • January 2023 • City of Port Orchard
Splash Pad ESDC • 4 Page 90 of 307
G:\PDX_BD\Clients\PortOrchard\General\Splash Pad ESDC Scoping\Exhibit A- PortOrchard Splash Pad ESDC Scope_v3.docx
Back to Agenda
Page 21 of 23
Consultant, will be charged at actual costs plus a 10 percent fee to cover administration and overhead.
Direct expenses will be paid at the rates shown in the table below.
Direct Expenses
Expenses incurred in-house that are directly attributable to the project will be invoiced at actual cost. These
expenses include the following.
Computer Aided Design and Drafting $18.00/hour
GIS and Hydraulic Modeling $10.00/hour
Mileage Current IRS Rate
Postage and Delivery Services At Cost
Printing and Reproduction At Cost
Travel, Lodging, and Subsistence At Cost
Consor • January 2023 • City of Port Orchard
Page 91 of 307 Splash Pad ESDC • 5
G:\PDX_BD\Clients\PortOrchard\General\Splash Pad ESDC Scoping\Exhibit A - Port Orchard Splash Pad ESDC Scope_v3.docx
Back to Agenda
Page 22 of 23
EXHIBIT B
Rates for Services to be Provided by Consultant. The Consultant shall furnish the services in accordance
with the rates specified attached hereto, as Exhibit B.
City of Port Orchard and Consor North America, Inc.
Professional Service Agreement Contract No. C005-23
McCormick Village Park Splash Pad Construction Support
Updated 4/2022 IBDR
Page 92 of 307
Page 23 of 23
SPLASH PAD ENGINEERING SERVICES DURING CONSTRUCTION (ESDC)
CITY OF PORT ORCHARD
PROPOSED FEE ESTIMATE
LABOR CLASSIFICATION
(HOURS)
Principal Engineer
VI
Principal Engineer
III
Professional
Engineer VII
Engineering
Designer III
Project
Coordinator IV
Administrative III
Hours
Labor
Expenses
ADD Units$18/hr
GIS Units $10/hr
Total
Task 1- Project Management and Coordination
Task 1.1- Coordination with City
2
3
5
$ 1,446
$
$
$
$ 1,446
Task 1.2 - Invoices and Budget Oversight
1
1 7
9
16
$ 2,420
$
$
$
$ 2,420
Task 1.3 - Pre -Construction Meeting
4
4
$ 888
$ 38
$
$
$ 926
Task 1. Subtotal
2
3
4
0
7
9
25
$ 4,754
$ 38
$
$
$ 4,792
Task 2 - Engineering Services During Construction
Task 2.1- Construction Meetings
2
8
10
$ 2,394
$
$
$
$ 2,394
Task 2.2 - Design Modifications
8
8
16
$ 4,248
$
$
$
$ 4,248
Task 2.3 - Submittal Reviews
10
10
60
80
$ 16,230
$
$
$
$ 16,230
Task 2.4- Requests for Information
10
10
10
30
$ 7,130
$
$
$
$ 7,130
Task 2.5 - Change Order Review
4
6
6
16
$ 3,660
$
$
$
$ 3,660
Task 2.6 - Construction Observation Site Visits
9
9
18
$ 3,636
$ 225
$
$
$ 3,861
Task 2.7- Review of As -Built Plans and Operations and Maintenance (O&M) Manuals
8
16
24
$ 4,688
$
$
$
$ 4,688
Task 2.8- Commissioning Site Visit
8
8
$ 2,472
$
$
$
$ 2,472
Task 2 Subtotal
42
0
59
101
0
0
202
$ 44,458
$ 225
$
$
$ 44,683
Task 3- Contingency
Task 3.1- Contingency
0
$ -
$ 8,000
$
$
$ 8,000
Task 3 Subtotal
TOTAL-. ALL TASKS
0
144
0
1 3
0
63
0
101
0
1 7
0
9
0
1 227
$ -
1 $ 49,212
$ 8,D00
$... 8,263
$
$... -
$.... -
$... 57,475
City of Pon orchard Page 93 Of 307 Splash Pad ESDC
January 2023 Connor Page I
G:\PD%BD\Clients\Port OrcM1artl\General\SPIasM1 Pad ESDC scoping\COPO ESDC -0—
Back to Agenda
fP_. City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
del i' (360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Agenda Item No.: Business Item 8C
Subject: Adoption of a Resolution Amending
Policies and Procedures for the City's
Annual Spring Clean-up Program
Meeting Date: February 28, 2023
Prepared by: Tony Lang
Public Works Director
Atty Routing No;
Atty Review Date
366922-006
February 17, 2023
Summary: On September 14, 2021, the Port Orchard City Council adopted Resolution 057-21 for the
"City of Port Orchard Policy and Procedures for Spring Cleanup Program". The City began this event in
the early 1990s, picking up extra solid waste from City residents with existing non-commercial solid
waste accounts. The event is held in conjunction with the City's solid waste residential pickup service
provided by Waste Management. The program is valued by the City's residents as it serves the City of
Port Orchard's public health, safety, and welfare, and helps to facilitate the City's residents in the
disposal of excess solid waste. The City's Policies and Procedures brochure includes a list of Specialty
Items eligible for the program and how much a resident would pay to have these items picked up and
disposed of during the Clean-up event. The costs for disposal of these items at the Olympic View
Transfer Station increased on January 1, 2023. The attached Policy and Procedures Brochure has been
updated with the current rates to keep the fees charged by the City in alignment with the Olympic
View Transfer Station rates. City Staff seeks approval to modify these rates and the Clean-up Brochure
on an annual basis keeping Specialty Item fees in alignment with the Olympic View Transfer Station
fees. By this Resolution, the City Council would approve the revised Policy and Procedures Brochure,
adopt the new rates, and allow City staff to modify these rates and the Clean-up Brochure on an
annual basis.
Recommendation: Staff recommends adoption of Resolution 016-23, thereby adopting the revised
City of Port Orchard Policy and Procedures, updated Spring Cleanup Program Brochure, and allowing
City Staff to modify Specialty Item fees on an annual basis so rates are in alignment with Olympic View
Transfer Station.
Relationship to Comprehensive Plan: N/A
Motion for Consideration: I move to adopt Resolution 016-23, thereby adopting the Revised City of
Port Orchard Policy and Procedures for the City's Annual Spring Clean-up Program.
Fiscal Impact: In addition to staff time to operate the Program, the City makes an annual payment to
Kitsap County Solid Waste for the total cost of all loads in excess of $3,000. This cost varies each year.
Alternative: Do not approve and provide alternative guidance.
Page 94 of 307
Back to Agenda
Staff Report 8C
Page 2 of 2
Attachments: Resolution 016-23
City of Port Orchard Policy and Procedures for Spring Cleanup Program Brochure -Clean
City of Port Orchard Policy and Procedures for Spring Cleanup Program-Redlined
2023 Clean-up Brochure
Page 95 of 307
Back to Agenda
RESOLUTION NO.016-23
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, ADOPTING REVISED
POLICIES AND PROCEDURES FOR THE CITY OF PORT ORCHARD'S ANNUAL SPRING
CLEAN-UP PROGRAM.
WHEREAS, The City of Port Orchard has hosted a clean-up event since the early 1990's to pick-
up extra solid waste from city residents with existing non-commercial solid waste accounts; and
WHEREAS, on September 14, 2021, the Port Orchard City Council adopted Resolution 057-21 for
the "City of Port Orchard Policy and Procedures for Spring Cleanup Program"; and
WHEREAS, The City's Policies and Procedures brochure, as adopted, includes a list of Specialty
Items eligible for the program and the corresponding fees residents need pay to have these items picked
up and disposed of during the Clean-up event; and
WHEREAS, The costs for disposal of these Specialty Items at the Olympic View Transfer Station
was increased effective January 1, 2023; and
WHEREAS, the City would like to keep the fees paid by the Residents in alignment with the rates
charged by the Transfer Station to offset the City's costs to haul and dispose of these large items; and
WHEREAS, City Staff seeks approval to modify these rates and the Clean-up Brochure on an
annual basis keeping Specialty Item fees in alignment with the Olympic View Transfer Station fees; now
therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS
FOLLOWS:
THAT: It is the intent of the Port Orchard City Council that the recitals set forth above are
hereby adopted and incorporated as findings in support of this Resolution.
THAT: The City Council hereby adopts the revised City of Port Orchard Policy and
Procedures, updated Spring Cleanup Program Brochure, and allowing City Staff to modify
Specialty Item fees on an annual basis so rates are in alignment with Olympic View Transfer
Station.
THAT: The Resolution shall take full force and effect upon passage and signatures hereon.
PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the
Clerk in authentication of such passage this 28t" day of February 2023.
ATTEST:
City Clerk, Brandy Wallace, MMC
Robert Putaansuu, Mayor
Page 96 of 307
Back to Agenda
ORCHARD .
CITY OF PORT ORCHARD
POLICY AND PROCEDURES
FOR
SPRING CLEAN-UP PROGRAM
Purpose
The purpose of this policy is to establish guidelines, standards and procedures for the City
of Port Orchard's Spring Clean-up Events (the "Program"). The City, in coordination with
its contractor solid waste service provider Waste Management, sets an annual Clean -Up
week in the spring. During this week, City residents are provided an efficient means —
through curb -side pick-up of additional solid waste items and white goods (i.e., appliances)
by City Staff and Waste Management, in addition to the regular refuse pick-up by Waste
Management. Providing solid waste services is a fundamental governmental service and
this Program is imperative to provide this needed public health and welfare service to
residents. This policy and procedures document is intended to govern the implementation
of this Program.
Background
The City of Port Orchard has hosted a clean-up event since the early 1990s, consistently
providing this vital service for its residents. For this program, the City has coordinated
with its solid waste providers, beginning with Brem-Air and now with Waste Management.
The current contract with Waste Management states, in pertinent part:
6.1 General
The Contractor shall provide two (2) city cleanup weeks annually (Spring and Fall),
upon 90 days' notice from the City. At each City cleanup, Contractor will pick up
additional household refuse from each single-family residence at the curb (limit 2
cubic yards) and from multi -family premises. The City will provide equipment and
manpower to pick up Bulky Material. Additional tonnage picked up by the Contractor
and the City during these weeks will be paid for by the Contractor (maximum of
$3,000.00 per event).
As the City has grown in size, the service area for the Program and associated costs have
Page 97 of 307
Back to Agenda
increased.
Program Parameters
Date/Timing.
o The Program involves a Spring event (typically in the month of April).
o Each event takes place over the course of five (5) consecutive weekdays, from
approximately 7am to 6pm.
o The Program involves the retrieval of refuse from individual, qualified
residential customers on the same regularly scheduled garbage collection date
for that particular customer.
o The event occurs during a week that is off -recycle (meaning not on a week
when Waste Management recycling service is occurring).
o Eligible refuse must be placed on the street curb the evening before the
qualified residential customer's regular garbage day during the event's
window.
Qualified Residential Customers.
o The Program's service area and route are dictated by Waste Management's
Residential Garbage Service Route. Properties that are served by this Program
are, therefore, those individual account holders who have a current Residential
Garbage Account with Waste Management.
■ Per Port Orchard Municipal Code ("POMC") 6.04.010, the City requires
in pertinent part: "the maintenance of the public health, safety,
sanitation and aesthetics requires that all generators of solid waste in
the city of Port Orchard accept, arrange for, and pay for solid waste
collection and disposal services established by the city."
■ Waste Management offers two types of accounts: commercial and
residential. Those eligible for Residential Garbage Accounts include:
single family residential properties and multi -family dwelling units
(duplexes, triplexes, etc.) where there is wagon service capabilities (not
dumpster service, which are offered through a commercial account).
Eligible Refuse.
o Waste Management will collect an additional two (2) cubic yards of household
trash per Eligible Residential Customer without an additional charge (in
addition to the regular waste management wagon) during the Program.
o General Household Items. City Staff will collect from qualified residential
accounts the following items on the street curb adjacent to the regular garbage
cans for pick-up, so long as the items — collectively — do not exceed a volume
2
Page 98 of 307
Back to Agenda
of four (4) feet by four (4) feet, without the payment of any associated fee to
the City:
■ Baby Crib (dismantled) / Highchair / Playpen / Stroller
■ Barbecue (no propane tank)
■ Baseboard Heater
■ Bicycle
■ Coffee or End Table
■ Computer Monitors / CPU
■ Countertop
■ Dresser
■ Electric Fan
■ Electric Space Heater (small)
■ File Cabinet
■ Furniture (made of wood, fiberboard, plastic, etc.)
■ Garbage Disposal
■ Lawn Table
■ Lawn Chair
■ Lawn Mower (oil and gas must be drained)
■ Masonite
■ Medicine Cabinet
■ Rugs (small, no rolls of carpeting)
■ Stereo
■ Swimming pool (plastic, folded into a bundle)
■ Swing set (disassembled and bundle)
■ Home Gym Equipment (Treadmill, Bowflex, etc)
■ TVs 30" or less will be picked up. Anything over 30" will not be picked
up.
■ Vacuum Cleaner
■ VCR or DVD players
■ Wheelchair (collapsible)
■ Yard Toys
■ Fencing, chain link/wire (rolled & secured)
o Specialty Items. Qualified residential accounts may also place the following
items on the street curb adjacent to the regular garbage cans for pick-up,
provided the account holder pays a fee to offset the City's costs to haul and
dispose of these large items as follows to the City Clerk no later than one (1)
week prior to the start date of the event, receives a tag from the City Clerk and
places the tag on the item:
■ Air Conditioner ........................................... $2-8 $28
3
Page 99 of 307
Back to Agenda
■ Bathtub (fiberglass/no cast iron) ...............
$45 $15
■ Chair (upholstered) ...................................
$44 $16
■ Copier/Printer (small home type) .............
$49 $10
■ Couch/Love Seat (each piece) ..................
$15 $54
■ Dishwasher .................................................
$28 $28
■ Dryer...........................................................
$2-9 $28
■ Freezer (Household- No Commercial).....
$28 $28
■ Gas Heater .................................................
$28 $28
■ Mattress or Box Spring ...............................
$44$16
■ Microwave ...................................................
$44$12
■ Range/Stove..............................................
$W $28
■ Refrigerator (large -No Commercial)
$;18 $28
■ Refrigerator (small)/Wine Cooler .............
$28 $20
■ Sinks (no cast iron) ......................................
$49 $10
■ Sleeper Couch .............................................
$-38 $66
■ Toilet.............................................................
$45 $15
■ Washer........................................................
$28 $28
• Water heater ..............................................
$2-9 $28
■ Water Softener System ............................
$28 $20
■ Wheel Chair (non -collapsible) ...................
$45 $15
*City Staff shall update the above disposal rates on an annual basis so they are in
alignment with Olympic View Transfer station's disposal rates.
Ineligible Refuse.
o All items not listed above are ineligible for pick-up as part of the program and
will be left on the curb with a "We're Sorry" tag that identifies the reason for
rejection, including but not limited to the following:
■ Hazardous Waste
■ Construction/Demolition Debris
■ Roofing Materials
■ Carpets
■ Vinyl
■ Tile
■ Cabinets
■ Oil or Paint Cans
■ Batteries
■ Waste management cans
■ Pool Tables
■ Furnaces
4
Page 100 of 307
Back to Agenda
■ Recycling
■ Tires
■ Car Parts
■ Boats
■ Fluorescent Lights
■ Motorcycles
■ Wood Burning Stoves/Fireplaces
■ Satellite Dish (large)
■ Wood (firewood or construction)
■ Plate Glass, Glass window or Glass Shower doors
o Items in excess of the size parameters described above are ineligible for pick-
up from the program.
o Loose debris is ineligible for pick-up; all items must be boxed, bound or
contained (but any containers utilized will not be returned).
o Items that require a fee but the fee is not pre -paid are ineligible for pick-up.
Responsibilities of Public Works
- The Public Works Department is tasked with the execution of the Program. This role
involves the following:
o During the event:
■ Typically, all staff report for the events and provide pick-up service for
the duration of the Program.
■ The Program utilizes two (2) dump trucks, a backhoe and 2-4 pick-up
trucks for the pick-up service.
■ Staff will retrieve the refuse and load it into the City's vehicles.
■ Staff will transport the refuse to the Olympic View"
Transfer Station, managed by Waste Management, or an appropriate
recycling facility.
o In advance of the events, staff will:
■ Update fees and obtain Council approval, as appropriate;
■ Prepare the route map (utilizing the Waste Management residential
service map);
■ Prepare advertising materials for the event and advertise for the public;
■ Prepare the "We're Sorry" tag for rejected items, and prepare a log for
tracking rejected items for code enforcement;
■ Obtain from the Clerk's Office the log of pre -paid items.
5
Formatted: Font color: Red
Page 101 of 307
Back to Agenda
o After the events, staff will:
■ Staff will maintain records of deposited loads/items, and route any
received invoices from the County to the Finance Department.
Responsibilities of City Clerk
The City Clerk is tasked with support of this Program. This role involves:
o Coordination of the pre -payment of fees for Specialty Items. The Clerk shall
develop an application short form for the use by members of the public who
seek the collection of a Specialty Item.
o The Clerk may accept applications and the associated fees during the regular
business hours for City Hall, provided applications must be received and
processed at least one (1) week prior to the date of the event.
o The Clerk will issue a "sticker" to those applicants who submit an application
for a valid Specialty Item and the associated fee.
o The Clerk will route the payment to the Finance Department.
o The Clerk will prepare a list of pre -paid items and associated property
addresses and send to the Public Works Department in advance of the event's
start date.
Responsibilities of Finance Department
The Finance Department is tasked with support of this Program. This role involves:
o Collection and deposit of fees collected by the Clerk for Specialty Items,
consistent with the fee schedule set out in this Policy (as may be amended by
City Staff and/or the -City Council).
■ Funding shall be held in the General Fund to offset the operational costs
of the Program, including but not limited to staff time and use of City
equipment.
o Payment of any invoice received from Kitsap County Solid Waste for loads
taken to -Olympic View to t4e V44ap C-^�Transfer Station as part of this
Program in excess of $3,000 (per the contract with Waste Management,
referenced above).
Responsibilities of Code Enforcement
- The City's Code Enforcement Officials are tasked with support of this Program. This
role involves:
o Following the event, Ineligible Refuse abandoned in the right of way or on
6
Page 102 of 307
Back to Agenda
private property may be prosecuted as a nuisance, consistent with POMC 9.30.
Code Enforcement will respond to complaints of abandoned refuse and may
take action consistent with the POMC and the City's applicable procedures.
Relevant Materials
Attachment 1: Clean-up Brochure
Attachment 2: "We're Sorry" Tag
Attachment 3: Waste Management Franchise Agreement (excerpt)
Approved by the City Council on (September 14, 2021)
Page 103 of 307
Back to Agenda
ORCHARD .
CITY OF PORT ORCHARD
POLICY AND PROCEDURES
FOR
SPRING CLEAN-UP PROGRAM
Purpose
The purpose of this policy is to establish guidelines, standards and procedures for the City
of Port Orchard's Spring Clean-up Events (the "Program"). The City, in coordination with
its contractor solid waste service provider Waste Management, sets an annual Clean -Up
week in the spring. During this week, City residents are provided an efficient means —
through curb -side pick-up of additional solid waste items and white goods (i.e., appliances)
by City Staff and Waste Management, in addition to the regular refuse pick-up by Waste
Management. Providing solid waste services is a fundamental governmental service and
this Program is imperative to provide this needed public health and welfare service to
residents. This policy and procedures document is intended to govern the implementation
of this Program.
Background
The City of Port Orchard has hosted a clean-up event since the early 1990s, consistently
providing this vital service for its residents. For this program, the City has coordinated
with its solid waste providers, beginning with Brem-Air and now with Waste Management.
The current contract with Waste Management states, in pertinent part:
6.1 General
The Contractor shall provide two (2) city cleanup weeks annually (Spring and Fall),
upon 90 days' notice from the City. At each City cleanup, Contractor will pick up
additional household refuse from each single-family residence at the curb (limit 2
cubic yards) and from multi -family premises. The City will provide equipment and
manpower to pick up Bulky Material. Additional tonnage picked up by the Contractor
and the City during these weeks will be paid for by the Contractor (maximum of
$3,000.00 per event).
As the City has grown in size, the service area for the Program and associated costs have
Page 104 of 307
Back to Agenda
increased.
Program Parameters
Date/Timing.
o The Program involves a Spring event (typically in the month of April).
o Each event takes place over the course of five (5) consecutive weekdays, from
approximately 7am to 6pm.
o The Program involves the retrieval of refuse from individual, qualified
residential customers on the same regularly scheduled garbage collection date
for that particular customer.
o The event occurs during a week that is off -recycle (meaning not on a week
when Waste Management recycling service is occurring).
o Eligible refuse must be placed on the street curb the evening before the
qualified residential customer's regular garbage day during the event's
window.
Qualified Residential Customers.
o The Program's service area and route are dictated by Waste Management's
Residential Garbage Service Route. Properties that are served by this Program
are, therefore, those individual account holders who have a current Residential
Garbage Account with Waste Management.
■ Per Port Orchard Municipal Code ("POMC") 6.04.010, the City requires
in pertinent part: "the maintenance of the public health, safety,
sanitation and aesthetics requires that all generators of solid waste in
the city of Port Orchard accept, arrange for, and pay for solid waste
collection and disposal services established by the city."
■ Waste Management offers two types of accounts: commercial and
residential. Those eligible for Residential Garbage Accounts include:
single family residential properties and multi -family dwelling units
(duplexes, triplexes, etc.) where there is wagon service capabilities (not
dumpster service, which are offered through a commercial account).
Eligible Refuse.
o Waste Management will collect an additional two (2) cubic yards of household
trash per Eligible Residential Customer without an additional charge (in
addition to the regular waste management wagon) during the Program.
o General Household Items. City Staff will collect from qualified residential
accounts the following items on the street curb adjacent to the regular garbage
cans for pick-up, so long as the items — collectively — do not exceed a volume
2
Page 105 of 307
Back to Agenda
of four (4) feet by four (4) feet, without the payment of any associated fee to
the City:
■ Baby Crib (dismantled) / Highchair / Playpen / Stroller
■ Barbecue (no propane tank)
■ Baseboard Heater
■ Bicycle
■ Coffee or End Table
■ Computer Monitors / CPU
■ Countertop
■ Dresser
■ Electric Fan
■ Electric Space Heater (small)
■ File Cabinet
■ Furniture (made of wood, fiberboard, plastic, etc.)
■ Garbage Disposal
■ Lawn Table
■ Lawn Chair
■ Lawn Mower (oil and gas must be drained)
■ Masonite
■ Medicine Cabinet
■ Rugs (small, no rolls of carpeting)
■ Stereo
■ Swimming pool (plastic, folded into a bundle)
■ Swing set (disassembled and bundle)
■ Home Gym Equipment (Treadmill, Bowflex, etc)
■ TVs 30" or less will be picked up. Anything over 30" will not be picked
up.
■ Vacuum Cleaner
■ VCR or DVD players
■ Wheelchair (collapsible)
■ Yard Toys
■ Fencing, chain link/wire (rolled & secured)
o Specialty Items. Qualified residential accounts may also place the following
items on the street curb adjacent to the regular garbage cans for pick-up,
provided the account holder pays a fee to offset the City's costs to haul and
dispose of these large items as follows to the City Clerk no later than one (1)
week prior to the start date of the event, receives a tag from the City Clerk and
places the tag on the item:
■ Air Conditioner ........................................... $2-8 $28
3
Page 106 of 307
Back to Agenda
■ Bathtub (fiberglass/no cast iron) ...............
$45 $15
■ Chair (upholstered) ...................................
$44 $16
■ Copier/Printer (small home type) .............
$49 $10
■ Couch/Love Seat (each piece) ..................
$15 $54
■ Dishwasher .................................................
$28 $28
■ Dryer...........................................................
$2-9 $28
■ Freezer (Household- No Commercial).....
$28 $28
■ Gas Heater .................................................
$28 $28
■ Mattress or Box Spring ...............................
$44$16
■ Microwave ...................................................
$44$12
■ Range/Stove..............................................
$W $28
■ Refrigerator (large -No Commercial)
$;18 $28
■ Refrigerator (small)/Wine Cooler .............
$28 $20
■ Sinks (no cast iron) ......................................
$49 $10
■ Sleeper Couch .............................................
$-38 $66
■ Toilet.............................................................
$45 $15
■ Washer........................................................
$28 $28
• Water heater ..............................................
$2-9 $28
■ Water Softener System ............................
$28 $20
■ Wheel Chair (non -collapsible) ...................
$45 $15
*City Staff shall update the above disposal rates on an annual basis so they are in
alignment with Olympic View Transfer station's disposal rates.
Ineligible Refuse.
o All items not listed above are ineligible for pick-up as part of the program and
will be left on the curb with a "We're Sorry" tag that identifies the reason for
rejection, including but not limited to the following:
■ Hazardous Waste
■ Construction/Demolition Debris
■ Roofing Materials
■ Carpets
■ Vinyl
■ Tile
■ Cabinets
■ Oil or Paint Cans
■ Batteries
■ Waste management cans
■ Pool Tables
■ Furnaces
4
Page 107 of 307
Back to Agenda
■ Recycling
■ Tires
■ Car Parts
■ Boats
■ Fluorescent Lights
■ Motorcycles
■ Wood Burning Stoves/Fireplaces
■ Satellite Dish (large)
■ Wood (firewood or construction)
■ Plate Glass, Glass window or Glass Shower doors
o Items in excess of the size parameters described above are ineligible for pick-
up from the program.
o Loose debris is ineligible for pick-up; all items must be boxed, bound or
contained (but any containers utilized will not be returned).
o Items that require a fee but the fee is not pre -paid are ineligible for pick-up.
Responsibilities of Public Works
- The Public Works Department is tasked with the execution of the Program. This role
involves the following:
o During the event:
■ Typically, all staff report for the events and provide pick-up service for
the duration of the Program.
■ The Program utilizes two (2) dump trucks, a backhoe and 2-4 pick-up
trucks for the pick-up service.
■ Staff will retrieve the refuse and load it into the City's vehicles.
■ Staff will transport the refuse to the Olympic View"
Transfer Station, managed by Waste Management, or an appropriate
recycling facility.
o In advance of the events, staff will:
■ Update fees and obtain Council approval, as appropriate;
■ Prepare the route map (utilizing the Waste Management residential
service map);
■ Prepare advertising materials for the event and advertise for the public;
■ Prepare the "We're Sorry" tag for rejected items, and prepare a log for
tracking rejected items for code enforcement;
■ Obtain from the Clerk's Office the log of pre -paid items.
5
Formatted: Font color: Red
Page 108 of 307
Back to Agenda
o After the events, staff will:
■ Staff will maintain records of deposited loads/items, and route any
received invoices from the County to the Finance Department.
Responsibilities of City Clerk
The City Clerk is tasked with support of this Program. This role involves:
o Coordination of the pre -payment of fees for Specialty Items. The Clerk shall
develop an application short form for the use by members of the public who
seek the collection of a Specialty Item.
o The Clerk may accept applications and the associated fees during the regular
business hours for City Hall, provided applications must be received and
processed at least one (1) week prior to the date of the event.
o The Clerk will issue a "sticker" to those applicants who submit an application
for a valid Specialty Item and the associated fee.
o The Clerk will route the payment to the Finance Department.
o The Clerk will prepare a list of pre -paid items and associated property
addresses and send to the Public Works Department in advance of the event's
start date.
Responsibilities of Finance Department
The Finance Department is tasked with support of this Program. This role involves:
o Collection and deposit of fees collected by the Clerk for Specialty Items,
consistent with the fee schedule set out in this Policy (as may be amended by
City Staff and/or the -City Council).
■ Funding shall be held in the General Fund to offset the operational costs
of the Program, including but not limited to staff time and use of City
equipment.
o Payment of any invoice received from Kitsap County Solid Waste for loads
taken to -Olympic View to t4e V44ap C-^�Transfer Station as part of this
Program in excess of $3,000 (per the contract with Waste Management,
referenced above).
Responsibilities of Code Enforcement
- The City's Code Enforcement Officials are tasked with support of this Program. This
role involves:
o Following the event, Ineligible Refuse abandoned in the right of way or on
6
Page 109 of 307
Back to Agenda
private property may be prosecuted as a nuisance, consistent with POMC 9.30.
Code Enforcement will respond to complaints of abandoned refuse and may
take action consistent with the POMC and the City's applicable procedures.
Relevant Materials
Attachment 1: Clean-up Brochure
Attachment 2: "We're Sorry" Tag
Attachment 3: Waste Management Franchise Agreement (excerpt)
Approved by the City Council on (September 14, 2021)
Page 110 of 307
Back to Agenda
City of Port Orchard
216 Prospect Street
General 2 IMPORTANT INFORMATION FOR
Information
Major 3 THE PROGRAM
Appliances
Due to an increase of residents taking part in the clean-up program
Excluded 3 and to avoid confusion of items allowed, the City has implemented
Items a "tagging" system for articles not collected that do not meet the
Clean Up List 4 program requirements.
Please pay attention to the item(s) you are placing out and verify-
ing that the constraints listed in this flyer are being met.
If you have any questions, please email us at
publicworks@portorchardwa.gov.
Thank you for your understanding.
Page 111 of 307
Back to Agenda
Week of April l o t h 1 4 t h P a g e z
GENERAL INFORMATION
1
I
The City of Port Orchard and Waste Management schedule one (1) annual Spring clean-up for city residents.
During this week, City residents are provided an efficient means to have household refuse and other household
items disposed of. Some items are free to set out, while others require a small fee. The City resident must pay
for certain items one week in advance in the Treasurer's Office at City Hall and place all items at the street curb
(next to garbage cans) on their regularly scheduled pick up day. The City will not carry items from private prop- 1
erty. There is no charge for the collection and disposal of most smaller items. Items must be boxed, bagged,
bundled, or easily handled. The total volume of the collection must fit into a space 4 feet by 4 feet wide and 4 1
feet high. The City will not dump any Waste Management cans. I
1 If the items do not comply with the City requirements, the City will not pick them up. The items will not be al-
lowed to remain at the street or in the right-of-way after the event.
1 I
I I
I YOU MUST BE A RESIDENT INSIDE PORT ORCHARD CITY LIMITS IN I
I I
I ORDER TO PARTICIPATE IN CLEAN-UP WEEK. 1
I I
I I
Please remember the following:
Pick u is on our regularly scheduled garbage collection day. No recycling or and waste will be 1
I p� Y g Y g g Y• Y g Y I
picked up.
I
• All fee items must be paid for prior to the week of pick-up at the Treasurer's Office in City Hall. See
list on page 4 for prices.
I I
1 • All items to be disposed of must be on the street curb with the regular garbage cans on the evening
before the resident's normal garbage collection day. The City crew will collect these item on the
normal collection day. THE CITY CREW WILL NOT BACKTRACK FOR ITEMS THAT WERE NOT I
PLACED OUT AT THE PROPER TIME OR PAID FOR IN ADVANCE. I
Waste Management will collect an additional two (2) cubic yards of contained extra household 1
I I
trash per eligible residential customer without an additional charge during the Program. City crews
I
1 will dump large bulky materials that are not easily handled by the Waste Management driver. The 1
City will not dump any Waste Management cans.
• No loose debris is allowed.
1 I
I 1
1 I
� I
i
_ — — — — — — — — — — — — Pe 112 of 307— — — — — — — — — — — — — � age
P a g e 3
Major Appliances
I
I
I
White goods such as stoves, washers, dryers, refrigerators, and freezers
can be included for Clean —Up Week. For a fee, the City crew will haul ap-
pliances to be recycled. Fees for white goods must be paid one (1) week
prior to the day of pick-up in the Treasurer's Office. The City will take
these items that have been paid for to the recycle site. Appliances must
be placed at the curb next to your garbage can. I
1
I
Excluded Items
its list contains examples of items that are prohibited and will not be collected. This is not a
imprehensive list. Please do not leave these items out as we will not collect them. Unac-
!ptable items will be left with a "We're sorry" tag identifying the reason.
• Hazardous Waste
• Construction/Demolition Debris
• Roofing Materials
• Carpets
• Vinyl
• Tile
• Cabinets
• Oil or Paint Cans
• Batteries
• Waste Management cans
• Pool Tables
• Furnaces
• Recycling (Cardboard, etc)
• Tires
• Car Parts
• Boats
• Fluorescent Lights
• Motorcycles
• Wood Burning Stoves/Fireplaces
• Satellite Dish (large)
• Wood (firewood or construction debris)
• Plate Glass, Glass window or Glass Shower
doors
Please do not leave these items out as we will not collect them.
Kitsap County residents may bring hazardous products to the Kitsap County Moder-
ate Risk Waste Collection Facility for proper handling. There is no charge for residen-
tial disposal. They are open Thursday through Saturday, 10:00am-4:00pm. Residen-
tial customers only! Business customers must call for an appointment. For addi-
tional information, please visit their website at https://spf.kitsapgov.com/pw/Pages/
HHWFacility.aspx or call 360.337.5777.
Page 113 of 307
Back to Agenda
Week of April l o t h— 1 4 t h
P a g e 4
'-_-_--_-- C___i__------ lean
Up
List
1
Due to limited space, we can't list all items.
If an item is not on this list, please email us at
i
publicworks@portorchardwa.gov to find out
if we take the item and if there is a fee.
1
I
Baby Crib (dismantled)/High Chair/Playpen
i
FEE ITEMS
1
•
Stroller
I
1
Barbecue (no propane tank)
•
Air Conditioner
$28 1
[
Baseboard Heater
•
Bathtub (fiberglass/no cast iron)
$15
i
t •
Bicycle
•
Chair (upholstered)
$16 1
1
•
Coffee or End Table
•
Copier/Printer (small home type)
$io
•
Computer Monitors/CPU
•
Sofa/Love Seat (each piece)
$54 1
1
Countertop
1
1
•
Dishwasher
$28
•
Dresser
i
1
Electric Fan
•
Dryer
$28 1
•
Electric Space Heater (small)
•
Freezer (Household, no commercial)
$28 1
1
1
•
File Cabinet
•
Gas Heater
$28 1
•
Furniture (made of wood fiberboard las-
> > P
Mattress or Box Spring
1
$i6
tic, etc.)
•
Microwave
$ia 1
•
Garbage Disposal
Lawn Table
•
Range/Stove
$28
1
1 •
Lawn Chair
Refrigerator
g
$28
•
Lawn Mower (Oil and gas has to be drained)
(household, no commercial)
1
1
Masonite
•
Refrigerator small /Wine Cooler
g ( )
$ao 1
1
1
1 •
Medicine Cabinet
•
Sinks (no cast iron)
$io 1
1 •
Swimming Pools (plastic, folded into bundle
Sleeper Couch
1
$66 1
1 .
Swing set (disassembled and bundled)
•
Toilet
$15
•
Home Gym Equipment (Treadmill, Bowflex,
1
I
etc.)
Washer
$28 I
•
TV's 30" or less. TV's over 30" will not be
•
Water Heater
$28 1
I
picked up.
•
Water Softener System
i
$20 1
i
0
I
Vacuum Cleaner
Wheel Chair (non -collapsible)
$15 1
•
VCR or DVD Player
i •
Wheel Chair (collapsible)IN
I
0
Yard Toys
1
'b-
Fencing, chain link/wire (rolled & secured)
�
_ _ _ _ _ _ _ _ s _ _
Page 74 0�307
_
Back to Agenda
Agenda Item No.
Subject
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Business Item 8D
Adoption of a Resolution Establishing an
Empoovee Inclusion Commission to focus
Meeting Date
Prepared by
on the City's Efforts Related to Diversity, Atty Routing No.
Equity and Inclusion Among City Atty Review Date
Employees
February 28, 2023
Debbie Lund
HR Director
366922-0008
February 22, 2023
Summary: On January 10, 2023, Human Resources Specialist Beth Spalding presented to the City Council
the culmination of nearly a year's worth of work related to diversity, equity and inclusion (DEI) at the City
of Port Orchard. After that presentation, the Council expressed a desire to continue the City's work
toward DEI and incorporate Ms. Spalding's recommendation to form an employee Inclusion Commission
to focus on DEI efforts at the employee level.
The proposed Inclusion Commission would operate on much the same basis as the City's current
employee Wellness Committee. The Inclusion Commission will research, study and recommend to the
Mayor goals, programs, and strategies to improve the DEI efforts of the City. The Inclusion Commission
will report their progress to the City Council at least annually.
Recommendation: In line with the Council's guiding principle of positively impacting diversity, equity and
inclusion, staff recommends the Council adopt the attached resolution approving an employee Inclusion
MEMO II O",
Relationship to Comprehensive Plan: The establishment of an employee Inclusion Commission should
complement the goals of the City's Comprehensive Plan by supporting a diverse workforce, aiming to
mirror the community the City serves, and embracing and celebrating the differences between
individuals.
Motion for consideration: "I move to adopt a Resolution establishing an employee Inclusion Commission
to focus on the City's efforts related to diversity, equity and inclusion among City employees."
Fiscal Impact: Any unbudgeted costs for the operations and proposed recommendations of the Inclusion
Commission will be brought to the City Council in the future for consideration.
Alternatives: Do not approve the proposed resolution and provide alternative guidance.
Attachments: Proposed Resolution
Page 115 of 307
Back to Agenda
RESOLUTION NO.
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, ESTABLISHING
AN EMPLOYEE INCLUSION COMMISSION TO FOCUS ON THE CITY'S EFFORTS
RELATED TO DIVERSITY, EQUITY, AND INCLUSION AMONG CITY EMPLOYEES.
WHEREAS, the City Council of the City of Port Orchard recognizes that organizations that
employ diverse populations have been shown to enjoy a number of positive benefits as compared
to less diverse organizations, including higher productivity, innovation, accuracy, revenue,
employee retention, and employee engagement; and
WHEREAS, the City of Port Orchard's racial and ethnic demographics have become
increasingly diverse over the past few decades; and
WHEREAS, the Port Orchard City Council recognizes that a workforce that is representative
of the population improves the delivery of municipal government services; and
WHEREAS, "diversity" describes a group with characteristic differences in areas such as sex,
race, ethnicity, sexual orientation, gender, religion, socioeconomic status, physical or mental
ability, etc.; and
WHEREAS, "equity" refers to designing and altering processes, programs, laws, etc. to
result in fair outcomes for all individuals; and
WHEREAS, "inclusion" refers to establishing a workplace culture designed to foster feelings
of belonging and welcome for each individual; and
WHEREAS, the Port Orchard City Council recognizes that improvements to workplace
inclusion, achievable through workplace education, promotions, and activities, can result in a
more welcoming and diverse workplace; now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS
FOLLOWS:
SECTION 1. ADOPTION AND PURPOSE STATEMENT. The City of Port Orchard hereby
establishes an Inclusion Commission consisting of City employees. The purpose of the Inclusion
Commission is to foster a culture of inclusion at the City through education, promotions, and
activities surrounding issues of diversity, equity, and inclusion. The Inclusion Commission will be
advisory to the Mayor and City Council on matters related to diversity, equity and inclusion.
SECTION 2. PARTICIPATION. Unless otherwise directed by the Mayor, participation on
the Inclusion Commission and organized programs and events will be voluntary. Employees
serving on the Inclusion Commission shall not be entitled to additional compensation above their
regular rate of pay.
Page 116 of 307
Back to Agenda
Resolution No.
Page 2 of 2
SECTION 3. COMMISSION COORDINATOR. The City of Port Orchard hereby designates
authority to the Human Resources Director to serve as the Inclusion Commission Coordinator or
delegate the role to an employee interested in serving as the Coordinator.
SECTION 4. MEETINGS. The Inclusion Commission Coordinator will schedule regular
meetings for the Commission. The meetings shall be for the purposes of making
recommendations to the Mayor related to diversity, equity and inclusion; coordinating education
and program efforts; and soliciting and receiving input and feedback related to diversity, equity,
and inclusion from City employees.
SECTION S. RESOURCES. The City Council authorizes the Mayor to propose a budget and
expend authorized funds as appropriate for the approved activities of the Commission and
necessary training and education of the Inclusion Commission members and City employees.
Employees participating in the Inclusion Commission meetings and work hour events shall do so
on City time with the support of their department and manager.
SECTION 6. GOALS. The Inclusion Commission will recommend to the Mayor initial and
ongoing short and long-term goals related to diversity, equity, and inclusion efforts impacting
City employees.
SECTION 7. REPORTS TO COUNCIL. The Inclusion Commission will report to the City
Council at least annually on the activities of the Commission and progress towards the City's
established goals related to diversity, equity, and inclusion.
PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested
by the City Clerk in authentication of such passage this 28' day of February 2023.
ATTEST:
Brandy Wallace, MMC, City Clerk
Robert Putaansuu, Mayor
Page 117 of 307
Back to Agenda
fP_. City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
del i' (360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Agenda Item No.: Business Item 8E
Subject: Adoption of a Resolution Approving a
Contract with KPFF Consulting Engineers
for the Bay Street Pathway West
Situational Study
Meeting Date: February 28, 2023
Prepared by: Tony Lang
Public Works Director
Atty Routing No.
Atty Review Date
366922-0009
February 17, 2023
Summary: On May 10, 2022, the Port Orchard City Council approved Contract C044-22 (WSDOT LA 10296)
accepting a grant from Washington State Department of Transportation. The funding is part of the
Transportation Improvement Program for the 2019-2022 Federal Funding Cycle and was awarded to the
City for the Bay Street Pathway West — Situational Study. The City identified a need for professional
architecture and engineering services with expertise in Civil Engineering, Structural Engineering, Coastal
Engineering, Geotechnical Engineering, Landscape Architecture, and Environmental Permitting. On August
26, 2022, and September 2, 2022, the City of Port Orchard Public Works Department published a Request
for Qualifications (RFQ) for Architectural and Engineering Services for the Bay Street Pathway West —
Situational Study, and by the September 16, 2022, deadline, the Public Works Department received one (1)
Statement of Qualifications (SOQ) from a qualified firm. After reviewing the SOQ received, and based upon
overall qualifications of the submitting firm, the Public Works Department determined KPFF Consulting
Engineers met the requirements and criteria as described in the RFQ and was a responsible and responsive
consultant to provide the Architectural and Engineering services for the Project. Public Works Staff met
with KPFF Consulting Engineers to discuss, clarify, and develop the project understanding and the
associated contract terms. On January 11, 2023, the City received a defined scope of work, budget, and
fees from KPFF Consulting Engineers in an amount not to exceed $560,103.86.
Relationship to Comprehensive Plan: Chapter 8 — Transportation
Recommendation: Staff recommends adoption of Resolution No. 003-23, approving and authorizing the
Mayor to execute Contract No. C010-23 with KPFF Consulting Engineers for the Bay Street Pathway West —
Situational Study in an amount of $560,103.86
Motion for Consideration: I move to adopt Resolution No. 003-23, approving and authorizing the Mayor to
execute Contract No. C010-23 with KPFF Consulting Engineers for the Bay Street Pathway West —
Situational Study in an amount of $560,103.86 and documenting the Professional Services procurement
procedures.
Fiscal Impact: WSDOT Federal Grant Funding is included in the 2023-2024 Budget as well as a local match.
Expenses for this study are included in GL Account No. 304.05.595.10.60.
Attachments: Resolution No. 003-23
Contract No. C010-23
Exhibit A Proposal
Page 118 of 307
Back to Agenda
RESOLUTION NO.003-23
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING
THE MAYOR TO EXECUTE CONTRACT NO. C010-23 WITH KPFF CONSULTING
ENGINEERS FOR ARCHITECTUAL AND ENGINEERING SERVICES FOR THE BAY
STREET PEDESTRIAN PATHWAY WEST — SITUATIONAL STUDY AND
DOCUMENTING PROCUREMENT PROCEDURES.
WHEREAS, On May 10, 2022, the Port Orchard City Council approved Contract C044-22
(WSDOT- LA 10296) accepting a grant from Washington State Department of Transportation;
and
WHEREAS the funding is part of the Transportation Improvement Program for the 2019-
2022 Federal Funding Cycle and was awarded to the City for the Bay Street Pathway West —
Situational Study (the "Project"); and
WHEREAS, the City has identified a need for professional architecture and engineering
services with expertise in Civil Engineering, Structural Engineering, Coastal Engineering,
Geotechnical Engineering, Landscape Architecture, and Environmental Permitting for the
"Project"; and
WHEREAS, on August 26, 2022, and September 2, 2022, the City of Port Orchard Public
Works Department advertised a Request for Qualifications (RFQ) for Architectural and
Engineering Services for the Bay Street Pathway West — Situational Study, and by the
September 16, 2022, deadline, the Public Works Department received one (1) Statement of
Qualifications (SOQ) from a qualified firm.; and
WHEREAS, after reviewing the SOQ received, and based upon the overall qualifications
of the submitting firm, the Public Works Department determined KPFF Consulting Engineers
met the requirements and criteria as described in the RFQ and was a responsible and
responsive consultant to provide the Architectural and Engineering services for the Project.;
and
WHEREAS, on January 4, 2023, Public Works Staff met with KPFF Consulting Engineers
to discuss, clarify, and develop the project understanding and the associated contract terms;
and
WHEREAS, on January 11, 2023, the City received a defined scope of work, budget, and
fees from KPFF Consulting Engineers; and
WHEREAS, the Port Orchard City Council believes KPFF Consulting Engineers to be a
highly qualified consulting firm for this Project; and
WHEREAS, the Port Orchard City Council, at the 2015 recommendation of the State
Auditor's Office, wishes to document their consultant selection process as described above for
this particular contract by Resolution; now, therefore,
Page 119 of 307
Back to Agenda
Resolution No.
Page 2of2
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES
AS FOLLOWS:
THAT: It is the intent of the Port Orchard City Council that the recitals set forth above
are hereby adopted and incorporated as findings in support of this Resolution.
THAT: The City Council approves and authorizes the Mayor to sign Contract No. C010-
23 with KPFF Consulting Engineers for the Bay Street Pathway West — Situational Study
in a form acceptable to the City Attorney.
THAT: The Resolution shall take full force and effect upon passage and signatures
hereon.
PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested
by the Clerk in authentication of such passage this 28t" day of February 2023.
ATTEST:
Brandy Wallace, MMC, City Clerk
Robert Putaansuu, Mayor
Page 120 of 307
Back to Agenda
Local Agency A&E Professional Services
Cost Plus Fixed Fee Consultant Agreement
Agreement Number:
Firm/Organization Legal Name (do not use dba's):
KPFF, Inc.
Address
Federal Aid Number
1601 5th Ave, Suite 1600, Seattle WA 98101
STPUL-9918(021)
UBI Number
Federal TIN or SSN Number
578063612
91-0755897
Execution Date
Completion Date
12/31 /2025
1099 Form Required
Federal Participation
❑ Yes ❑✓ No
❑✓ Yes ❑ No
Project Title
Port Orchard Bay St Pathway, Situational Study
Description of Work
Provide a feasibility assessment to connect the current westerly terminus of the Bay Street Pedestrian pathway
at the Kitsap Transit Foot Ferry terminal at Sydney Avenue, with the easterly terminus of the Tremont Street
Improvement Project. The proposed alignment of the Bay Street Pedestrian Pathway will run along the
shoreline of Sinclair inlet where feasible. The Consultant will provide a focused, detailed analysis and
alternatives of the proposed trail segment along the waterfront from Sydney Avenue to Port Orchard Boulevard,
with a higher level examination of potential multi -use pathway cross -sections and alignments from Bay Street,
along Port Orchard Boulevard, to Tremont Street. The connection may include multi -use pathway or a complete
street improvement with sidewalks and bike lanes.
❑i Yes ❑ No DBE Participation
Total Amount Authorized: $560,103.86
❑i Yes ❑ No MBE Participation
Management Reserve Fund: 0
❑i Yes ❑ No WBE Participation
❑✓ Yes ❑ No SBE Participation
Maximum Amount Payable: $560,103.86
Index of Exhibits
Exhibit A
Scope of Work
Exhibit B
DBE Participation
Exhibit C
Preparation and Delivery of Electronic Engineering and Other Data
Exhibit D
Prime Consultant Cost Computations
Exhibit E
Sub -consultant Cost Computations
Exhibit F
Title VI Assurances
Exhibit G
Certification Documents
Exhibit H
Liability Insurance Increase
Exhibit I
Alleged Consultant Design Error Procedures
Exhibit J
Consultant Claim Procedures
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 1 of 14
Revised 0210112021
THIS AGREEMENT, made and entered into as shown in the "Execution Date" box on page one (1) of this
AGREEMENT, between the City of Port Orchard ,
hereinafter called the "AGENCY," and the "Firm / Organization Name" referenced on page one (1) of this
AGREEMENT, hereinafter called the "CONSULTANT."
WHEREAS, the AGENCY desires to accomplish the work referenced in "Description of Work" on page one (1)
of this AGREEMENT and hereafter called the "SERVICES;" and does not have sufficient staff to meet the required
commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide
the necessary SERVICES; and
WHEREAS, the CONSULTANT represents that they comply with the Washington State Statutes relating
to professional registration, if applicable, and has signified a willingness to furnish consulting services to
the AGENCY.
NOW, THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein,
or attached and incorporated and made a part hereof, the parties hereto agree as follows:
I. General Description of Work
The work under this AGREEMENT shall consist of the above -described SERVICES as herein defined, and
necessary to accomplish the completed work for this project. The CONSULTANT shall furnish all services, labor,
and related equipment and, if applicable, sub -consultants and subcontractors necessary to conduct and complete the
SERVICES as designated elsewhere in this AGREEMENT.
II. General Scope of Work
The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit "A" attached
hereto and by this reference made a part of this AGREEMENT. The General Scope of Work was developed
utilizing performance based contracting methodologies.
III. General Requirements
All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall
receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and/or
individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress,
and presentation meetings with the AGENCY and/or such State, Federal, Community, City, or County officials,
groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT
sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days'
notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit "A."
The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will
outline in written and graphical form the various phases and the order of performance of the SERVICES in
sufficient detail so that the progress of the SERVICES can easily be evaluated.
The CONSULTANT, any sub -consultants, and the AGENCY shall comply with all Federal, State, and local laws,
rules, codes, regulations, and all AGENCY policies and directives, applicable to the work to be performed under
this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State
of Washington.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 2 of 14
Revised 0210112021
Participation for Disadvantaged Business Enterprises (DBE) or Small Business Enterprises (SBE), if required, per
49 CFR Part 26, shall be shown on the heading of this AGREEMENT. If DBE firms are utilized at the
commencement of this AGREEMENT, the amounts authorized to each firm and their certification number will be
shown on Exhibit `B" attached hereto and by this reference made part of this AGREEMENT. If the Prime
CONSULTANT is a DBE certified firm they must comply with the Commercial Useful Function (CUF)
regulation outlined in the AGENCY's "DBE Program Participation Plan" and perform a minimum of 30% of the
total amount of this AGREEMENT. It is recommended, but not required, that non -DBE Prime CONSULTANTS
perform a minimum of 30% of the total amount of this AGREEMENT.
In the absents of a mandatory DBE goal, a voluntary SBE goal amount of ten percent of the Consultant Agreement
is established. The Consultant shall develop a SBE Participation Plan prior to commencing work. Although the
goal is voluntary, the outreach efforts to provide SBE maximum practicable opportunities are not.
The CONSULTANT, on a monthly basis, shall enter the amounts paid to all firms (including Prime)
involved with this AGREEMENT into the wsdot.diversitycompliance.com program. Payment information
shall identify any DBE Participation.
All Reports, PS&E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned.
All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit "C —
Preparation and Delivery of Electronic Engineering and other Data."
All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared
by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for
these SERVICES, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or
on behalf of the AGENCY of any such instruments of service, not occurring as a part of this SERVICE, shall
be without liability or legal exposure to the CONSULTANT.
Any and all notices or requests required under this AGREEMENT shall be made in writing and sent to the other
party by (i) certified mail, return receipt requested, or (ii) by email or facsimile, to the address set forth below:
If to AGENCY:
Name: Ian Smith
Agency: City of Port Orchard
Address: 216 Prospect Street
City: Port Orchard State: WA Zip: 98366
Email: ismith@portorchardwa.gov
Phone: 360.876.4991
Facsimile:
IV. Time for Beginning and Completion
If to CONSULTANT:
Name: John McMillan, P.E.
Agency: KPFF Consulting Engineers
Address: 1601 5th Ave, Suite 1600
City: Seattle State: WA Zip: 98101
Email: John.McMillan@kpff.com
Phone: 206-622-5822
Facsimile: 206-622-8130
The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing by
the AGENCY. All work under this AGREEMENT shall be completed by the date shown in the heading of this
AGREEMENT titled "Completion Date."
The established completion time shall not be extended because of any delays attributable to the CONSULTANT,
but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of
unavoidable delays caused by an act of GOD, governmental actions, or other conditions beyond the control of the
CONSULTANT. A prior supplemental AGREEMENT issued by the AGENCY is required to extend the
established completion time.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed FeeeConsultant Page 3 of 14
Agreement Revised 0210112021
V. Payment Provisions
The CONSULTANT shall be paid by the AGENCY for completed SERVICES rendered under this AGREEMENT
as provided hereinafter. Such payment shall be full compensation for SERVICES performed or SERVICES
rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete SERVICES,
specified in Section II, "Scope of Work". The CONSULTANT shall conform to all applicable portions of 48 CFR
Part 31 (www.ecfr.gov). The estimate in support of the Cost Plus Fixed Fee amount is attached hereto as Exhibits
"D" and "E" and by this reference made part of this AGREEMENT.
A. Actual Costs: Payment for all consulting services for this PROJECT shall be on the basis of the
CONSULTANT'S actual cost plus a fixed fee. The actual cost shall include direct salary cost, indirect cost rate,
and direct non -salary costs.
Direct (RAW) Labor Costs: The Direct (RAW) Labor Cost is the direct salary paid to principals,
professional, technical, and clerical personnel for the time they are productively engaged in work necessary
to fulfill the terms of this AGREEMENT. The CONSULTANT shall maintain support data to verify the
direct salary costs billed to the AGENCY.
2. Indirect Cost Rate (ICR) Costs: ICR Costs are those costs, other than direct costs, which are included as such
on the books of the CONSULTANT in the normal everyday keeping of its books. Progress payments shall
be made at the ICR rates shown in attached Exhibits "D" and "E" of this AGREEMENT. Total
ICR payment shall be based on Actual Costs. The AGENCY agrees to reimburse the CONSULTANT
the actual ICR costs verified by audit, up to the Maximum Total Amount Payable, authorized under this
AGREEMENT, when accumulated with all other Actual Costs.
A summary of the CONSULTANT'S cost estimate and the ICR percentage is shown in Exhibits "D" and
"E", attached hereto and by this reference made part of this AGREEMENT. The CONSULTANT (prime and
all A&E sub -consultants) will submit to the AGENCY within six (6) months after the end of each firm's
fiscal year, an ICR schedule in the format required by the AGENCY (cost category, dollar expenditures, etc.)
for the purpose of adjusting the ICR rate for billings received and paid during the fiscal year represented by
the ICR schedule. It shall also be used for the computation of progress payments during the following year
and for retroactively adjusting the previous year's ICR cost to reflect the actual rate. The ICR schedule will
be sent to Email: ConsultantRates@wsdot.wa.gov.
Failure to supply this information by either the prime CONSULTANT or any of their A&E sub -consultants
shall cause the AGENCY to withhold payment of the billed ICR costs until such time as the required
information is received and an overhead rate for billing purposes is approved.
The AGENCY's Project Manager and/or the Federal Government may perform an audit of the
CONSULTANT'S books and records at any time during regular business hours to determine the actual ICR
rate, if they so desire.
3. Direct Non -Salary Costs: Direct Non -Salary Costs will be reimbursed at the Actual Cost to the
CONSULTANT. (excluding Meals, which are reimbursed at the per diem rates identified in this section)
These charges may include, but are not limited to, the following items: travel, printing, long distance
telephone, supplies, computer charges and fees of sub -consultants. Air or train travel will be reimbursed
only to economy class levels unless otherwise approved by the AGENCY. The CONSULTANT shall
comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in
accordance with WSDOT's Accounting Manual M 13-82, Chapter 10 — Travel Rules and Procedures, and
revisions thereto. Air, train, and rental car costs shall be reimbursed in accordance with 48 Code of Federal
Regulations (CFR) Part 31.205-46 "Travel Costs." The billing for Direct Non -Salary Costs shall include an
itemized listing of the charges directly identifiable with the PROJECT. The CONSULTANT shall maintain
the original supporting documents in their office. Copies of the original supporting documents shall be
supplied to the AGENCY upon request. All above charges must be necessary for the services provided
under this AGREEMENT.
Agreement Number:
QUI
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 4 of 14
Revised 02101/2021
4. Fixed Fee: The Fixed Fee, which represents the CONSULTANT'S profit, is shown in attached Exhibits "D"
and "E" of this AGREEMENT. This fee is based on the Scope of Work defined in this AGREEMENT and
the estimated person -hours required to perform the stated Scope of Work. In the event the CONSULTANT
enters into a supplemental AGREEMENT for additional work, the supplemental AGREEMENT may
include provisions for the added costs and an appropriate additional fee. The Fixed Fee will be prorated
and paid monthly in proportion to the percentage of work completed by the CONSULTANT and reported
in the Monthly Progress Reports accompanying the billings. Any portion of the Fixed Fee earned but not
previously paid in the progress payments will be covered in the final payment, subject to the provisions of
Section IX entitled "Termination of Agreement."
5. Management Reserve Fund (MRF): The AGENCY may desire to establish MRF to provide the Agreement
Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable
unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in
this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed the lesser of $100,000 or
10% of the Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included
for the MRF is shown in the heading of this AGREEMENT. This fund may not be replenished. Any
changes requiring additional costs in excess of the MRF shall be made in accordance with Section XIII,
"Extra Work."
6. Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the
CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this
AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and
the MRF. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in
Section XIII, "Extra Work." No minimum amount payable is guaranteed under this AGREEMENT.
B. Monthly Progress Payments: The CONSULTANT may submit billings to the AGENCY for reimbursement of
Actual Costs plus the ICR and calculated fee on a monthly basis during the progress of the work. Such billings
shall be in a format approved by the AGENCY and accompanied by the monthly progress reports required under
Section III, "General Requirements" of this AGREEMENT. The billings will be supported by an itemized
listing for each item including Direct (RAW) Labor, Direct Non -Salary, and allowable ICR Costs to which will
be added the prorated Fixed Fee. To provide a means of verifying the billed Direct (RAW) Labor costs for
CONSULTANT employees, the AGENCY may conduct employee interviews. These interviews may consist of
recording the names, titles, Direct (RAW) Labor rates, and present duties of those employees performing work
on the PROJECT at the time of the interview.
C. Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made
promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT,
contingent, if applicable, upon receipt of all PS&E, plans, maps, notes, reports, electronic data and other related
documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by
the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have
against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by
the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that
the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect
to such claims.
The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time
of final audit; all required adjustments will be made and reflected in a final payment. In the event that such
final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to
the AGENCY within thirty (30) calendar days of notice of the overpayment. Such refund shall not constitute
a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of
overpayment. The CONSULTANT has twenty (20) working days after receipt of the final POST AUDIT to
begin the appeal process to the AGENCY for audit findings.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 5 of 14
Revised 0210112021
D. Inspection of Cost Records: The CONSULTANT and their sub -consultants shall keep available for inspection
by representatives of the AGENCY and the United States, for a period of six (6) years after receipt of final
payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon
these records with the following exception: if any litigation, claim or audit arising out of, in connection with,
or related to this AGREEMENT is initiated before the expiration of the six (6) year period, the cost records and
accounts shall be retained until such litigation, claim, or audit involving the records is completed.
An interim or post audit may be performed on this AGREEMENT. The audit, if any, will be performed by the
State Auditor, WSDOT's Internal Audit Office and/or at the request of the AGENCY's Project Manager.
VI. Sub -Contracting
The AGENCY permits subcontracts for those items of SERVICES as shown in Exhibit "A" attached hereto and by
this reference made part of this AGREEMENT.
The CONSULTANT shall not subcontract for the performance of any SERVICE under this AGREEMENT without
prior written permission of the AGENCY. No permission for subcontracting shall create, between the AGENCY
and sub -consultant, any contract or any other relationship.
Compensation for this sub -consultant SERVICES shall be based on the cost factors shown on Exhibit "E" attached
hereto and by this reference made part of this AGREEMENT.
The SERVICES of the sub -consultant shall not exceed its maximum amount payable identified in each sub -
consultant cost estimate unless a prior written approval has been issued by the AGENCY.
All reimbursable direct labor, indirect cost rate, direct non -salary costs and fixed fee costs for the sub -consultant
shall be negotiated and substantiated in accordance with section V "Payment Provisions" herein and shall be
memorialized in a final written acknowledgement between the parties.
All subcontracts shall contain all applicable provisions of this AGREEMENT, and the CONSULTANT shall require
each sub -consultant or subcontractor, of any tier, to abide by the terms and conditions of this AGREEMENT. With
respect to sub -consultant payment, the CONSULTANT shall comply with all applicable sections of the STATE's
Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011.
The CONSULTANT, sub -recipient, or sub -consultant shall not discriminate on the basis of race, color, national
origin, or sex in the performance of this AGREEMENT. The CONSULTANT shall carry out applicable
requirements of 49 CFR Part 26 in the award and administration of DOT -assisted contracts. Failure by the
CONSULTANT to carry out these requirements is a material breach of this AGREEMENT, which may result in the
termination of this AGREEMENT or such other remedy as the recipient deems appropriate.
VII. Employment and Organizational Conflict of Interest
The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona
fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has not paid or
agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any
fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the
award or making of this contract. For breach or violation of this warrant, the AGENCY shall have the right to annul
this AGREEMENT without liability or, in its discretion, to deduct from this AGREEMENT price or consideration
or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee.
Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work
or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the
CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen's
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 6 of 14
Revised 0210112021
Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made
by a third party as a consequence of any act or omission on the part of the CONSULTANT's employees or other
persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation
and responsibility of the CONSULTANT.
The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of this
AGREEMENT, any professional or technical personnel who are, or have been, at any time during the period of this
AGREEMENT, in the employ of the United States Department of Transportation or the AGENCY, except regularly
retired employees, without written consent of the public employer of such person if he/she will be working on this
AGREEMENT for the CONSULTANT.
VIII. Nondiscrimination
During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, sub -consultants,
subcontractors and successors in interest, agrees to comply with the following laws and regulations:
• Title VI of the Civil Rights Act of 1964
(42 U.S.C. Chapter 21 Subchapter V § 2000d
through 2000d-4a)
• Federal -aid Highway Act of 1973
(23 U.S.C. Chapter 3 § 324)
• Civil Rights Restoration Act of 1987
(Public Law 100-259)
• American with Disabilities Act of 1990
(42 U.S.C. Chapter 126 § 12101 et. seq.)
• 23 CFR Part 200
• Rehabilitation Act of 1973 • 49 CFR Part 21
(29 U.S.C. Chapter 16 Subchapter V § 794) • 49 CFR Part 26
• Age Discrimination Act of 1975 • RCW 49.60.180
(42 U.S.C. Chapter 76 § 6101 et. seq.)
In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit "F"
attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit "F" in
every sub -contract, including procurement of materials and leases of equipment, unless exempt by the Regulations
or directives issued pursuant thereto.
IX. Termination of Agreement
The right is reserved by the AGENCY to terminate this AGREEMENT at any time with or without cause upon ten
(10) days written notice to the CONSULTANT.
In the event this AGREEMENT is terminated by the AGENCY, other than for default on the part of the
CONSULTANT, a final payment shall be made to the CONSULTANT for actual hours charged and any appropriate
fixed fee percentage at the time of termination of this AGREEMENT, plus any direct non -salary costs incurred up to
the time of termination of this AGREEMENT.
No payment shall be made for any SERVICES completed after ten (10) days following receipt by the
CONSULTANT of the notice to terminate. If the accumulated payment made to the CONSULTANT prior to Notice
of Termination exceeds the total amount that would be due when computed as set forth in paragraph two (2) of this
section, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for
any excess paid.
If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT,
the above formula for payment shall not apply.
In the event of a termination for default, the amount to be paid to the CONSULTANT shall be determined by the
AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing SERVICES
to the date of termination, the amount of SERVICES originally required which was satisfactorily completed to
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 7 of 14
Revised 0210112021
date of termination, whether that SERVICE is in a form or a type which is usable to the AGENCY at the time of
termination, the cost to the AGENCY of employing another firm to complete the SERVICES required and the
time which may be required to do so, and other factors which affect the value to the AGENCY of the SERVICES
performed at the time of termination. Under no circumstances shall payment made under this subsection exceed the
amount, which would have been made using the formula set forth in paragraph two (2) of this section.
If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT's failure to
perform is without the CONSULTANT's or its employee's fault or negligence, the termination shall be deemed to
be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed
for actual costs and appropriate fixed fee percentage in accordance with the termination for other than default
clauses listed previously.
The CONSULTANT shall, within 15 days, notify the AGENCY in writing, in the event of the death of any member,
partner, or officer of the CONSULTANT or the death or change of any of the CONSULTANT's supervisory and/or
other key personnel assigned to the project or disaffiliation of any principally involved CONSULTANT employee.
The CONSULTANT shall also notify the AGENCY, in writing, in the event of the sale or transfer of 50% or
more of the beneficial ownership of the CONSULTANT within 15 days of such sale or transfer occurring. The
CONSULTANT shall continue to be obligated to complete the SERVICES under the terms of this AGREEMENT
unless the AGENCY chooses to terminate this AGREEMENT for convenience or chooses to renegotiate any term(s)
of this AGREEMENT. If termination for convenience occurs, final payment will be made to the CONSULTANT
as set forth in the second and third paragraphs of this section.
Payment for any part of the SERVICES by the AGENCY shall not constitute a waiver by the AGENCY of
any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the
CONSULTANT, or for failure of the CONSULTANT to perform SERVICES required of it by the AGENCY.
Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights
with respect to any future act or omission by the CONSULTANT.
X. Changes of Work
The CONSULTANT shall make such changes and revisions in the completed work of this AGREEMENT as
necessary to correct errors appearing therein, without additional compensation thereof. Should the AGENCY find
it desirable for its own purposes to have previously satisfactorily completed SERVICES or parts thereof changed or
revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered
as Extra Work and will be paid for as herein provided under section XIII "Extra Work."
XI. Disputes
Any disputed issue not resolved pursuant to the terms of this AGREEMENT shall be submitted in writing within
10 days to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and
binding on the parties of this AGREEMENT; provided however, that if an action is brought challenging the
Director of Public Works or AGENCY Engineer's decision, that decision shall be subject to judicial review. If the
parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under
the procedures found in Exhibit "J". In the event that either party deem it necessary to institute legal action or
proceeding to enforce any right or obligation under this AGREEMENT, this action shall be initiated in the Superior
Court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto
agree that all questions shall be resolved by application of Washington law and that the parties have the right of
appeal from such decisions of the Superior Court in accordance with the laws of the State of Washington. The
CONSULTANT hereby consents to the personal jurisdiction of the Superior Court of the State of Washington,
situated in the county in which the AGENCY is located.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 8 of 14
Revised 0210112021
XII. Legal Relations
The CONSULTANT, any sub -consultants, and the AGENCY shall comply with all Federal, State, and local laws,
rules, codes, regulations and all AGENCY policies and directives, applicable to the work to be performed under this
AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of
Washington.
The CONSULTANT shall defend, indemnify, and hold The State of Washington (STATE) and the AGENCY and
their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part
from the negligence of, or the breach of any obligation under this AGREEMENT by, the CONSULTANT or the
CONSULTANT's agents, employees, sub consultants, subcontractors or vendors, of any tier, or any other persons
for whom the CONSULTANT may be legally liable; provided that nothing herein shall require a CONSULTANT
to defend or indemnify the STATE and the AGENCY and their officers and employees against and hold harmless
the STATE and the AGENCY and their officers and employees from claims, demands or suits based solely upon
the negligence of, or breach of any obligation under this AGREEMENT by the STATE and the AGENCY, their
agents, officers, employees, sub -consultants, subcontractors or vendors, of any tier, or any other persons for whom
the STATE and/or the AGENCY may be legally liable; and provided further that if the claims or suits are caused
by or result from the concurrent negligence of (a) the CONSULTANT or the CONSULTANT's agents, employees,
sub -consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT is legally
liable, and (b) the STATE and/or AGENCY, their agents, officers, employees, sub -consultants, subcontractors and or
vendors, of any tier, or any other persons for whom the STATE and or AGENCY may be legally liable, the defense
and indemnity obligation shall be valid and enforceable only to the extent of the CONSULTANT's negligence or
the negligence of the CONSULTANT's agents, employees, sub -consultants, subcontractors or vendors, of any tier,
or any other persons for whom the CONSULTANT may be legally liable. This provision shall be included in any
AGREEMENT between CONSULTANT and any sub -consultant, subcontractor and vendor, of any tier.
The CONSULTANT shall also defend, indemnify, and hold the STATE and the AGENCY and their officers
and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the
alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents,
proprietary information, know-how, copyright rights or inventions by the CONSULTANT or the CONSULTANT's
agents, employees, sub -consultants, subcontractors or vendors, of any tier, or any other persons for whom the
CONSULTANT may be legally liable, in performance of the Work under this AGREEMENT or arising out of any
use in connection with the AGREEMENT of methods, processes, designs, information or other items furnished or
communicated to STATE and/or the AGENCY, their agents, officers and employees pursuant to the AGREEMENT;
provided that this indemnity shall not apply to any alleged patent or copyright infringement or other allegedly
improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or
inventions resulting from STATE and/or AGENCY'S, their agents', officers' and employees' failure to comply
with specific written instructions regarding use provided to STATE and/or AGENCY, their agents, officers and
employees by the CONSULTANT, its agents, employees, sub -consultants, subcontractors or vendors, of any tier, or
any other persons for whom the CONSULTANT may be legally liable.
The CONSULTANT's relation to the AGENCY shall be at all times as an independent contractor.
Notwithstanding any determination by the Executive Ethics Board or other tribunal, the AGENCY may, in its sole
discretion, by written notice to the CONSULTANT terminate this AGREEMENT if it is found after due notice and
examination by the AGENCY that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or
any similar statute involving the CONSULTANT in the procurement of, or performance under, this AGREEMENT.
The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT's own
employees or its agents against the STATE and /or the AGENCY and, solely for the purpose of this indemnification
and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51
RCW. This waiver has been mutually negotiated between the Parties.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 9 of 14
Revised 0210112021
Unless otherwise specified in this AGREEMENT, the AGENCY shall be responsible for administration of
construction contracts, if any, on the project. Subject to the processing of a new sole source, or an acceptable
supplemental AGREEMENT, the CONSULTANT shall provide On -Call assistance to the AGENCY during contract
administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper
construction techniques, job site safety, or any construction contractor's failure to perform its work in accordance
with the contract documents.
The CONSULTANT shall obtain and keep in force during the terms of this AGREEMENT, or as otherwise
required, the following insurance with companies or through sources approved by the State Insurance
Commissioner pursuant to Title 48 RCW.
Insurance Coverage
A. Worker's compensation and employer's liability insurance as required by the STATE.
B. Commercial general liability insurance written under ISO Form CG 00 01 12 04 or its equivalent with minimum
limits of one million dollars ($1,000,000.00) per occurrence and two million dollars ($2,000,000.00) in the
aggregate for each policy period.
C. Business auto liability insurance written under ISO Form CG 00 01 10 01 or equivalent providing coverage for
any "Auto" (Symbol 1) used in an amount not less than a one million dollar ($1,000,000.00) combined single
limit for each occurrence.
Excepting the Worker's Compensation Insurance and any Professional Liability Insurance, the STATE and
AGENCY, their officers, employees, and agents will be named on all policies of CONSULTANT and any sub -
consultant and/or subcontractor as an additional insured (the "AIs"), with no restrictions or limitations concerning
products and completed operations coverage. This coverage shall be primary coverage and non-contributory and
any coverage maintained by the AIs shall be excess over, and shall not contribute with, the additional insured
coverage required hereunder. The CONSULTANT's and the sub -consultant's and/or subcontractor's insurer shall
waive any and all rights of subrogation against the AIs. The CONSULTANT shall furnish the AGENCY with
verification of insurance and endorsements required by this AGREEMENT. The AGENCY reserves the right to
require complete, certified copies of all required insurance policies at any time.
All insurance shall be obtained from an insurance company authorized to do business in the State of Washington.
The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the
execution of this AGREEMENT to:
Name: Ian Smith
Agency: City of Port Orchard
Address: 216 Propsect Street
City: Port Orchard State: WA Zip: 98366
Email: ismith@portorchardwa.gov
Phone: 360.876.4991
Facsimile:
No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY.
The CONSULTANT's professional liability to the AGENCY, including that which may arise in reference to
section IX "Termination of Agreement" of this AGREEMENT, shall be limited to the accumulative amount of the
authorized AGREEMENT amount or one million dollars ($1,000,000.00), whichever is greater, unless the limit of
liability is increased by the AGENCY pursuant to Exhibit H. In no case shall the CONSULTANT's professional
liability to third parties be limited in any way.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 10 of 14
Revised 0210112021
The parties enter into this AGREEMENT for the sole benefit of the parties, and to the exclusion of any third party,
and no third party beneficiary is intended or created by the execution of this AGREEMENT.
The AGENCY will pay no progress payments under section V "Payment Provisions" until the CONSULTANT has
fully complied with this section. This remedy is not exclusive; and the AGENCY may take such other action as is
available to it under other provisions of this AGREEMENT, or otherwise in law.
XIII. Extra Work
A. The AGENCY may at any time, by written order, make changes within the general scope of this AGREEMENT
in the SERVICES to be performed.
B. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance
of any part of the SERVICES under this AGREEMENT, whether or not changed by the order, or otherwise
affects any other terms and conditions of this AGREEMENT, the AGENCY shall make an equitable adjustment
in the: (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms
and shall modify this AGREEMENT accordingly.
C. The CONSULTANT must submit any "request for equitable adjustment," hereafter referred to as "CLAIM,"
under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY
decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final
payment of this AGREEMENT.
D. Failure to agree to any adjustment shall be a dispute under the section XI "Disputes" clause. However, nothing
in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed.
E. Notwithstanding the terms and conditions of paragraphs (A.) and (B.) above, the maximum amount payable for
this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement
to this AGREEMENT.
XIV. Endorsement of Plans
If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering
data furnished by them.
XV. Federal Review
The Federal Highway Administration shall have the right to participate in the review or examination of the
SERVICES in progress.
XVI. Certification of the Consultant and the Agency
Attached hereto as Exhibit "G-1(a and b)" are the Certifications of the CONSULTANT and the AGENCY, Exhibit
"G-2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered
Transactions, Exhibit "G-3" Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying
and Exhibit "G-4" Certificate of Current Cost or Pricing Data. Exhibit "G-3" is required only in AGREEMENT's
over one hundred thousand dollars ($100,000.00) and Exhibit "G-4" is required only in AGREEMENT's over
five hundred thousand dollars ($500,000.00.) These Exhibits must be executed by the CONSULTANT, and
submitted with the master AGREEMENT, and returned to the AGENCY at the address listed in section III "General
Requirements" prior to its performance of any SERVICES under this AGREEMENT.
Agreement Number:
WWI
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 11 of 14
Revised 0210112021
XVII. Complete Agreement
This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the
parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or
be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or
modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as a supplement
to this AGREEMENT.
XVIII. Execution and Acceptance
This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed
to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements,
representations, warranties, covenants, and AGREEMENT's contained in the proposal, and the supporting material
submitted by the CONSULTANT, and does hereby accept this AGREEMENT and agrees to all of the terms and
conditions thereof.
XIX. Protection of Confidential Information
The CONSULTANT acknowledges that some of the material and information that may come into its possession
or knowledge in connection with this AGREEMENT or its performance may consist of information that is exempt
from disclosure to the public or other unauthorized persons under either chapter 42.56 RCW or other local, state
or federal statutes ("State's Confidential Information"). The "State's Confidential Information" includes, but is
not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles,
credit card information, driver's license numbers, medical data, law enforcement records (or any other information
identifiable to an individual), STATE and AGENCY source code or object code, STATE and AGENCY security
data, non-public Specifications, STATE and AGENCY non -publicly available data, proprietary software, State
security data, or information which may jeopardize any part of the project that relates to any of these types of
information. The CONSULTANT agrees to hold the State's Confidential Information in strictest confidence
and not to make use of the State's Confidential Information for any purpose other than the performance of this
AGREEMENT, to release it only to authorized employees, sub -consultants or subcontractors requiring such
information for the purposes of carrying out this AGREEMENT, and not to release, divulge, publish, transfer,
sell, disclose, or otherwise make it known to any other party without the AGENCY's express written consent
or as provided by law. The CONSULTANT agrees to release such information or material only to employees,
sub -consultants or subcontractors who have signed a nondisclosure AGREEMENT, the terms of which have
been previously approved by the AGENCY. The CONSULTANT agrees to implement physical, electronic, and
managerial safeguards to prevent unauthorized access to the State's Confidential Information.
Immediately upon expiration or termination of this AGREEMENT, the CONSULTANT shall, at the AGENCY's
option: (i) certify to the AGENCY that the CONSULTANT has destroyed all of the State's Confidential
Information; or (ii) returned all of the State's Confidential Information to the AGENCY, or (iii) take whatever other
steps the AGENCY requires of the CONSULTANT to protect the State's Confidential Information.
As required under Executive Order 00-03, the CONSULTANT shall maintain a log documenting the following:
the State's Confidential Information received in the performance of this AGREEMENT; the purpose(s) for which
the State's Confidential Information was received; who received, maintained and used the State's Confidential
Information; and the final disposition of the State's Confidential Information. The CONSULTANT's records shall
be subject to inspection, review, or audit upon reasonable notice from the AGENCY.
The AGENCY reserves the right to monitor, audit, or investigate the use of the State's Confidential Information
collected, used, or acquired by the CONSULTANT through this AGREEMENT. The monitoring, auditing, or
investigating may include, but is not limited to, salting databases.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 12 of 14
Revised 0210112021
Violation of this section by the CONSULTANT or its sub -consultants or subcontractors may result in termination of
this AGREEMENT and demand for return of all State's Confidential Information, monetary damages, or penalties.
It is understood and acknowledged that the CONSULTANT may provide the AGENCY with information which
is proprietary and/or confidential during the term of this AGREEMENT. The parties agree to maintain the
confidentiality of such information during the term of this AGREEMENT and afterwards. All materials containing
such proprietary and/or confidential information shall be clearly identified and marked as "Confidential" and shall
be returned to the disclosing party at the conclusion of the SERVICES under this AGREEMENT.
The CONSULTANT shall provide the AGENCY with a list of all information and materials it considers confidential
and/or proprietary in nature: (a) at the commencement of the term of this AGREEMENT; or (b) as soon as such
confidential or proprietary material is developed. "Proprietary and/or confidential information" is not meant to
include any information which, at the time of its disclosure: (i) is already known to the other party; (ii) is rightfully
disclosed to one of the parties by a third parry that is not acting as an agent or representative for the other party;
(iii) is independently developed by or for the other party; (iv) is publicly known; or (v) is generally utilized by
unaffiliated third parties engaged in the same business or businesses as the CONSULTANT.
The parties also acknowledge that the AGENCY is subject to Washington State and federal public disclosure
laws. As such, the AGENCY shall maintain the confidentiality of all such information marked proprietary and/
or confidential or otherwise exempt, unless such disclosure is required under applicable state or federal law. If a
public disclosure request is made to view materials identified as "Proprietary and/or confidential information" or
otherwise exempt information, the AGENCY will notify the CONSULTANT of the request and of the date that such
records will be released to the requester unless the CONSULTANT obtains a court order from a court of competent
jurisdiction enjoining that disclosure. If the CONSULTANT fails to obtain the court order enjoining disclosure, the
AGENCY will release the requested information on the date specified.
The CONSULTANT agrees to notify the sub -consultant of any AGENCY communication regarding disclosure that
may include a sub -consultant's proprietary and/or confidential information. The CONSULTANT notification to the
sub -consultant will include the date that such records will be released by the AGENCY to the requester and state
that unless the sub -consultant obtains a court order from a court of competent jurisdiction enjoining that disclosure
the AGENCY will release the requested information. If the CONSULTANT and/or sub -consultant fail to obtain
a court order or other judicial relief enjoining the AGENCY by the release date, the CONSULTANT shall waive
and release and shall hold harmless and indemnify the AGENCY from all claims of actual or alleged damages,
liabilities, or costs associated with the AGENCY's said disclosure of sub -consultants' information.
XX. Records Maintenance
During the progress of the Work and SERVICES provided hereunder and for a period of not less than six (6) years
from the date of final payment to the CONSULTANT, the CONSULTANT shall keep, retain and maintain all
"documents" pertaining to the SERVICES provided pursuant to this AGREEMENT. Copies of all "documents"
pertaining to the SERVICES provided hereunder shall be made available for review at the CONSULTANT's place
of business during normal working hours. If any litigation, claim or audit is commenced, the CONSULTANT shall
cooperate with AGENCY and assist in the production of all such documents. "Documents" shall be retained until
all litigation, claims or audit findings have been resolved even though such litigation, claim or audit continues past
the six (6) year retention period.
For purposes of this AGREEMENT, "documents" means every writing or record of every type and description,
including electronically stored information ("ESI"), that is in the possession, control, or custody of the
CONSULTANT, including, without limitation, any and all correspondences, contracts, AGREEMENT `s,
appraisals, plans, designs, data, surveys, maps, spreadsheets, memoranda, stenographic or handwritten
notes, reports, records, telegrams, schedules, diaries, notebooks, logbooks, invoices, accounting records,
work sheets, charts, notes, drafts, scribblings, recordings, visual displays, photographs, minutes of meetings,
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Con3:3sultant Agreement Page 13 of 14
Revised 0210112021
tabulations, computations, summaries, inventories, and writings regarding conferences, conversations or
telephone conversations, and any and all other taped, recorded, written, printed or typed matters of any kind or
description; every copy of the foregoing whether or not the original is in the possession, custody, or control of the
CONSULTANT, and every copy of any of the foregoing, whether or not such copy is a copy identical to an original,
or whether or not such copy contains any commentary or notation whatsoever that does not appear on the original.
For purposes of this AGREEMENT, "ESI" means any and all computer data or electronic recorded media of any
kind, including "Native Files", that are stored in any medium from which it can be retrieved and examined, either
directly or after translation into a reasonably useable form. ESI may include information and/or documentation
stored in various software programs such as: Email, Outlook, Word, Excel, Access, Publisher, PowerPoint, Adobe
Acrobat, SQL databases, or any other software or electronic communication programs or databases that the
CONSULTANT may use in the performance of its operations. ESI may be located on network servers, backup
tapes, smart phones, thumb drives, CDs, DVDs, floppy disks, work computers, cell phones, laptops or any other
electronic device that CONSULTANT uses in the performance of its Work or SERVICES hereunder, including any
personal devices used by the CONSULTANT or any sub -consultant at home.
"Native files" are a subset of ESI and refer to the electronic format of the application in which such ESI is normally
created, viewed, and /or modified.
The CONSULTANT shall include this section XX "Records Maintenance" in every subcontract it enters into in
relation to this AGREEMENT and bind the sub -consultant to its terms, unless expressly agreed to otherwise in
writing by the AGENCY prior to the execution of such subcontract.
In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the
"Execution Date" box on page one (1) of this AGREEMENT.
1
Sig
Signature
1-16-2023
Date
Date
Any modification, change, or reformation of this AGREEMENTshall require approval as to form by the Office
of the Attorney General.
Agreement Number:
Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 14 of 14
Revised 0210112021
Back to Agenda
Exhibit A
See Attached
Scope of Work
Project No.
Agreement Number:
Exhibit A -Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 1
Back to Agenda
BAY STREET PATHWAY WEST, SITUATIONAL STUDY
SCOPE OF WORK
Contents
ProjectDescription................................................................................................................................... 2
Introduction..........................................................................................................................................
2
Assumptions........................................................................................................................................
4
Information Provided by the City.....................................................................................................
4
Task1:
Project Management..................................................................................................................5
1.1
Contract Administration.................................................................................................
5
1.2
Project Management Plan...............................................................................................
5
1.3
Subconsultant Management...........................................................................................
5
1.4
Coordination Meetings...................................................................................................
6
Task2:
Data Collection...........................................................................................................................
8
2.1
Data Collection.................................................................................................................
8
2.2
Survey................................................................................................................................9
Task 3:
Public Involvement Support..................................................................................................11
3.1
Public Outreach Engagement Plan..............................................................................11
3.2
Project Advisory Committee........................................................................................11
3.3
Virtual Engagement.......................................................................................................12
3.4
Project Advertising and Public Engagement.............................................................13
Task4:
Concept Planning.....................................................................................................................14
4.1
Basis of Design................................................................................................................14
4.2
Alternative Development............................................................................................14
4.3
Concept Plan Development..........................................................................................15
Task 5:
Environmental Services..........................................................................................................
22
5.1
Cultural Resources Services.........................................................................................
22
5.2
Environmental Strategy Support.................................................................................
23
Task 6:
Geotech and Soil Evaluation Services..................................................................................
24
6.1
Geotechnical Services....................................................................................................
24
6.2
Hazardous Materials Review.......................................................................................
24
Task 7:
Coastal Engineering Evaluation Services............................................................................27
7.1
Coastal Engineering Services.......................................................................................
27
Task8:
WSDOT Coordination.............................................................................................................
28
8.1
WSDOT Coordination...................................................................................................
28
Task 9:
Grant Application Support - (Optional Service)...............................................................
29
MUKILTEO 5T"
STREET - SCOPE OF WORK
i
KPFF CONSULTING
ENGINEERS FEBRUARY
2021
Page 136 of 307
Project Description
Introduction
The Bay Street Pathway West Project Situational Study goals include providing a
feasibility assessment to connect the current westerly terminus of the Bay Street
Pedestrian pathway at the Kitsap Transit Foot Ferry terminal at Sydney Avenue, with
the easterly terminus of the Tremont Street Improvement Project. The proposed
alignment of the Bay Street Pedestrian Pathway will run along the shoreline of Sinclair
inlet where feasible. The Consultant will provide a focused, detailed analysis and
alternatives of the proposed trail segment along the waterfront from Sydney Avenue to
Port Orchard Boulevard, with a higher level examination of potential multi -use pathway
cross -sections and alignments from Bay Street, along Port Orchard Boulevard, to
Tremont Street. (Refer to Figure 1 for the proposed multi -use pathway trail alignment
feasibility study area) The connection may include multi -use pathway or a complete
street improvement with sidewalks and bike lanes.
The Consultant shall develop alternatives, support community outreach and
engagement and assist the City in arriving at a preferred alternative. The alternatives
developed by the CONSULTANT will incorporate current planned public and private
development and projected future development within the project limits and the City's
waterfront. (Refer to Figure 2)
Schedule
• NTP January 2023
• Alternatives presented to the public Q2 2023
• Preferred Alternative Selected by the City Q3 2023
• Concept design completed Q4 2023
• Design and Construction dependent on funding
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 137 of 307
2
JANUARY 2023
of
idL
Key Stakeholders
City of Port Orchard, local residents, local businesses, Kitsap Transit, Port
Orchard Fire Department, Local Bicycle Community, Port of Bremerton, and
Local Tribes.
Assumptions
The following are general project assumptions for the Scope of Work; other assumptions
are found within the project tasks.
1. Project limits are the existing Bay Street Trail near the Kitsap Transit Foot Ferry
(northern limit) to Tremont Street (southern limit). The overall corridor is
approximately 1.5 miles in length.
2. Scope of the project improvements will be refined through an engagement
process with a project steering committee, stakeholders, and City staff.
3. Alternative routing/treatment concepts shall be developed in partnership with
the City and stakeholders. Feedback on alternatives shall be collected through a
public engagement process. City staff shall make the final decision on a
preferred alternative, considering input from the public, project steering
committee and stakeholders.
4. A concept design shall be developed by the CONSULTANT upon selection of the
preferred alternative by the City.
5. The City shall acquire Rights -of -Entry required access to property along the
corridor and provide them to the CONSULTANT.
Information Provided by the City
1. Record drawings for roadway, water, sewer, stormwater and lighting.
2. City CADD PS&E standards and survey standards for use by the
CONSULTANT, unless authority for plan and survey standards are delegated to
the CONSULTANT.
3. Relevant information for on -going and planned City and 3rd party
redevelopment projects.
4. Utility agencies and contact person within the project limits.
5. Identification of known critical areas and issues within the project's limits.
6. Geotechnical Reports and bore log data of relevant past projects along and
adjacent to the proposed project alignment.
7. Traffic counts and traffic collision data for the project area.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 139 of 307
4
JANUARY 2023
Task 1: Project Management
The CONSULTANT shall provide overall project administration and management for
the duration of the project.
1.1 Contract Administration
The CONSULTANT shall develop and manage the project scope, schedule, and budget
and execute contract administration activities as needed to complete the scope of work.
Monthly invoices for work completed to date shall be submitted to the City with cost
tracking at the Task Level.
The CONSULANT may re -allocate budget between tasks and sub -consultants at the
approval of the City to meet project needs.
Deliverable(s):
1. Scope, schedule, and budget updates as warranted (electronic PDF).
2. Monthly progress report summary (electronic PDF).
3. Monthly invoices (electronic PDF).
1.2 Project Management Plan
The CONSULTANT shall develop and maintain a simplistic Project Management Plan
(PMP). The PMP shall include:
• Project Team Org Chart and Contact List
• Work Breakdown Structure
• Change Management, Schedule Management and Risk Management Plans
• Quality Control and Quality Assurance Procedures
A Risk Registry and design issue log shall be maintained by the CONSULTANT.
An electronic file sharing site shall also be developed and maintained by the
CONSULTANT for project use.
Deliverable(s):
1. PMP (living document) (electronic PDF or DOCX).
2. Risk Registry (living document) (electronic PDF or DOCX).
3. Design issue log (living document) electronic PDF or DOCX).
4. Electronic file sharing site.
1.3 Subconsultant Management
The CONSULTANT shall prepare SUBCONSULTANT contracts and manage
SUBCONSULTANTS to ensure accurate and timely implementation of the work plan
and the appropriate coordination of work activities, including the review of all
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 140 of 307
5
JANUARY 2023
SUBCONSULTANTS' work on various project elements. In addition, the
CONSULTANT shall conduct reviews of SUBCONSULTANTS' progress and invoices.
1.4 Coordination Meetings
The CONSULTANT shall schedule, attend, and host project meetings to support the
project and facilitate communication.
Project Management Meetings
The CONSULTANT Project Manager (PM), Consultant Lead Engineer and the City PM
shall have a monthly virtual meeting to discuss project issues, current status, and
upcoming work for the duration of the project design phase, with an expected duration
of 60 minutes. The CONSULTANT PM shall also attend five two-hour face-to-face
meetings with various City staff to support the project, with virtual meetings assumed.
Design Milestone Meetings
CONSULTANT will schedule meetings with the City at project milestones noted below
to coordinate the planning process. Meetings are assumed virtual and last ninety
minutes each.
• Kickoff
• Early alternative layout
• Concept Review
• Preferred Alternative Presentation
The project kickoff meeting shall be attended by the CONSULTANT PM, the Lead
Engineer, Urban Designer, Structural Lead, Consultant Project Coordinator and the
Active Transportation Lead.
All other milestone meetings will be attended by the CONSULTANT PM and
CONSULTANT LEAD ENGINEER only.
City Council/Executive Committee Briefings
The CONSULTANT PM will attend up to three (3) briefing sessions with City
Engineering Staff or Council members.
Assumption(s):
1. Briefings will occur prior to the public outreach meetings.
Deliverable(s):
1. Meeting presentation material.
2. Meeting draft and final notes.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 141 of 307
6
JANUARY 2023
Back to Agenda
Third -Party Project Technical Coordination Meetings
The CONSULTANT will attend up to four (4) 90-minute meetings with third parties
relevant to the project to coordinate technical issues on the project, such as utility
coordination needs, Right -of -Way coordination, and permitting coordination. Third
parties may include utility providers and transit service providers in the corridor.
Assumption(s):
Meetings shall be technical in nature and require two CONSULTANT staff
member per meeting.
2. The CONSULTANT shall develop exhibits and supporting material for each
meeting.
3. City staff shall be invited to all technical coordination meetings.
Deliverable(s):
1. Meeting agenda provided 2 business days ahead of scheduled meetings
2. Meeting presentation/coordination materials.
3. Meeting draft and final notes.
Coordination with WSDOT is addressed within Task 8 of this scope of work
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 142 of 307
7
JANUARY 2023
Task 2: Data Collection
2.1 Data Collection
The CONSULTANT shall review existing data, document the major findings, determine
what additional data is needed, and conduct a site visit to review existing conditions. In
addition, the CONSULTANT shall complete the following activities:
• Collect and review utility GIS information.
• Coordinate with the City and private utilities to ensure utility information is
shown correctly within the plan set.
• Collect existing record drawings within the project vicinity.
• Collect proposed redevelopment planning documents and the current
development plan sets from active relevant proposed development projects
Assumption(s):
1. The existing conditions site visit shall occur after survey has been collected.
2. City will provide information in electronic PDF format, including traffic counts,
transit information, and background records.
3. City will provide anticipated development plans for all developments within the
project area.
Deliverable(s):
1. Tech memo summary of project existing condition site visit.
2. Tech memo summary of utility coordination data revisions or updates.
3. Tech memo summary on anticipated redevelopment within the project vicinity
4. Electronic publication of collected records.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 143 of 307
8
JANUARY 2023
2.2 Survey
The CONSULTANT shall provide full topographic survey for the waterfront portion of
the project from Sydney Avenue at the east terminus of the project limits to the
intersection of SR 166/Port Orchard Boulevard (with topo survey collected four
hundred feet south of this intersection along Port Orchard Boulevard). Survey shall
extend 100 feet beyond side street curb returns.
Within these areas:
1. The CONSULTANT shall utilize existing survey collected by WSDOT for
proposed Fish Passage Culvert work near the intersection of Bay Street and Port
Orchard Boulevard.
2. The CONSULTANT shall utilize existing survey collected by KPFF Consulting
Engineers near the planned City Community Events Center redevelopment
location.
The CONSULTANT shall utilize Photogrammetry or lidar methods From SR 166/Port
Orchard Boulevard to Tremont St along Port Orchard Boulevard to meet the standard of
care for the concept planning study.
The CONSULTANT shall collect right-of-way survey within the project vicinity.
Monuments shall be located and used to establish rights -of -way for the project vicinity
within 100 feet of alternative pathways.
The CONSULTANT shall collect surface visual utility survey, including drainage and
sewer utility measure -downs of accessible catch basins, manholes, inlets, and other
drainage structures within the project vicinity. Information on non -visual underground
utilities shall be collected by the CONSULTANT using GIS information, record
drawings, 3rd party utility locates or other means.
The CONSULTANT shall develop a Civil 3D basemap of the existing conditions per the
City Standards and a Civil 3D existing condition Digital Terrain Model.
Topo survey beyond the ROW limits shall be collected to existing building faces or 30
feet beyond the ROW without entry into private property by the CONSULANT using
Photogrammetry or Lidar methods. Survey will be conducted to water edge and based
on level of tide at time of survey.
Parcel limits shall be reviewed against parcel limits identified in the Community Event
Center project produced by KPFF Consulting Engineers for a local redevelopment
project.
Trees six (6") inches in diameter and larger will be surveyed. Trees will be labeled with
trunk and dripline diameter and will be classified as coniferous or deciduous on the
basemap survey.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 144 of 307
9
JANUARY 2023
Assumption(s)
• Ground -Based Lidar or aerial survey methods will be utilized by the
CONSULTANT for survey collection on private property within the corridor.
• Civil 3D 2020 shall be the project's existing condition file format and mapping
will conform to City standards provided by City. APWA standards will be used
if the City does not have specific survey standards.
• City will provide title block and associates information for the construction
control sheet at least three (3) weeks prior to deliverable due dates.
• Survey requiring confined space entry is beyond the scope of work. Manholes
over 25 feet deep or full of debris/water may not be as -built since they may
require confined space entry to access the manhole in order to accurately
measure the depth (if needed).
• Survey basemaps will be provided in U.S. Survey Feet NAD 83(2011) horizontal
and NAVD 88 vertical datums, unless otherwise directed.
• Through 811 service, the survey basemap will state the utility locate ticket
number and list potential utility stakeholders in the vicinity.
• CONSULTANT will rely upon a private 3rd party utility locator to place tone
(paint) marks within the survey limits for conductible utilities within ROW.
CONSULANT shall collect data of field marked conductible utility locates, as
warranted, during survey data collection.
• Establishment of parcel limits will not be made beyond GIS limits. If a TCE or
right-of-way need is established in the concept design phase, the CONSULTANT
shall note the issue for future project action during the project design phase.
Property line and easement locations shown on survey basemap will be based on
public record information and work prepared by KPFF Consulting Engineers on
other nearby projects
Parcel limit history along the waterfront has conflicting historic records. Survey
parcel limits used by the team shall include parcel limits developed by other
projects approved by the City.
Deliverable(s):
Existing Conditions survey in Civil 3D 2020 format in 2D and 3D with right-of-
way limits.
2. Existing Surface DTM in Civil 3D 2020 format.
3. Horizontal and Vertical Control Drawings.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 145 of 307
10
JANUARY 2023
Task 3: Public Involvement Support
3.1 Public Outreach Engagement Plan
The CONSULTANT shall lead the public engagement efforts for this project. The
CONSULTANT shall work with City staff to develop and execute a Public Outreach
Engagement Plan to meaningfully engage community members in the development of
the preferred concept and overall project delivery. The Public Outreach Engagement
Plan will identify a schedule for public involvement, key stakeholders, messaging, and
intended outcomes.
As part of this task, the CONSULTANT will review documentation of the previous City
proposed trail system work within the project vicinity to assess past concerns and
relevant issues.
The CONSULTANT public engagement lead shall participate in weekly meetings with
project staff during peak outreach periods.
Assumption(s):
1. City staff will participate in development of the Public Engagement Plan.
2. The Plan will cover four key outreach periods: project notification,
understanding existing needs and concerns, input on the design concept, and
feedback on the preferred alternative.
3. The CONSULTANT PM and outreach lead will participate in four public
engagement check -ins with the City.
Deliverable(s):
1. Draft and Final Public Engagement Plan.
2. Meeting agendas and meeting summaries.
3.2 Project Advisory Committee
The City Transportation Committee will serve as the Advisory Committee for the project
to support project delivery and guide engagement opportunities with stakeholders. The
City Transportation Committee is comprised of three council members, the City Mayor,
City Director(s) and the City Engineer.
The CONSULTANT shall coordinate with the Advisory Committee. The project
advisory committee shall provide input to the project design and serve as a resource for
the design team to vet concepts and approaches to project delivery.
Assumption(s):
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 146 of 307
11
JANUARY 2023
The design team shall formally brief the Advisor Committee on the project
status, relevant issues, and design decisions requiring approval and input by the
Advisory Committee:
• One meeting before the alternatives are formally identified
• One meeting before major public engagement events
• One meeting before formal selection of the preferred alternative
2. The City's project manager will coordinate with Port of Bremerton and Kitsap
Transit. The City's project manager will invite representatives to the City
Transportation Committee meeting as necessary for development of the
alternatives.
Deliverable(s):
1. Advisory Committee Meeting Materials, Agendas and Notes.
3.3 Virtual Engagement
CONSULTANT will develop survey content to support a virtual public engagement
process, which will include one online open house. An informal public engagement
survey will also be developed by the CONSULTANT to seek feedback on relevant
project topics with the public.
CONSULTANT will provide graphic and written materials to the City for posting on the
City's project website throughout the course of the project and for open house content,
council study sessions and meetings with businesses.
Assumption(s):
1. City will maintain and host the project website and one virtual open house.
2. The City will host the survey on their website using the link provided by the
CONSULTANT.
3. CONSULTANT will design the survey content for the City to review.
4. Survey questions will require limited narrative comment analysis and will
primarily be multiple choice or rating -based.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 147 of 307
12
JANUARY 2023
3.4 Project Advertising and Public Engagement
The CONSULTANT shall prepare a hard copy mailer for all property owners on the
corridor after NTP to communicate a project is coming, notify the public of engagement
opportunities, and provide opportunities to communicate desires and needs to the
design team.
The CONSULTANT will participate in up to four listening sessions with residents along
the corridor to understand key issues and concerns with the proposed alternative.
The CONSULTANT will prepare one fact sheet about the project that will serve as an
attachment for email communications and will be posted on the City's website.
The CONSULTANT will provide language and graphics to City staff to distribute
information on social media and via email listservs.
The CONSULTANT will develop paper fliers and post in area businesses and
community facilities advertising the project public engagement survey, including QR
codes and links to the survey location.
The CONSULTANT will write a press release to be shared with various media in Port
Orchard advertising the survey. This press release would also include short releases for
Facebook and Twitter.
Assumption(s):
City staff will lead social media outreach and distribute notice via its contact
email distribution list and other established notification channels.
2. City staff will coordinate meetings with residents.
3. City staff will print and mail hard copy mailer and post cards.
4. Port Orchard communications staff will share the press release with appropriate
media outlets.
Deliverable(s):
1. Public outreach graphics.
2. Content for the flier, postcard, press release, and signs.
3. Documentation of materials delivery and public comments in an Excel or Word
Document
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 148 of 307
13
JANUARY 2023
Task 4: Concept Planning
4.1 Basis of Design
The CONSULTANT shall prepare a basis of design documenting design decisions,
standards, and guidelines used in the design work and key assumptions in coordination
with the City.
Basis of design shall also include a summary of proposed known redevelopment by
other projects within the project limits.
Deliverable(s):
1. Basis of Design (living document).
4.2 Alternative Development
The CONSULANT shall develop up to three alternatives to deliver a multi -use pathway
or complete street improvements to improve accessible connection options from the
Kitsap Transit Foot Ferry Terminal at Sydney Avenue to the northern terminus of Port
Orchard Blvd at the intersection of Bay Street and Port Orchard Boulevard. The design
shall assume a compact roundabout will be constructed within this intersection at a
future date.
The CONSULANT shall develop up to three alternatives to deliver a multi -use pathway
or complete street improvements to provide an accessible connection from the northern
terminus of Port Orchard Blvd to the intersection of Tremont Street West and Port
Orchard Blvd.
Concept work near downtown Port Orchard shall be advanced to a higher level of
design than work along Port Orchard Blvd.
The Alternative Development phase shall:
1. Evaluate opportunities to address stakeholder requests and concerns.
2. Identify design challenges and solutions.
3. Identify solutions to improve the quality of the walking and biking environment,
including City identified goals for placemaking, urban design, and traffic
calming opportunities.
4. Accommodate existing transit access at the Kitsap Foot Ferry Terminal at Sydney
Avenue.
5. Coordinate design efforts with WSDOT vision for a future fish passage project on
the East side of Port Orchard Boulevard, which may include significant
structural work and estuary reconstruction.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK 14
KPFF CONSULTING ENGINEERS JANUARY 2023
Page 149 of 307
6. Planning level layout for a future single lane roundabout at the intersection of
Port Orchard BLVD and Bay Street.
7. Identify potential utility impacts.
Evaluate and report benefits and costs for each alternative with respect to the
project goals.
9. Identify potential wall / structure locations and heights in the corridor with
recommended wall types.
10. Focus on trail system termination / terminus
11. Evaluate safe crossing trail crossing SR 166 and Port Orchard Blvd integrated
into the proposed roundabout layout, working in partnership with the City and
WSDOT.
Assumption(s):
1. Three workshops shall be held with the design team and the City to review the
alternative treatments and routing.
2. A planning -level cost estimate shall be developed for the recommended project
elements.
Deliverable(s):
1. Alternative plan exhibits (Large Roll plots)
2. Planning -level cost estimates
3. Alternative Evaluation Memorandum
4.3 Concept Plan Development
The CONSULTANT shall prepare a concept design package for the project's preferred
alternative. The concept design package shall be developed to a planning level of detail
(10% design level of advancement) and include plans noted below.
Deliverable(s):
1. Draft and Final Concept Plans
4.3.1 General Plans
The CONSULTANT shall develop and update a cover sheet and drawings index. The
CONSULTANT shall document general notes, abbreviations, and symbols.
The CONSULTANT shall develop survey control sheets for the project based on
collected topographical survey, providing horizontal and vertical control for the project.
Deliverable(s):
1. Cover sheet.
2. General notes and legend sheet.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 150 of 307
15
JANUARY 2023
3. Survey control sheets.
4.3.2 Roadway/ROW Plans
The CONSULTANT shall produce roadway paving plans for the project and include any
pertinent ROW information in the alignment sheets.
Assumption(s):
1. Plan sheets and profile sheets may be on separate plan sheets.
2. Pavement sections depths for inclusion into the project shall be provided to the
CONSULTANT by the City.
3. Right of Way plans shall highlight required right-of-way and current ownership.
Deliverable(s):
1. Roadway Paving / ROW Plans
2. Profiles
3. Typical Sections
4. Round About Intersection Detail at Port Orchard BLVD and Bay Street
5. Key detail sheets
4.3.3 Channelization and Signage Plans
The CONSULTANT shall develop channelization and signage plans for the project.
Assumption(s):
1. City roadway signage within the corridor shall be replaced.
2. Other agency or private signage will be reused unless otherwise provided by
their respective owner(s).
Deliverable(s):
1. Channelization and Signage Plans.
4.3.4 Structural Plans
The CONSULTANT shall develop structural engineering concept plans for proposed
project elements.
Assumption(s):
1. Structures may include retaining walls, in water seawalls and piers
Deliverable(s):
1. Structural Design Concept Plans
4.3.5 Stormwater Evaluation
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 151 of 307
16
JANUARY 2023
The CONSULTANT shall prepare a planning level Stormwater evaluation report for the
project. The Stormwater evaluation report shall document the applicable regulations
facing the project. Elevations critical to project delivery shall be documented. The
evaluation shall focus on identification of required stormwater investments, estimated
drainage system costs and next steps to obtain stormwater compliance.
The focus of the report shall be technical and the narrative is expected to be brief,
utilizing tables, maps, schematic sketches/ details, and bullets whenever possible. The
draft stormwater evaluation report shall be turned in at the conclusion of the alternative
evaluation process.
A high-level summary of stormwater implementation for alternatives considered by the
project shall be provided and used as part of the alternative evaluation process.
Upon receiving City comments, the CONSULTANT shall formally reply to received
comments via written response. A stormwater evaluation report shall be produced and
submitted to the City upon completion of the project planning efforts.
Deliverable(s):
1. Draft and Final stormwater evaluation report.
2. Draft stormwater report comment responses.
4.3.6 Illumination Analysis and Design Memo
The CONSULTANT will evaluate existing illumination in the corridor and develop
recommendations for trail illumination, including coordination with PSE and other
franchise utilities. Lighting evaluation will be consistent with WSDOT and City of Port
Orchard standards. The analysis will be completed using AGi 32 software. The
CONSULTANT will develop a cost estimate of the recommendations. The
CONSULTANT will submit an Existing Conditions memo summarizing the existing
conditions lighting analysis, and a recommendations memo summarizing recommended
illumination design and lighting levels along the trail corridor.
Assumption(s):
1. Consultant will work with the City and Stakeholders to develop proposed trail
illumination standards, lighting fixtures and specifications.
Deliverable(s):
1. Existing lighting analysis memo with light level exhibits.
2. Memo addressing recommended illumination design and lighting levels along
the trail corridor.
4.3.7 Landscape & Urban Design Memo
The CONSULTANT shall develop landscape and urban design memo, to support the
preferred alternative concept, including:
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 152 of 307
17
JANUARY 2023
• Planting palette and photo cut sheets for a variety of planting conditions
including trees, shrubs, and groundcover options.
• Urban design elements within the project footprint, including placemaking
elements, pedestrian amenities and biking facilities
• Urban design/placemaking elements such as: sidewalk paving patterns and
finish treatments, site furnishings, decorative lighting elements, wayfinding
signage, trail identity features, and public art opportunities.
• Illustrative plan graphics and sections, up to five (5) graphics, which will also be
utilized to support public outreach.
Assumption(s):
1. Landscape and Urban Design Memo will include variations in response to
location and land use (and will address downtown Port Orchard limits only)
2. Conceptual urban design shall identify unique areas along the shared -used path
for pedestrian and bike amenities including hard and softscape. These areas may
be used for resting, and/or trail mixing zones and will be identified in the
conceptual design.
3. Arborist services and sign design are outside the project scope.
Deliverables:
1. Urban Design and Landscape Memo
4.3.8 Transportation Analysis
The CONSULTANT shall provide planning level transportation analysis services to
inform the development of the Port Orchard BLVD trail alternatives and to support
project advancement for a preferred alternative. The analysis will evaluate the existing
intersection operations and use the City's travel forecasts to evaluate future traffic
operations at the Tremont Street SW/Port Orchard BLVD, High Street/Port Orchard
BLVD, and Bay Street/Port Orchard BLVD intersections including a high-level
roundabout evaluation at the Bay Street/Port Orchard BLVD intersection.
The transportation analysis shall review and analyze historical crash data for the last
five (5) years at intersections and mid -block street segments within the study area. Using
this data, the CONSULTANT will analyze the frequency, types, and rates and locations
of crashes.
The CONSULTANT shall also produce a summary report that will evaluate each of the
three developed corridor alternatives and describe the project's likely traffic impacts of
the preferred alternative for the Port Orchard BLVD as well as recommend next steps
regarding WSDOT coordination.
Assumption(s):
1. City shall supply consultant with existing and future travel forecasts for the
study intersections.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 153 of 307
18
JANUARY 2023
2. City shall provide collected traffic data within the project vicinity and
collision history.
Deliverable(s):
1. Draft and Final Transportation Analysis memo
4.3.9 Engineer's Estimate
The CONSULTANT shall deliver an estimate for construction costs for alternatives. The
estimate shall include a basis of estimate, documenting key assumptions and cost
estimating methodology. A more detailed estimate shall be prepared for the preferred
alternative.
Assumption(s):
In providing opinions of cost, financial analyses, economic feasibility projections,
and schedules for the project, the CONSULTANT shall have no control over cost
or price of labor and materials, unknown or latent conditions of existing
equipment or structures that might affect operation or maintenance costs,
competitive bidding procedures and market conditions, time or quality of
performance by operating personnel or third parties, and other economic and
operational factors that might materially affect the ultimate project cost or
schedule. The CONSULTANT, therefore, shall not warranty that the actual
project costs, financial aspects, economic feasibility, or schedules shall not vary
from CONSULTANT's opinions, analyses, projections, or estimates.
2. Budget -level cost estimates shall include appropriate contingency factors to
account for project uncertainties that cannot be explicitly accounted for at the
project's various engineering stages. Risks that have been identified shall be
listed along with potential cost and schedule impacts.
3. The effort to prepare quantities for the estimate unit cost items and lump sums
shall be provided under the respective design discipline task using the City's
standard measurements.
4. All "soft costs' to be included within the cost estimate, such as City -procured
items, and City self -preformed work will be provided to the CONSULTANT two
weeks before the estimate due date.
5. Quantities shall be developed from engineered drawings to the maximum extent
feasible.
6. Basis of estimate shall be limited to an executive summary of four pages
maximum, with supporting appendix material as needed.
7. City shall provide direction on what edition of WSDOT Standard Specifications
to use as the basis for the budget -level cost estimate bid items developed by the
CONSULTANT
Deliverable(s):
1. Estimate in excel or PDF format with notes provided on basis of estimate.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 154 of 307
19
JANUARY 2023
4.3.10 Constructability Review
The CONSULTANT shall develop a constructability review report for the preferred
alternative. The report shall address, at minimum, the following:
• Identification of major constructability challenges
• Potential in -water or near -water work restrictions or work windows
• Maintenance of traffic, work zone recommendations/considerations
Deliverable(s):
1. Constructability Review Report
4.3.11 Concept Design Summary Report
The CONSULTANT shall prepare a Concept Design Summary Report to signify the
completion of the project's planning phase milestone.
The summary report shall include:
• Executive summary of the proposed project purpose and need
• Identified project needs
• Recommended project scope
• Next steps
• Public outreach summary
• Project construction cost estimate summary
• Right of Way need identification
• Project Risk Findings
The project concept design sheets shall be included as a project appendix
Other project submittals may be included as project appendix materials at the option of
the City.
Deliverable(s):
1. Draft and Final Concept Design Summary Report
4.3.12 Quality Management
The CONSULTANT shall prepare the Quality Management Plan, and conduct thorough
quality reviews and checks for each submittal. This task covers senior reviews of major
work deliverables, including the concept design work. The project quality manager
shall be responsible for ensuring that they are completed and documented. Such
reviews shall be performed after deliverables are assembled and before their submittal
to the City.
Quality control efforts and reviews shall encompass the work performed by the
CONSULTANT and its SUBCONSULTANTS. Routine checking of calculations, plan
sheets, and other work, done as peer review on the various discipline items, is included
in the scope of the individual task.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 155 of 307
20
JANUARY 2023
Back to Agenda
Deliverable(s):
1. Quality Management Plan (electronic PDF).
2. Quality Management documentation (electronic PDF).
3. Submittal Comment Logs, with notes of action taken and responses.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK 21
KPFF CONSULTING ENGINEERS JANUARY 2023
Page 156 of 307
Task 5: Environmental Services
5.1 Cultural Resources Services
The CONSULTANT will prepare a cultural resources literature review for the project,
including the following components:
Background research: The CONSULTANT will conduct a search on Washington
Department of Archaeology and Historic Preservations (DAHP) WISAARD
system to identify recorded historic built environment, historic register listed
properties, archaeological sites, cemeteries, and previously completed cultural
resources assessments in proximity to the project location. The CONSULTANT
will review relevant correspondence between the project proponent,
stakeholders, and DAHP. The CONSULTANT will review pertinent
environmental, archaeological, ethnographic, and historical information
appropriate to the project location from a variety of available resources. The
CONSULTANT will create a Project in WISAARD and obtain a DAHP Project
Tracking Number.
2. Information Requests: With the City's permission, the CONSULTANT will
contact the cultural resources staff of tribes that may have an interest in or
information regarding the project location via email to request any Tribal
knowledge regarding archaeological or cultural resources within or near the
project location that the Tribe would like to share. This is an information request
only and does not take the place of any formal government -to -government
consultation that may be required. The CONSULTANT will include the City
project manager on these requests.
3. Cultural resources literature review report: The CONSULTANT will prepare a
technical memo presenting the results of background research, methods,
expectations, and management recommendations. The report will provide
supporting documentation of findings, including historical maps and
photographs, and will conform to DAHP reporting standards. This report will
include recommendations for additional work that may need to be scoped.
Report will be provided electronically in PDF format. This task includes one
round of consolidated comments from the client prior to the submission of the
final report to DAHP. The CONSULTANT will assist the client in submitting the
cultural resources assessment and any associated documentation to DAHP, via
their WISAARD system.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 157 of 307
22
JANUARY 2023
Assumption(s):
1. This scope does not include preparation of Section 106 or GEO 21-02 compliance
documents, a field survey assessment, or preparation of an Inadvertent
Discovery Plan or Archaeological Resources Monitoring Plan.
2. No meetings with clients or stakeholders will be required.
3. This scope does not include documentation of resources on DAHP archaeological
sites or isolate forms, historic property inventory forms, or evaluating resources
for potential significance under local, state, and/or national historic registers.
Deliverable(s):
1. Draft and final cultural resources literature review report
5.2 Environmental Strategy Support
The CONSULTANT shall provide environmental strategy support for the program,
which will include providing to the Agency a two- to three -page memorandum
containing summary -level desktop information related to existing environmental
conditions in the 1.5-mile study area and federal, state, and local environmental
permitting and approval information. Environmental conditions information will be
limited to the existing land use, Comprehensive Plan and zoning designations, Shoreline
Master Plan designations, parks/recreation areas, and mapped critical areas. Permitting
and approval information will include potential federal, state, and local approvals and
permits that could be needed related to land use, parks/recreation areas, and mapped
critical areas, and their triggers. Approvals may include NEPA, Section 404/401, SEPA,
Hydraulic Project Approvals, Section 4(f)/6(f), shoreline permits, and critical areas
permits.
Assumption(s):
1. GIS analysis or report graphics are included in this scope.
2. Environmental review will be on a corridor level and will not evaluate alignment
alternatives.
3. This analysis will use existing resources, including City maps, Comprehensive
Plan, and municipal code. No fieldwork will be completed as part of this scope,
nor will any new data be collected.
4. The technical memo shall be an internal planning document for the City and will
not be submitted to any state or federal agency.
5. This scope does not include preparation of SEPA/NEPA documentation,
preparation of permit applications, or consultation with agencies.
The Environmental Strategy support will require 18 months of invoicing and
other project administration.
Deliverable(s):
1. Draft and Final Environmental Memorandum
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 158 of 307
23
JANUARY 2023
Back to Agenda
Task 6: Geotech and Soil Evaluation Services
6.1 Geotechnical Services
The CONSULTANT shall evaluate the existing geotechnical and paving issues within
the corridor and produce design criteria recommendations for use in planning level
project development. Key tasks include:
The City shall identify any known soil / foundation challenges to the CONSULTANT.
Key tasks include:
• Conduct office study/search for available geotechnical data and review of
available geotechnical data and identification of known issues.
• Perform a site reconnaissance, assuming 2 geotechnical engineers.
• Geotechnical Engineer will provide general commentary on the geotechnical
components of the project based on the soil information we are able to obtain.
• Prepare a Draft and Final Soil and Geology Report.
Assumption(s):
1. The soils within the project corridor are not contaminated.
2. The site reconnaissance is limited to observation of existing topography and
features; no excavation, subsurface exploration or lab testing will be conducted
during the site reconnaissance.
3. Interpretation of geotechnical challenges and risk will not be supported by
geotechnical calculations or rigorous evaluations during this phase of work.
4. Recommendations related to retaining structures will be limited to
recommendations for wall and structure types based on existing information.
Actual design of the structures will be performed in a future project phase.
Deliverable(s):
1. Draft and Final Soil and Geology Report.
6.2 Hazardous Materials Review
The CONSULTANT shall provide planning level environmental strategy support for the
program with a moderate -level environmental hazardous materials risk -evaluation of
the project vicinity to identify and evaluate the potential presence of subsurface
contaminants that may be encountered during the various stages of project development
and construction.
Results of the hazardous materials environmental assessment shall be presented in a
technical memo. The memo shall include the following:
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 159 of 307
24
JANUARY 2023
• Obtain and review readily accessible environmental records for the project
corridor and adjacent properties. The search includes the project corridor and
other properties within an eighth of a mile to a mile radius from the Project Area,
based on type of regulatory database listing, WSDOT guidance, and ASTM
standards.
• Obtain and review historical aerial photographs, topographic maps, and Sanborn
Fire Insurance maps for the project vicinity, and city directories for the streets
included in the project corridor itself.
• Review existing technical documents and reports available from Ecology and
EPA, or as provided by the City or KPFF, concerning previous environmental
investigations for the project site and/or adjacent properties.
• Conduct a visual reconnaissance of the project site to observe current land uses
and activities pertaining to the potential for subsurface contaminants to
adversely impact the project site. If there are properties being considered for
right-of-way acquisition, these will be included as part of the visual
reconnaissance. However, the reconnaissance will be limited to features readily
observed from public access corridors and shall not include entering private
properties or viewing conditions within buildings. The site reconnaissance will
include noting the presence and approximate locations of environmental
conditions or associated physical features identified during the environmental
records review.
Evaluate the resulting data with respect to potential impacts of subsurface
contaminants on development, construction, and potential property acquisitions
of the corridor project.
Prepare a technical memorandum in accordance with the local agency and
WSDOT requirements for a "mid -level" hazardous materials environmental
assessment.
Assumption(s):
1. Hazardous materials environmental assessments are not considered to be a
Phase I Environmental Site Assessment (ESA) that adheres to the American
Society for Testing and Materials (ASTM) standards. If the hazardous materials
environmental assessment reveals issues that could impact the project site, more
detailed investigations, which may include Phase I ESAs or Phase II ESAs, may
be recommended.
2. The hazardous materials technical memo will not include assessment of existing
conditions for environmental resources such as: cultural and built environment
historic resources, land use, natural resources and critical areas, sensitive
receptors for air quality and noise, parks and recreation areas, visual resources,
Tribal Boundaries, Tribal owned parcels along the corridor, and/or general
demographic information.
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 160 of 307
25
JANUARY 2023
3. The site reconnaissance conducted will be limited to features readily observed
from public access corridors, and shall not include entering private properties or
viewing conditions within buildings (i.e., "windshield survey').
4. The hazardous materials technical assessment shall be an internal planning
document for the City and will not be submitted to any state or federal agency.
5. One round of review of the hazardous materials environmental assessment will
be required.
Deliverable(s):
1. Draft and Final Hazardous Materials Assessment Technical Memo
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 161 of 307
26
JANUARY 2023
Back to Agenda
Task 7: Coastal Engineering Evaluation
Services
7.1 Coastal Engineering Services
The CONSULTANT shall evaluate the existing coastal engineering issues within the
project vicinity against potential project alternatives.
The CONSULTANT shall develop a written evaluation memo of the existing coastal site
conditions, potential challenges facing the project related to coastal/marine influence,
and written recommendations on design parameters relative to construction locations
near the body of waters.
The CONSULTANT shall also include with the written memo identified risks and
challenges facing up to three project alternatives and shall develop recommendations for
potential in -water or near water structure types.
Assumption(s):
1. City shall notify the CONSULTANT of any known challenges within the project
vicinity.
Deliverable(s)
1. Draft and Final Coastal Engineering Project Memo, including written coastal
engineering recommendations on risks/challenges facing project delivery
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 162 of 307
27
JANUARY 2023
Task 8: WSDOT Coordination
8.1 MOT Coordination
The CONSULTANT shall support the City's project delivery coordination with WSDOT
and support the following activities:
Coordination with WSDOT regarding a WSDOT delivered fish passage project
near the intersection of Bay Street and Port Orchard Blvd. This will include
review, comment, and coordination with WSDOT staff regarding WSDOT
developed plans and vision for a WSDOT delivered fish passage project within
the overall project study.
Formal coordination with Olympic Region regarding preliminary approval of the
Consultant designed and City delivered roundabout within the intersection of
Bay Street and Port Orchard Blvd.
Compatibility review between WSDOT and Port Orchard long term vision
within the intersection of Bay Street and Port Orchard Blvd, and Bay Street itself.
The Consultant shall provide WSDOT coordination effort not addressed in other tasks
including:
Conversion and adoption of WSDOT produced plans, surveys and CADD files
into civil 3D usable files for project use.
Conversion and adoption of proposed WSDOT design build contractor's
produced plans, surveys and CADD files into civil 3D usable.
Briefing and communication of City goals and vision to WSDOT local programs
and the WSDOT fish passage team leadership.
Assumption(s):
1. WSDOT's fish passage program will construct significant modifications to Bay
Street before the Bay Street Trail is constructed.
2. The Consultant shall not coordinate directly with any WSDOT design build
contractor without approval of WSDOT and City staff.
3. The team will meet virtually with WSDOT eight times over the course of the
study.
Deliverable(s)
1. Meeting notes and materials for all WSDOT meetings.
2. Incorporation and adoption of WSDOT provided materials
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK
KPFF CONSULTING ENGINEERS
Page 163 of 307
28
JANUARY 2023
Back to Agenda
Task 9: Grant Application Support -
(Optional Service)
Reserved
PORT ORCAHRD BAY STREET TRAIL STUDY - SCOPE OF WORK 29
KPFF CONSULTING ENGINEERS JANUARY 2023
Page 164 of 307
Back to Agenda
Exhibit B
DBE Participation
This project has a stated UDBE goal of 16%.
See Attached UDBE / DBE Inclusion Plan prepared by KPFF Consulting Engineers
Agreement Number:
Exhibit B - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 1
Back to Agenda
KPFF Consulting Engineers
UDBE INCLUSION PLAN
Port Orchard Bay Street Trail Situational Study
1- Voluntary Participation Targets
This project, which has been awarded to CONSULTANT, has a mandatory UDBE
goal of 16.0% documented within the City of Port Orchard's Bay Street Pathway
West, Situation Study Request for Proposal. This goal is based on a percentage
of the total contract value of this project, inclusive of subsequent changes, of the
assumed scope of work. This project has federal funding.
KPFF Inc. recognizes the importance of inclusion and equality in the engineering
and construction industry. KPFF Inc. commits to reach out to small and diverse
businesses to help Washington State and local agencies meet or exceed the
Underutilized Disadvantaged Business Enterprises (UDBE) goals. KPFF Inc.
acknowledges that it has the education and training programs to communicate to
its employees the expected employee behaviors and performance relative to
implementing the State and Federally Funded Contract Inclusion Plan.
2 - Diverse Business Subcontractors
CONSULTANT anticipates utilizing the following certified small and
diverse firms as subcontractors/suppliers on this project:
Blue Coast
Coastal Engineering
3.1%
Furtado & Associates
Survey Services
14.9%
HWA Geosciences
Geotechnical Engineering
6.3%
x
Sub Total 21.2% 0% 0% 3.1%
Total 24.3 %
CONSULTANT will utilize the following efforts to meet or exceed the
voluntary exclusion goals:
• Provide opportunities for the above listed firms to perform all services
required by the project related to the scope of work and qualifications noted
in the table above
• Provide other consultants who qualify for small and diverse firms
opportunities for work related to the project not currently identified within
the project scope or request qualifications information.
Page 166 of 307
Back to Agenda
For the work anticipated to be contracted on the Port Orchard Bay St Pathway project.
3 - Strategies
In general, CONSULTANT will work to meet the goal by utilizing the
following methods:
Provide opportunities for the above listed firms to perform all services
required by the project related to the scope of work and qualifications noted
in the table above
If additional opportunities arise not currently identified within the project
scope, we will reach out to qualified small and diverse firms for any
additional services before reaching out to other firms.
4 - Mentoring and Training
CONSULTANT will work to further mentoring, training, and capacity
building programs by utilizing the following methods:
Provide sub consultants leadership roles within the project, including
significant face to face relationship building opportunities with the City of
Port Orchard, WSDOT, other stakeholders and KPFF team members
Provide opportunities for the above listed firms to perform all services
required by the project related to the scope of work and qualifications noted
in the table above
5 - Prompt Payment and Dispute Resolution
CONSULTANT will ensure prompt payment of all subcontractors and
return retainage by using the following methods:
• KPFF's utilizes the commercial accounting software BST-10, a fully
integrated accounting platform. Once KPFF receives and processes
payments from a client, BST will automatically initiate payment for all sub -
consultants on the next Friday.
• KPFF's Chief Financial Officer is responsible for ensuring prompt payment
on all contracts and ensuring our accounting and automatic payment
process is performing as expected.
• KPFF's project manager is responsible for contacting sub consultants who
report outstanding invoices if prompt payments have been made by KPFF
but not received or reported as received by sub consultants.
If payment is contested or other disputes arise, CONSULTANT will
resolve disputes by utilizing the following methods:
• All disputes between sub consultants and KPFF are addressed in face-to-
face communications, with a goal of resolving issues fairly. We want to
treat others as we would like to be treated. If this effort does not resolve a
topic, non -binding mediation will be used. Our proposed dispute handling
process with sub consultants is noted below.
Page 167 of 307
Back to Agenda
The Subconsultant shall make no claim against KPFF without first
providing KPFF with a written notice of damages and providing KPFF
thirty (30) days to cure before an action is commenced. KPFF shall make
no claim against Subconsultant without first providing Subconsultant with
a written certification from an independent professional, licensed and
practicing in the field of Subconsultant and in the state where the Project
is located, stating the basis for the alleged claim. This certificate shall be
provided by KPFF not less than thirty (30) days prior to the presentation
of any claim.
6 — MSVWBE Outreach
To date, CONSULTANT has utilized the following methods to perform
outreach to the UDBE community and inform firms of the opportunity
to work as subcontractors/subconsultants on the project:
KPFF contacted over four professional service firms directly via phone and
email when developing a proposal to the City issued project RFP once an
opportunity for collaboration was identified. Firms who meet the
professional qualifications with the availability to meet the project needs in
terms of staffing and who confirmed an interest to join a KPFF primed team
joined our team.
KPFF has long term relationships with many UDBE firms and continues to
reach out to this community through several networking events,
participation in ASCE, APWA and ACEC community events and uses these
events as opportunities to build relationships within the UDBE community.
In the future, CONSULTANT anticipates utilizing the following
methods to perform outreach to UDBE
subcontractors/subconsultants and inform them of upcoming
opportunities on the project:
KPFF participates in various industry meet and greets and networking
opportunities, including UDBE inclusion events to develop new teaming
opportunities with potential new sub -consultants met at these events. We
encourage UDBE firms that are new to us to reach out with potential
opportunities and place value in fostering these new relationships.
KPFF also regularly utilizes the local (City of Seattle, King County), State
(Washington State Office of Minority and Women's Business Enterprises),
and federal tools (dsbs.sba.gov) to identify qualified firms and contacts
firms directly when a client needs additional services.
KPFF has long term relationships with many UDBE firms and continues to
reach out to this community through several networking events,
participation in ASCE, APWA and ACEC community events and uses these
events as opportunities to build relationships within the MSVWBE
community.
CONSULTANT anticipates utilizing the following methods to ensure
that small businesses have enough time and information to provide it
with bids or statements of qualifications:
Page 168 of 307
Back to Agenda
KPFF participates in various industry meet and greets and networking
opportunities, including UDBE inclusion events to develop new teaming
opportunities with potential new sub -consultants and existing sub -
consultants at these events. We encourage UDBE firms that are new to us
to reach out with potential opportunities and place value in fostering these
new relationships.
KPFF regularly meets with new and existing qualified sub -consultants to
identify opportunities for partnership and strengthen relationships.
CONSULTANT anticipates utilizing the following methods to ensure
small businesses understand the schedule and project processes
and can learn ways to enhance their capabilities:
• We share contract information, such as Request for Proposals, directly with
our sub consultants when forming a teaming arrangement, and go over
schedule requirements, expectations, and project roles.
CONSULTANT anticipates utilizing the following methods to create
subcontract packages that create opportunities and allow for the
participation of small and diverse businesses:
• Provide opportunities for the above listed firms to perform all services
required by the project related to the scope of work and qualifications noted
in the table above
• Provide opportunities for potential additional work outside the current scope
of work to other qualified UDBE firms before reaching out to other UDBE
firms.
7 — Diversity Expert
CONSULTANT will utilize the following individuals as experts on
diverse businesses and to help manage the processes listed in this
plan:
CONSULTANT offers the following diversity expert resources:
A KPFF project coordinator with diverse business participation reporting experience
and experience in Diversity Compliance Management Systems (DCMS) reporting.
The project coordinator will have the support of other project coordinators also
familiar in diversity business processes and practices. This project coordinator is
Carinna Lee currently who has experience reporting participation on similar projects
with similar sized agencies.
Page 169 of 307
Back to Agenda
8 — Past Performance
CONSULTANT has completed the following projects that achieved
diverse business participation in the past five years.
A few examples below.
The table below shows our inclusion performance on current public agency projects.
Table 1 — MSVWBE Inclusion Performance on Current WSDOT Contracts
Project Name
Owner
%of
Final Contract
Total MWBE
Utilization
Amount
Dollars Spent
Mercer Avenue West
Seattle Department
14% DBE
$12,373,900
$1,732,346
of Transportation
Greenlake AAC
Seattle Department
19%WMBE
$436,239
$81,914
of Transportation
Montlake Hub Capital
Seattle Department
47% WMBE
$696,111
$328,629
Improvements
of Transportation
Rainier Transit Plus
Seattle Department
25%WMBE
$197,189
$50,914
Multimodal Corridor
of Transportation
Federal Way Transit
Sound Transit
20% S/DBE
$1,780,000
$356,000
Center
Achieved
NAVFAC NW Land/
US Navy
39.2% DBE
$4,356,273
$1,707,659
Water Interface
Page 170 of 307
Back to Agenda
Exhibit C
Preparation and Delivery of Electronic Engineering and Other Data
In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is
to use in preparing electronic files for transmission to the agency. The format and standards to be provided may
include, but are not limited to, the following:
I. Surveying, Roadway Design & Plans Preparation Section
A. Survey Data
AutoCAD 2020
Civil 3d 2020
Horizontal Control: Washington State Plane Coord NAD 83/11
Vertical Control: North American Vertical Datum of 1988 (NAVD-88)
Survey data shall be provided using a Computer Aided Drafting (CAD) File submittal.
B. Roadway Design Files
AutoCAD/Civil 3d 2020 file format
Upon request, Roadway design files shall be electronically submitted using an "e-transmit" submittal
process.
C. Computer Aided Drafting Files
AutoCAD/Civil 3d 2020 file format
Agreement Number:
Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 4
Back to Agenda
D. Specify the Agency's Right to Review Product with the Consultant
The Agency reserves the right to review Consultant work at milestone submittal dates, as noted in the
project scope of work and other mutually agreeable times.
E. Specify the Electronic Deliverables to Be Provided to the Agency
Electronic versions of deliverables (reports, plans, drawings) shall be provided to the agency as noted in the
scope of work.
F. Specify What Agency Furnished Services and Information Is to Be Provided
As noted in the project scope.
Agreement Number:
Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 2 of 4
Back to Agenda
IL Any Other Electronic Files to Be Provided
As needed to support the project delivery
III. Methods to Electronically Exchange Data
Data shall be transfered via a file sharing site, such as Microsoft Sharepoint as a first preference. Email, while
not preferred, shall be acceptable if time is of the essence.
Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 3 of 4
A. Agency Software Suite
City of Port Orchard software suite is Microsoft Office.
Operating system shall be Windows platform.
PDF review sessions shall be on Bluebeam Revu.
B. Electronic Messaging System
The City of Port Orchard shall uses microsoft outlook email. All emails are subject to public records
request.
C. File Transfers Format
See previous materials.
Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 4 of 4
Back to Agenda
Exhibit D
See Attached
Prime Consultant Cost Computations
Agreement Number:
Exhibit D - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 1
Back to Agenda
1�
�1■i
I
II
Page 176 of 307
Back to Agenda
m
?m
Page 177 of 307
Back to Agenda
Exhibit E
Sub -consultant Cost Computations
If no sub -consultant participation at this time. The CONSULTANT shall not sub -contract for the
performance of any work under this AGREEMENT without prior written permission of the AGENCY.
Refer to section VI "Sub -Contracting" of this AGREEMENT.
Agreement Number:
Exhibit E - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 1
Ba
w w
w
u u
N
u u
A w
u
u
O1
x
2
m y
2
3
z
=
3
=
v
EL
N
3
m
jo
�
m
Sa
f0
m
ti
O
2
ti
O
f1 _.
Pm
O C
Page 179 of 307
Back t�
IIIIIIIIIIIIIIIIIIIIE
IIIIIIIIIIIIIIIIIIIIE
IIIIIIIIIIIIIIIIIIIIE
IIIIIIIIIIIIIIIIIIIIS
IIIIIIIIIIIIIIIIIIIIE
IIIIIIIIIIIIIIIIIIIIE
IIIIIIIIIIIIIIIIIIIIS
IIIIIIIIIIIIIIIIIIIIE
liiiiiiiiiiiiiiiiinm
IIIIIIIIIIIIIIIIIINE
W
Page 180 of 307
Back to Agenda
Page 181 of 307
Back to Agenda
Page 182 of 307
Back to Agenda
. . . . . . . . . . .
. . . . . . . . . .
.
.
. . . . . . . . .
.....
Page 183 of 307
Back to Agenda
a �
Ha
Page 184 of 307
Back to Agenda
Exhibit F - Title VI Assurances Appendix A & E
APPENDIX A
During the performance of this contract, the contractor, for itself, its assignees, and successors in
interest (hereinafter referred to as the "contractor") agrees as follows:
1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts
and the Regulations relative to Non-discrimination in Federally -assisted programs of the U.S. Department of
Transportation, (Title of Modal Operating Administration), as they may be amended from time to time, which
are herein incorporated by reference and made a part of this contract.
2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not
discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors,
including procurements of materials and leases of equipment. The contractor will not participate directly or
indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices
when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21.
[Include Modal Operating Administration specific program requirements.]
3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations,
either by competitive bidding, or negotiation made by the contractor for work to be performed under a
subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or
supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and
the Regulations relative to Non-discrimination on the grounds of race, color, or national origin. [Include
Modal Operating Administration specific program requirements.]
4. Information and Reports: The contractor will provide all information and reports required by the Acts, the
Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other
sources of information, and its facilities as may be determined by the Recipient or the (Title of Modal
Operating Administration) to be pertinent to ascertain compliance with such Acts, Regulations, and
instructions. Where any information required of a contractor is in the exclusive possession of another who fails
or refuses to furnish the information, the contractor will so certify to the Recipient or the (Title of Modal
Operating Administration), as appropriate, and will set forth what efforts it has made to obtain the information.
5. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non- discrimination
provisions of this contract, the Recipient will impose such contract sanctions as it or the (Title of Modal
Operating Administration) may determine to be appropriate, including, but not limited to:
a. withholding payments to the contractor under the contract until the contractor complies; and/or
b. cancelling, terminating, or suspending a contract, in whole or in part.
6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in
every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the
Regulations and directives issued pursuant thereto. The contractor will take action with respect to any
subcontract or procurement as the Recipient or the (Title of Modal Operating Administration) may direct as a
means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor
becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction,
the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In
addition, the contractor may request the United States to enter into the litigation to protect the interests of the
United States.
Local Agency A&E Professional Services Cost Page 185 of 307 Agreement Number
Plus Fred Fee Consultant Agreement Revised 0210112021
Back to Agenda
Exhibit F - Title VI Assurances Appendix A & E
APPENDIX E
During the performance of this contract, the contractor, for itself, its assignees, and successors in interest
(hereinafter referred to as the "contractor") agrees to comply with the following non-discrimination statutes
and authorities; including but not limited to:
Pertinent Non -Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 CFR Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. §
4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of
Federal or Federal -aid programs and projects);
• Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of
sex);
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits
discrimination on the basis of disability); and 49 CFR Part 27;
• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination
on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits
discrimination based on race, creed, color, national origin, or sex);
• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or
activities" to include all of the programs or activities of the Federal -aid recipients, sub -recipients and
contractors, whether such programs or activities are Federally funded or not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of
disability in the operation of public entities, public and private transportation systems, places of public
accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by
Department of Transportation regulations at 49 C.F.R. parts 37 and 38;
• The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits
discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and
Low -Income Populations, which ensures discrimination against minority populations by discouraging
programs, policies, and activities with disproportionately high and adverse human health or
environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency,
and resulting agency guidance, national origin discrimination includes discrimination because of limited
English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to
ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating
because of sex in education programs or activities (20 U.S.C. 1681 et seq).
Local Agency A&E Professional Services Page 186 of 307 Agreement Number
Negotiated Hourly Rate Consultant Agreement Revised 0210112021
Back to Agenda
Exhibit G
Certification Documents
Exhibit G-1(a)
Certification of Consultant
Exhibit G-1(b)
Certification of
Exhibit G-2
Certification Regarding Debarment, Suspension and Other Responsibility Matters -
Primary Covered Transactions
Exhibit G-3
Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying
Exhibit G-4
Certificate of Current Cost or Pricing Data
Agreement Number:
Exhibit G - Local Agency A&E Professional Services Cost Pius Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 1
Exhibit G-1(a) Certification of Consultant
I hereby certify that I am the and duly authorized representative of the firm of
KPFF, Inc.
whose address is
1601 Fifth Avenue, Suite 1600, Seattle WA 98101
and that neither the above firm nor I have:
a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration,
any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT)
to solicit or secure this AGREEMENT;
b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of
any firm or person in connection with carrying out this AGREEMENT; or
c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely
for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in
connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any);
I acknowledge that this certificate is to be furnished to the City of Port Orchard
and the Federal Highway Administration, U.S. Department of Transportation in connection with this
AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and
Federal laws, both criminal and civil.
KPFF, Inc
Consultant (Firm Name)
W�r 1
/( 1 / 16/2023
(Authorized Official of Consultant) Date
Agreement Number:
Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021
Exhibit G-1(b) Certification of City of Port Orchard
I hereby certify that I am the:
❑ To be filled in by City Staff
❑ Other
of the City of Port Orchard
, and City of Port Orchard
or its representative has not been required, directly or indirectly as an express or implied condition in connection
with obtaining or carrying out this AGREEMENT to:
a) Employ or retain, or agree to employ to retain, any firm or person; or
b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution, donation, or consideration
of any kind; except as hereby expressly stated (if any):
I acknowledge that this certificate is to be furnished to the
and the Federal Highway Administration, U.S. Department of Transportation, in connection with this
AGREEMENT involving participation of Federal -aid highway funds, and is subject to applicable State and
Federal laws, both criminal and civil.
Signature
Date
Agreement Number:
Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021
Exhibit G-2 Certification Regarding Debarment, Suspension and Other
Responsibility Matters - Primary Covered Transactions
I. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals:
A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily
excluded from covered transactions by any Federal department or agency;
B. Have not within a three (3) year period preceding this proposal been convicted of or had a civil judgment
rendered against them for commission of fraud or a criminal offense in connection with obtaining,
attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under
a public transaction; violation of Federal or State anti-trust statues or commission of embezzlement,
theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving
stolen property;
C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity
(Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b)
of this certification; and
D. Have not within a three (3) year period preceding this application / proposal had one or more public
transactions (Federal, State and local) terminated for cause or default.
II. Where the prospective primary participant is unable to certify to any of the statements in this certification,
such prospective participant shall attach an explanation to this proposal.
KPFF, Inc.
Consultant (Firm Name)
1-16-2023
(Authorized Official of Consultant) Date
Agreement Number:
Exhibit G -Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02101/2021
Back to Agenda
Exhibit G-3 Certification Regarding the Restrictions of the Use of Federal Funds
for Lobbying
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her
knowledge and belief, that:
No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any
person for influencing or attempting to influence an officer or employee of any Federal agency, a Member
of Congress, an officer or employee of Congress, or any employee of a Member of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan,
the entering into of any cooperative AGREEMENT, and the extension, continuation, renewal, amendment,
or modification of Federal contract, grant, loan or cooperative AGREEMENT.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress,
an officer or employee of Congress, or an employee of a Member of Congress in connection with this
Federal contract, grant, loan or cooperative AGREEMENT, the undersigned shall complete and submit
Standard Form - LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction
was made or entered into. Submission of this certification is a prerequisite for making or entering into
this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000.00, and not more than $100,000.00,
for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require
that the language of this certification be included in all lower tier sub -contracts, which exceed $100,000,
and that all such sub -recipients shall certify and disclose accordingly.
KPFF, Inc.
Consultant (Firm Name)
r n►
1-16-2023
Signa/t re (Authorized Official of Consultant) Date
Agreement Number:
Exhibit G -Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02101/2021
Exhibit G-4 Certificate of Current Cost or Pricing Data
This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section
2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted,
either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's
representative in support of Bay St Pathway, Situational Study * are accurate, complete, and current
as of January 16th, 2023 **.
This certification includes the cost or pricing data supporting any advance AGREEMENT's and forward pricing
rate AGREEMENT's between the offer or and the Government that are part of the proposal.
Firm: KPFF, Inc.
1-16-2023
Title
Date of Execution***:
*Identify the proposal, quotation, request for pricing adjustment, or other submission involved, giving the appropriate identifying number (e.g. project title.)
**Insert the day, month, and year, when price negotiations were concluded and price AGREEMENT was reached.
***Insert the day, month, and year, of signing, which should be as close as practicable to the date when the price negotiations were concluded and the
contract price was agreed to.
Agreement Number:
Exhibit G - Local Agency A&E Professional Services Cost Aus ixet ee Consultant Agreement Revised 0210112021
Back to Agenda
Exhibit H
Liability Insurance Increase
To Be Used Only If Insurance Requirements Are Increased
The professional liability limit of the CONSULTANT to the AGENCY identified in Section XII, Legal Relations
and Insurance of this Agreement is amended to $
The CONSULTANT shall provide Professional Liability insurance with minimum per occurrence limits in the
amount of $
Such insurance coverage shall be evidenced by one of the following methods:
• Certificate of Insurance.
• Self-insurance through an irrevocable Letter of Credit from a qualified financial institution.
Self-insurance through documentation of a separate fund established exclusively for the payment of professional
liability claims, including claim amounts already reserved against the fund, safeguards established for payment
from the fund, a copy of the latest annual financial statements, and disclosure of the investment portfolio for
those funds.
Should the minimum Professional Liability insurance limit required by the AGENCY as specified above exceed
$1 million per occurrence or the value of the contract, whichever is greater, then justification shall be submitted
to the Federal Highway Administration (FHWA) for approval to increase the minimum insurance limit.
If FHWA approval is obtained, the AGENCY may, at its own cost, reimburse the CONSULTANT for the additional
professional liability insurance required.
Notes: Cost of added insurance requirements: $
• Include all costs, fee increase, premiums.
• This cost shall not be billed against an FHWA funded project.
• For final contracts, include this exhibit.
Agreement Number:
Exhibit H - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 1
Back to Agenda
Exhibit I
Alleged Consultant Design Error Procedures
The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a
nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution
and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage
due to the alleged error by the consultant.
Step 1 Potential Consultant Design Error(s) is Identified by Agency's Project Manager
At the first indication of potential consultant design error(s), the first step in the process is for the Agency's
project manager to notify the Director of Public Works or Agency Engineer regarding the potential design
error(s). For federally funded projects, the Region Local Programs Engineer should be informed and
involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an
agency staff person other than the project manager, who has not been as directly involved in the project,
to be responsible for the remaining steps in these procedures.)
Step 2 Project Manager Documents the Alleged Consultant Design Error(s)
After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the
Director of Public Works or Agency Engineer's concurrence, the project manager obtains more detailed
documentation than is normally required on the project. Examples include: all decisions and descriptions
of work; photographs, records of labor, materials and equipment.
Step 3 Contact the Consultant Regarding the Alleged Design Error(s)
If it is determined that there is a need to proceed further, the next step in the process is for the project
manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged
error(s). The project manager and other appropriate agency staff should represent the agency and the
consultant should be represented by their project manager and any personnel (including sub -consultants)
deemed appropriate for the alleged design error(s) issue.
Step 4 Attempt to Resolve Alleged Design Error with Consultant
After the meeting(s) with the consultant have been completed regarding the consultant's alleged design
error(s), there are three possible scenarios:
• It is determined via mutual agreement that there is not a consultant design error(s). If this is the case,
then the process will not proceed beyond this point.
It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case,
then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement
with the consultant. The settlement would be paid to the agency or the amount would be reduced from
the consultant's agreement with the agency for the services on the project in which the design error
took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary
of the settlement for review and to make adjustments, if any, as to how the settlement affects federal
reimbursements. No further action is required.
• There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may
request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency
Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal
counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5.
Agreement Number:
Exhibit I - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 1 of 2
Step 5 Forward Documents to Local Programs
For federally funded projects all available information, including costs, should be forwarded through the
Region Local Programs Engineer to LP for their review and consultation with the FHWA. LP will meet
with representatives of the agency and the consultant to review the alleged design error(s), and attempt
to find a resolution to the issue. If necessary, LP will request assistance from the Attorney General's Office
for legal interpretation. LP will also identify how the alleged error(s) affects eligibility of project costs
for federal reimbursement.
• If mutual agreement is reached, the agency and consultant adjust the scope of work and costs
to reflect the agreed upon resolution. LP, in consultation with FHWA, will identify the amount
of federal participation in the agreed upon resolution of the issue.
• If mutual agreement is not reached, the agency and consultant may seek settlement by arbitration
or by litigation.
Agreement Number:
Exhibit I - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 0210112021 Page 2 of 2
Back to Agenda
Exhibit J
Consultant Claim Procedures
The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following
procedures should only be utilized on consultant claims greater than $1,000. If the consultant's claim(s) are a total
of $1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the
Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant's claim(s)
that total $1,000 or less.
This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential
claim by the consultant.
Step 1 Consultant Files a Claim with the Agency Project Manager
If the consultant determines that they were requested to perform additional services that were outside
of the agreement's scope of work, they may be entitled to a claim. The first step that must be completed
is the request for consideration of the claim to the Agency's project manager.
The consultant's claim must outline the following:
• Summation of hours by classification for each firm that is included in the claim;
• Any correspondence that directed the consultant to perform the additional work;
• Timeframe of the additional work that was outside of the project scope;
• Summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with
the additional work; and
• Explanation as to why the consultant believes the additional work was outside of the agreement
scope of work.
Step 2 Review by Agency Personnel Regarding the Consultant's Claim for Additional Compensation
After the consultant has completed step 1, the next step in the process is to forward the request to the
Agency's project manager. The project manager will review the consultant's claim and will met with the
Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the
FHWA is participating in the project's funding, forward a copy of the consultant's claim and the Agency's
recommendation for federal participation in the claim to the WSDOT Local Programs through the Region
Local Programs Engineer. If the claim is not eligible for federal participation, payment will need to be from
agency funds.
If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Local Programs
(if applicable), and FHWA (if applicable) agree with the consultant's claim, send a request memo, including
backup documentation to the consultant to either supplement the agreement, or create a new agreement
for the claim. After the request has been approved, the Agency shall write the supplement and/or new
agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for
the agreement is subject to audit. No further action in needed regarding the claim procedures.
If the Agency does not agree with the consultant's claim, proceed to step 3 of the procedures.
Agreement Number:
Exhibit J - Local Agency A&E Professional Services Cost PluseFixed Fee Consultant Agreement Revised 0210112021 Page 1 of 2
Step 3 Preparation of Support Documentation Regarding Consultant's Claim(s)
If the Agency does not agree with the consultant's claim, the project manager shall prepare a summary
for the Director of Public Works or Agency Engineer that included the following:
• Copy of information supplied by the consultant regarding the claim;
• Agency's summation of hours by classification for each firm that should be included in the claim;
• Any correspondence that directed the consultant to perform the additional work;
• Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs associated
with the additional work;
• Explanation regarding those areas in which the Agency does/does not agree with the consultant's
claim(s);
• Explanation to describe what has been instituted to preclude future consultant claim(s); and
• Recommendations to resolve the claim.
Step 4 Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency Documentation
The Director of Public Works or Agency Engineer shall review and administratively approve or disapprove
the claim, or portions thereof, which may include getting Agency Council or Commission approval (as
appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain
concurrence from WSDOT Local Programs and FHWA regarding final settlement of the claim. If the claim
is not eligible for federal participation, payment will need to be from agency funds.
Step 5 Informing Consultant of Decision Regarding the Claim
The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final
decision regarding the consultant's claim(s). Include the final dollar amount of the accepted claim(s)
and rationale utilized for the decision.
Step 6 Preparation of Supplement or New Agreement for the Consultant's Claim(s)
The agency shall write the supplement and/or new agreement and pay the consultant the amount
of the claim. Inform the consultant that the final payment for the agreement is subject to audit.
Agreement Number:
Exhibit J - Local Agency A&E Professional Services Cost PluseFixed Fee Consultant Agreement Revised 0210112021 Page 2 of 2
Back to Agenda
aw a
Agenda Item No
Subject:
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Business Item 8F
Adoption of a Resolution Accepting
Meeting Date:
Prepared by:
Transportation Improvement Program
Project #1.5C, Documenting Certified Atty Routing No.
Construction Costs and Maximum Atty Review Date
Transportation Impact Fee Credits
Granted Pursuant to Contract No. 035-21
February 28, 2023
Tony Lang
Public Works Director
N/A
N/A
Summary: On February 1, 2021, the City and McCormick Communities LLC entered into a development
agreement for transportation identified as Contract C035-21 which required the construction of
various transportation improvements and provided a framework to grant traffic impact fee credits to
McCormick Communities. McCormick Communities has substantially completed the construction of
the McCormick Village Drive Roundabout project, identified as TIP Project #1.5C "Old Clifton Road —
Campus Parkway Intersection" in the development agreement (note that Campus Parkway has since
been renamed as McCormick Village Drive), other than minor repairs covered by a bond. Contract
C035-21, section 12 stipulates that McCormick Communities LLC would receive credit equal to the
lesser of the actual costs incurred by the developer or the engineer's estimate contained in the City's
Traffic Impact Fee Calculation plus an annual inflator per the CPI-U.
The City's Traffic Impact Fee Calculation was adopted by Ordinance 007-21 on February 9t", 2021. The
engineer's estimate for project #1.5C as found in the rate study attached to Ordinance 007-21 was
$1,600,000. Since Ordinance 007-21 was adopted, the traffic impact fee was adjusted once on March
1, 2021, by the CPI-U with an increase of 1.7 percent and again on March 1, 2022, by 4.6 percent.
Pursuant to Contract C035-21, the engineer's estimate for TIP Project #1.5C increased on March 1,
2021, by 1.7 percent and March 1, 2022, by 4.6 percent thus increasing the engineer's estimate for the
project from $1,600,000 to $1,702,051.20. On December 2, 2022, the City received certified
construction cost documentation from McCormick Communities LLC for TIP Project #1.5C showing
total expenditures of $2,595,177. The engineer's cost estimate adjusted per the CPI-U is less than the
certified construction costs for TIP Project #1.5C. The City wishes to document the maximum approved
traffic impact fee amount granted to McCormick Communities, LLC for the construction of TIP project
#1.5C.
Relationship to Comprehensive Plan: Chapter 8 - Transportation
Recommendation: Staff recommends that the City Council adopt Resolution 002-23 accepting the
Transportation Improvement Program Project #1.5C-Old Clifton Road - McCormick Village Drive
(formerly known as Campus Pkwy) Intersection, documenting Certified Construction Costs, and
establishing maximum Transportation Impact Fee Credits.
Page 198 of 307
Back to Agenda
Staff Report 8F
Page 2of2
Motion for Consideration: I move to adopt Resolution 002-23 accepting the Transportation
Improvement Program Project #1.5C-Old Clifton McCormick Village Drive (formerly known as Campus
Pkwy) Intersection, documenting Certified Construction Costs, and establishing maximum
Transportation Impact Fee Credits.
Fiscal Impact: In accordance with Contract C035-21, the City will provide a Transportation Impact Fee
credit within the agreed -upon area until the maximum credit amount of $1,702,051.20 is reached.
Alternatives: The City is contractually obligated to accept the Transportation Improvement Program
Project #1.5C-Old Clifton Road - McCormick Village Drive (formerly known as Campus Pkwy)
Intersection pursuant to validated and accepted Certified Construction Costs, thus establishing the
maximum Impact Fee Credit.
Attachments: Resolution 002-23
Ordinance 007-21- Impact Fees
Agreement C035-21 McCormick Communities, LLC-Transportation
Certified Construction Costs Approval Memo
Page 199 of 307
Back to Agenda
RESOLUTION NO. 002-23
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, ACCEPTING
TRANSPORTATION IMPROVEMENT PROGRAM PROJECT #1.5C, DOCUMENTING
CERTIFIED CONSTRUCTION COSTS AND MAXIMUM TRANSPORTATION IMPACT
FEE CREDITS GRANTED PURSUANT TO CONTRACT C035-21.
WHEREAS; on February 1, 2021, the City and McCormick Communities LLC entered into a
development agreement for transportation identified as Contract C035-21; and
WHEREAS; Contract C035-21 required the construction of various transportation
improvements and provided a framework to grant traffic impact fee credits to McCormick
Communities; and
WHEREAS; McCormick Communities has substantially completed the construction of the
McCormick Village Drive Roundabout project, identified as TIP Project #1.5C "Old Clifton Road —
Campus Parkway Intersection" in the development agreement (note that Campus Parkway has
since been renamed as McCormick Village Drive), other than minor repairs covered by a bond; and
WHEREAS, Contract C035-21, section 12 stipulates that McCormick Communities LLC
would receive credit equal to the lesser of the actual costs incurred by the developer or the
engineers' estimate contained in the City's Traffic Impact Fee Calculation plus an annual inflator
per the CPI-U; and
WHEREAS, the City's Traffic Impact Fee Calculation was adopted by Ordinance 007-21 on
February 9t", 2021; and
WHEREAS, the engineers' estimate for project #1.5C as found in the rate study attached to
Ordinance 007-21 was $1,600,000; and
WHEREAS, since Ordinance 007-21 was adopted, the traffic impact fee was adjusted once
on March 1, 2021, by the CPI-U with an increase of 1.7 percent and again on March 1, 2022, by 4.6
percent; and
WHEREAS, pursuant to Contract C035-21, the engineer's estimate for TIP Project #1.5C
increased on March 1, 2021, by 1.7 percent and March 1, 2022, by 4.6 percent thus increasing the
engineer's estimate for the project from $1,600,000 to $1,702,051.20; and
WHEREAS, on December 2, 2022, the City received certified construction cost
documentation from McCormick Communities LLC for TIP Project #1.5C showing total
expenditures of $2,595,177; and
WHEREAS, the engineer's cost estimate adjusted per the CPI-U is less than the certified
construction costs for TIP Project #1.5C; and
Page 200 of 307
Back to Agenda
Resolution No.
Page 2 of 2
WHEREAS, the City wishes to document the maximum approved traffic impact fee amount
granted to McCormick Communities, LLC for the construction of TIP project #1.5C;
now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES
AS FOLLOWS:
THAT: The City hereby accepts the dedication of a roundabout known as TIP Project
#1.5C the Old Clifton Road — Campus Parkway (McCormick Village Drive) Roundabout.
THAT: Pursuant to Contract C035-21, a maximum traffic impact fee credit amount for
TIP Project #1.5C is hereby established in the amount of $1,702,051.20.
THAT: The Mayor is hereby authorized to accept a bill of sale for the roundabout
improvements associated with TIP #1.5C pending review and approval of the bill of sale
by the City Engineer.
PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested
by the City Clerk in authentication of such passage this 28t" day of February 2023.
Brandy Wallace, MMC, City Clerk
Robert Putaansuu, Mayor
Page 201 of 307
Back to Agenda
ORDINANCE NO. 007-21
AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON,
REGARDING TRANSPORTATION IMPACT FEES; AMENDING SECTION
20.182.060 OF THE PORT ORCHARD MUNICIPAL CODE TO ADOPT A NEW
TRANSPORTATION IMPACT FEE SCHEDULE, CLARIFYING ADOPTION
PROCEDURES AND INDEXING TRANSPORTATION IMPACT FEES TO CPI-U;
ADDING A NEW SECTION 20.182.125 TO THE PORT ORCHARD MUNICIPAL
CODE TO DESIGNATE THE CITY'S 6 YEAR/20 YEAR TRANSPORTATION
IMPROVEMENT PLAN AS THE CAPITAL FACILITIES PLAN FOR
TRANSPORTATION; PROVIDING FOR SEVERABILITY AND CORRECTIONS; AND
ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the State of Washington Growth Management Act, Chapter 36.70A RCW and
related sections ("GMA") requires the City to adopt a Comprehensive Plan that provides
adequate public facilities to serve development; and
WHEREAS, counties, cities, and towns that are required or choose to plan under RCW
36.70A.040 are authorized to impose impact fees on development activity as part of the
financing for public facilities, provided that the financing or system improvements to serve
new development must provide for a balance between impact fees and other sources of
public funds and cannot rely solely on impact fees; and
WHEREAS, RCW 82.02.050 -.110 and WAC 365-196-850 authorize counties, cities, and
towns planning under the Growth Management Act (GMA) to impose impact fees for public
streets and roads, publicly owned parks, open space, and recreation facilities, and school
facilities, and fire protection facilities; and
WHEREAS, the City of Port Orchard has adopted transportation, school, and park impact
fees, as codified in subsection 20.182.060 of the Port Orchard Municipal Code (POMC) and
Appendices A-C in Exhibit 1 of Ordinance 019-17; and
WHEREAS, the City Council finds that new development activity in the City of Port Orchard
will create additional demand and need for public facilities; and
WHEREAS, the City of Port Orchard has previously adopted a transportation impact fee
program pursuant to the authority provided in Chapter 82.02 RCW; and
WHEREAS, in 2015 the City's current transportation impact fee rate was established at
$2,552 per new PM peak hour trip, with a separate impact fee rate of $560 per new PM peak
hour trip applied to growth in the McCormick Woods PUD; and
Page 202 of 307
Back to Agenda
Ordinance r4o. uu7-Lt
Page 2 of 37
WHEREAS, this year the City Council adopted the City's 6 Year/20 Year Transportation
Improvement Plan (TIP) as part of the City's Comprehensive Plan (Ordinance 015-20); and
WHEREAS, the City Council desires to adopt an updated transportation impact fee
schedule to ensure that all projects on the current TIP receive appropriate impact fee funding
per RCW Section 82.02.050; and
WHEREAS, the City Council deems it in the best interests of the city of Port Orchard
to formally designate the TIP as the "capital facilities plan" for the purpose of identifying the
proposed transportation improvements reasonable and necessary to meet the future
development needs of the service area consistent with the city's level of service policy, as
required by RCW 82.02.050; and
WHEREAS, the City contracted with Transportation Solutions, Inc. to prepare an
updated transportation impact fee rate study and recommended impact fee rate, which was
provided to the City in December 2020 (Exhibit A); and
WHEREAS, the City has prepared an updated transportation impact fee schedule
based on the findings and recommendations of the study prepared by Transportation
Solutions, Inc., and
WHEREAS, on January 19, 2021, the City Council held a study session on the updated
transportation impact fee schedule; and
WHEREAS, on February 9, 2021, at its regular meeting the City Council held a public
hearing on this ordinance, considered the updated transportation impact fee schedule and
the public testimony, and reviewed the ordinance proposed for its adoption; and
WHEREAS, the transportation, parks and school impact fees are currently adopted as
appendices to Chapter 20.182 of the Port Orchard Municipal Code, and
WHEREAS, the City Council desires to directly adopt the transportation, parks, and
school impact fees by ordinance, for ease of reference and use; and
WHEREAS, this ordinance is exempt from the requirements of the State
Environmental Policy Act (SEPA), Chapter 43,21C RCW, and the City's environmental
regulations, Chapter 20.160 POMC; now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, DO ORDAIN AS
FOLLOWS:
Page 203 of 307
Back to Agenda
Ordinance ivo. uu7-zl
Page 3 of 37
SECTION 1. The City Council adopts all of the "Whereas" sections of this ordinance as
findings in support of this ordinance.
SECTION 2. Subsection 20.182.060 of the Port Orchard Municipal Code is hereby
amended to read as follows:
20.182.060 Fee schedules and establishment of service area.
(1) Impact fee schedules setting forth the amount of the impact fees to be paid by
developers aFe listed On the appendices attached to the „Fdin nee adapting this ,.hap r
shall be adopted by ordinance of the City Council and incorporated herein by this
reference. The read „r tFan peFt tier ; act fee schedule is On Appendix A aFk imp
fees a in Appendix B and wheel impact fees a On Appendix C. The impact fee
schedules may be revised at any time the city council deems just and appropriate.
(2) For the purpose of road and park impact fees, the entire city shall be considered one
service area.
(3) For the purpose of school impact fees, the entire boundary of the school district shall
be considered one service area.
(4) Transportation impact fees adopted by the City shall automatically increase annually
per CPI-U (All Urban Consumers Index) (1982-1984=100), not seasonally adjusted, for the
Seattle -Tacoma -Bellevue area for that 12-month period from January 1St to December 31St
Indexed as the Annual Average, as is specified by the Bureau of Labor Statistics, United
States Department of Labor. Increases based on CPI-U shall take effect on March 1St of
the following vear.
SECTION 3. A new subsection 20.182.125 is hereby added to the Port Orchard
Municipal Code to read as follows:
20.182.125 Designation of Capital Facilities Plan for Transportation.
The city designates the 6 Year/20 Year Transportation Improvement Plan (TIP) as the
City's comprehensive capital facilities plan for the purpose of identifying the proposed
transportation improvements reasonable and necessary to meet the future development
needs of the service area consistent with the city's level of service policy, as required by RCW
82.02.050. The TIP identifies the specific subset of transportation improvements in the impact
fee project list that forms the basis for the transportation impact fee program.
SECTION 4. Adoption of Transportation Impact Fee Schedule. The City hereby adopts a
new transportation impact fee schedule which is included as a part of Exhibit A to this
ordinance, in accordance with POMC 20.182.060. This transportation impact fee schedule
Page 204 of 307
Back to Agenda
Ordinance No. 007-21
Page 4 of 37
shall become effective on the effective date established in Section 9 below and shall replace
and supersede any previously adopted transportation impact fee schedule.
SECTION S. Park and School Impact Fees Unchanged. The park and school impact fee
schedules that were previously adopted by the City Council shall remain in effect and are
respectively shown on Exhibits B and C of this ordinance.
SECTION 6. Sections 4 and 5 of this Ordinance are deemed of special effect and shall not
be codified.
SECTION 7. Severability. If any section, sentence, clause, or phrase of this ordinance
should be held to be invalid or unconstitutional by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity of constitutionality of any other
section, sentence, clause, or phrase of this ordinance.
SECTION 8. Corrections. Upon the approval of the city attorney, the city clerk, and/or
code publisher is authorized to make any necessary technical corrections to this ordinance,
including but not limited to the correction of scrivener's/clerical errors, references, ordinance
numbering, section/subsection numbers, and any reference thereto.
SECTION 9. Effective Date. This ordinance shall be in full force and effective February
23, 2021. A summary of this ordinance in the form of the ordinance title may be published
in lieu of publishing the ordinance in its entirety.
PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and
attested by the City Clerk in authentication of such passage this 9th day of February 2021.
Robert Putaansuu, Mayor
ATT
Br ndy ffn6mcrn, MMC, City Clerk
APPROVED AS TO FORM- Sponsored by;
If111111I{�+rq+',
Charlotte A. Archer, City AttorAn
f pRT gRC;at, Scott Diener, Councilmember
SAL
INASH!of "���~
9� '6J 2 307
Back to Agenda
Ordinance ivo. uu7-zl
Page 5 of 37
PUBLISHED: February 11, 2021
EFFECTIVE DATE: February 23, 2021
EXHIBIT A: TRANSPORTATION IMPACT FEE SCHEDULE WITH RATE STUDY (2021)
EXHIBIT B: PARKS IMPACT FEE SCHEDULE (EXISTING)
EXHIBIT C: SCHOOL IMPACT FEE SCHEDULE (EXISTING)
Page 206 of 307
Back to Agenda
.� Transportation
INNOVATIVE I PRACTICAL
Solutions
I EQUITABLE
Ordinance No. 007-21
TRANSPORTATION IMPACT FEE RATE STUDY
2020 UPDATE
FINAL REPORT
December 2020
Prepared for:
City of Port Orchard
Prepared by:
Transportation Solutions, Inc.
16932 Woodinville -Redmond Rd NE
Suite A206
Woodinville, WA 98072
Page 207 of 307
Back to Agenda
City of Port Orchard
Table of Contents
2020 Transportation Impact Fee Rate Update
1. Introduction....................................................................................................................................... 1
Definitionof Impact Fees ............................... .,,................ ....
... .................................................................. ........... 1
StatutoryBasis for Impact Fees ...... :..::.:.......... :..........................................................................................
......... 1
2. Impact Fee Analysis............................................................................................................................ 2
Methodology......................................................................................................................................................
2
CurrentImpact Fee Methodology ............................ ..............
.. .....,........................................I....... 2
Projects Eligible for Impact Fees..........................................................................................................................
2
EligibleProject Costs ......................................................................................................................................
3
ImpactFee Calculation.......................................................................................,.............................................
3
Sample Transportation Impact Fees .................................. :::
................................. .............................................. 6
3. Additional Issues for Consideration..................................................................................................... 6
Anticipated Annual Revenues from Impact Fees................................................................................................
6
AnticipatedGrant Revenue...............................................................................................................................:..
6
Anticipated Need for Other Public Funds...........................................................................................................
7
4. Transportation Impact Fee Rate Comparison..................................................................................... 7
5. Credits and Adjustments..................................................................................................................... 7
ImpactFee Credits.................................................................._.........................................................................
7
IndependentFee Calculation ........................ .............................................................
......................................... 8
Construction Cost Index Adjustment ................ ................... ................................
:............................................... 8
6. Conclusions........................................................................................................................................ 8
Appendices
Appendix A. Transportation Impact Fee Project List
Appendix B. Transportation Impact Fee Rate Schedule
Appendix C. Comparison of 2019-2020 TIF Rates in Western Washington
List of Tables
Table 1. Impact Fee -Eligible Transportation Improvement Projects....................................................................... S
Table 2. Transportation Impact Fee Comparison for Typical Land Uses...........,,,...,............................................... 6
Transportation Solutions, Inc.
December 2020
Page 208 of 307
Back to Agenda
City of Port Orchard
1. Introduction
2020Transportation Impact Fee Rate Update
This document summarizes the development of an updated transportation impact fee rate for the City
of Port Orchard. It describes the existing impact fee rate, the basis for the fee, the rate methodology,
the impact fee project list, and the recommended fee rate.
Definition of Impact Fees
Impact fees are a comprehensive grouping of charges based on new development within a local
municipality. These fees are assessed to pay for capital facility improvement projects necessitated by
new development growth (including but not limited to parks, schools, and streets/roads).
Transportation impact fees are collected to fund improvements that add capacity to the transportation
system, accommodating the travel demand created by new development. The Revised Code of
Washington (RCW) Section 82.02.050 identifies the intent of impact fees as the following:
To ensure that adequate facilities are available to serve new growth and development;
To promote orderly growth and development by establishing standards by which counties, cities,
and towns may require, by ordinance, that new growth and development pay a proportionate
share of the cost of new facilities needed to serve new growth and development; and
To ensure that impact fees are imposed through established procedures and criteria so that
specific developments do not pay arbitrary fees or duplicative fees for the same impact.
Statutory Basis for Impact Fees
Transportation impact fees are a financing mechanism authorized by the Growth Management Act
(GMA) of Washington State (see RCW 36.70A.070 and 82.02.050). State law imposes strict limitations on
impact fees. These limitations are intended to assure property owners that the fees collected are
reasonably related to their actual impacts and will not be used for unrelated purposes.
If impact fees are imposed, the funds collected from developments can be expended only on
transportation system improvements which are: (a) identified in the comprehensive plan as needed for
growth, and (b) reasonably related to the impacts of the new development from which fees are
collected.
Specifically, condition (a) requires that impact fees are not used on improvements needed to remedy
existing deficiencies. Those needs must be entirely funded from public sector resources. Condition (b) is
satisfied if the local government defines a reasonable service area, identifies the public facilities within
the service area that require improvement during the designated planning period, and prepares a fee
schedule taking into account the type and size of the development as well as the type of public facility
being funded.
To achieve the goal of simplicity, impact fee calculations are applied on an average basis for the entire
transportation system, rather than project -by -project. This is a key difference between impact fees and
State Environmental Policy Act (SEPA) mitigation, whereby pro-rata shares of specific project
improvements are collected.
Pre -calculated impact fees are easier to administer than traditional SEPA development mitigation, at the
point of development review. However, more complex administrative procedures are necessary to track
Transportation Solutions, Inc.
December 2020
Page 209 of 307
Back to Agenda
City of Port Orchard
2020 Transportation Impact Fee Rate Update
the funds collected from each development. This is necessary to assure that the funds are expended
only on eligible transportation system improvements and to assure that impact fee revenues are used
within six years. Fees not expended within six years must be refunded with interest to the current
owner of the property.
The methodology and results described below are consistent with the requirements of the GMA. The
procedures and recommendations described herein can be formally enacted by an impact fee ordinance
incorporating this memo by reference.
2. Impact Fee Analysis
Methodology
The conceptual basis for the transportation impact fee is that growth (i.e. new development) should pay
a proportionate share of the cost to provide future transportation capacity. This proportionate share is
calculated based on the estimated cost of growth -related transportation improvement projects
identified in the Comprehensive Plan and on an estimate of growth's share of capacity utilization for
each project. The impact fee analysis is limited to projects that provide capacity improvements needed
for growth. Projects related to maintenance, such as pavement overlays and physical obsolescence, as
well as improvements necessary to mitigate existing capacity deficiencies, are not eligible for impact fee
funding. However, agencies have been encouraged by the Department of Commerce to consider
multimodal transportation improvements and, to that end, shoulder widening, sidewalks, bike lanes and
parallel trails are reasonable to include as both motorized and nonmotorized capacity enhancements.
Current Impact Fee Methodology
The Port Orchard transportation impact fee program was developed and adopted in 2015 as ordinance
number 023-15 and later reorganized under ordinance number 019-17. The impact fee methodology is
based on proportionate growth share of impact fee eligible project costs.
As of December 2020, the transportation impact fee rate is $2,552 per new PM peak hour trip. A
separate impact fee rate of $560 per new PM peak hour trip is applied to growth in the McCormick
Woods PUD. This rate represents the difference between the citywide rate and a GEM1 fee rate of
$1,992 per trip which was required per the McCormick Woods Development Agreement adopted in
2005.
Projects Eligible for Impact Fees
Not all planned transportation projects and programs are eligible for impact fees. Planned improvement
project are divided below into the following categories in order to establish a list of qualifying projects
that will form the basis for the Port Orchard impact fee rate:
• Project Improvements
• Planned Transportation Projects needed within 20 years
• Maintenance Projects
Proeect Improvements
Project improvements are transportation improvements necessary for a specific development that do
not provide significant system benefits. These are typically low -volume local streets that serve driveways
and parking areas. They may provide connections to other developments, but not for the purpose of
Transportation Solutions, Inc.
December 2020
Page 210 of 307
Back to Agenda
City of Port Orchard
2020Transportation Impact Fee Rate Update
significant system capacity. Other project improvements include safety improvements and new access
connections to existing arterials that serve only one development. Project improvements are typically
required by other development regulations or as SEPA mitigation for specific development impacts not
anticipated in the Comprehensive Plan. Project improvements are not eligible for impact fees. For the
purpose of this rate analysis, roadway extensions that connected existing developments, but were not
significant arterials, were considered project improvements that could be required under other City
codes and regulations but would not be included in the impact fee calculation.
Planned Transportation Projects
The Port Orchard 2021-2040 Transportation Improvement Program (TIP) identifies transportation
projects which are needed to serve traffic growth for the next twenty years. Projects with capacity
benefits are eligible for impact fee funding. Capacity -related improvements may include adding turn
lanes, lane widening or separating non -motorized modes, adding signals or roundabouts for intersection
capacity, or other improvements. The methodology for roadway capacity calculation is described in the
Transportation Element of the Comprehensive Plan. The proportional share of these projects reasonably
related to growth are eligible for impact fees.
Maintenance Projects
Maintenance programs, general studies, and non -capital activities are generally not eligible for impact
fees. A component of ongoing pavement preservation could be eligible for impact fees if it is
demonstrated that growth increases the magnitude of pavement reconstruction requirements. For
instance, if existing conditions require a two-inch asphalt overlay, but added traffic from growth
requires a three-inch asphalt overlay to achieve the same pavement life, the cost of the additional inch
of asphalt could be attributed to growth. If the overlay or reconstruction provides increased lane width,
intersection improvements, or shoulder widening the cost of the expansion could be considered eligible.
Eligible Project Costs
Impact fee eligible projects and their estimated costs are identified in Table 1. These costs include
various elements which are necessary for the construction of transportation improvements, including
design, permitting, right-of-way, construction, and construction management. Ongoing or future
maintenance is not an eligible impact fee cost. TIP projects which are not capacity -related, or which are
considered maintenance projects/programs are not included in the TIF project list.
Impact Fee Calculation
The impact fee was calculated based on the increase in PM peak hour vehicle trips resulting from
growth, the cost of improvements related to growth, and the City's transportation financing strategy, as
defined in the 2016 Comprehensive Plan. The calculation methodology is described below.
Local Funding Responsibility
Roadway projects are generally eligible for state and federal grant funds. These funds are not
predictable and vary in amount by grantor. Additionally, cost -sharing agreements with Washington State
Department of Transportation (WSDOT) and Kitsap County are anticipated to reduce some of the City's
project cost responsibility.
This analysis assumes the City will be responsible for 50 percent of total impact fee -eligible project costs
over the 20-year planning horizon, with the other 50 percent anticipated to be funded by grant and
intergovernmental revenue roadway projects.
Transportation Solutions, Inc.
December 2020
Page 211 of 307
Back to Agenda
City of Port Orchard
2020 Transportation Impact Fee Rate Update
Exceptions were applied to the following projects which are anticipated to be fully funded by the City of
Port Orchard or by local development, with no grants or intergovernmental revenue:
• Bethel/Sedgwick Corridor Phase 1 Design (TIP #1.3)
• Old Clifton Rd Design — 60% (TIP #1.5A)
• Old Clifton Rd & Campus Parkway roundabout (TIP #1.5C)
• Old Clifton Rd & McCormick Woods Dr roundabout (TIP #2.08)
• Glenwood Connector Roadway (per development agreement)
• Feigley Rd improvements (per development agreement)
Proportionate Share of Project Cost
Growth's proportionate share of each improvement project was calculated as the proportion of added
capacity which will be used by new development trips, per the Port Orchard travel demand model.
The Port Orchard travel demand model was most recently updated and recalibrated in 2019. It
incorporates trip generation data published in the Institute of Transportation Engineers (ITE) Trip
Generation Manual, 10' Edition and calibrated to fit 2019 weekday PM peak hour traffic counts. The
travel demand model trip distribution and traffic assignment procedures were calibrated based on
regional and national guidance, including the Kitsap County travel demand model and Federal Highway
Administration travel demand model calibration guidance, in addition to local engineering expertise and
traffic counts.
To generate 2040 PM peak hour travel demand forecasts, the calibrated 2019 PM travel demand model
was modified to include housing and employment growth forecasts identified in the Port Orchard
Comprehensive Plan. A total of 7,352 new weekday PM peak hour trips are anticipated citywide
between 2019 and 2040. These new trips were assigned to the transportation network, resulting in
traffic growth forecasts for each intersection and roadway segment on the TIF project list.
The proportionate growth share of TIF project costs was calculated by dividing the 2019-2040 PM peak
hour trip growth by the capacity contribution, in vehicles per hour, of each improvement project:
[Proportionate Share o}'Pr ojr.-ct Cost/= PM peak tar trip growth
added PM peak hrcapaeity
The resulting proportionate share for each TIF project is identified in Table 1. Total project costs and
growth share are summarized below:
Total TIF Project Cost $145,863,474
Anticipated Grant & Intergovernmental Revenue $78,597,474
Anticipated City & Developer (Non -Grant) Responsibility $67,266,000
Growth/Development Share of Project Cost $36,343,224
Transportation Solutions, Inc.
December 2020
Page 212 of 307
City of Port Orchard
Back to Agenda
2020 Transportation Impact Fee Rate Update
Table 1. Impact Fee -Eligible Transportation Improvement Projects
TIP
Ip1
Project Name
Cast
Estimate {$)
Local
Share ($)
Growth
ar
ar
Share'
Growth Share
{$)
DA
Glenwood Connector Roadway
2,000,000
2,000,000
100%
2,000,000
1.1
Tremont St Widening CN Phase
23,600,000
7,570,000
24%
1,851,656
1.3
Bethel/Sedgwick Corridor Ph. 1 Design
1,211,000
1,211,000
24%
293,489
1.4
Old Clifton Rd/Anderson Hill Rd
Roundabout
2,420,000
968,000
81%
786,112
1.5A
Old Clifton Rd Design - 60%
562,000
562,000
100%
562,000
1.5C
Old Clifton Rd/Campus Pkwy Roundabout
1,600,000
1,600,000
100%
1,600,000
1.7
Vallair Ct Connector
2,498,000
1,249,000
8%
96,697
2.01
Sidney Ave (N) Widening
13,113,000
6,557,000
48%
3,144,444
2.02
Sedgwick Rd West Design/ROW
1,444,000
722,000
100%
722,000
2.03
2.04A
Sedgwick Rd West Constr.
Bethel/Sedgwick Corridor Ph. 1
ROW/Constr.
4,331,000
14,360,000
2,166,000
7,180,000
100%
24%
2,165,500
1,740,094
2.04B
Bethel/Sedgwick Corridor Ph. 2
17,498,000
5,249,000
28%
1,464,306
2.04C
Bethel/Sedgwick Corridor Ph. 3
6,111,000
1,833,000
5%
97,776
2.04D
Bethel/Sedgwick Corridor Ph. 4
9,179,000
4,590,000
45%
2,067,975
2.04E
Bethel/Sedgwick Corridor Ph. 5
11,059,000
5,530,000
100%
5,529,500
2.05
Sidney Rd (S) Widening
7,820,000
3,910,000
66%
2,593,367
2.06
Pottery Ave (N) Widening
1,998,000
999,000
28%
277,500
2.07
Old Clifton Rd Shoulder & Ped. Impr.
3,372,000
1,686,000
100%
1,686,000
2.08
Old Clifton Rd/McCormick Woods Dr
Roundabout
1,600,000
1,600,000
100%
1,600,000
2.09
Melcher St Widening
749,000
375,000
7%
25,279
2.1
Fireweed Rd Widening
468,000
234,000
5%
11,700
2.12
Sherman Ave Widening
656,000
328,000
5%
16,400
2.13
Tremont St Widening Ph. 2 - PO Blvd
10,684,000
5,342,000
100%
5,342,000
2.14
Pottery Ave (S) Widening
5,245,000
2,623,000
16%
415,119
2.16
Blueberry Rd Widening
749,000
375,000
22%
80,518
2.17
Geiger Rd Widening
468,000
234,000
5%
11,700
2.18
Salmonberry Rd Widening
281,000
141,000
21%
28,803
2.19
Piperberry Way Extension
468,000
234,000
11%
2S,66S
2.21
Old Clifton Rd/Feigley Rd Roundabout
243,000
122,000
26%
31,150
DA
Feigley Rd Improvements
76,474
76,000
100%
76,474
Total
145,863,474
67,266,000
54°%
36,343,224
'Project ID number in Port Orchard 2021-2040 Transportation Improvement Program. DA = development agreement project
2Portion of project cost which is anticipated to be funded by City of Port Orchard and developer funds (i.e. not funded by
grants or intergovernmental revenue)
3Portion of added capacity which is used by growth (i.e. new development). Developer -funded projects are assigned 100%
growth share.
Transportation Solutions, Inc.
5
December 2020
Page 213 of 307
Back to Agenda
City of Port Orchard
2020 Transportation Impact Fee Rate Update
Impact Fee Rate
The citywide transportation impact fee rate was calculated by dividing the sum of the growth share of
TIF project cost by the total citywide PM peak hour trip growth forecast, as shown:
Development share ❑f project costs _ $36,343,224
Citywide PM trip growth 7,352 new trips = $4,943 / PM peak hour trip
Sample Transportation Impact Fees
Table 2 summarizes the fee rates which would be paid by several typical developments If the above
calculated rate were adopted in an impact fee ordinance. A comprehensive transportation impact fee
rate schedule is included in Appendix B.
Table 2. Transportation Impact Fee Comparison for Typical Land Uses
Land Use Type
ITE
LUC,
Trip
Rate
Per Unit
2015 TIF
Rate ($/unit)
2020 TIF
Rate f$/unit)
Single -Family Home
Low -Rise Multifamily
210
220
0.99
0.56
DU
DU
2,552
1,582
4,894
2,768
Senior Attached Housing
252
0.26
DU
638
1,285
General Office
710
1.15
1,000 ftZ
3,803
5,684
Shopping Center
820
2.51*
1,000 ftZ
6,406
12,110
Light Industrial
110
0.63
1,000 ftZ
2,476
3,114
'Land Use Code and trip rates per Institute of Transportation Engineers Trip Generation Manual 101h Edition
*Includes 34% reduction for pass -by trips, per Institute of Transportation Engineers Trip Generation Handbook
3. Additional Issues for Consideration
Anticipated Annual Revenues from Impact Fees
The anticipated annual revenue from the proposed transportation impact fee, based on the travel
demand growth forecast of 7,352 new trips by 2040, is shown below:
350 trips $4,9�1.3
* _ $1,730,050 / year
year PM trip
The transportation impact fee is anticipated to generate an average of $1,730,050 per year. This
represents a 20-year average and may be more or less in any given year.
Anticipated Grant Revenue
Transportation improvement projects are generally eligible for state and federal grant funds. These
funds are not predictable and vary in amount by grantor. The financing plan in the Transportation
Element identifies a 50 percent grant and intergovernmental funding goal for roadway projects. This
assumption is applied in the impact fee rate calculation.
Transportation Solutions, Inc. 6
December 2020
Page 214 of 307
Back to Agenda
City of Port Orchard
2020 Transportation Impact Fee Rate Update
Anticipated Need for Other Public Funds
The anticipated impact fee revenue does not fully fund the non -grant share of TIF project costs. The
anticipated need for other public funds is summarized below:
Total TIF Project Cost $145,863,474
Anticipated Grant & Intergovernmental Revenue $78,597,474
Growth/Development Share of Project Cost $36,343,224
Remaining Unfunded Commitment (2019-2040) $30,922,776
The City will need to identify other revenue sources to fund the remaining unfunded revenue
commitment of $30,922,776 associated with the TIF projects. This represents an annual funding
commitment of $1,546,139.
4. Transportation Impact Fee Rate Comparison
The City of Bellingham Public Works Department has compiled a list of transportation impact fee rates
for 79 public agencies in western Washington. The full comparison chart is included in Appendix B.
Provided below are current transportation impact fee rates for several agencies which are located near
Port Orchard. The updated impact fee rate of $4,943 per PM trip would be just above the western
Washington average rate, but far from the highest in western Washington.
Western WA Maximum Transportation Impact Fee:
City of Poulsbo Transportation Impact Fee:
City of Gig Harbor Transportation Impact Fee:
Proposed Port Orchard Transportation Impact Fee:
Western WA Average Transportation Impact Fee:
City of Bainbridge Island Transportation Impact Fee:
Kitsap County Transportation Impact Fee:
Western WA Minimum Transportation Impact Fee:
5. Credits and Adjustments
Impact Fee Credits
$14,064 (City of Sammamish)
$5,397
$5,020
$4,943
$4,363
$1,687
$700
$589 (City of Oak Harbor)
An applicant may request a credit for impact fees in the amount of the total value of system
improvements, including dedications of land, improvements, and/or construction provided by the
applicant. Credits should be considered on a case -by -case basis and shall not exceed the impact fee
payable.
Claims for credit should be made before the payment of the impact fee. Credits for the construction
should be provided only if the land, improvements, and/or the facility constructed are listed as planned
transportation projects in the Rate Analysis and Impact Fee Ordinance. Credits are not generally given
for code -based frontage improvements or right -or -way dedications, or direct access improvements to
and/or within the subject development (project improvements) unless the improvement is part of a
project listed in the Rate Analysis and Impact Fee Ordinance.
Transportation Solutions, Inc.
December 2020
Page 215 of 307
Back to Agenda
City of Port Orchard
Independent Fee Calculation
2020 Transportation Impact Fee Rate Update
An applicant may submit an independent fee calculation for a proposed development activity. The
documentation submitted should be prepared by a traffic engineer licensed in Washington State and
should be limited to adjustments in the trip generation rates used in the fee calculation.
Construction Cost Index Adjustment
Transportation impact fees should be adjusted yearly to account for inflation. Annual adjustments will
be based on the All -Urban Consumers Index (CPI-U) for the Seattle -Tacoma -Bellevue area for the
previous 12-month period from December to December as specified by the Bureau of Labor Statistics,
United States Department of Labor. The CPI adjustment would take effect on March 1.
6. Conclusions
The recommended transportation impact fee rate is $4,943 per new PM peak hour trip.
Transportation Solutions, Inc.
December 2020
Page 216 of 307
Back to Agenda
City of Port Orchard
Transportation Solutions, Inc.
2020Transportation Impact Fee Rate Update
Appendix A. Transportation Impact Fee Project List
December 2020
Page 217 of 307
Back to Agenda
City of Port Orchard
Transportation Impact Fee Project List - 2020 Update
DA
Glenwood Connector Roadway
2,000,000
2,000,000
100%
2,000,000
1.1
Tremont St Widening CN Phase
23,600,000
7,570,000
24%
1,851,656
1.3
Bethel/Sedgwick Corridor Ph. 1 Design
1,211,000
1,211,000
24%
293,489
1.4
Old Clifton Rd/Anderson Hill Rd Roundabout
2,420,000
968,000
81%
786,112
1.5A
Old Clifton Rd Design - 60%
562,000
562,000
100%
562,000
1.5C
Old Clifton Rd/Campus Pkwy Roundabout
1,600,000
1,600,000
100%
1,600,000
1.7
Vallair Ct Connector
2,498,000
1,249,000
8%
96,697
2.01
Sidney Ave (N) Widening
13,113,000
6,557,000
48%
3,144,444
2.02
Sedgwick Rd West Design/ROW
1,444,000
722,000
100%
722,000
2.03
Sedgwick Rd West Constr,
4,331,000
2,166,000
100%
2,165,500
2.04A
Bethel/Sedgwick Corridor Ph. 1 ROW/Constr.
14,360,000
7,180,000
24%
1,740,094
2.0413
Bethel/Sedgwick Corridor Ph. 2
17,498,000
5,249,000
28%
1,464,306
2.04C
Bethel/Sedgwick Corridor Ph. 3
6,111,000
1,833,000
5%
97,776
2.04D
Bethel/Sedgwick Corridor Ph. 4
9,179,000
4,590,000
45%
2,067,975
2.04E
Bethel/Sedgwick Corridor Ph. 5
11,059,000
5,530,000
100%
5,529,500
2.05
Sidney Rd (S) Widening
7,820,000
3,910,000
66%
2,593,367
2.06
Pottery Ave (N) Widening
1,998,000
999,000
28%
277,500
2.07
Old Clifton Rd Shoulder & Ped. Impr.
3,372,000
1,686,000
100%
1,686,000
2.08
Old Clifton Rd/McCormick Woods Dr Roundabout
1,600,000
1,600,000
100%
1,600,000
2.09
Melcher St Widening
749,000
375,000
7%
25,279
2.1
Fireweed Rd Widening
468,000
234,000
5%
11,700
2.12
Sherman Ave Widening
656,000
328,000
5%
16,400
2.13
Tremont St Widening Ph. 2 - PO Blvd
10,684,000
5,342,000
100%
5,342,000
2.14
Pottery Ave (S) Widening
5,245,000
2,623,000
16%
415,119
2.16
Blueberry Rd Widening
749,000
375,000
22%
80,518
2.17
Geiger Rd Widening
468,000
234,000
5%
11,700
2.18
Salmonberry Rd Widening
281,000
141,000
21%
28,803
2.19
Piperberry Way Extension
468,000
234,000
11%
25,665
2.21
Old Clifton Rd/FeigleyRd Roundabout
243,000
122,000
26%
31,150
DA
Feigley Rd Improvements
76,474
76,000
100%
76,474
Total
Total Project Cost
146,863,474
$145,863,474
67,266,000
54%
36,343,224
Local Share (Development + City)%)
46%
Growth/Development Share ($)
$36,343,224
2019-2040 PM Peak Hour Trip Growth (vph)
7,352
2020 Transportation Impact Fee Rate ($/trip)
$4,943
Remaining Unfunded Commitment ($)
$30,922,776
Annual Funding Commitment ($/yr)
$1,546,139
Page 218 of 307
Back to Agenda
City of Port Orchard
Transportation Solutions, Inc.
2020 Transportation Impact Fee Rate Update
Appendix B. Transportation Impact Fee Rate Schedule
December 2020
Page 219 of 307
Back to Agenda
City of Port Orchard Traffic Impact Fee Rate Schedule — Residential (2020 Update)
ITE
Code
ITE Land Use Category'
ITE Trip
Rate.--
Rate per
Unit'
Impact Fee per Unit
210
Single -Family Detached Housing
0.99
DU
$4,894
220
Low -Rise Multifamily Housing (1-2 floors)
0.56
DU
$2,768
221
Mid -Rise Multifamily Housing (3-10 floors)
0.44
DU
$2,175
230
Mid -Rise Residential w/ 1 st Floor Commercial
0.36
DU
$1,779
240
Mobile Home Park
0.46
DU
$2,274
251
Senior Housing Detached
0.30
DU
$1,483
252
Senior Housing Attached
0.26
DU
$1,285
253
Congregate Care Facility
0.18
DU
$890
254
Assisted Living
0.26
bed
$1,285
260
Recreational Home
0.28
DU
$1,384
270
Residential PUD
0.69
DU
$3,411
-
Accessory Dwelling Unit (<— 450 sf)
0.56
DU
$2,768
Accessory Dwelling Unit (> 450 sf)
0.28
DU
$1,384
Institute of Transportation Engineers, Trh Generation Manual ,(10th Edition)
2 Trip generation rate per development unit for PM peak hour of the adjacent street traffic (4-6 PM)
3 DU = Dwelling Unit
ORCHARD
Transportation Solutions
.� p
INNOVATIVE I PRACTICAL I EQUITABLE
Page 220 of 307
Back to Agenda
Pity of Pnrt Orr_hard Traffir- Imnart Fee Rate Schedule - Non -Residential LUC 1-799 (2020 Update)i
ITE
ITE Land Use Category
Base Trip
% Primary
Net Trip
Rate per
t Fee
L!pp'rcJnitit
Code'
Rate'
Trips
Rate
Unit'
PORT AND
TERMINAL
30 1
Intennodal Truck Terminal
1.87
1.870
ksf
90
Park and Ride vnth Bus Service
0.43
0.430
s aca
2 t 25
INDUSTRIAL
110
General Light Industrial
0,fi3
0.630
KSF
130
Industrial Park
0.40
0.400
KSF
$1,977
140
Manufacturing
0.67
0.670
KSF
$3,312
150
Warehousing
0.19
0.190
KSF
$939
151
Mini Warehouse
0.17
0.170
KSF
$840
170
Utilities
2.27
2.270
KSF
$11,221
10
5 add Trade Cori tractor
1.97
1,970
SF
9 738
LODGING
310
Hate)
0.60
0.buu
room $2,986
311
All Suites Hotel
0.36
0.360
room $1,779
312
Business Hotel
0.32
0.320
room $1,582
320
otel
0.38
0.380
room 1878
RECREATIONAL
411
Public Park
0.11
0.110
acre
$544
416
Campground/RV Park
0.27
0.270
site
$1,335
430
Golf Course
0.28
0.280
acre
$1,384
432
Golf Driving Range
1.25
1.250
tee
$6,179
433
Batting Cages
2.22
2.220
cage
$10,973
434
Rock Climbing Gym
1.64
1.640
KSF
$8,107
435
Multi -Purpose Recreational Facility
3.58
3.580
KSF
$17,696
437
Bowling Alley
1.16
1.160
KSF
$5,734
444
Movie Theater
14.60
*
14.600
screen
$72,168
445
Multiplex Movie Theater
13.73
13.730
screen
$67,867
488
Soccer Complex
16.43
16.430
field
$81,213
490
Tennis Courts
4.21
4.210
court
$20,810
491
Racquet/Tennis Club
3.82
3.820
court
$18,882
492
Health Fitness Club
3.45
3.450
KSF
$17,053
493
Athletic Club
6.29
6.290
KSF
$31,091
495
Recrea0 nal Communi Center
2.3.1
2.310
S
41 8
INSTITUTIONAL
520
Public Elementary School
1.37
1.370
KSF
$6,772
522
Public Middle/Junior High School
1.19
1.190
KSF
$5,882
530
Publlo High School
0.97
0.970
KSF
$4,795
537
Charter Elementary School
0.14
0.140
student
$692
538
School District Office
2.04
2.040
KSF
$10,084
540
Junior / Community College
1.86
1.860
KSF
$9,194
560
Church
0.49
0.490
KSF
$2,422
565
Day Care Center
11.12
44%
4.893
KSF
$24,185
566
Cemetery
0.46
0.460
acre
$2,274
571
Prison
0.05
0.050
bed
$247
575
Fire & Rescue Station
0.48
0.480
KSF
$.2,373
_M0.1kar,
8,16
8.160
KSF
40335
MEDICAL
610
Hospital
0.97
"
0.970
KSF
$4,795
620
Nursing Home
0.59
0.590
KSF
$2,916
630
Clinic
3.28
3.280
KSF
$16,213
640
Animal Hospital / Veterinary Clinic
3.53
3.530
KSF
$17.449
650
Freestandin Emar enc Room
1.52
1,520
kSF
7 513
OFFICE
710
General Office
1.15
1.150
KSF
$5,684
712
Single -Tenant Office (<5,000 so
2.45
2.450
KSF
$12,110
715
Single Tenant Office (>5,000 sf)
1.71
1.710
KSF
$8,453
720
MedicallDentalOffce
3.46
3.460
KSF
$17,103
730
Government Office Building
1.71
1.710
KSF
$6,453
732
US Post Office
11.21
11.210
KSF
$55,411
733
Government Office Complex
2.82
2.820
KSF
$13,939
750
Office Park
1.07
1.070
KSF
$5,289
760
Research and Development Center
0.49
0.490
KSF
$2,422
770
IBuslness Park
0,42
0,420
1 KSF
$2,076
' Institute ofTransportabon Engineers, Irlp Generation Manua1O00t haioon)
2 Trip generation rate per development unit, for PM Peak Hour of the adjacent street traffic (4-6 pm).
a DU = Dwelling Unit; KSF = 1,000 square feet; VSP = Vehicle servicing position
` Pass -by and diverted trip rate data not available. Primary trip rates may be applied based on local data, development context, and engineering judgment
Page 221 of 307
Back to Agenda
Citv of Port Orchard Traffic Inniinc.t Fea Rate RrhPdi le- Nnn.RPsiriPntial I I Ir mn.ano rqn?n I Inri 5rol
ITE
Code
RETAIL
ITE Land Use Category
9 ry
Base Trip
Rate'
% Primary
Trips'
Net Trip
Rate
Rate per
Unit'
Impact Fee
per Unit
810
Tractor Supply Store
1.40
56%
0.924
KSF
$4,567
811
Construction Equipment Rental Store
0.99
74%
0.733
KSF
$3,621
812
Building Materials and Lumber Store
2.06
74%
1.524
KSF
$7,535
813
Free -Standing Discount Superstore (w/ Grocery)
4.33
71 %
3.074
KSF
$15,196
814
Variety Store
6.84
66%
4.514
KSF
$22,315
815
Free Standing Discount Store (w/o Grocery)
4.83
83%
4.009
KSF
$19,816
816
Hardware/Paint Store
2.68
74%
1.983
KSF
$9,803
817
Nursery (Garden Center)
6.94
74%
5.136
KSF
$25,385
818
Nursery (Wholesale)
5.18
74%
3.833
KSF
$18,948
820
Shopping Center
3.81
66%
2.515
KSF
$12,430
823
Factory Outlet Center
2.29
66%
1.511
KSF
$7,471
840
Automobile Sales (New)
2.43
100%
2.430
KSF
$12,011
841
Automobile Sales (Used)
3.75
100%
3.750
KSF
$18,536
842
Recreational Vehicle Sales
0.77
100%
0.770
KSF
$3,806
843
Automobile Parts Sales
4.91
44%
2.160
KSF
$10,679
848
Tire Store
3.98
72%
2.866
KSF
$14,165
849
Tire Superstore
2.11
72%
1.519
KSF
$7.09
850
Supermarket
9.24
64%
5.914
KSF
$29,231
851
Convenience Market
49.11
49%
24.064
KSF
$118,948
853
Convenience Market w/Gas Pumps
49.23
17%
8.369
VFP
$41,366
854
Discount Supermarket
8.38
51%
4.274
KSF
$21.126
857
Discount Club
4.18
63%
2.633
KSF
$13,017
861
Sporting Goods Superstore
2.02
66%
1.333
KSF
$6,590
862
Home Improvement Superstore
2.33
58%
1.351
KSF
$6,680
863
Electronics Superstore
4.26
60%
2.556
KSF
$12,634
866
Pet Supply Superstore
3.55
66%
2.343
KSF
$11,581
867
Office Supply Superstore
2.77
66%
1.828
KSF
$9,037
875
Department Store
1.95
66%
1.287
KSF
$6,3b2
876
Apparel Store
4.12
66%
2.719
KSF
$13,441
879
Arts and Crafts Store
6.21
66%
4.099
KSF
$20,259
880
Pharmacy/Drug Store w/o Drive-Thru
8.51
47%
4.000
KSF
$19,771
881
Pharmacy/Drug Store w/ Drive-Thru
10.29
38%
3.910
KSF
$19,328
882
Marijuana Dispensary
21.83
100%
21.830
KSF
$107,906
890
Furniture Store
0.52
47%
0.244
KSF
$1,208
899
SERVICES
Li uor Store
1 .37
tr4°%
10.477
KSF
51 787
911
Walk -In Bank
12.13
55%
7.885
KSF
$38,973
912
Drive-in Bank
20.45
65%
13.293
KSF
$65,705
918
Hair Salon
1.45
65%
0.943
KSF
$4,659
920
Copy, Print, and Express Ship Store
7.42
66%
4.897
KSF
$24,207
925
Drinking Place
11.36
100%
11.360
KSF
$56,152
930
Fast Casual Restaurant
14.13
57%
8.054
KSF
$39,811
931
Quality Restaurant
7.80
56%
4.368
KSF
$21,591
932
High Turnover (Sit -Down) Restaurant
9.77
57%
5.569
KSF
$27,527
933
Fast Food w/o Drive-Thru
28.34
57%
16.154
KSF
$79,848
934
Fast Food w/ Drive-Thru
32.67
50%
16.335
KSF
$80,744
935
Fast Food Restaurant wl Drive-Thru w/o Indoor Seating
42.65
50%
21.325
KSF
$105,409
936
Coffee/Donut Shop w/o Drive-Thru
36.31
57%
20.697
KSF
$102,304
937
Coffee/Donut Shop w/ Drive-Thru
43.38
50%
21.690
KSF
$107,214
938
Coffee/Donut Shop w/ Drive-Thru w/o Indoor Seating (Espresso Stand)
83.33
11 %
9.166
KSF
$45,309
939
Bread/Donut/Bagel Shop w/o Drive-Thru
28.00
57%
15.960
KSF
$78,890
940
Bread/Donut/Bagel Shop w/ Drive-Thru
19.02
50%
9.510
KSF
$47,008
941
Quick Lubrication Vehicle Stop
4.85
72%
3.492
VSP
$17,261
942
Automobile Care Center
3.11
72%
2.239
KSF
$11,068
943
Automobile Parts and Service Center
2.26
72%
1.627
KSF
$9,043
944
Gasoline/Service Station
14.03
58%
8.137
VFP
$40,223
945
Gas Station w/Convenience Market
13.99
12%
1.679
VFP
$8,298
947
Self -Serve Car Wash
5.54
58%
3.213
stall
$15,883
948
Automated Car Wash
77.50
58%
44.950
stall
$222,188
950
Truck Stop
22.73
58%
13.183
KSF
$65,166
960
Super Convenience Market/ Gas Station
22.96
35%
8.036
VFP
$39,722
970
Wnr
7.31
100%
7.310
KSF
36133
msuwar or i ranspunanon engineers, f rig uenerauon rmanuar iium toitronI
z Trip generation rate per development unit, for PM Peak Hour of the adjacent street traffic (4-6 pm).
s Average primary trip rates, per Trip Generation Handbook (3rd Edition), 2017. Additional primary rates based on similar land use and engineering judgment.
Pass -by rates should be used with caution and refined using local data whenever possible. " DU = Dwelling Unit; KSF =1,000 square feet; VSP = Vehicle servicing position
3
Page 222 of 307
Back to Agenda
City of Port Orchard
2020Transportation Impact Fee Rate Update
Appendix C. Comparison of 2019-2020 TIF Rates in Western Washington
Transportation Solutions, Inc.
December 2020
Page 223 of 307
Back to Agenda
Comparison of 2019-2020 TIF Base Rates in 74 Cities and 5 Counties in Western Washington
With Bellingham and Whatcom County Cities Highlighted for Emphasis
(Based on information available. Average includes both Cities and Counties. See TIF rate table on next page for additional details]
Data compiled Nov. 2019 by Chris Comeau, AICP-CTP, Transportation Planner, Bellingham Public Works LQmeau@Wb.arn or (360) 778-7946
*Western WA Stale Average TIF
Santmamah
North Bend
Kenmore
Issaquah
$8,882
Duvall
$8,756
Lynnwood
$7,944
Penton
$7,820
La Center
$7,561
Bothell
$7,406
Shoreline
$7,397
Redmond
$7,357
Sharelme
$7,224
Carnation
$7,141
Newcastle
$6,475
Fife
$6,413
Marysville
iiiiiimme
$6,300
Edmonds
$6,249
Buckley
$G,074
Camaz
=00
$5,974
Oes Moines
$5,573
Poulsho
$5,397
Bellevue
$5,293
Mount Vernon
$5,100
Gig Harbor
$5,020
Port Orchard (Proposed)
$4,943
Auburn
$4,895
Kent
$4,518
Puyallup
$4,500
Pier'e County
$4,479
Covington
$4,461
Edgewood
$4,413
W WA Average T IF-
$4,363
Sultan
$4,350
Mercer Island
$4,287
Woodinville
$4,211
Milton
$4,190
Federal Way
$3,999
Bonney Lake
$3,995
Maple Valley
$3,986
Mount Lake ferrate
$3,985
Mill Creek
$3,900
Kirkland
$3,815
Shelton
$3,736
Tumwater
$3,705
Ridgcheld
$3,1383
Manse
$3,524
Stanwood
$3.523
Sealac
$3,508
Washougal
$3,398
Arlington
$3,355
Clark County
$3,333
Lake 5tevens
EMM $3,257
Enumclaw
$3,239
Olympia
$3,213
University Place
111111111111111t $3,199
Ferndale
$3,163
Battleground
$3,024
Thurston County
1 $2,959
Sedro-Woolley (Proposed)
$2,809
Ana-tes
1 $2,731
Burlington
$2,665
5umner 1
$2,632
Port Orchard (Existing)
$2,552
Granite Falls
$2,500
Segmrn
$2,491
Snohomish County
$2,453
Everett
$2,400
Vancouver
$2,153
Orbng ONEEMENEEMOMMI
$2,149
Lynden
$2,111
Bellingham
$2,025
Lacey
$2,013
Mukiltea
$1,875
Bainbridge Island
$1,687
Snohomish
$1,603
Blaine
$1,558
yelm
$1,497
Tukwila !_ $1,244
Burien � $948
Kitsap County S $700
Oak Harbor $589
$11,630
$2,000 $4,000 56,000 $9,000 $10,000 512,000 $14,000 $16,000
Cost Per P.M. Peak Hour (4:00 - 6:00pm) Vehicle or Person Trip
Page 224 of 307
Back to Agenda
Exhibit B
Ordinance No. 007-21
PORT ORCHARD CITY PA
Iz
Appendix E: Impact Fee Calculations
E.1 Introduction
This study of impact fees for parks and recreational facilities for the City of Port
Orchard presents the methodology, summarizes the data, and explains the calculation of
the fees. The methodology is designed to comply with the requirements of Washington
law. This introduction describes the basis for parks and recreational impact fees,
including:
• Definition and Rationale of Impact Fees
• Statutory Basis For Impact Fees
• Methodology for Calculating Impact Fees
• Need for Additional Parks and Recreational Facilities
■ Determining the Benefit of Parks and Recreational Facilities to Development
• Methodology and Relationship to Port Orchard City Parks Plan
• Level of Service and Calculations
E 1.1 Definition and Rationale of Impact Fees
Impact fees are charges paid by new development to reimburse local governments for
the capital cost of public facilities that are needed to serve new development and the
people who occupy the new development. New development is synonymous with
"growth."
Local governments charge impact fees on either of two bases. First, as a matter of policy
and legislative discretion, they may want new development to pay the full cost of its
share of new public facilities because that portion of the facilities would not be needed
except to serve the new development. In this case, the new development is required to
pay for virtually all the cost of its share of new public facilities.
Port Orchard City Parks Plan 2011
Page 225 of 307
Back to Agenda
On the other hand, local governments may use other sources of revenue to pay for the
new public facilities that are required to serve new development. If, RCW 82.02.050 (2)
prohibits impact fees that charge 100% of the cost, but does not specify how much less
than 100%, leaving that determination to local governments. However, such revenues
are not sufficient to cover the entire costs of new facilities necessitated by new
development; the new development may be required to pay an impact fee in an amount
equal to the difference between the total cost and the other sources of revenue.
There are many kinds of "public facilities" that are needed by new development,
including parks and recreational facilities, fire protection facilities, schools, roads, water
and sewer plants, libraries, and other government facilities. This study covers parks and
recreational facilities for the City of Port Orchard, Washington. Impact fees for parks
and recreational facilities are charged to all residential development within the City of
Port Orchard.
E1.2 Statutory Basis for Impact Fees
RCW 82.02.050 - 82.02.090 authorizes local governments in Washington to charge
impact fees. The impact fees that are described in this study are not mitigation payments
authorized by the State Environmental Policy Act (SEPA). There are several important
differences between impact fees and SEPA mitigations. Two aspects of impact fees that
are particularly noteworthy are: 1) the ability to charge for the cost of public facilities
that are "system improvements" (i.e., that provide service to the community at large) as
opposed to "project improvements" (which are "on -site" and provide service for a
particular development), and 2) the ability to charge small-scale development their
proportionate share, whereas SEPA exempts small developments. Four types of public
facilities can be the subject of impact fees: 1) public streets and roads; 2) publicly owned
parks, open space and recreational facilities; 3) school facilities; and 4) fire protection
facilities (in jurisdictions that are not part of a fire district). RCW82.02.050 (2) and (4)
and RCW82.02.090 (7)
Impact fees must be limited to system improvements that are reasonably related to, and
which will benefit new development. RCW 82.02.050(3) (a) and (c). Local governments
must establish reasonable service areas (one area, or more than one, as determined to
be reasonable by the local government), and local governments must develop impact fee
rate categories for various land uses. RCW 82.02.060(6) Impact fees cannot exceed the
development's proportionate share of system improvements that are reasonably related
to the new development. The impact fee amount shall be based on a formula (or other
method of calculating the fee) that determines the proportionate share.
RCW82.02.050(3)(b) and RCW82.02.060(I )
Impact fees can be charged for new public facilities (RCW 82.02.060(I)(a)) and for the
unused capacity of existing public facilities (RCW 82.02.060(7)) subject to the
Port Orchard City Parks Plan
2011
Page 226 of 307
Back to Agenda
proportionate share limitation described above. Additionally, the local government
must separate the impact fees from other monies, expend the money on CFP projects
within 6 years, and prepare annual reports of collections and expenditures.
RCW82.02.070(I)-(3)
E 2 Methodology for Calculating Impact Fees
Prior to calculating impact fee rates, several issues must be addressed in order to
determine the need for, and validity of such fees: responsibility for public facilities, the
need for additional park and recreational facilities, the need for revenue for additional
parks and recreational facilities, and the benefit of new parks and recreational facilities
to new development.
In general, local governments that are authorized to charge impact fees are responsible
for specific public facilities for which they may charge such fees. The City of Port
Orchard is legally and financially responsible for the parks and recreational facilities it
owns and operates within its jurisdiction. In no case may a local government charge
impact fees for private facilities, but it may charge impact fees for some public facilities
that it does not administer if such facilities are "owned or operated by government
entities" (RCW 82.82.090(7).
E 2.1 Need for Additional Park and Recreational Facilities
The need for additional parks and recreational facilities is determined by using standards
for levels of service for park and recreational facilities to calculate the quantity of
facilities that are required. For the purpose of quantifying the need for parks and
recreational facilities, this study uses the City's value of investment in parks and
recreational facilities per capita. As greater growth occurs, more investment is required,
therefore more parks and recreational facilities are needed to maintain standards.
E 2.2 Determining the Benefit to Development
The Washington State law regarding Impact Fees imposes three provisions of the
benefit provided to development by impact fees: 1) proportionate share, 2) reasonably
related to need, and 3) reasonably related to expenditure (RCW 80.20.050(3)). First,
the "proportionate share" requirement means that impact fees can be charged only for
the portion of the cost of public facilities that is "reasonably related" to new
development.
Second, fulfilling the requirement that impact fees be "reasonably related" to the
development's need for public facilities, including personal use and use by others in the
family (direct benefit), use by persons or organizations who provide goods or services
to the fee -paying property (indirect benefit), and geographical proximity (presumed
benefit). Impact fees for park and recreational facilities, however, are only charged to
Port Orchard City Parks Plan 2011
Page 227 of 307
Back to Agenda
residential development in the City because the majority of benefits are to the
occupants and owners of dwelling units. As a matter of policy, the City of Port Orchard
elects not to charge parks and recreational impact fees to non-residential properties
because there is insufficient data to document the proportionate share of parks
reasonably needed by non-residential development.
Lastly, the requirement that expenditures be "reasonably related" to the development
that paid the impact fee includes that fee revenue must be earmarked for specific uses
related to public facilities ensures that expenditures are on identifiable projects, the
benefit of which can be demonstrated and that impact fee revenue must be expended
within 6 years, thus requiring a timeliness to the benefit to the fee -payer.
E 2.3 Methodology and Relationship to the Port Orchard City Parks Plan
Impact fees for parks and recreational facilities in the City of Port Orchard are based on
the value per capita of the City's existing investment in parks and recreational facilities
for the population of the City. New development will be provided the same investment
per capita, to be funded by a combination of general and capital improvement fund
revenue and impact fees. The amount of the impact fee is determined by charging each
new development for the average number of persons per dwelling unit multiplied times
the amount of the investment per capita that is to be paid by growth.
E3. Level of Service Standard Calculations
The level of service, as defines as the capital investment per person, is calculated by
multiplying the capacity of parks and recreational facilities times the average costs of
those items. Within this calculation, there are two variables that benefit from further
definition explanation: The value of parks and recreational inventory, and the Service
population.
E 3.1 Value of Parks and Recreational Inventory
The value of the existing inventory of parks and recreational facilities is calculated by
determining the value of each park as well as each recreational facility. The sum of all of
the values equal the current value of the City's parks and recreational system
E 3.2 Service Population
The service population is the number of persons served by the inventory of parks and
recreational facilities. Port Orchard's service population consists of the City's current
2011 population of 1 1,144 as provided by the Washington State of Financial
Management. The forecast population for 2030 of is the projected population
Port Orchard City Parks Plan 2011
Page 228 of 307
Back to Agenda
estimated for Comprehensive Planning efforts and adopted by all Kitsap County
jurisdictions, through the County Wide Planning Policies. This figure is provided to
estimate future population growth within the existing City boundaries and is utilized in
calculating the annual portion of that growth rate for the Impact Fee calculations.
E 3.3 Calculation of Park and Recreational Capital Investment per Person
The City of Port Orchard's capital value per person is the standard the City uses to
ensure that each resident receives an equitable amount of parks and recreational
facilities. The City provides this value by investment in parks and recreational facilities
that are most appropriate for each site and which respond to changing needs and
priorities as the City grows and the demographics and needs of the population changes.
Attachment E I (at the end of this Appendix) lists the types of land and recreational
facilities that make up the City of Port Orchard's existing park system. Each component
is listed in the first column, along with the capital value of each type of park land or
recreational facility in the final column. The capital value for all City owned parks &
recreational facilities in the inventory comes to a total of $7,228,929. This total value is
divided by the service population of 1 1,144 for the City determines the current capital
value per person of $649. (Please reference Attachment E2: Figure E 1)
E 4 PARKS AND RECREATIONAL FACILITY NEEDS
This section calculates the value of parks and recreational facilities that are needed to
serve growth, reduced by the typical proportion of project values that are grant or
otherwise funded. Impact fees are related to the needs of growth through calculating
the total value of parks and recreational facilities that are needed for growth. The
calculation is accomplished by multiplying the capital investment per person times the
number of new persons that are forecast for the City's growth. (Please reference
Attachment E2: Figure E2)
E 4.1 Calculation of Total Value Needed For Growth
The calculations for the total value of Parks and Recreation Facilities needed to
accommodate the forecasted growth is a tabulation of the level of service standard for
capital investment per person from Figure E I times the total amount of population
growth forecast for the six year Impact Fee planning period. The resulting calculation
shows the total value of parks and recreational facilities that are needed to serve the
growth that is forecast for Port Orchard (Please reference Attachment E2: Figure E2).
The result of Figure E2 illustrates that Port Orchard needs parks and recreational
facilities valued at $1,928,434 in order to serve the growth of 2,973 additional people
(forecast at an annual growth rate of 495 per year) who are expected to be added to
the City's population during the six year Impact Fee planning period.
Port Orchard City Parks Plan
2011
Page 229 of 307
Back to Agenda
E 4.2 Total Investment to be Paid by Growth
The investment to be paid by growth is calculated by subtracting the amount of any
revenues the City invests in infrastructure for growth from the total investment in parks
and recreational facilities needed to serve growth. The previous calculation showed the
total amount that is needed to invest in additional parks and recreation facilities in order
to serve future growth. The proportionate share of that investment to be paid by
growth is dependent upon the historic share of improvements provided by the City of
Port Orchard through grants or other revenue streams. The proportionate share for
development to pay for new facilities includes the City of Port Orchard historical use of
local sources, such as real estate excise tax, grant funding, and other revenues to pay for
part of the cost of parks and recreational facility capital costs. Revenues that are used
for repair, maintenance or operating costs are not used to reduce impact fees because
they are not used, earmarked or prorated for the system improvements that are the
basis of the impact fees. The City's investment has averaged 50% of the cost of capital
improvement projects for parks and recreational facilities (Please reference Attachment
E2: Figure E3). The result of Figure E3 illustrates that Port Orchard expects to use
$964.217 in grants and other revenues to serve the total needs of additional parks and
recreational facilities to maintain the City's standards for future growth, with the
remaining $964,217 to be paid by growth as a proportionate share.
E5 IMPACT FEE PER UNIT OF DEVELOPMENT
In this section the investment in additional parks and recreational facilities to be paid by
growth is used to calculate the park and recreational facilities growth cost per person
which is then used to calculate the impact fee per dwelling unit.
E 5.1 Growth Cost Per Person
The growth cost per person is calculated by dividing the investment in parks and
recreational facilities that is to be paid by growth by the amount of population growth
during the six year Impact Fee planning period (Please reference Attachment E2: Figure
E4). The result of Figure E4 illustrates the calculation of the cost per person of parks
and recreational facilities that needs to be paid by growth is $324 per person. The
amount to be paid by each new dwelling unit depends on the number of persons per
dwelling unit.
E 5.2 Impact Fee per Dwelling Unit
The impact fee per dwelling unit is calculated by multiplying the growth cost per person
by the number of persons per dwelling unit. The number of persons per dwelling unit is
the factor used to convert the growth cost of parks and recreational facilities per
Port Orchard City Parks Plan
2011
Page 230 of 307
Back to Agenda
person into impact fees per dwelling unit. The number of persons per dwelling unit data
is based on the adopted 2008 Port Orchard Comprehensive Plan, Chapter 3. Housing;
which sets an population household size of 2.5 persons per single family unit and a
calculation of 1.8 persons per Multi -family housing unit within the City of Port Orchard
(Please reference Attachment E2: Figure E5 and E6 respectively).
The resulting calculations of Figure E5 shows the calculation of the parks and
recreational facilities impact fee of $81 1 per single family dwelling unit. The resulting
calculations of Figure E6 show the calculation of the parks and recreational facilities
impact fee of $584 per multi -family dwelling unit. Impact Fee amounts, upon adoption
by City Council, are to be implemented and collected subject to the provisions of Port
Orchard Municipal Code Section 16.70.
E6. Summary
This study of impact fees for parks and recreational facilities for the City of Port
Orchard summarizes the methodology, presents the data, and explains the calculation of
the fees that result in the recommended amounts. Similar sized Cities within Kitsap
County have chosen to utilize much higher impact fee amounts, for example the City of
Poulsbo recently raised their Park Impact Fee from $500 to $1,195 per unit. The
proposed Park Impact Fees for the City of Port Orchard of $81 1 per single family
dwelling unit and $584 per multi -family dwelling unit, although consistent with the City
of Port Orchard level of service, still are well below the Washington State average of
$ 2,849 per single family dwelling unit and $2,147 per multi -family dwelling unit
respectively. (Sourced from the National Impact Fee Survey 2009, prepared by Clancy
Mullen, Duncan Associates, Austin, TX on December 20, 2009) The methodology
utilized for arriving at the City of Port Orchard impact fee amounts has been a
statewide standard incorporated for numerous Washington State cities and is designed
to comply with the requirements of Washington law.
Port Orchard City Parks Plan
2011
Page 231 of 307
Back to Agenda
INTENTIONAL BLANK PAGE
CITY OF PORT ORCHARD COMPREHENSIVE PARKS PLAN
Page 232 of 307
Back to Agenda
Exhibit C
Ordinance No. 007-21 Appendix C
Ordinance No. 023-15
South Kitsap School District 2015 Coital Facilities Plan
VII. DISTRICT FINANCE PLAN
The principal funding mechanism for school facility construction and modernization has
traditionally been voter approved bonds. More recently, school districts have been turning to capital
levies to support modernizations and elementary school new construction projects. Other funding
sources can include state funding assistance and development impact (mitigation) fees.
General Obligation Bonds
Bonds are typically used to fund construction of new schools and other major capital improvement
projects. A 60% voter approval is required for passage. Bonds are then retired over time through
the collection of property taxes.
The South Kitsap School District had an assessed valuation of $6,123,112,269 as of August 31,
2014. The limit for all outstanding bonds for SKSD is 5% of assessed value or $306,155,613. The
District had $5,645,481 of debt as of August 31, 2014, and therefore has a current bonding capacity
of $300,510,132.
State Funding Assistance
The source of State Funding Assistance, formerly State Match Funds, is the Common School
Construction Fund. Bonds are sold on behalf of the fund then retired with revenues accruing
predominantly from the sale of renewable resources (i.e., timber) from state school lands set aside
by the Enabling Act of 1889. If these sources are insufficient to meet the needs of the program, the
Legislature can appropriate additional funding, or the State Board of Education can ration project
funding on a priority basis.
School districts may qualify for state funding assistance for specific capital projects based on an
eligibility system. Eligible projects are prioritized using seven different criteria. Funds are then
disbursed to districts on a percentage basis that is based on a formula that compares each district's
assessed valuation per pupil relative to the entire state assessed valuation per pupil. This percentage
is known as the Funding Assistance Percentage, formerly State Match Ratio.
The base to which this percentage is applied is the cost of construction as determined by the
"Construction Cost Allocation" multiplied by the "Eligible Area". The Construction Cost
Allocation (CCA) is used by OSPI to help define or limit its level of financial support for school
construction. It is a budget driven value that is not intended to fully reflect the actual cost of school
construction in Washington State. The Eligible Area portrays either the square footage of new
space required to address unhoused students for an enrollment project, or the building square
footage approved for upgrade or replacement for a modernization project.
State funding assistance is available to assist districts with construction costs for enrollment and
modernization related school construction projects but cannot be used for site acquisition, the
purchase of portables or for normal building maintenance. Because the availability of state
assistance funds may not always keep pace with the enrollment growth or modernization needs of
all of Washington's school districts, assistance funds from the state may not be received by a school
district until two or three years after a school project has begun. In such cases, a district may be
required to "front fund" meaning it must be prepared to finance the entire project with local funds.
The State's share of the project funding is then provided to the district later in the form of a
reimbursement. In some cases projects may not receive any state assistance at all. State funding
assistance is not guaranteed.
39
Page 233 of 307
Back to Agenda
Appendix C
Ordinance No. 023-15
South Kitsap School District 2015 Capital Facilities Plan
New Development_ MilleadowImpact Fees
The authority for local jurisdictions to condition new development on the mitigation of school
impacts is provided for under the State Subdivision Act, Chapter 58.17 RCW, the State
Environmental Policy Act, Chapter 43.21C RCW, and the Growth Management Act, Chapter
36.70A RCW. These state statutes seek to ensure that adequate public facilities are available to
meet the demands of new growth by authorizing permitting jurisdictions to condition development
approval on the implementation of mitigation measures that enable local jurisdictions to meet the
infrastructure demands of new development.
Subdivision Act Miti2atiork RCW 58.17.110 requires the permitting jurisdiction to find
that proposed plats adequately provide for schools and school grounds. The proposed
development must provide land sufficient to ensure that such facilities are provided for
potential new students.
• SEPA Mitivation, SEPA provides that local jurisdictions may condition the approval of a
new development to the mitigation of specific adverse environmental impacts which are
identified in SEPA environmental documents. See RCW 43.21C.060. Under SEPA, the
"built environment" includes public schools. See WAC 197-11-444(2) (d) (iii).
GNIA Midi ation. Development impact fees have been adopted by Kitsap County and the
City of Port Orchard as a means of supplementing traditional funding sources for the
construction of public facilities needed to accommodate new development. The City of
Bremerton does not impose an impact fee on new development. The District participates in
the permit review processes of jurisdictions within its boundaries to ensure that its interests
are considered when new developments are proposed that will generate additional students.
Six -Year Finance Plans
The Six -Year Capital Finance Plan (Table 12) portrays how South Kitsap School District intends to
fund improvements to school facilities for the years 2015 through 2020.
40
Page 234 of 307
Back to Agenda
Appendix C
Ordinance No. 023-15
South Kitsap School District 2015 Capital Facilities Plan
Table 12
Capital Finance Plan (2015-2020)
Sources:
CFP Balance/Impact Funds (Aug 2014) $ 1,000,164
Impact Fee Collections 2015-2020 (est.) $ 1,438,680
Transfer from General Funds $ 0
State Matching Funds (est.) $ 0
Sale of General Obligation Bonds $ 0
Improvements to Existing Facilities $ 4,750,000 $7,188,844
Uses:
CFP Balance/Impact Funds (Aug 2020 est.) $ 378,769
Improvements to Existing Facilities $ 4,750,000
Construction for Enrollment Growth $ 0
Site Acquisition $ 1,760,075
Construction of Support Facilities $ 0
Interim Classroom Space $ 300,000
Program Changes $ 0 $ 7,188,844
Balance: $ 0
41
Page 235 of 307
Appendix C
Ordinance No. 023-15
South Kitsap School District 2015 Capital Facilities Plan
VIII. UNFUNDED NEED CALCULATION
The calculation of the South Kitsap School District unfunded need in support of jurisdictional
school impact fee collection is provided on the spreadsheets that follow. This calculation recognizes
projected costs anticipated over the life of the six -year plan including acquisition costs for interim
housing and debt service payments on a 56 acre school site that was purchased in 2005.
The "Unfunded Need Total' on the last line of the SKSD Impact Fee Calculation document
portrays the cost of addressing new home construction related enrollment growth identified within
the six -year capital construction plan. This value is greater than the actual school impact fees
specified and collected under respective Kitsap County and City of Port Orchard impact fee
ordinances.
42
Page 236 of 307
Back to Agenda
Appendix C
Ordinance No. 023-15
South Kitsap School District 2015 Capital Facilities Plan
Descri lion
Grade Spi
Value
Units
Comments
Student Generation Faclor-SFH
Elemectary
0.32
SludentslResidence
2007 Kendrick Demographic Study
Student Generation Faclor-SFH
Jr, High
0.10
StudentslResidence
2007 Kendrick Demographic Study
Student Generation Faclor-SFH
Sr. High
0.10
StudenlslResidence
2007 Kendrick Demographic Study
Student Generation Factor-MFH
Elementary
0.18
SludentslResidence
2007 Kendrick Demographic Study
Student Generation Faclor-MFH
Jr, High
0.09
SludentslResidence
2007 Kendrick Demographic Study
Student Generation Faclor-MFH
Sr. High
0.09
SludentslResidence
2007 Kendrick Demographic Study
Facility Acreage
Elementary
14.00
Acres
District Average
Facility Acreage
Jr. High
22.00
Acres
District Average
Facility Acreage
Sr, High
42.00
Acres
Plan for New High School
Cost per Acre
All
$115,000
CostlAcre
Market Estimate
Facility Size - New Construction
Elemenlary
550
SludertslSchool
District Standard
Facility Size - New Construction
Jr. High
900
Students/School
District Standard
Facility Sae - New Construction
Sr. High
1800
Students/School
Plan for New High School
Facility Size - Temporary Construction
Elementary
24
SludentlClassroom
District LOS
Facility Size - Temporary Construction
Jr. High
26
Student/Classroom
District LOS
Facility Size - Temporary Construction
Sr. High
26
Student/Classroom
District LOS
Permanent Sq. Footage (Total)
Elementary
501894
Square Feet
State Study & Survey
Permanent Sq. Footage (Total)
Jr. High
286193
Square Feel
Stale Study & Survey
Permanent Sq, Footage (Total)
Sr. High
345474
Square Feet
State Study & Survey
Portable Sq, Footage (Total)
Elementary
45900
Square Feel
Portables Inventory
Portable Sq, Footage (Total)
Jr. High
18900
Square Feel
Portables Inventory
Portable Sq, Footage (Total)
Sr, High
10800
Square Feet
Portables Inventory
Facility Cost - New Construction
Elementary
Cosyschool
Facility Cost - New Construction
Jr, High
Cost/School
Facility Cost - New Construction
Sr, High
CosflSchool
Facility Cost • Temporary Construction
Elementary
$300,000
Coffortable
Standard Dbl Portable including Site Costs
Facility Cost - Temporary Construction
Jr, High
$300,000
CosdPortable
Standard Dbl Portable including Site Costs
Facility Cost - Temporary Construction
Sr. High
$300,000
CosllPortable
Standard Dbl Portable including Site Costs
Boeckh Index Area Cost Allowance
All
$206.70
CosUsq, ft,
OSPI.2015
SPI Footage
Elementary
90.0
Sq. FUStudent
OSPI.2015
SPI Footage
Jr. High
121.3
Sq. FIJStuderd
OSPI.2015
SPI Footage
Sr. High
130.0
Sq, R]Studert
OSPI.2015
State Match Ratio
All
59.98%
Percent
OSPI.2015
Average Assessed Value - SFH
All
$201,260
Cosbil:
Kitsap County Assessor SFH 2O15
Average Assessed Value - MFH
All
$100,630
Cost1Unt
Ktsap County Assessor SFH 2O15 @ 50%
Capital Bond Interest Rate
All
0.00%
Percent
Years Amortized
All
10
Years
Property Tax Levy Rate - Capital Conslruclion
All
$0.00
Costl$1000 A.V.
43
Page 237 of 307
Back to Agenda
Appendix C
Ordinance No. 023-15
South Kitsal2 School District 2015 Capital Facilities Plan
School Site Acquisition Cost:
CALCULATIONS
((Acres X Cost per Acre)/Facility Capacity) X Student Generation Factor
Facility
Cost per
Facility
SGF SGF
Cost per
Cost per
Acreage
Acre
Capacity
SFH MFH
SFH
MFH
Elementary 14
$115,000.00
550
0.32 0.18
$936.73
$526.91
Jr. High 22
900
0.10 0.09
$0.00
$0.00
Sr. High 42
$115,000.00
1800
0.10 0.09
$268.33
$241.50
$1,205.06
$768.41
School Construction Cost:
((Facility Cost/Facility Capacity) X Student Generation Fa(ctor) X Pei manent/Total Sq. Ft.)
% Perm/ Facility
Facility
SGF
SGF Cost per
Total Sq. Ft. Cost
Size
SFH
MFH SFH
Elementary
92%
550
0.32
0.18 $0.00
Jr. High
94%
900
0.10
0.09 $0.00
Sr. High
97%
1800
0.10
0.09
$0.00
Temporary Facility Cost:
((Facility Cost/Facility Capacity)
X Student Generation Factor) X (Temporary/Sq. Ft)
%Tempt
Facility Facility
SGF
SGF
Total Sq. Ft.
Cost Size
SFH
MFH
Elementary 8%
$300,000.00 48
0.32
0.18
Jr. High 6%
52
0.10
0.09
Sr. High 3%
52
0.10
0.09
State Match Credit
Area Cost Allowance X SPI Sq.
Ft X State Match X Student
Generation Factor
Boeckh
SPI State
SGF
SGF
Index
Footage Match %
SFH
MFH
Elementary $206.70
90.00
0.32
0,18
Jr. High $206.70
121.30
0.10
0.09
Sr. High $206.70
130.00
0.10
0.09
Tax Pavmant Credit
Average Assessed Value
Capital Bond Interest Rate
Net Present Value of Average Dwelling
Years Amortized
Property Tax Levy Rate
Present Value of Revenue Stream
NEED SUMMARY
School Site Acquisition Cost
Permanent Facility Cost
Temporary Facility Cost
State Match Credit
Tax Payment Credit
UNFUNDED NEED TOTAL
Cost per
SFH
$165.77
$0.00
$0.00
$165.77
Cost per
MFH
$0.00
$0.00
$0.00
Cost per
MFH
$93.24
$0.00
$0.00
$93.24
Cost per Cost per
SFH MFH
$0.00 $0.00
$0.00 $0,00
$0.00 $0.00
SFH MFH
0.00% 0.00%
10
10
$0.00
0.00
$0.00
$0.00
SINGLE FAMILY
MULTI FAMILY
$1,205.06
$768.41
$0.00
$0.00
$165.77
$93.24
$0.00
$0.00
$0.00
$0.00
$1,370.83
$861.65
44
Page 238 of 307
Back to Agenda
Name and Mailing Address
City of Port Orchard
216 Prospect Street
Port Orchard, WA 98366
CITY OF PORT ORCHARD 202102190203
Agreement Rec Fee: $ 132.50
02/19/2021 02:48 PM Page: 1 of 30
Paul Andrews, Kitsap Co Auditor
The Recorder is required to use only the information
you provide on this cover sheet to index the document.
Type or print legibly.
Document Titles) Development Agreement between the City of Port Orchard and
McCormick for Development and Funding of Certain Transportation Improvements
Auditor's File Number of Document (s) Referenced.
Grantor(s) person(s) that conveys, sells or grants interest in property:
McCormick Communities, LLC
Grantee(s) person that buys, receives or to whom conveyance of property is made:
City of Port Orchard
Abbreviated Legal Description:
• Quarter, Quarter, Section, Township, Range (and Government lot # if applicable); OR
• Plat/Condo Name, lot or unit number, building or block number; OR
• Short Plat, Large Lot number, lot number and auditor file number
A PORTION OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 5, TOWNSHIP 23 NORTH, RANGE 1 EAST
See additional descriptions on Page 1 through 5
Assessor's 14 digit Tax Parcel Number: 052301-4-023-2008
See additional parcel No's on Pages 1 through 5
04/25/14
Page 239 of 307
Back to Agenda
Parcels and legals
McCormick North
052301-4-023-2008
RESULTANT PARCEL A OF BOUNDARY LINE ADJUSTMENT SURVEY RECORDED UNDER AUDITOR'S FILE NO. 201912050259, IN
VOLUME 90 OF SURVEYS, PAGES 59-63, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF THE
SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 5, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., IN KITSAP
052301-4-027-2004
RESULTANT PARCEL E OF BOUNDARY LINE ADJUSTMENT SURVEY RECORDED UNDER AUDITOR'S FILE NO. 201912050259, IN
VOLUME 90 OF SURVEYS, PAGES 59-63, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF THE
SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER AND OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTEROF
052301-4-024-2007
RESULTANT PARCEL B OF BOUNDARY LINE ADJUSTMENT SURVEY RECORDED UNDER AUDITOR'S FILE NO. 201912050259, IN
VOLUME 90 OF SURVEYS, PAGES 59-63, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF THE
SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 5, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., IN KITSAP
052301-4-025-2006
RESULTANT PARCEL C OF BOUNDARY LINE ADJUSTMENT SURVEY RECORDED UNDER AUDITOR'S FILE NO. 201912050259, IN
VOLUME 90 OF SURVEYS, PAGES 59-63, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF THE
NORTHEAST QUARTER OF THE SOUTHEAST QUARTER AND OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTEROF
052301-4-026-2005
RESULTANT PARCEL D OF BOUNDARY LINE ADJUSTMENT SURVEY RECORDED UNDER AUDITOR'S FILE NO. 201912050259, IN
VOLUME 90 OF SURVEYS, PAGES 59-63, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF THE
NORTHEAST QUARTER OF THE SOUTHEAST QUARTER AND OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTEROF
052301-4-013-2000
THE NORTH HALF OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 5, TOWNSHIP 23 NORTH, RANGE
1 EAST, W.M., KITSAP COUNTY, WASHINGTON; EXCEPT ROADS, AND SUBJECT TO RESERVATIONS, RESTRICTIONS AND
042301-3-011-2005
RESULTANT PARCEL A OF BOUNDARY LINE ADJUSTMENT SURVEY RECORDED UNDER AUDITOR'S FILE NO. 201610250060, IN
VOLUME 83 OF SURVEYS, PAGES 76 - 78, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF THE
NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 4, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., IN KITSAP
McCormick West
082301-2-002-2004
PARCEL 1 OF LAND SEGREGATION REQUEST RECORDED UNDER AUDITOR'S FILE NO. 3208728, RECORDS OF KITSAP COUNTY,
WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH 1005 FEET OF THE NORTHWEST QUARTER OF SECTION 8, TOWNSHIP 23
NORTH, RANGE 1 EAST, W.M., IN KITSAP COUNTY, WASHINGTON; EXCEPT THE EAST 1340 FEET THEREOF; ALSO EXCEPT THAT
PORTION LYING NORTHWESTERLY AND NORTHERLY OF THE SOUTHERLY RIGHT-OF-WAY MARGIN OF OLD CLIFTON ROAD;
082301-2-003-2003
PARCEL 2 OF LAND SEGREGATION REQUEST RECORDED UNDER AUDITOR'S FILE NO. 3208728, RECORDS OF KITSAP COUNTY,
WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH 1005 FEET OF WEST 894 FEET OF THE EAST 1340 FEET OF THE
NORTHWEST QUARTER OF SECTION 8, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., IN KITSAP COUNTY, WASHINGTON;
Page 240 of 307
Back to Agenda
082301-1-013-2003
RESULTANT PARCEL B PER BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO. 3220649, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH 1189 FEET OF THE WEST 1058.22 FEET OF THE
NORTHEAST QUARTER OF SECTION 8, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., IN KITSAP COUNTY, WASHINGTON; EXCEPT
THAT PORTION LYING NORTHERLY OF THE SOUTHERLY RIGHT OF WAY MARGIN OF OLD CLIFTON ROAD; ALSO EXCEPT THAT
PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 8, TOWNSHIP 23 NORTH, RANGE 1 EAST,
W.M., IN KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF THE
NORTHWEST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION 8; THENCE SOUTH 1*27'44 WEST ALONG THE WEST
LINE OF SAID NORTHWEST QUARTER OF THE NORTHEAST QUARTER A DISTANCE OF 839.00 FEET; THENCE NORTH 30*44'56
EAST 462.00 FEET TO THE EAST LINE OF THE WEST 226.00 FEET OF SAID NORTHWEST QUARTER OF THE NORTHEAST
QUARTER; THENCE SOUTH 87*00'18 EAST 205.07 FEET TO THE EAST LINE OF THE WEST 431.00 FEET OF SAID NORTHWEST
082301-2-004-2101
TAXABLE PORTION FROM 082301-2-004-2002 (PER DOR REG. NO. 10442 001)CONTAINING 10.00 ACRES*****
082301-1-010-2006
PARCEL 5 OF LAND SEGREGATION REQUEST RECORDED UNDER AUDITOR'S FILE NO. 3208728, RECORDS OF KITSAP COUNTY,
WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH 1189 FEET OF THE NORTHEAST QUARTER OF SECTION 8, TOWNSHIP 23
NORTH, RANGE 1 EAST, W.M, IN KITSAP COUNTY, WASHINGTON; EXCEPT THE WEST 1058.22 FEET THEREOF; ALSO EXCEPT
THAT PORTION LYING EASTERLY OF THE WESTERLY LINE OF THE PLAT OF AMENDED PLAT OF MCCORMICK WOODS, AS
RECORDED IN VOLUME 25 OF PLATS, PAGES 54 THROUGH 61, RECORDS OF KITSAP COUNTY, WASHINGTON; ALSO EXCEPT
082301-1-014-2002
RESULTANT PARCEL C PER BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO. 3220649, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: SECTION 8, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., IN KITSAP
COUNTY, WASHINGTON; EXCEPT THE NORTH 1189 FEET OF THE NORTHEAST QUARTER OF SAID SECTION 8; ALSO EXCEPT
THAT PORTION OF THE WEST 60 FEET THEREOF CONVEYED BY INSTRUMENT RECORDED UNDER AUDITOR'S FILE NO.
9512290366; ALSO EXCEPT THAT PORTION LYING EASTERLY OF THE WESTERLY LINE OF THE PLAT OF AMENDED PLAT OF
MCCORMICK WOODS, AS RECORDED IN VOLUME 25 OF PLATS, PAGES 54 THROUGH 61, RECORDS OF KITSAP COUNTY,
172301-2-002-2003
TRACT 1 OF 20-ACRE LAND SEGREGATION DOCUMENT RECORDED UNDER AUDITOR'S FILE NO. 200010310145, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH HALF OF THE NORTHWEST QUARTER OF THE
NORTHWEST QUARTER OF SECTION 17, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
172301-2-004-2001
TRACT 3 OF 20-ACRE LAND SEGREGATION DOCUMENT RECORDED UNDER AUDITOR'S FILE NO. 200010310145, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH 1050.00 FEET OF THE EAST HALF OF THE NORTHWEST
QUARTER OF SECTION 17, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON; EXCEPT THAT
PORTION THEREOF LYING WITHIN MCCORMICK WOODS DIVISION 5, ACCORDING TO THE PLAT THEREOF, RECORDED IN
VOLUME 26 OF PLATS, PAGES 60 THROUGH 65, RECORDS OF KITSAP COUNTY, WASHINGTON; TOGETHER WITH THAT
PORTION OF THE NORTHEAST QUARTER OF SAID SECTION 17 LYING NORTHWESTERLY OF SAID MCCORMICK WOODS DIVISION
172301-2-003-2002
TRACT 2 OF 20-ACRE LAND SEGREGATION DOCUMENT RECORDED UNDER AUDITOR'S FILE NO. 200010310145, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE SOUTH HALF OF THE NORTHWEST QUARTER OF THE
NORTHWEST QUARTER OF SECTION 17, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON
172301-2-006-2009
TRACT 5 OF 20-ACRE LAND SEGREGATION DOCUMENT RECORDED UNDER AUDITOR'S FILE NO. 200010310145, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH HALF OF THE SOUTHWEST QUARTER OF THE
NORTHWEST QUARTER OF SECTION 17, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
172301-2-005-2000
TRACT 4 OF 20-ACRE LAND SEGREGATION DOCUMENT RECORDED UNDER AUDITOR'S FILE NO. 200010310145, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 17,
TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON; EXCEPT THE NORTH 1050.00 FEET THEREOF,
AND EXCEPT THAT PORTION LYING WITHIN MCCORMICK WOODS DIVISION 5, ACCORDING TO THE PLAT THEREOF, RECORDED
IN VOLUME 26 OF PLATS, PAGES 60 THROUGH 65, RECORDS OF KITSAP COUNTY, WASHINGTON AND MCCORMICK WOODS
Page 241 of 307
Back to Agenda
172301-2-007-2008
TRACT 6 OF 20-ACRE LAND SEGREGATION DOCUMENT RECORDED UNDER AUDITOR'S FILE NO. 200010310145, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE
NORTHWEST QUARTER OF SECTION 17, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON
172301-3-004-2009
TRACT 7 OF 20-ACRE LAND SEGREGATION DOCUMENT RECORDED UNDER AUDITOR'S FILE NO. 200010310145, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THAT PORTION OF THE SOUTHWEST QUARTER OF SECTION 17,
TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON, LYING NORTHERLY AND WESTERLY OF THE
FOLLOWING DESCRIBED LINE: BEGINNING AT THE NORTHEAST CORNER OF THE SOUTHEAST QUARTER OF SAID SECTION 17:
THENCE S 01*17'27 W ALONG THE EAST LINE THEREOF A DISTANCE OF 260.04 FEET TO THE SOUTH LINE OF MCCORMICK
WOODS DIVISION 9, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 28 OF PLATS, PAGES 117 THROUGH 126,
RECORDS OF KITSAP COUNTY, WASHINGTON, AND THE TRUE POINT OF BEGINNING OF THE HEREIN DESCRIBED LINE; THENCE
N 87*53'44 W ALONG THE SOUTHERLY LINES OF SAID MCCORMICK WOODS DIVISION 9 AND MCCORMICK WOODS DIVISION
6, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 26 OF PLATS, PAGES 100 THROUGH 107, RECORDS OF KITSAP
COUNTY, WASHINGTON A DISTANCE OF 3299.65 FEET TO THE SOUTHWEST CORNER OF SAID MCCORMICK WOODS DIVISION
6; THENCE S 00*00'00 W A DISTANCE OF 415.00 FEET; THENCE N 87*53'44 W TO AN INTERSECTION WITH THE WEST LINE OF
McCormick Woods
042301-3-010-2006
RESULTANT PARCEL A OF CITY OF PORT ORCHARD BOUNDARY LINE ADJUSTMENT NO. L-1078, BEING A SURVEY RECORDED
UNDER AUDITOR'S FILE NO. 201512020024, IN VOLUME 81 OF SURVEYS, PAGES 199 - 201, INCLUSIVE, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER AND THE
SOUTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 4, TOWNSHIP 23 NORTH, RANGE 1 EAST, AND A PORTION
OF THE NORTHEAST QUARTER OF THE NORTHWEST QUARTER AND THE NORTHWEST QUARTER OF THE NORTHWEST
6031-000-131-0002
TRACT C (FUTURE DEVELOPMENT) MCCORMICK WOODS SECOND AMENDMENT ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 26 OF PLATS, PAGES 189 THROUGH 196, INCLUSIVE; BEING AN AMENDMENT OF VOLUME 25 OF
PLATS, PAGES 34 THROUGH 41, INCLUSIVE AND VOLUME 25 OF PLATS, PAGES 54 THROUGH 61, INCLUSIVE; ALL RECORDS OF
5552-000-045-0008
TRACT U (FUTURE DEVELOPMENT), ELDON TRAILS DIVISION 1, ACCORDING TO THE PLAT RECORDED IN VOLUME 34 OF PLATS,
PAGE(S) 130-138, INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON; SITUATE IN KITSAP COUNTY, WASHINGTON.
092301-1-005-2002
PARCEL 7 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THAT PORTION OF THE NORTHEAST QUARTER AND THE NORTHWEST
QUARTER OF THE SOUTHEAST QUARTER, ALL IN SECTION 9, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY,
WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF THE SOUTHWEST QUARTER OF THE
NORTHEAST QUARTER OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 1 EAST, SAID POINT ALSO BEING AN ANGLE POINT IN
THE BOUNDARY OF THE PLAT OF MCCORMICK WOODS DIVISION 10, ACCORDING TO PLAT RECORDED IN VOLUME 29 OF
Page 242 of 307
Back to Agenda
092301-4-004-2007
PARCEL 6 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THAT PORTION OF THE WEST HALF OF THE SOUTHEAST QUARTER, AND
THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER, AND THE EAST HALF OF THE SOUTHWEST QUARTER, ALL IN
SECTION 9, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 16,
TOWNSHIP 23 NORTH, RANGE 1 EAST, SAID POINT ALSO BEING AN ANGLE POINT IN THE BOUNDARY OF THE PLAT OF
MCCORMICK WOODS DIVISION 10, ACCORDING TO PLAT RECORDED IN VOLUME 29 OF PLATS, PAGES 120 THROUGH 131,
INCLUSIVE, RECORDS OF KITSAP COUNTY, WASHINGTON, SAID ANGLE POINT BEING ON TRACT "C" OF SAID PLAT; THENCE N
28*49'59" E, ALONG THE SOUTHEAST LINE OF TRACTS "C", "M" AND "E" OF SAID PLAT, A DISTANCE OF 1,778.57 FEET TO AN
ANGLE POINT IN TRACT "E" ON THE BOUNDARY OF SAID PLA T; -I HENCE N 57*51'24" W, ALONG -I HE NOR I HEAS I LINE OF
TRACTS "E" AND "R" AND THE BOUNDARY OF SAID PLAT, A DISTANCE OF 342.19 FEET TO AN ANGLE POINT IN SAID
BOUNDARY AND A POINT ON THE ARC OF A CURVE, THE CENTER OF WHICH BEARS S 48*12'46" E; THENCE NORTHEASTERLY,
ALONG THE ARC OF A CURVE TO THE RIGHT, ALONG THE SOUTHEAST LINE OF TRACT "A" AND THE BOUNDARY OF SAID PLAT,
SAID CURVE HAVING A RADIUS OF 430.00 FEET, THROUGH A CENTRAL ANGLE OF 07*10'40" A DISTANCE OF 53.87 FEET;
THENCE N 48*57'54" E, CONTINUING ALONG SAID SOUTHEAST LINE, A DISTANCE OF 127.51 FEET TI A POINT OF CURVE;
THENCE NORTHEASTERLY ALONG THE ARC OF A CURVE TO THE LEFT, CONTINUING ALONG SAID SOUTHEAST LINE, SAID CURVE
HAVING A RADIUS OF 370.00 FEET, THROUGH A CENTRAL ANGLE OF 04*46'06" A DISTANCE OF 30.79 FEET TO AN ANGLE
POINT OF SAID TRACT AND BOUNDARY; THENCE N 55*21'34" W, ALONG THE NORTHEAST LINE OF SAID TRACT, A DISTANCE
OF 275.56 FEET TO AN ANGLE POINT IN SAID TRACT AND BOUNDARY; THENCE N 52*27'56" W, DEPARTING SAID BOUNDARY,
A DISTANCE OF 161.08 FEET TO AN ANGLE POINT IN THE MCCORMICK WOODS GOLF COURSE BOUNDARY AND THE TRUE
POINT OF BEGINNING. THENCE, ALONG THE BOUNDARY OF SAID GOLF COURSE, THE FOLLOWING COURSES AND DISTANCES:
N 87*11'40" W A DISTANCE OF 162.52 FEET; N 50*48'10" W A DISTANCE OF 287.49 FEET; N 14*47'19" E A DISTANCE OF
545.96 FEET; N 18*30'16" E A DISTANCE OF 922.17 FEET; N 75*12'04" E A DISTANCE OF 66.76 FEET; N 09*11'12" E A DISTANCE
OF 99.99 FEET; N 51*34'13" W A DISTANCE OF 171.18 FEET; N 13*43'49" E A DISTANCE OF 177.17 FEET TO A POINT ON THE
ARC OF A CURVE THE OF WHICH BEARS S 09*47'43" E; THENCE EASTERLY, DEPARTING FROM SAID GOLF COURSE BOUNDARY
ALONG THE ARC OF A CURVE TO THE RIGHT, SAID CURVE HAVING A RADIUS OF 400.00 FEET, THROUGH A CENTRAL ANGLE OF
092301-1-009-2008
RESULTANT LOT B OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO. 200811100041, RECORDS OF
KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: LOT B OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER
RECORDING NO. 200711060175, RECORDS OF KITSAP COUNTY, WASHINGTON; TOGETHER WITH THAT PORTION OF TRACT E,
PLAT OF MCCORMICK WOODS DIVISION 10, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 29 OF PLATS, PAGES
120-131 INCLUSIVE, DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST EASTERLY CORNER OF SAID TRACT, SAID CORNER
ALSO BEING AN ANGLE POINT IN SAID LOT B; THENCE SOUTH 28*49'59" WEST, ALONG THE SOUTHEASTERLY LINE OF SAID
TRACT, A DISTANCE OF 225.55 FEET TO A POINT ON AN ARC OF A CURVE, THE CENTER OF WHICH BEARS NORTH 3*21'25"
EAST; THENCE WESTERLY, ALONG THE SOUTHWESTERLY LINE OF SAID TRACT AND ALONG AN ARC OF A CURVE TO THE RIGHT,
SAID CURVE HAVING A RADIUS OF 370.00 FEET, THROUGH A CENTRAL ANGLE OF 8*58'20" A DISTANCE OF 57.94 FEET;
THENCE NORTH 11*43-39" WEST, DEPARTING FROM SAID LINE, A DISTANCE OF 65.52 FEET; THENCE NORTH 35*26'50" EAST A
DISTANCE OF 102.47 FEET; THENCE NORTH 20*30'09" EAST A DISTANCE OF 101.55 FEET TO THE NORTHEASTERLY LINE OF
SAID TRACT; THENCE SOUTH 57*51'24" EAST, ALONG SAID LINE, A DISTANCE OF 99.72 FEET TO THE POINT OF BEGINNING;
EXCEPT THAT PORTION OF SAID LOT B DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST EASTERLY CORNER OF SAID TRACT
E; THENCE NORTH 57*51'24" WEST, ALONG THE NORTHEASTERLY LINE OF SAID TRACT, A DISTANCE OF 99.72 FEET TO THE
TRUE POINT OF BEGINNING; THENCE NORTH 57*51'24" WEST, CONTINUING ALONG SAID LINE, A DISTANCE OF 181.46 FEET
TO THE MOST NORTHERLY CORNER OF SAID TRACT AND A POINT ON AN ARC OF A CURVE, THE CENTER OF WHICH BEARS
SOUTH 46*37'48" EAST; THENCE NORTHEASTERLY, DEPARTING FROM SAID LINE AND ALONG AN ARC OF A CURVE TO THE
RIGHT, SAID CURVE HAVING A RADIUS OF 370.00 FEET, THROUGH A CENTRAL ANGLE OF 5*35-42" A DISTANCE OF 36.13 FEET;
092301-4-005-2006
PARCEL 10 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE EAST HALF OF THE NORTHEAST QUARTER OF THE SOUTHEAST
QUARTER OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
Page 243 of 307
Back to Agenda
092301-4-003-2008
PARCEL 5 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 9,
TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON LYING NORTHERLY OF THE NORTH RIGHT-OF-
WAY LINE OF MCCORMICK WOODS DRIVE SW AS DEEDED TO KITSAP COUNTY BY DEED RECORDED UNDER KITSAP COUNTY
RECORDING NUMBER 200610090200.>>>EXCEPTTHAT PORTION CONVEYED TO KITSAP COUNTY FOR DETENTION POND
092301-4-002-2009
PARCEL 4 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE SOUTH HALF OF THE SOUTHEAST QUARTER OF SECTION 9 AND THE
NORTH 200 FEET OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 16, TOWNSHIP 23 NORTH, RANGE
1 EAST, W.M., KITSAP COUNTY, WASHINGTON LYING SOUTHERLY OF THE SOUTH RIGHT-OF-WAY LINE OF MCCORMICK
WOODS DRIVE SW AS DEEDED TO KITSAP COUNTY BY DEED RECORDED UNDER KITSAP COUNTY RECORDING NUMBER
200610090200. EXCEPT THAT PORTION LYING WITHIN THE PLAT OF MCCORMICK WOODS DIVISION 10, ACCORDING TO THE
162301-1-021-2003
PARCEL 3 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THAT PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST
QUARTER OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON LYING
SOUTHEASTERLY OF THE PLAT OF MCCORMICK WOODS DIVISION 10, ACCORDING TO THE PLAT RECORDED IN VOLUME 29 OF
162301-1-020-2004
PARCEL 2 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST
QUARTER OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
162301-1-019-2007
PARCEL 1 OF 20 ACRE LAND SEGREGATION RECORDED UNDER AUDITOR'S FILE NO. 200612270418, RECORDS OF KITSAP
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE NORTHEAST
QUARTER OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
Page 244 of 307
DEVELOPMENT AGREEMENT
BY AND BETWEEN THE CITY OF PORT ORCHARD AND McCORMICK FOR THE
DEVELOPMENT AND FUNDING OF
CERTAIN TRANSPORTATION IMPROVEMENTS
THIS DEVELOPMENT AGREEMENT is made and entered into this 3 day February,
2021, by and between the City of Port Orchard, a non -charter, optional code Washington
municipal corporation, hereinafter the "City," and McCormick Communities, LLC, a limited
liability company organized under the laws of the State of Washington, together with
McCormick Development Corporation, a Washington Corporation, hereinafter collectively the
"Developer" or "McCormick" (together the "Parties").
In addition, McCormick Land Company, a Washington corporation, hereafter "MLC," is
a Party for purposes of Sections 7, 15, and such other sections as specifically refer to MLC.
The Parties hereby agree as follows:
RECITALS
WHEREAS. the Washington Stale Legislature has authorized the execution of a
development agreement between a local government and a person having ownership or control
of real property within its jurisdiction (IZCW 36.70B.170(1)); and
WHEREAS, a development agreement must set forth the development standards and
other provisions that shall apply to, govern, and vest the development, use and mitigation ol'the
development of the real property for the duration specified in the agreement (IZ(`W
36.70B.170(1)); and
WHEREAS, a development agreement must be consistent with the applicable
development regulations adopted by a local government planning under chapter 36.70A RCW
(RCW 36.70B.170(1)); and
WHEREAS, Port Orchard adopted Chapter 20?6 of the fort Orchard Municipal Code
("POMC") which establishes the standards and procedures for Development Agreements in Port
Orchard; and
WHEREAS, Chapter 20.26 POMC is consistent with State law; and
WHEREAS, the Developer has applied for a Development Agreement under Chapter
20.26 POMC and such Agreement has been processed consistently with the POMC and State
law; and
WI-IERI`sAS, this Development Agreement by and between the City of 13ol-I Orchard and
the Developer {hereinafter the -Development Agreement"). relates primarily to the development
of property owned by Developer within and scar McCormick Woods in the Ocinit) of 01d
Clifton Itoad and Campus Parkway and that is more particularly described on Exhibits A-1, A-2,
Development Agreement for Funding Transportation Improvements
Page 1 of 19
FG:54082696.4
Page 245 of 307
B-1, and B-2 (hereinafter the "McCormick Property"); and
WHEREAS, in 2005 the City's predecessor in interest entered into a Development
Agreement with Developer's predecessor in interest for the development of certain transportation
improvements; and
WHEREAS, since that time, the City annexed the property and in accordance with RCW
36.7013.190 assumed jurisdiction and agreed to be bound by the 2005 Transportation
Development Agreement; and
WHEREAS. as part of that 2005 Agreement, the predecessor to the Developer (GEM 1,
LLC) constructed some projects and paymems for those projects are still on -going and will
continue until GEM I, LLC's successor is fully reimbursed; and
WHEREAS, since annexing this property, the City's transportation plans have been
updated; and
WHEREAS, the City is in the process of adopting updated transportation impact fees;
and
WHEREAS, during this process, an in-depth look at the projects needed to meet the
projected development by Developer and others in the City was performed; and
WHEREAS. the updated transportation impact fees are based, in part, on the 2005
Development Agreement with the Developer's predecessor as well as on the updated project list;
and
WHEREAS, the Developer did not acquire from GEM 1, LLC ("GEM 1"), and GEM 1
still retains, the right to reimbursement that accrued under the 2005 Transportation Agreement
when GEM 1 constructed the Glenwood Connector Roadway and minor improvements to
Feigley Road, the only projects identified in that 2005 agreement that have been constructed; and
WHEREAS, the City has been paying such reimbursement to GEM l and its successor
since 2008, and nothing in this Agreement changes or is intended to change the City's obligation
to continue paying such reimbursement to GEM 1; and
WHEREAS, GEM 1 assigned its right to reimbursement to the McCormick Land
Company in 2016, after which time, the City paid reimbursement to the McCormick Land
Company ("MLC"); and
WHEREAS, MLC continues to own property in Port Orchard; and
WHEREAS, MLC has signed this Agreement to confirm that this Agreement will fully
replace and supersede the 2005 Transportation Development Agreement ("2005 Transportation
DA"); and
Development Agreement for Funding Transportation Improvements
Page 2 of 19
FG:54082696.4
Page 246 of 307
WHEREAS, the Developer now seeks to update the 2005 Transportation DA in
conjunction with obtaining a permit to build the Campus Parkway Roundabout; and
WHEREAS, the purpose of this Agreement is to carry forward and better define the
concurrency evaluation that was part of the 2005 Transportation DA, to carry forward the impact
fee reimbursement for MLC, and to establish an impact fee credit system for Developer to
recover its costs of building the McCormick Projects described below; and
W11F'REAS, apart from concurrency and impact fee credits/reimbursement, this
Agreement does not address development standards, vesting, or any other regulation that impacts
how the McCormick Property will be developed; and
WI-It?RE!1S. the Parties agree that the 2005 "l"ransponation DA, as set forth in the traffic
study attached to that 2005 i'raiisVortation DA, anticipated the gcneraliun of4.935 PM peA' Bout.
trips. Based on the development activity since 2005. sotlle of these "trips" have been absorbed.
The parties believe it is advantageous to set Furth the remaining capacity that may be utilized in
I'ttture development 1111ases and have confirmed the concurrency numbers as of the date of this
Agreement; and
WHEREAS, in consideration of the benefits conferred by this new Development
Agreement, which reflect the current plan', of both the City and the Developer and include
confirmation of concurrency, a new project list, and a set impact fee credit calculation, the
parties deem it in their best interests and the best interests of the community to repeat and replace
the 2005 Transportation DA with this updated agreement; and
WHEREAS, there are two projects identified on both Exhibit A to the 2005
Transportation DA and also on the City's new TIP. As described ill (tic liew 'I'II', these projects
are ID 111.5C, "Old Clifton Rd — Campus Pkwy Intersection and ID 42.08 Old Clifton 141 &
McCormick Woods Dr. Intersection Impr". These two projects are collectively referred to herein
as "the McCormick Projects"; and
WHEREAS, the McCormick Projects are eligible for credits under RCW 82.02.060(4);
and
WHEREAS, the following events have occurred in the processing of the Developer's
application:
a) The Developer applied I'ar this Development Agreenlca,t on December 4, 2020: and
b) The Development Agreement is related to and h<tti been consolidated under I'OMC
20.22.020(2) with the !'allowing project permits:
Land Disturbing Activity Permit PW20-031
Stormwater Drainage Permit PW20-032
c) The Developer is ready and willing to commence construction on the project known
as Old Clifton Rd - Campus Parkway Intersection (a roundabout project) and has applied for a
Development Agreement for Funding Transportation Improvements
Page 3 of 19
FG:54082696.4
Page 247 of 307
Land Disturbing Activity permit and Stormwater Drainage Permit to perform this project;
d) The Old Clifton Rd — Campus Parkway Intersection is included in the City's
transportation plan upon which the updated impact fees are based and therefore the Developer
may be reimbursed fi•om the impact fees for Ihat project;
e) The City Council held a public hearing on February 9, 2021 regarding this
Development Agreement;
(0the City Council authorized the Mayor
f) After a public hearing, by Ordinance No. _,
to sign this Development Agreement with the Developer;
AGREEMENT
Section 1. The McCormick Projects. The two transportation projects described above
as "the McCormick Projects" will serve the McCormick Property as well as provide connectivity
and capacity for the City. The Campus Parkway Roundabout LDAP Permit #PW20-0031 and
SDP Permit PW20-032 as well as the future development of the McCormick Woods Drive
Roundabout, which will be permitted at a later date, are both subject to impact fee credit in
accordance with this Agreement.
Section 2. The McCormick Property. The McCormick Property comprises
McCormick North, McCormick West, and McCormick Woods, which are legally described by
parcel number in Exhibit A-1 and depicted on A-2, attached hereto and incorporated herein by
this reference. The McCormick Projects will serve the McCormick Property and the credits
authorized by this Development Agreement are only applicable to lots for which building
permits are applied for after the date of this Agreement within the boundaries of the McCormick
Property as defined on Exhibit A-1 and as shown on the Map attached hereto as Exhibit A-2.
Section 3. Definitions. As used in this Development Agreement, the following terms,
phrases and words shall have the meanings and be interpreted as set forth in this Section.
a) "2005 Transportation Development Agreement" or "2005 Transportation DA" means
the 2005 Development Agreement for Transportation which was executed between Kitsap
County and Gem 1, LLC and dated April 25, 2005 and which was assumed by the City of Port
Orchard upon annexation on May 27, 2009.
b) "Adopting Ordinance" means the Ordinance which approves this Development
Agreement, as required by RCW 36.70B.200 and Chapter 20.26 POMC.'
c) "Commence construction" as to the McCormick Projects means that the required
permit(s) have issued and there are "boots on the ground" at the construction site.
d) "Completion" as to the McCormick Projects means passing final inspection
associated with the LDAP/SDP permits and providing the required 2-year warranty and
Development Agreement for Funding Transportation Improvements
Page 4 of 19
FG:54082696.4
Page 248 of 307
Back to Agenda
maintenance bond for the improvement(s).
"Cpl-tj" Iz►eans the percentage rate change for the All Urban Consumers Index (CP1-U)
(1982-1984- 100). not seasonally adjusted, for the Seattle -Tacoma -Bellevue area for that 12
month period [loin January I ' to December 311 Indexed as the Annual Average, as is specified
by the Bureau of Labor Statistics, United States Department of Labor. Increases based on CP1-U
shall take effect on March I" of the following year.
e) "Council" or "City Council" means the duly elected legislative body governing the
City of Port Orchard.
f) "Director" means the City's Community Development Director.
g) "Effective Date" means the effective date of the Adopting Ordinance.
h) "Maximum credit" or "maximum reimbursement" means the maximum amount that
is eligible for projects subject to this Agreement, or for past projects done by GEM 1/MLC, for
which reiniburserttent or impact fee credits will be provided by the City to the Developer or
MLC.
i)-McCormick Project(s)" or "Prajict(s)" incalls the two transpe�rtatinn protects
described ab►tivt which serve both the McCormick Pmperiy and the greater cc�ntIII Lill ity, as
specified in Section 1 and as provided for in all associated permits/approvals, and all
incorporated exhibits.
Section 4. Exhibits. Exhibits to this Agreement are as follows:
a) Exhibit A-1— Parcel numbers of the McCormick Property that are subject to
impact fee credit.
b) Exhibit A-2 — Map depicting the boundaries of the McCormick Property that are
subject to the impact fee credit in this Agreement.
c) Exhibit B-1— Parcel numbers of the McCormick Property with vested
concurrency.
d) Exhibit B-2 Map depicting the boundaries of the McCormick Property with
vested concurrency .
e) Exhibit C — Map showing the original boundaries for the 2005 Transportation
DA which remains the reimbursement area for MLC
Section 5. Parties to Development Agreement. The parties to this Agreement are:
Development Agreement for Funding Transportation Improvements
Page 5 of 19
FG:54082696.4
Page 249 of 307
a) The "City" is the City of Port Orchard, 216 Prospect Street, Port Orchard, WA 98366.
b) The "Developer" veloper" or "Property Owner" or "McCormick" is a private enterprise which
owns the McCormick Property in fee, and whose principal ollice is located at 12332 NF, 1 15th
Place, Kirkland, WA.
c) GEM 1, LLC is the prior owner of the property that was subject to the 2005
Transportation DA, and MLC is the successor to GEM I for purposes of reimbursement. MLC is
located a[ 1869 MrGilvra Blvd E, Seattle, WA 98112 and is still receiving reimbursement from
the City for transportation projects done under the 2005 Transportation DA. These payments will
continue in accordance with Section 15 of this Agreement.
Section 6. Projects are a Private Undertaking. It is agreed among the parties that the
Projects are private improvements for which credits are required pursuant to RCW 82.02.060(4)
and that the City has no interest in the improvements until such time as each Project is completed
and dedicated to the City.
Section 7. Term of Agreement. This Agreement shall commence upon the effective date
of the Adopting Ordinance approving this Agreement and shall continue in force for a period of
twenty (20) years unless extended or terminated as provided herein, provided that reimbursement
to MLC pursuant to Section 15 shall surviVI: expiration until full rrinlbursenlent is received by
MLC. Following the expiration of the term or extension thereof; or if sooner ternlirtaled. this
Agreement shall have no force and effect.
Section 8. Repeal and Replacement of 2005 Transportation DA. In consideration of
the benefits to (lie Developer provided by the timely construction of the McCormick Projects, the
confirmation of concurrency, the agreement on a credit calculation for transportation impact fees
which will he charged to llte McCormick Property, and the continuation of reimbursement from
impact fees to MI.C. the Developer, MIX. and the City agree to rescind, and by execution of this
Agreement do rescind, the 2005 '1"ransportadon Agreement, and replace it with this Development
Agreement,
Section 9. Concurrency. The Parties agree that City streets affected by development of
the McCormick Property have the capacity to serve the McCormick Property in compliance with
the City's concurrency requirements so long as such development does not result in the
generation of more than 3,806 PM peak hour tl.ips, which is the number of remaining trips
identified in Section 9 of the ''005 Transportation DA reserved for the McCormick Property
identified on Exhibits B-1 and B-2. This remaining concurrency provided in the 2005
Transportation DA is being carried forward for the duration of this Agreement as set forth below.
These trips are available as of December 15, 2020.
Available PM Lots/lunits for Map Designation on
Area Peak Tri s Residential t Ex. C
McCormick North North
village local center 659 e Note 1 North
(Se
Development Agreement for Funding Transportation Improvements
Page 6 of 19
FG:54082696.4
Page 250 of 307
(residential +
commercial
_
• Single Family
312
315
North
Residential
--
Total McCormick North
971
West
McCormick West
• Multifamil
415
419
West
• Single Family
1,530
'
1,545
West
Residential
Total McCormick West
1,945
McCormick Woods
697
640
Wd
McCormick Woods Retail
63
N/A
Wd
McCormick Woods
122
N/A
GC
Conference iGolf Facilities)
Woods iecuacy lots
8
8
Not depi
_McCormick
Total McCormick Woods
890
L rand Total I i1buft I _ I '
There are 659 PM Peak Trips available within the Village local center. Residential PM Peak
Trips will be calculated per unit and commercial PM Peak trips will be calculated by use type
and square footage.
The defined areas for the assigned concurrency numbers above are listed by parcel number on
Exhibit B-1 and sho%1 I1 (except for the eight legacy lots, which are vacatlt lots in prior
subdivisions) on Exh i bit B-2, which Exhibits are attached hereto and incorporated herein by this
rercrence as if set luf'tll in Eull. Residential development shall be limited by either the PNl peal:
hour trips or the number of units, wilichever is more restrictive. Cotrnrlercial clevelopnlent shall
be limited only by tile I'M peak hour trips. To the extent that McCormick in the Future proposes
residential or commercial development whilin the McCormick Property that will genl:l'ate more
than the number of PM peak hour trips shown in the above table. the City will make a new
concurrency determination regarding the capacity of its street system at that time.
Section 10. Project Schedule. The Developer will commence construction of the two
McCormick Pre►iccts on the following schedule
a) Work on lire roundabout at the intersection of Old Clifton Road and Campus Parkway
(Project 11) #1.5C on the City's 'i-ll') (Permits APW20-031 and PW20-032) ,,hall
commence no later than June 0, 2021, and Ieveloper will complete constrLIC6011 in a
timely and workmanlike manner. Such work shall be completed no later than September
30, 2022.
b) Developer will submit a complete set of plans lbr a roundabout at the intersection of Old
Clifton Road and McCormick Woods Drive (Project ID ii2.01i no later than June. 1, 2023
Development Agreement for Funding Transportation Improvements
Page 7 of 19
FG:54082696.4
Page 251 of 307
and will commence construction of said roundabout no later than June 1, 2024, provided
that the City has before then acquired the additional land, not owned by Developer, that is
needed for this roundabout; and Developer will complete construction in a timely and
workmanlike manner. Such work shall be completed no later than September 30. 2025 so
long as the City has acquired the land necessary for the rotnldabOnt before June 1, 2024.
If the City has not acquired the land necessary for the roundabout bi Iore..lunc I, 2024,
but does so more than 24 months before expiration or this Agreement. Developer shall
construct the roundabout with 24 months of such acquisition.
Section IL Project standards. Developer will finance. design. �li,d construct these
McCormick 11,1Yijects to comply with City standards, including obtaining all necessary permits.
'rhe City will approve the plans before consh•uctiotl begins: attd tl,c City will accept
resptansibility for the operation of the Projects once construction is completed and a two-year
warranty and maintenance: bond is in place. A Pt-ojcct will be deemed completed when all of the
following, taccurti: I. The City deerti,s it substantially complete; 2. All punch list items are
finished:.3. The City the Inrforniance bond; 4. The Developer has put a 2-year warranty
and maintenance bond in place; 5. The Developer has completed all property dedications; and 6.
The Developer has provided the City with a Bill of Sale for the improvements containing the
certified construction costs (stamped by licensed engineer) to the City l'or determination of the
maximum credits available under this Agreement. The City will confirm completeness of the
Project by issuing a Final Notice of Completeness to the Developer.
Section 12. Project costs. The maximum amount of the credit (or reimbursement) for
project costs performed under this Agreement shall be limited to no greater than the engineer's
estimate contained in the C ity's transportati0l, impact Ice calculation. pltts an ranottaI inflmor per
the CPI-U, or, the actual costs incurred by the Developer. whichever is less. The credits provided
under Section 14 below are limited to this maximum credittreimbursement amount and once the
project cost maximum(~) have been achieved through credits or direct reimbursement to
Developer, the credits will no longer be available and full impact fees will be due for further
development.
Section 13. Applicable Impact Fees. The repeal and replacement of the 2005
Transportation I)A results in all propert4 owners both within and without the McCormick
Property hcing subject to the C'ity's established city-wide impact fees as these now exist or may
he modified in the future by the City Council. This Agreement further confirms that impact Ices,
permit fees, capital facilities charges, and other similar fees which are adopted by the City as o1'
the I:11ective Date of this Agreement may be increased by the City from time to time, and made
applicable to permits and approvals liar the McCormick Property, as long as such fees and
charges apply to similar applications and projects elsewhere in the City. All impact fees shall be
pslid as set rorth it, the approved permit or approval, or as addressed in chapter 20.182 of the Port
Orchard Municipal Code. except as modified by this Agreement. Nothing in this Agreement
restricts or prohibits the City from raisin} its tees, including trata5pOltation impact fees. and the
Developer agrees to pay the impact fees at the rates that are in effect at the time ►vilen payment is
due minus any credits applicable according to this Agreement.
Section 14. Impact Fee Credits. The City hereby grants the Developer a credit against
transportation impact fees for its costs to finance, design, and construct the McCormick Projects.
Development Agreement for Funding Transportation Improvements
Page 8 of 19
FG:54082696.4
Page 252 of 307
Back to Agenda
The credit is available to parcels located in the areas identified and shown on Exhibits A-1 and
A-2. The credits will be calculated and applied as follows:
a) Each parcel or lot that is developed within the McCormick Property credit area
(Exhibits A-1 and A-2) will pay the City's adopted impact fees until Developer
provides documclttation to the City that Developer has expended a Illlllinitlill of
$50,000 towards the design or construction of one of* tile McCornlic.k Projects. At
the time of this Agreement, the parties believe that Developer has already met this
threshold, therefore, once Developer provides the documentation, the City will
begin applying the credit described in this Agreement.
b) Once McCormick provides documentation to the City of such $50,000
expenditure, the City will grant a credit in the amount of $1,000 per new home (or
per peak pm trip for commercial/multifamily development) against its standard
transportation impact 11c:e for each application to develop a lot or parcel within the
McCormick Property credit area (G'xhibits A-1 and A 22) until such time as the
credits granted by the City equal the amount of credit clue to Developer under
Section 12 above. This credit amount shall be adjusted as follows:
i. The $1,000 credit shall be adjusted annually per the CPI-U, such
adjustment to occur on March I" of each year;
ii. If the amount outstanding for reimbursement of project costs is less than
the credit, then the lesser amount shall be provided as a credit;
iii. If the City reimburses the Developer directly w iih SUA mitigation funds
received From .mother developer. then that amount shall be deducted
dollar Far dollar front the amount of project costs outstanding and the
credits available will be reduced accordingly.
c) l_Ipoll completion of' each Project, Developer sh.tll submit certified pr(fIect costs to
the City (or review and acceptallce by the City Engineer. Once these costs and
executed Bill of Sale are reviewed and accepted by the City I'itlginetr, the
maximum credit due to Developer will be established and will equal the amount
of the project costs as so certified in accordance with this subsection and Section
12. The City will grant the credits described in Subsection b) above against the
transportation impacts fees that would otherwise be due for development of lots
and parcels within the McCormick 1'ropert5credit area as identified and shown on
Exhibits A-1 and A-2. Such credits shall be provided until such time as the
Developer receives full credit and/or reimbursement for its project costs or this
Agreement terminates, whichever occurs first.
The City agrees that these credits are consistent with RCW 82.02.060(4); that they are
appropriate in light of the unusual cilrurnstances described in the Recitals above: that they are
consistent with the intent of PONW 20.182.080: and that the City Council has legislatively
approved this Agreement and exempted these credits for developmrin of the McCormick
Projects from the specific provisions of POMC 20.182.080.
Development Agreement for Funding Transportation Improvements
Page 9 of 19
FG:54082696.4
Page 253 of 307
Back to Agenda
Section I.-s. N-IcCormick Land Cam )arty Reimbursement. This Agreement reallirms the
City's obligatiun to reimburse MLC fair construction of rile Glenwood Connecooi Itnaclway and
minor improvements to Feigley Road. The maximum reimbursement amounts outstanding, for
these projects as of August 1, 2020 is $1,542,239.64. Regardless of any fee credits prilvided for
in this Agreement, the City's reimbursement for such project shall continue at the rate of $720.80
for each unit of housing constructed or for each PM Peak trip, or fraction thereof, for which an
impact fee is assessed in the MLC reimbursement area as depicted on Exhibit C until such time
as MLC is fully reimbursed or this Agreement expires, whichever occurs first. This
reimbursement amount shall be increased annually by CPI-U (Seattle/Tacoma/Bellevue) for the
most recent twelve-month period (January I" to December 31") prior to the date of the
adjustment. Such adjustment shall take el cct can Niarch P' of each year, commencing on Mal -ell
1, 2021. Disbursements shall be made annually ill .i;:rrt iary Or each year based ctn the ctlections
from January 1Ito December 31st in the prior year, however in 2021. such payrticnt shall only be
from collections from August 1 to December 31, 2020 as payment from collections through July
31, 2020 has already occurred. MLC agrees to the repeal of the 2005 Transportation DA and
accepts the continued reimbursement under this new Agreement and agrees to be bound by this
new Agreement as shown by its signature to this Agreement. This Section 15 shall survive
expiration of this Agrventcnt and shall remain in effect until such time as MLC has been fully
reimbursed under the terms of this Agreement for construction of the Glenwood Connector
Roadway and minor improvements to Feigley Road.
Section 16. Dedication of Public Lands. The Developer shall cedicate the land that it owns
that is needed to construct the McCormick 111% jeeis prior to final completion of each I)roject_
Neither Project shall be deemed completed until such dedicatiots have occurred. In addition.
consistent with Section 9 of the 2005 Transportation DA, to the extent that projects on the City's
TIP including Old Clifton Widening and the Feigley Road Roundabout require additional
dedications of right-of-way from within the McCormick Property, McCormick will dedicate that
portion of the additional right-of-way. Such dl x leatiUrts shall ctceur a mutually agreeable
tinielmme prior to the bid solicitation for the project requiring additional right-of-�vay.
Section 17. Default.
a) Subject to extensions of time by mutual consent in writing, failure or delay by either
Party to perform any term or provision of this Agreement shall constitute a default. In the event
of alleged default or breach of any terms or conditions of this Agreement, the Party alleging such
default or breach shall give the other Party not less than thirty (30) days' notice in writing,
specifying the nature of the alleged defatilt and the manner in which said default may be cured.
During this thirty (30) day period. the Party charged shall not be considered in default for
purposes of termination or institution of liz9al proceeding's.
b) After notice and expiration of the thirty (30) day period. if such default has not been
cured or is not being diligently cured in the manner set forth in the notice, the Other Party to this
Agreement may. M its optic)n, illstit>.tte legal proceedings pursuant to this Agreement. in addition.
the City may &vide to the an aCtion to enforce the City's Codes. and to obtain penalties and
costs as provided in the fort Orchard Municipal Code for violations of this Development
Development Agreement for Funding Transportation Improvements
Page 10 of 19
FG:54082696.4
Page 254 of 307
Back to Agenda
Agreement and the Code.
Section 118. Termination. This Agreement shall term' ate upon the expiration of the term
idemilietl in Section 7. which expiration date is February , 2041. Upon terilination of this
Agreement, the City shall record a notice of such termination in a firm satisfactory to the City
Attorney that the Agreement has been terminated. In addition, this Agreement shall
autonratic.ally terminate and be of no further force and effect as to any single-family residence,
any other residential dwelling unit or any non- residential building and the lot or parcel upon
which such residence or building is located, when it has been approved by the City for
occupancy and impact fees have been paid.
Section 19. Extension and Modification. Any request for extension or modification, if
allowed under the City's code, shall be subject to the provisions contained in Chapter 20.26
POMC.-
Section 20h Effect upon Termination on Developer and MLC. Termination of this
Agreement as to the Developer or as to MLC. shall not affect any of the Developer's or MLC's
respective obligations to comply with the City Comprehensive Plan and the terms and conditions
or any applicable zoning code(s) or subdivision map or other land use entitlements approved
with respect to the McCormick Property or the NILC property, or any other conditions specified
in the Agreement to continue alter the termination of this Agreement or obligations to pay
assessments, liens, fees or taxes. Furthermore, ilthe Agreement expires without the project costs
being fully recovered by impact Iec credit or mitigation funds, the Developer will no longer be
eligible to receive such credits. Provided, however, that Section 15 of this Agreement will
survive termination if MLC has not yet been fully reimbursed and this Agreement will only
expire as to MLC after both termination and full reimbursement have occurred.
Section 21. lJfects upon Termination on City. Upon any termination of this Agreement as
to the McCormick Property, or any portion thereof, or as to MLC property, the ►:artitlements,
conditions of development, limitations on fees and all other terms and conditions of this
Agreement shall 110 1OW-ler be vested hereby with respect to the property affected by such
ternliliation (provided th.tt vesting of such entitlements, conditions or fees may then be
established fOr suc11 property ptn•suant to the then existing planning and zoning laws). The City
will be under no obligation to provide any additional credits or reimbursement to Developer even
if the project costs have not been fully recovered at the time of expiration or termination.
Section 22. Assignment and Assumption. The Developer shall have the right to sell,
assign or transfer this Agreement will, all rights. title, and interests therein to any person, firm or
corporation at any time during Ills: tern] of'this Agreement With a sale of the underlying property.
Uevctoper Shall provide Ilse City with wri Lien notice of am+ intent to sell. assign, or transfer aIt or
a portion of IIle McCormick Property, at least ill days it, advance or such action. A twrtsfer by
Developer will not impact the rights OfMIX under this Agreement. This requirement for notice,
however. does not apply to the sale by Developer or individual residential lots approved by the
City for development of houses.
Development Agreement for Funding Transportation Improvements
Page 11 of 19
FG:54082696.4
Page 255 of 307
,Section 23. Binding on Successors; Covenants Running with the Land. The conditions
and covenants set liorth in this Agreement and incorporated herein by the Exhibits shall run with
the land and the benefits and burdens shall bind and inure to the benefit of the Parties. The
Developer and every purchaser, assignee or transferee of an interest in the McCormick Property,
or any portion thereof. shall be obligated and bound by the terms and conditions of this
Agreement. and shall be the beneficiary ther^eol' and a Party thereto, but only with respect to the
McCormick Property. or such 1)01.601' thereof, sold, assigned or transferred to it. Any such
purchaser, assignee or transferee shall observe and fully perform all of the duties and obligations
of a Developer contained in this Agreement, as such duties and obligations pertain to the portion
of the McCormick Property sold, assigned or transferred to it.
Section 24. Amendment to Agreement; Effect of Agreement on Future Actions. No
waiver. alteration. or modification to any of the provisions of this Agreement shall be binding
rtillrtis in ► citing, signed by [lie duly authorized representative~ of the Parities. be consistent with
Chapter 20.26 POMC. and. where considered substantive as determined by the Director, follow
tilt: same procedures set lorth in Chapter 20.26 POMC. However, nothing in this Agreement
shall prevent the City Council from making any amendment to its Comprehensive Plan, Zoning
Code. Official Zoning Map or development regulation. or to impacts lees that affect the
McCormick Property in the same manner as other properties, after the Effective Date of this
Agreement.
Section 25. Releases.
a) General. Developer may tree itself from further obligations relating to the sold,
assigned, or transferred properly. provided that tl'e buyer'. assignee or transferee expressly
assumes the obligations under this Agreement as provided herein.
b) Previously collected impact fees. Developer expressly waives and f'oreverreleases
City lion' any and all claims it stay have will' regards to the amount or usage of any
transportation impact lees which the City collected Crud/ lroperty that %vas subject to the 2005
Transportation DA prior to the efii:ctive date sal' this Agreement. Developer further agrees that
City can utilize these previously collected funds on any project it deems appropriate and is not
limited to the projects outtlined in the 2005 Transportation DA. These projects include, but are
not limited, to the Old Clifton Road/Anderson Hill Road Roundabout (Project 2.07), the Old
Clifton Road non -motorized shoulder and pedestrian improvements (Project 1.5A), Old Clifton
Widening Design (Project 1.5A), and Bethel Avenue (Project 1.3).
c) Obligations to Kitsap County F minguished. This Agreement being a complete
replacement to the 2005 Transportation DA, neirl'cr Party has any obligations to Kitsap County,
Section 26. Notices. Notices. demands. correslwndencc 10 the City, MI-C. and/or Developer
(as applicable) shall be sufl icierltly given if' dispatched by pre -paid first-class nail to the
addresses of the parties as designated ill "Written Notice— Section 38 below. Notice to ti'e City
shall be to the attention of both the City Clerk and the City Attorney. Notices to successors -in -
interest of the Developer shall be required to be given by the City Only ft'r those successors -in -
interest who have given the City written notice of their address for such notice. The parties
Development Agreement for Funding Transportation Improvements
Page 12 of 19
FG:54082696.4
Page 256 of 307
hereto may, from time to time, advise the other of new addresses for such notices, demands or
correspondence.
Section 27. Reimbul:5ement for Agreement Expenses of the City. Developer agrees to
reimburse the City for actual expenses incurred over and above fees paid by Developer as an
applicant incurred by City directly relating to this Agreement, including recording lees,
pttblisilillg fces and reasonable staff and consultant costs not otherwise included within
application lees. This Agremnlcnt snail not take effect until the fees provided for in this section,
as well as any processing, Fees owed to the City for the transportation project known as the
Campus Parkway ROUndabout are paid to lire City. Upon payment{)l' all expenses. the
Developer may request written acknowledgement of all fees. Such pa%nnent of all fees- shall be
paid, at tlx: latest, within thirty (30) clays From the City's presentation of a written statement of
charges to the Developer.
Section 28. Applicable Lav►•, Resolution of Disputes, and Attorneys' Fees. if any dispute
arises between the City and Developer under any of the provisions of this Agreement.
.jurisdiction of any resulting litigation shall be filed in Kitsap County Superior Cntn't. Kitsalp
C'ottnty. Washington or the U.S. District Cotnrt l'or Western Washington. This Agreement shall
be governed by and construed in accordance with the laws of the State of Washington. The non -
prevailing Party in any action brought to enforce this Agreement shall pay the other Parties'
expenses and reasonable ationleY's fees.
Section 2c). No Third -Party Beneficiaries. Except as otherwise provided herein, this
Agreement shall not create ally rights enforccable by any party who is not a Party to this
Agreement.
Section 30. City's right to breach. The pansies agree that the City tllay. withOUt incurring
any liability, engage in action that would otherwise be a breach if tho City rakes a determination
on the record that the action is necessary to avoid a serious threat to public health and safety, or
if the action is required by federal or state law.
Section 31. Developer's Compliance. The City's duties under the agreement are expressly
conditioned upon the Developer's or Property Owner's substantial compliance with each and
every terns, condition.. provision and/or covenant in this Agreement, including all applicable
l*cderal, state. and local laws and regulations and the Developers/Property Owner's obligations
as identified in ally approval or prtyiect permit for the property identified in this Agreement.
Section 32. Limitation on City's Liability for Breach. Any breach of this Agreement by
the City shall give right only to damages under state contract law and shall not give rise to any
liability under Chapter 64.40 RCW. the Fifth and Fourteenth Amendments to the U.S.
Constitution. or similar state constitutional provisions.
Section 33. Third Party Legal Challenge. In the event any legal action or special
proceeding is commenced by ally person or entity other than a Patty to cllallenlge this Agreement
or any provision herein, the City nlay elect to tender the derense of such lawsuit or individual
claims in the lawsuit to Developer . In such event, Developer shall hold the City harmless from
Development Agreement for Funding Transportation Improvements
Page 13 of 19
FG:54082696.4
Page 257 of 307
and defend the City from all costs and expenses incurred in the defense of such lawsuit or
individual claims in the lawsuit, including but not limited to, attorneys' fees and expenses of
litigation. The Developer shall not settle any lawsuit without the consent of the City. The City
shall act in good faith and shall not unreasonably withhold consent to settle.
section 34. Specific Performance. The: pallies specifically agree that damages are not an
adequate remedy lnr breach of this Agreement. and that the parties tire entitled to compel specific
perfor fiance of all material terms ol'this Development Agreement by any Party in del'ault hereof.
Section 35. Recording. This Agreement shall be recorded against the property with the real
property records of the Kitsap County Auditor. During the term of the Agreement, it is binding
upon the owners of tilt property and any successors in interest to such property.
Section 6. Severability. If any phrase, provision or section of this Agreement is
determined by a court of competent jurisdiction to be invalid or unenforceable. or if any
provision of this Agreement is rendered invalid or unenforceable according to the terms of any
statute of the State of Washington which became effective after the effective date of the
ordinance adopting this Development Agreement. and either Party in good Iaith determines that
such provision or provisions are material to its entering into this Agreement, that Party may elect
to terminate this Agreement as to all of its obligations remaining unperformed.
Sec i n 37. Non -Waiver of Breach. The failure of a Party to insist upon strict performance
of any of the covenants and agreements contained herein, or to exercise any option herein
conferred in one or more instances shall not be construed to be a waiver or relinquishment of
said covenants, agreements, or options, and the same shall be and remain in full force and effect.
Section 38. Written Notice. All written communications regarding enforcement or alleged
breach of this Agreement shall be sent to the parties at the addresses listed below, unless notified
to the contrary. Unless otherwisc sPecilied, any written notice hereunder shall become effective
upon the date of both emai ling and mailing by registered or certified mail. and shall be deemed
sufficiently given iI'sent to the addressee at the address stated below:
McCORMICK:
Eric Campbell
12332 NE 115" Place
Kirkland, WA 98033
eric;ir�nis �rcxt Ilc.ccrm
Nick Tosti
805 Kirkland Avenue, Suite 200
Kirkland, WA 98033
��ic ktost i� r�'t:mt1 i l.eam
CITY:
Mayor
City of Port Orchard
216 Prospect Street
Port Orchard WA 98366
r�aut u ( Citvoi'iortorchard.us
Copies shall also be transmitted to the City
Clerk and City Attorney at the above address.
Development Agreement for Funding Transportation Improvements
Page 14 of 19
FG:54082696.4
Page 258 of 307
GEM 1, LLC / McCORMICK
LAND COMPANY
Doug Skrobut
1869 McGilvra Blvd E
Seattle, WA 98112
dSkrobut(4 -itlail.com
Section 39. Time is of the essence. All time limits set forth herein are of the essence.
The Parties agree to perform all obligations under this Agreement with due diligence.
Section 40. Entire Agreement. The written provisions and terms of this Agreement.
together witli the Exhibits attached hereto. shall supersede all prior verbal statements of any
officer or other representative of the parties, and such statements shall not be effective or be
construed as entering into or forming a part of or altering in any manner whatsoever, this
Agreement. The entire agreement between the parties with respect to the subject matter
hereunder is contained in this Agreement and exhibits thereto.
IN WITNESS WHEREOF, the parties have executed this Agreement on this L day of
February, 2021.
MCCORMICK COMMUNITIES, LLC
By:p
Its: A` 2
GEM 1, LLC/McCORMICK LAND
COMPANY
By:
; !L
1L[tOVED V-s '1' FORM:
Patrick Schneider
Attorney for McCormick
CITY OF PORT ORCHARD
�Nt1�IIIfrryNp
Its: Mayor ,N,"� pORT 0R��,,,
- : SEAL -
?�+I I i ►
APPROVED
6n i Fer SMI obertson
ttorney for Port Orchard
Development Agreement for Funding Transportation Improvements
Page 15 of 19
FG:54082696.4
Page 259 of 307
Back to Agenda
APPROVED AS TO FORM:
Duana Kolouskova
Attorney for GEM 1, LLC/MLC
ATTEST:
Bran y in rson
Port Orchard City Clerk
Development Agreement for Funding Transportation Improvements
Page 16 of 19
FG;54082696.4
Page 260 of 307
Back to Agenda
NOTARY BLOCK FOR PORT ORCHARD
STATE OF WASHINGTON )
) ss.
COUNTY OF KITSAP )
I certify that I know or have satisfactory evidence that Mir. Itch 11,g ansLltl is the person
who appeared hefOre me, and said person acknowledged that: he signed this instrument, an oath
stated that he was authorized to execute the instrument and acknowledged it as (he-Mavor of l'ort
Orchard to be the free and voluntary act of such Party for the uses and purposes mentioned in
the instrument. )v
Dated:
p1QTANY N '
PUSUC
JrrWASNk"r;�`��
Jti</JPPh11q-M1 'A
(print or type name)
NOTARY PUBLIC in and for the
State of Washingt residi at:
My Commission expires: 1
Development Agreement for Funding Transportation Improvements
Page 17 of 19
FG:54082696.4
Page 261 of 307
Back to Agenda
NOTARY BLOCK FOR McCORMICK COMMUNITIES
STATE OF WASHINGTON )
ss.
COUNTY OF
I certify that I know or have satisfactory evidence that Mr. E nc- (k,--40
is the person
who appeared before me, and said person acknowledged that die/she) signcd this instniment, on
oathstated that (liglshe) was &0101'ized to excc:ute the instrument and acknowledged it as the,
of McCormick CoinipUnilie5. LLC to be the free and voluntary act of such Party for the
uses and purposes mentioned in the instrument.
Dated: & C 20 `Ll
Notary Public
State of Washington
ANDREW D. MARSHALL
MY COIvII�fISSION EXPIRES
03-06-2021
� � I
(print or type name)
NOTARY PUBLIC in and for the
State of Washington, residing at:_
VA4'k.1 J
My Commission expires: (j3 ()
Development Agreement for Funding Transportation Improvements
Page I8 of 19
FG:54082696.4
Page 262 of 307
Back to Agenda
NOTARY BLOCK FOR GEM 1 / McCORMICK LAND COMPANY
STATE OF WASHINGTON
ss.
COUNTY OF ` )
I certify that I know or have satisfactory evidence that Mr. DOLig Skurbul is the person
who appeared before me, and said person acknowledged that (he/she) signed this instrument, on
oath stated that (he/she) was authorized to execute the instrument and acknowledged it as the _
•f of Cil-Ki i, (ompa y to be the free and voluntary act of such
Party for the uses and purposes mentioned in the instrument.
Dated: 5 20 21
Notary Public
State of Washington
ANDREW D. MARSHALL
MY COMMISSION EXPIRES
03-06-2021
(print or type name)
NOTARY PUBLIC in and for the
State
of Washi gton, residing at:_
G�
My Commission expires:
Development Agreement for Funding Transportation Improvements
Page 19 of 19
FG:54082696.4
Page 263 of 307
Back to Agenda
Exhibit A-1
McCormick Property
List of Parcels Subject to Impact Fee Credit
McCormick North
052301-4-023-2008
052301-4-027-2004
052301-4-024-2007
052301-4-025-2006
052301-4-026-2005
052301-4-013-2000
042301-3-011-2005
McCormick West
082301-2-002-2004
082301-2-003-2003
082301-1-013-2003
082301-2-004-2101
082301-1-010-2006
082301-1-014-2002
172301-2-002-2003
172301-2-004-2001
172301-2-003-2002
172301-2-006-2009
172301-2-005-2000
172301-2-007-2008
172301-3-004-2009
McCormick Woods
042301-3-010-2006
6031-000-131-0002
5552-000-045-0008
092301-1-005-2002
092301-4-004-2007
092301-1-009-2008
092301-4-005-2006
092301-4-003-2008
092301-4-002-2009
162301-1-021-2003
162301-1-020-2004
162301-1-019-2007
Page 264 of 307
Back to Agenda
Exhibit A-2
McCormick Property
Maps of Parcels/Areas Subject to Impact Fee Credit
J , r
7� _
�..r_
+.•.4...
ire ! Wd. ls1 .-a
d
W : wd — � T
1 ,<• •� s Wd
f
M-1
Wd
McCormick North
McCormick West
McCormick Woods
L. egend
North
.......................................10
........................................ S
West
.................I...................
- - WTI
Page 265 of 307
Back to Agenda
Exhibit B-1
List of Parcels with Vested Concurrency
McCormick North
McCormick Woods
052301-4-023-2008
042301-3-010-2006
052301-4-027-2004
6031-000-131-0002
052301-4-024-2007
5552-000-045-0008
052301-4-025-2006
092301-1-005-2002
052301-4-026-2005
092301-4-004-2007
052301-4-013-2000
092301-1-009-2008
042301-3-011-2005
092301-4-005-2006
092301-4-003-2008
McCormick West
092301-4-002-2009
082301-2-002-2004
162301-1-021-2003
082301-2-003-2003
162301-1-020-2004
082301-1-013-2003
162301-1-019-2007
082301-2-004-2101
082301-1-010-2006
Legacy Lots
082301-1-014-2002
5190-000-018-0009
172301-2-002-2003
6031-000-032-0002
172301-2-004-2001
6031-000-025-0001
172301-2-003-2002
6031-000-063-0004
172301-2-006-2009
5161-000-021-0009
172301-2-005-2000
5145-000-023-0008
172301-2-007-2008
5139-000-013-0008
172301-3-004-2009
6031-000-074-0001
Page 266 of 307
Back to Agenda
Exhibit B-2
Map of Parcels/Areas with Vested Concurrency
L
4
j
�-4
146rfiv
d
G
GC
W
WI
West
7
-7
Wd
7
W 3—
Legend
McCormick North
McCormick West
McCormick Woods -
Golf Facilities
................ .......................
North
.......................................
.......... ";W-, ....... . ......
est
..................
.... I ...........................
See Exhibit 131 for legacy lots vested to concurrency with this agreement
Page 267 of 307
Exhibit C
Boundary of 2005 Traffic Agreement
rl
j Iry rr`
-rT.
4
'lye it f �•���; 1��� �� �r
_L ` I i { , _ � � . '•''•?fay: • ,.�
41,
-: ;-
■ F r J
■
Y'V1 r� \ i• i. T
Page 268 of 307
Back to Agenda
CITY OF PORT ORCHARD
Public Works Director
216 Prospect Street, Port Orchard, WA 98366
Voice: (36o) 876-4991 • Fax: (36o) 876-498o
mdorsey@cityofportorchard.us
www.cityofportorchard.us
MEMORANDUM
TO: Noah Crocker, Finance Director
FROM: K. Chris Hammer, P.E. - City Engineer k�t��
DATE: December 13, 2022
RE: 2021 Campus Parkway/McCormick West Roundabout TIF Credit
Submittal #3
On February 19, 2021, a Development Agreement (City of Port Orchard Contract No.
C035-21) between McCormick Communities, LLC and the City of Port Orchard was
recorded and became effective. Pursuant to Section 14 (b) of the Agreement,
McCormick Communities, LLC was required to provide documentation of expenditures
of at least $50,000 on "McCormick Projects" (a term defined in the Agreement) to trigger
Transportation Impact Fee Credits described in Section 14 of the Agreement.
On March 23, 2021, McCormick Communities, LLC submitted, and the City reviewed
and approved Transaction Summary #1 with associated invoices in the amount of
$100,124 for the Campus Parkway/McCormick West Roundabout Project and
commenced with Transportation Impact Fee Credits as required by the Agreement.
On July 29, 2021, McCormick Communities, LLC submitted, and the City reviewed and
approved Transaction Summary #2 with associated invoices in the amount of $468,037.
On June 9, 2022, McCormick Communities, LLC submitted, and the City reviewed and
approved Transaction Summery #3 with associated invoices in the amount of
$1,465,743.
On December 2, 2022, McCormick Communities, LLC submitted, and the City reviewed
and approved Transaction Summary #4 with associated invoices in the amount of
$561,272 for an updated Transportation Impact Fee Credit amount of $2,595,176 for the
Campus Parkway/McCormick West Roundabout Project (see attached.)
The TIF credit amount for this project is $1,600,000. This amount was increased 1.7% in 2021
and 4.6% in 2022. The project was substantially completed in 2022.. The project qualifies for a
TIF credit of $1,702,051.20.
Enc: Transactions Summary (5/1/2022 thru 11/30/2022)
U:\2_Development
Program\C_DeveloperConstructedlnfrastructu re\Active Projects\OldClifton Dr&Cam pus Pkwylntersection(RA B).2021 \Cost
Certification\Submittal #3\Campus Parkway_McWest_RAB_TIF Credit Memo-2022 No. 3.doc
Page 269 of 307
Back to Agenda
;W 4
a
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Agenda Item No.: Business Item 8G
Subject: Approval of a Letter of Intent with Kitsap
Public Facilities District to Fund Future
Construction Costs for the Communitv
Events Center
Meeting Date: February 28, 2023
Prepared by: Nicholas Bond, AICP
Atty Routing No.
Atty Review Date
DCD Director
N/A
N/A
Summary: In 2019, the City was awarded funding from the Kitsap Public Facilities District (KPFD) as
memorialized in the Contract C082-19, an interlocal agreement between the City and KPFD, to fund a
Community Event Center (CEC) building in Port Orchard. Since that time, significant inflation and
construction costs have increased the expected cost to construct the CEC. In addition, sales tax revenues
from which KPFD funding is provided has increased significantly. As such, the City has requested that KPFD
funding be increased by $6,546,000 above the previously awarded amount to fund the construction of the
CEC.
The Mayor and KPFD's Executive Director have negotiated a Letter of Intent concerning an increase in
project funding as well as to outline how bonds will be obtained to fund the project. The purpose of the
Letter of Intent is to outline the general terms of a future amendment to Contract C082-19 which will be
brought forward for City Council approval and KPFD Board approval at a future date.
Recommendation: Staff recommends that the City Council authorize the Mayor to execute a Letter of
Intent between the City and the Kitsap Public Facilities District as presented.
Relationship to Comprehensive Plan: The CEC project is identified as a capital project in the city's
Comprehensive Plan.
Motion for consideration: "I move to authorize the Mayor to execute a Letter of Intent between the City of
Port Orchard and the Kitsap Public Facilities District as presented."
Fiscal Impact: The Letter of Intent is likely to result in a future contract amendment increasing the amount
of funding received from the KPFD for the CEC project in an amount of $6,546,000.
Alternatives: Do not authorize the Mayor to execute the Letter of Intent. Modify the proposed Letter of
Intent (note that the KPFD would need to agree to any modifications).
Attachments: Letter of Intent
Page 270 of 307
LETTER OF INTENT
February 16, 2023
Re: Letter of Intent to Fund Future Construction Costs for
Port Orchard Community and Events Center
The City of Port Orchard ("City') has seen significant inflation in the construction cost
estimates for the Port Orchard Community Events Center ("POCEC") and is requesting additional
funding from the Kitsap Public Facilities District ("KPFD"), specifically for increased construction
costs for the POCEC. The City is requesting funding for 66% of the total project cost, which is
currently estimated at $28,100,000. This represents an increase in requested funding of approximately
$6,546,000, above the KPFD's existing funding commitment set out in the ILA.
The KPFD continues to be fully supportive of the POCEC. The KPFD is further aware that
construction costs have increased in the last several years and may continue to increase in the coming
years. Meanwhile, the KPFD is supporting other regional center projects whose costs are still
undetermined but also rising, and the KPFD has not fully determined its financial capacity to support
its current projects.
This letter of intent (this "LOI") sets forth the terms and conditions under which the KPFD
would be willing to commit to additional funding for the construction of the POCEC in addition to the
commitment set out in the ILA.
I. Project: The Project consists of a special events center as defined by RCW 35.57.020(1)(a).
The Project is identified in Attachment A to the Third Amendment to the Regional Center
Interlocal Agreement ("ILA") between the City and the KPFD, dated April 18, 2022.
2. Pending Commitments to the City: The City has committed to performing certain Tasks in
the ILA (Attachment B to the ILA) and the KPFD has agreed to provide funding of $12,000,000
for certain Tasks, per the conditions of the ILA. In its most recent Amendment, the ILA
allocates $9,210,000 for construction in Tasks 7 and 8 of Attachment B.
3. Funding Amount: Based on the understanding that the actual construction costs are unknown
and are estimated without actual construction drawings, details, and bids, the parties agree to
revisit the amount of construction funds from the KPFD when the City has more detailed and
accurate information, with the understanding the KPFD will support an increase in funding for
construction not to exceed an additional $6,546,000, at which time the parties will negotiate a
further ILA Amendment for Tasks 7 and 8.
4. Conditions:
1) The Amended ILA will continue to be (a) subject to the availability of funds (ILA
Section 6.3), (b) will require the successful negotiation of an ILA Amendment with
Operation Standards (ILA, Section 6.5), and require the KPFD review of the entire
funding plan for the construction phase (ILA, Schedule B, Task 7).
10619999.v1
Page 271 of 307
Letter of Intent
Page 2 of 2
2) The KPFD will ask Kitsap County to issue and carry the bond for construction funds in
an amount of up to $15,756,000 for Tasks 7 and 8.
3) In the event that Kitsap County cannot or will not carry the bond on behalf of the KPFD,
and the KPFD elects to obtain the bond on its own, the total amount of construction
funding provided to the City of Port Orchard will be contingent upon the projected
amount of annual tax rebate revenue, interest rate obtained by the KPFD, and the
positive projected annual remaining funds available. This amount may be less than
$15,756,000.
5. Counterparts: Electronic Execution and Delivery: This LOI may be executed in
counterparts, each of which will be deemed an original but all of which will constitute one and
the same instrument. Signatures may be affixed manually or via DocuSign or similar electronic
means. No party may raise (a) the use of a signature via DocuSign or similar electronic means
or (b) the fact that the LOI or any signature or agreement was transmitted or communicated
through the use of facsimile machine, e-mail, PDF, DocuSign, or similar electronic format, as
a defense to the formation of a contract, and each party forever waives any such defense, except
to the extent such defense related to lack of authenticity.
This LOI is merely an outline of possible terms to amend the existing ILA in the future and is non-
binding.
DATED the date first above written.
KITSAP PUBLIC FACILITIES DISTRICT
By:
Name: Patrick Hatchel, Board Chair
Attest
By:
Name: John Morrissey, Board Vice -Chair
Approved As to Form:
By:
Name: Brian Lawler, District Legal Counsel
CITY OF PORT ORCHARD
By:
Name: Robert Putaansuu, Mayor
Approved As to Form:
By:
Name: Charlotte Archer, City Attorney
10619999.v1
Page 272 of 307
Back to Agenda
Agenda Item No.:
Subject:
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Business Item 8H
Approval of Amendment No. 9 to Contract
No. 066-20 with Rice Fergus Miller, Inc. for
Meeting Date: February 28, 2023
Prepared by: Nicholas Bond, AICP
the Design Development and Construction Atty Routing No.
Drawings of the Port Orchard Community Atty Review Date
Events Center-LEED Feasibility
DCD Director
N/A
N/A
Summary: The City, in partnership with the Kitsap Public Facilities District (KPFD), is in the design process for
a Community Event Center. The City and KPFD executed an Agreement to identify this 8-phase Project (C082-
19), and to memorialize KPFD's committed funding. Following a qualifications -based selection process
consistent with Chapter 39.80 RCW and the City's Procurement Policies, on July 29, 2020, the City executed a
Professional Services Contract Agreement with the selected firm, Rice Fergus Miller, Inc., for the Project
("Underlying Agreement"). The City and Consultant executed Amendment Nos. 1 through 8 to the Underlying
Agreement during 2021 and mid-2022. The proposed contract amendment before the City Council would add
a task to the CEC design contract concerning modifying the current plans to achieve a Leadership in Energy
and Environmental Design (LEED) Silver building standard. Previously, amendment #8 evaluated the
feasibility of meeting LEED certification for the new CEC. LEED certification is a requirement of state funding
that the City will be seeking for the construction of the CEC.
Previous Contract Amendments to C066-20 are as follows:
Amendment #1: Frontage Improvement/CEC Plaza Concept Planning - $210,943.00
Amendment #2: Materials Testing - $2,672.00
Amendment #3: Frontage and Access Improvements, Additional Cost - $109,153.28
Amendment #4: Borings and materials testing - $12,200.00
Amendment #5: Contract Term Extension - $0.00
Amendment #6: Tasks 4-5 completion under original City and KPFD Agreement - $1,389,500 total (covered by
KPFD Contract C082-19 Amendment #3)
Amendment #7: Seawall design, shoreline restoration, and permitting - $631,200
Amendment #8: LEED Certification Feasibility Assessment - $16,500
Relationship to Comprehensive Plan: This contract will provide plans and permits for a project identified in
the City's Comprehensive Plan, Parks Plan, and Downtown Subarea Plan.
Recommendation: Staff recommends authorizing the Mayor to execute Amendment No. 9 to Contract No.
C066-20 with Rice Fergus Miller, Inc. for the South Kitsap Community Event Center Project in an amount of
$229,800.
Page 273 of 307
Back to Agenda
Staff Report 8H
Page 2of2
Motion for consideration: I move to authorize the Mayor to execute Amendment No. 9 to Contract
No. C066-20 with Rice Fergus Miller, Inc. for the South Kitsap Community Event Center Project in an
amount of $229,800.
Fiscal Impact: This will be an additional unexpected General Fund expense.
Alternatives: Revise the Scope of Work.
Attachments: Contract C066-20, Amendment #9 to C066-20, Scope and Fee.
Page 274 of 307
Back to Agenda
Amendment No. 98 to Contract No. C066-20
CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH
RICE FERGUS MILLER, INC.
THIS AMENDMENT to Contract No. C066-20 ("Amendment") is made effective as of the
day of DeeembeFebruary, 20232, by and between the City of Port Orchard ("City"), a municipal corporation,
organized under the laws of the State of Washington, and Rice Fergus Miller, Inc., a corporation organized
under the laws of the State of Washington, located and doing business at 275 51 St., Bremerton, WA 98337
("Consultant").
WHEREAS, on July 29, 2020, the City executed a Professional Services Agreement with Consultant
for the South Kitsap Community Event Center Project (the "Project") ("Underlying Agreement"); and
WHEREAS, on July 27, 2021, the City and Consultant executed Amendment No. I to the Underlying
Agreement, increasing the contract amount and adding additional scope of work (work within the scope of
the initial Request for Qualifications); and
WHEREAS, on September 17, 2021, the City and Consultant executed Amendment No. 2 to the
Underlying Agreement, adding additional scope of work (work within the scope of the initial Request for
Qualifications); and
WHEREAS, on October 12, 2021, the City and Consultant executed Amendment No. 3 to the
Underlying Agreement, increasing the contract amount and adding additional scope of work (work within
the scope of the initial Request for Qualifications); and
WHEREAS, on January 25, 2022, the City and Consultant executed Amendment No. 4 to the
Underlying Agreement, increasing the contract amount and adding additional scope of work due to
unforeseen on -site conditions; and
WHEREAS, on March 21, 2022, the City and Consultant executed Amendment No. 5 to the
Underlying Agreement, extending the contract term to accommodate the scope of work; and
WHEREAS, on April 12, 2022, the City and Consultant executed Amendment No. 6 to the
Underlying Agreement, updating the scope and fee for tasks 4 and 5 of C082-19; and
WHEREAS, on September 13, 2022, the City and the Consultant executed Amendment No. 7 to the
Underlaying Agreement, adding additional design work related to shoreline improvements and permitting;
and
WHEREAS, on December 13, 2022, the City and the Consultant executed Amendment No. 8 to the
Underlaying Agreement, adding additional design work LEED Certification feasibility; and
WHEREAS, the City received funding from the Kitsap Public Facilities District ("KPFD") via an
Agreement between the City and the PFD (C082-19) for this 8-phase Project, which will result in a
Community Event Center; and
Page 275 of 307
WHEREAS, the Consultant was selected as the most qualified firm to perform all phases of the
Project, and to date the Consultant and City and have completed phases 1-3 as set out in C082-19; and
WHEREAS, the City has learned that a condition of funding building and library construction from
state funds is LEED certification; and
WHEREAS, the City wishes to evaluate the feasibility of meeting the LEED r entsmodi
the architectural plans for the CEC to meet a LEED silver certification and has prepared amendment No. 99
to Contract No. C066-20 for this purpose; and
WHEREAS, the Parties wish to memorialize their agreement to so amend the Underlying
Agreement; NOW, THEREFORE,
In consideration of the mutual benefits accruing, it is agreed by and between the parties thereto as
follows:
1. The Underlying Agreement, including previous Amendments Nos. 1-8-7, is amended as follows
(amendment shown in legislative marks):
a. The Scope of Work is amended to add the tasks as set out on Attachment 1 hereto
(Amendment #98 Request).
b. The total contract cost is increased by $16,500229,800 plus reimbursable expenses and
applicable taxes as set out on Attachment 1 hereto (Amendment #99 Request).
c. The contract term remains with a termination date of December 31, 2024, unless extended
or earlier terminated in accordance with the terms of the Underlying Agreement.
2. In all other respects, the Underlying Agreement between the parties shall remain in full force and
effect, amended as set forth herein, but only as set forth herein.
IN WITNESS WHEREOF, the parties have executed this Amendment on the day and year set
forth above.
CITY OF PORT ORCHARD, CONSULTANT
WASHINGTON
Robert Putaansuu, Mayor
ATTEST/AUTHENTICATED:
Brandy Wallace, MMC, City Clerk
APPROVED AS TO FORM:
Signature
Printed Name and Title
Page 276 of 307
Charlotte A. Archer, City Attorney
Page 277 of 307
Back to Agenda
RafergusmILLER
ARCHITECTURE INTERIORS PLANNING VIZLAB
January 22, 2023
ILIMMUSTArs,
Development Director
City of Port Orchard
216 Prospect St
Port Orchard, WA 98366
275 Fifth Street, Suite 100 Bremerton, WA 98337
(360) 377-8773 rfmarch.com
Re: South Kitsap Community Events Center
Amendment 09 Request
LEED Design Development & Construction Documents
RFM Project: 2020002.00
Dear Nick,
Rice Fergus Miller (RFM) is pleased to present the following Letter of Proposal to amend our
contract for the above referenced project.
I. Project Description
The City of Port Orchard is seeking funds for this project that now require LEED Silver
Certification. Based on the LEED feasibility work completed under Amendment 08, this
amendment is to revise our design to meet LEED v4 Silver Certification.
II. Scope of Services
The attached LEED v4 for BD+C New Construction Checklist dated January 23, 2023, identifies
the "Maybe" items that will be evaluated for addition to the design. The following are included in
this scope:
• Revise the previously completed Design Development package to include the additional
LEED v4 design items and update the cost estimate.
• LEED v4 design Construction Documents and additional documentation required for
Design Submittals to USGBC.
• A LEED Specialty Consultant has been added to the team to guide the design team,
compile the LEED documentation, and lead the submittal process with USGBC to be
completed during the Construction Documents Phase.
The following disciplines are included in this scope of work to provide the deliverables listed
above:
• LEED Specialty Consultant
• Civil Engineer
• Landscape Architect
• Structural Engineer
Page 278 of 307
Back to Agenda
South Kitsap Community Events Center
LEED Feasibility Structures
January 21, 2023
• MEP Engineer
• Acoustical Consultant
• Cost Estimator
III. Exclusions and Additional Services
• Signage/Environmental Graphic
Designer
We are not currently under contract for Bid and Construction Administration phases. There are
LEED related tasks specific to the Construction Phase, including Construction Submittals
required from the General Contractor, that will be necessary to secure LEED Silver certification.
The design team's LEED scope for that phase will be part of a future contract amendment.
IV. Owner Responsibilities
It is our understanding that City of Port Orchard will provide full information, including a
program, setting forth its design objectives, constraints, and criteria; and, the services of other
consultants not included here when such services are deemed to be necessary.
V. Schedule
We have a critical deadline of July 1, 2023 to complete building permit submittals prior to the
WA State code cycle change. In order to meet this, we need approval to proceed with this work,
preferably as early as March 1, 2023.
VI. Compensation
For the Scope of Services outlined above for Rice Fergus Miller and its consultants,
compensation shall be a Fixed Fee of Two Hundred Twenty Nine Thousand Eight Hundred
Dollars ($229,800.00); plus, reimbursable expenses and any applicable taxes.
VII. Terms of Agreement
Please provide an amendment to our South Kitsap Community Events Center contract upon
accepting this proposal.
Vill. Summary
Thank you for the opportunity to propose on your project. We look forward to discussing our
proposal further and working with you. Please contact me if you have any questions.
Sincerely,
Tean
ergus it , nc
'Kelly, Pr ncipal
Architect
Attachment: LEED Checklist
Page 279 of 307
Back to Agenda
,y LEED v4 for BD+C: New Construction Project Checklist
Port Orchard Community Project Name Y Events Center
Project Manager George Oakley /Michelle Rosenberger
Date 1/23/2023
33 1 19 1 17 1 41 11rotal
Y ?Y ?N N
1 IP1
"v4.1 substitution
Silver = 50pts
G—
"ArchEcology
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Credit Phase Status Lead
Integrative Process
D NA
Max
Pts
110
1
5
2
1
8
Location and Transportation
Possible Points: no
LT 1
LEED ND Location D NA
1 16
1
LT 2
Sensitive Land Protection D Attempting
ArchE --] 1
Requirement Development footprint on previously developed land OR is not farmland, floodplain, habitat;
waterbodies (100ft) or wetlands (50 ft.), minor improvements allowed in H2O buffers
Notes Previously developed site.
Next Steps Document 28-Dec ArchE
2 LT 3 High Priority Site D NA
Requirement Historic district infill (1 p) or Priority designation (1 p) or Brownfield with soil or groundwater
contamination and remediation (2 p)
Notes None of the above applies to this site.
Next Steps
3 ILT 4 Surrounding Density and Diverse Uses* D Attempting ArchE
Requirement (4.1) Locate where surrounding density within a 0.25 mi offset is 7 du/acre, 0.5 FAR or 22,000
sf/buildable acre (2 p); 12 DU/acre, 0.8 FAR or 35,000 sf/buildable acre (3 p) AND/OR main entrance
is 0.5 mi walk to diverse uses - 4 to 7 1 8+ 2 . AND/OR Walkscore 1-5
Notes Walk Score 66 - Somewhat walkable (v4.1 Walk Score of 60 to 69 = 2 pts)
Next Steps Documentation 28-Dec ArchE
3 LT 5 Access to Quality Transportation* D Attempting ArchE
Requirement (4. 1) Poth1. Access to Public Transit Service - Meet minimum weekday and weekend trips on bus,
streetcar within 0.25 mi. OR rapid bus, rail, or commuter ferry within 0.5 mi. Must have paired
routes but only one direction counts. See tables.
Notes Five bus routes and foot ferry within 0.25 mile. Weekday trips (for bus and ferry) = 111 (> 100),
weekend trips = 78 > 70). If greater than 100 weekday and 70 weekend = 2 points.
Next Steps Documentation 3-Jan ArchE
LT 6 Bicycle Facilities D Attempting ArchE
Requirement Locate 200 yds. from bike network that connects to at least one of the following within 3 mi.; 10+
diverse uses; school/employment center if >50% residential; rapid bus, rail or ferry. Provide bike
storage - short term for 2.5% of peak visitors AND long term for 5% of nonresidential occupants
Wor 30% res occupants. Provide shower for first 100 nonresidential FTEs +1 for each 150 additional.
Notes Include showers, short and covered longterm bike racks to comply.
Next Steps Check if proximate to a bike network with services. 29-Dec ArchE
LT 7 Reduced Parking Footprint* D Attempting ArchE
Requirement (4.1) Do not provide off-street parking OR do not exceed code parking and achieve 30% reduction
from ITE base ratios OR provide dedicated parking for carshore vehicles -1 spot for every 100
Notes
Next Steps
occupants OR sell parking separately from all property sales or leases.
:onfirm approach to this credit and possible shared parking with other sites.
Review parking requirements with Architect and City. 19-Jan ArchE
2
5
5
f
f
Port Orchard Community Events Center Page 28p of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
Back to Agenda
LT 8 Green Vehicles* D Attempting ArchE
Requirement (v4.1) Install electric vehicle supply equipment for 5% (or minimum 2 spots, whichever is greater)
of all parking OR make 10% of all parking EV ready.
Notes lone dual head charger is possible but maybe unlikely with only six total spaces.
Next Steps I I Determine interest with Owner. 29-Dec ArchE
3 ISustainable Sites Possible Points: 10
SSp 1 Const. Activity Pollution Prevention C Prereq IArchE Req.
Requirement Implement TESC plan which conforms to the more stringent of 2012 US EPA Construction General
Permit or local equivalent. Provide Plan, narratives on stringency and compliance, and GC
declaration OR photos OR implementation narrative.
Notes Civil has provided ESC DID plan.
Next Steps Confirm acceptability of plan. 29-Dec ArchE
SS 1 Site Assessment D Attempting ArchE 1
Requirement Complete and document a site survey or assessment that includes: topography, hydrology, climate,
vegetation, soils, human use and human health effects.
Notes ISite assessment report has been provided.
Next Steps Confirm acceptability of plan. 29-Dec ArchE
2 1 SS 2 Site Dev.- Protect or Restore Habitat* D Attempting ArchE 2
Requirement (v4.1) Protect 40% of any greenfield areas from all activity AND restore 15%/25% of previously
disturbed site with native or adapted veg AND restore soils that will serve as final habitat AND plant
a min of 6 plant species, including 2 from tree, shrub and groundcover categories. Designate at least
Notes
May be possible given previous development of site (bank building and associated parking).
Determine LEED boundary. Confirm areas.
29-Dec
ArchE
Next Steps
SS 3
Open Space* D
Attempting
ArchE 1
Requirement
(v4.1) Provide 30% or more of total site area - must be 25% vegetated (no turf), physically
accessible, and encourage social or physical activity, gardening, habitat or visual interest. Green
roo area i accessible can be included or both pedestrian hardsca e and vegetation.
Notes
Possible, assess site.
Next Steps
Confirm LEED boundary 29-Dec ArchE
s ISS4
Rainwater Management*
D
NA
3
Requirement
(v4.1) Retain (i.e. infiltrate, evapotranspirate or collect and reuse) on site the runoff from the site for
the 80th percentile (1 p), 85th percentile (2 p) or 90th percentile (3 p) of regional rainfall events
using LID and green infrastructure OR zero lot line projects with a minimum density of 1.5 FAR -
retain on site the runoff from the developed site at the 70th-80th percentile of regional rainfall
events using LID GI 1-3
Notes
I Liquefaction zone. Soils inadequate for infiltration. Exempt from Flow Control. (Per Civil and
Next Steps
2 1 1 1 SS 5 Heat Island Reduction D Attempting ArchE 2
Requirement Option 1: Non roof and Roof surfaces meet criteria using weighted average calculation (2 p) OR
Option 2: A minimum of 75% of parking under cover.
Notes Generate weighted calculations.
Next Steps Confirm LEED boundary 29-Dec ArchE
SS 6 Light Pollution Reduction D Attempting ArchE 1
Requirement Using BUG rating or calculation method -meet Uplight rating for the project's lighting zone AND
Notes
Next Steps
backlight and glare ratings based on distance from boundary and mounting location.
Determine MLO Lighting Zone
Send guidance to electrical engineer. 28-Dec ArchE
Port Orchard Community Events Center Page 221 of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
❑Y
7 rWater Efficiency
WEp 1 I Outdoor Water Use Reduction D I Prereq I KPG Psomas Req.
Requirement No irrigation after 2 yr. establishment or reduce irrigation by 30% for calculated baseline for peak
watering month. Reduction must be due to species selection and irrigation system efficiency using
EPAs WaterSense Budget Tool.
Notes lWaterSense budget calcs
Next Steps lWaterSense budget calcs 3-Jan KPG Psomas
WEp 2 Indoor Water Use Reduction D Prereq ArchE Req.
Requirement Reduce water consumption by 20% from baseline by installing fixtures (WaterSense labeled if
eligible), and appliance and process equipment to required efficiency and process standards.
Notes Toilets 1.28 gpf, RR faucets 0.5 gpm, Kitchen faucets 1.5 gpm - This meets minimum requirements.
Energy Starappliances. Pre-rinsespray<= 1.3 m
Next Steps Water use calculator 3-Jan ArchE
WEp 3 Building -Level Water Metering D Prereq ArchE Req.
Requirement Install permanent water meters that measure the total potable water use for the building and
associated grounds.
Notes Track water use for 5 years and submit to LEED
Next Steps Draft letter to be provided to owner 28-Dec ArchE
T-11WE 1 Outdoor Water Use Reduction D Attempting KPG Psomas 2
Requirement Option 1: No irrigation beyond two-year establishment period. (2 p) OR Option 2: Reduce irrigation
by at least 50% from the calculated baseline for the site's peak watering month. (1 p)
Notes WaterSense budget calcs
Next Steps WaterSense budget calcs 3-Jan KPG Psomas
a WE 2 Indoor Water Use Reduction D Attempting ArchE 6
Requirement Achieve further water use reductions with high efficiency fixtures and fittings, and alternative water
sources -1 p for every 5% savings after mandatory 20% required.
Notes 25% to 30% seems readily attainable.
Next Steps I lConfirm FTE - Water use calculator 3-Jan ArchE
2 WE 3 Cooling Tower Water Use D NA 2
WE 4 Water Metering D Attempting ArchE 1
Requirement Install permanent water meters that serve at least 80% of use for two or more of the following
subsystems - irrigation, indoor plumbing fixtures and fittings, domestic hot water, boiler, reclaimed
water or other process water.
Notes Irrigation submeter yes, confirm other.
Next Steps I lConfirm desire to pursue
3-Jan IArchE
13 Energy and Atmosphere Possible Points:
EAp 1 Fundamental Commissioning and Verify. C Prereq ArchE
Requirement Owner to hire Commissioning Authority prior to the end of DD. Systems include HVAC&R, domestic
hot water pumps and controls, electrical service and distribution, lighting and controls, renewable
energy. Exterior enclosure to be included in OPR/BOD. Documentation includes facility operations
Notes Solicit CxA during DD
Next Steps Provide CxA contact list 28-Dec lArchE
EAp 2 Minimum Energy Performance D Prereq ArchE
Requirement Option 1 whole building energy simulation to demonstrate 5% reduction over ASHRAE 90.1 - 2010
via energy model. OR Option 2 Prescriptive Compliance by meeting ASHRAE 50%Advanced Energy
Design Guide. OR Option 3 Prescriptive compliance using Advanced Buildings Core Performance
Guide.
Notes Energy model required
Next Steps Review MEP DD plans, build energy model 9-Jan ArchE
33
Req.
Req.
Port Orchard Community Events Center Page 283 of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
Back to Agenda
0
❑Y
EAp 3 Building -Level Energy Metering D Prereq ArchE Req.
Requirement Install base building energy meters or submeters that can be aggregated to provide base building -
level data representing total building energy consumption. Commit to sharing data with USGBC at
Notes Track energy use for 5 years and submit to LEED
Next Steps Draft letter to be provided to owner 28-Dec ArchE
EAp 4 Fundamental Refrigerant Management D Prereq
Requirement Do not use CFCs in HVAC & R equipment.
Notes Project will comply
Next Steps I MEP plans to be provided 28-Dec
EA 1 Enhanced Commissioning C Attempting Owner
Requirement Option 1, Path 1: Use a 3rd party CxA who in addition to Fundamental Commissioning will review
submittals, develop a systems manual, • verify training of personnel, • perform post occupancy review
at 8-10 months, develop an ongoing commissioning plan. (3 p) OR Option 1, Path 2: Monitoring -
Based approach that combines achieving Option 1 with an M&V approach. (4pts) AND/OR Option 2:
Complete an envelope commissioning process per NIBS Guidelines. (2 p)
Notes Enhanced scope assumed. Envelope commissioning to be explored.
Next Steps Solicit CxA 3-Jan Owner
5 1 4 1 1 9 JEA2 Optimize Energy Performance D
Requirement Points for levels of energy use reduction beyond required.
Notes Whole building energy simulation required
Next Steps Review MEP DID plans, build energy model 9-Jan ArchE
t1 JEA 3 Advanced Energy Metering D Attempting ArchE
Requirement Install advance energy metering which meets required characteristics for all whole building sources
Notes
Next Steps Determine feasibility with MEP 9-Ian ArchE
z JEA4 Demand Response C NA
3 1 EA 5 Renewable Energy Production* D Attempting ArchE
Requirement (M.1) Use on -site renewable energy systems or procure renewable energy from offsite sources for
all or a portion of the building's annual building energy use. Points achieved for implementing one
or more strategies using table. Tier 1: On -site renewable energy generation, Tier 2: New off -site
renewable energy,Tier 3: Off -site renewable energy.
Notes v4.1
Next Steps I Revisit if points are needed 9-Jan ArchE
EA 6 Enhanced Refrigerant Management D NA
2 EA 7 Green Power and Carbon Offsets LC Attempting ArchE
Requirement Purchase 50% (1 p) or 100% (2 p) of energy costs fora minimum of 5 years from Green-e certified
renewable sources in the US.
Notes Revisit if points needed - In v4.1 it is married to Renewable Energy Production above
Next Steps I I Revisit 9-Jan ArchE
Req.
6
18
z
3
2
Port Orchard Community Events Center Page 2W of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
Back to Agenda
❑y
s IMaterials and Resources
MRp 1 Storage and Collection of Recyclables D PreReq Owner
Requirement Provide easily accessible area for collection and storage of recyclables -minimum of paper,
cardboard, glass, plastics and metals. Provide safe collection area for two of the following -
Notes I Info. from owner at a later date.
Next Steps I I Identify and provide storage location 28-Dec Owner
MRp 2 CEtD Waste Management Planning C Prereq
Requirement Implement construction waste and demolition diversion plan that identifies at least five (5)
Notes
Project will need to source separate or pursue waste prevention. ArchE can provide a sample plan if
needed.
Provide plan
Next Steps
2 1 2 1 1 MR 1
Building Life -Cycle Impact Reduction*
C
Attempting ArchE
Requirement
(v4.1) Demonstrate reduced environmental effects during initial project decision -making by reusing
existing building resources or demonstrating a reduction in materials use through life -cycle
assessment. Achieve one of the following options: Option 1. Building and Material Reuse - Maintain
existing structural elements 15-75% by area (1-5 p.) OR Option 2. Whole Building Life -Cycle
Assessment - Path 1: Conduct a life -cycle assessment (LCA) of the project's structure and enclosure
(1 p). Path 2: Conduct LCA that demonstrates a min. of 5% reduction, compared with a baseline
building in at least 3 of 6 impact categories, one must be global warming potential (2 p). Path 3:
Min.10% reduction (3 p). Path 4: Meet requirements of Path 3 and incorporate reuse and/or salvage
materials into the project's structure and enclosure. Demonstrate reductions of at least 20%
reduction for global warming potential and 10% reduction in 2 additional impact categories listed (4
p). No impact category may increase more than 5% compared with the baseline building.
Notes
Whole Building LCA
Next Steps
Explore further with Architect 9-Ian ArchE
t1 IMR 2
BPDO - Environmental Product Decl.
C
Attempting
ArchE
Requirement
Option 1: Use at least 20 different permanently installed products sourced from at least 5 different
manufacturers that have Environmental Product Declarations (1 p). AND/OR Option 2: Use third
party certified products that demonstrate impact reduction in min 3 of 6 environmental impacts -
GWP, ODP, acidification, eutrophication, ground -level ozone, and non renewable energy use -for
50%, by cost, of the total value of permanently installed products in the project (1 p). Local
Notes
0
Provide guidance for best achievable
Next Steps
Coordinate with architect 9-Jan ArchE
2 MR 3
BPDO - Sourcing of Raw Materials
C
Attempting
ArchE
Requirement
Option 1: Use 20 different permanently installed products from at least 5 different manufacturers
that have publicly released sustainable reporting from their raw material suppliers. (1 p) OR Option
2: Use building materials for 25% by cost that combined meet one of 5 criteria - "Take back"
programs, bio-based material, FSC, reused, or recycled. Double for local (100 mile radius) and no
more than 30% structure (1 p)
Notes
Building material costs are a prime consideration
Next Steps Confirm desire to pursue 9-Jan ArchE
MR 4 BPDO - Material Ingredients C Attempting ArchE
Requirement Option 1: Use 20 different permanently installed products from at least 5 different manufacturers
that publish the chemical inventory to 0.1% of their products through direct disclosure or third party
certification - health product declaration, Cradle to Cradle certification, or other approved program.
(1 p) AND/OR Option 2: Use permanently installed materials with optimized ingredients for 25% by
cost of building materials - GreenScreen, Cradle to Cradle, REACH, or other (1 p). AND/OR Option 3:
Use permanently installed materials with 25% by cost able to provide supply chain documentation
for worker safety and health. (1 p)
Notes I Provide guidance for best achievable
Next Steps I 1coordinate with architect 9-Jan ArchE
Req.
Req.
5
2
2
2
Port Orchard Community Events Center Page 2V of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
2 1 MR 5 C&D Waste Management C Attempting GC 2
Requirement Option 1: Divert 50% C&D waste and 3 waste streams (1 p) OR 75% and 4 waste streams (2 p) OR
Notes IVerify source separation is possible
Next Steps I lWaste management plan
28-Dec IGC
2 ossible Points;
EQp 1 Minimum Indoor Air Quality Performance D Prereq Sider+Byers
Requirement Meet ventilation requirements of ASHRAE 62.1-2010, including airflow monitoring stations.
Notes Make client aware of air flow requirement - greater than 1,000 cfm
Next Steps I Mechanical plans with air distribution 28-Dec Sider+Byers
EQp 2 Environmental Tobacco Smoke Control D Prereq Owner
Requirement No Smoking in building or within 25 feet of openings, or on site. Signage to be posted within 10' of
all building entrances.
Notes Written policy required. Signage must be permanent and contain specified language.
Next Steps Identify signage locations 28 Dec Owner
EQ 1 Enhanced Indoor Air Quality Strategies D Attempting RFM Arch
Requirement Option 1: Implement entryway systems (10' inside in direction of travel), MERV 13 filtration and
separately exhaust chemical spaces. (1 p) OR Option 2: Exterior contamination prevention (evaluate
ambient air quality at intakes), increased ventilation, monitor CO2, additional contaminant control
or monitoring if applicable. (1 p)
Notes Option 2 - Monitor CO2 within ALL densely occupied spaces (Defined as 25 occupants per 1,000 sf).
Next Steps I Identify qualifying spaces 9-Jan RFM Arch
EQ 2 Low -Emitting Materials* C Attempting RFM Arch
Requirement (v4.1) Achieve threshold of compliance for the following products: Interior paints & coatings at 75%
emissions/100% VOC content per SCAQMD 2007; Interior adhesives & sealants at 75%
emissions/100% VOC content per SCAQMD 2017; Flooring at 90% emissions; Composite Wood at
75% ULEF or no added urea; Wall panels at 75% emissions; Ceilings at 90% of emissions; Insulation
at 75% of emissions; furniture at 75% by cost. 2 categories = 1 p, 3 categories = 2 p, 4 categories =
3 p, 5 categories 3 p + exemp.
Paints, ceilings, insulation and flooring are all very feasible. Basis of Design products must have
Notes emissions. Specifications are important. ArchE will provide Div. 1 spec section.
Next Steps Product specifications 28-Dec RFM Arch
EQ 3 Construction IAQ Management Plan C Attempting GC
Requirement Implement IAQ Management Plan, including keeping HVAC equipment and vent openings sealed,
Req.
Req.
2
3
Notes Standard practice. ArchE can provide a sample plan if needed.
Next Steps Provide management plan 9-Jan GC
2 JEQ4 Indoor Air Quality Assessment*
C
Attempting
Owner 2
Requirement (v4.1) Option 1: Full flush -out before occupancy of 14,000 cf OSA/gsf while maintaining 60° - 80 °
temp and 60% max humidity OR Partial flush of 3,500 cf OSA/gsf and then proceeding during
occupancy at lower rate (1 p) OR Option 2, Path 1: Air testing of particulate matter and inorganic
ases to meet target limits. 1 AND OR Path 2: Air testing of VOCs 1
Notes Particulate and VOC testing
Next Steps lConfirm Owner's interest in pursuing 9-Jan Owner
EQ 5 Thermal Comfort
D
Attempting
ArchE 1
Requirement Design HVAC and envelope to meet ASHRAE 55-2010 (or ISO 7730:2005 or CEN15251:2007) AND
provide individual thermal controls to 50% of individual occupant spaces and ALL shared multi -
occupant spaces. Controls to address air temp, radiant temp, air speed or humidity.
Notes
Next Steps
Can be difficult depending on zoning and programming.
Confirm desire to pursue 12-Jan ArchE
Port Orchard Community Events Center Page 2V of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
Back to Agenda
EQ 6 Interior Lighting D Attempting Blanca 2
Requirement Option 1: For 90% of individual occupant spaces and all multi -occupant spaces, provide controls
with at least 3 levels of lighting. (1 p) AND/OR Option 2: Implement 4 of 8 lighting strategies - a)
No uplighting that can hit occupants; b) CRI of 80+; c) Rated life of 24,000 hrs. or L70 for LED for
75% of connected load; d) Limit direct only overhead lighting to 25% or less of lighting load; e) Meet
given thresholds for surface reflectance for 90% of occ. floor area, f) Meet reflectance thresholds for
furniture; g) Meet wall surface illuminance reps for 75% of occ. floor area, along with e) and f), or h)
Meet ceiling illuminance reqs for 75% of occ. floor area, along with e) and f). (1 p)
Notes (Option 1 is typically feasible with dimming switches but may require task lamps for workstation
Next Steps Lighting plan 28-Dec Blanca
3 1 EQ 7 Daylight D Attempting ArchE 3
Requirement Provide glare control. AND Option 1: Use simulation to demonstrate 50%/75%/90%spatial daylight
autonomy AND annual sunlight exposure <10% (2-3 p). OR Option 2: Simulation to demonstrate
illuminance between 300 and 3000 lux for 75%/90% regularly occupied area (1-2 p); Or Option 3:
Measurement to demonstrate illuminance between 300 and 3000 lux for 75°0/90% regularly
occu iea area. t-j
Notes I Can be difficult to achieve. DL Simulation required with no guarantee of success.
Next Steps I jAssess floor plan and sun control 9-Jan ArchE
tI JEQ8 Quality Views
D
Attempting
ArchE
Requirement Direct line of site to outdoors for 75% of regularly occupied area AND meet 2 of 4 view quality
factors - multiple lines of sight 90% apart; flora/fauna/sky/movement,unobstructed views within 3
times head height; view actor of 3 or greater per cited study.
Notes Review floor plan for feasibility
Next Steps Asses floor plan and site 9-Jan ArchE
EQ 9 Acoustic Performance*
D
Attempting
ArchE
Requirement (v4.1) For all occupied spaces, meet two of the following criteria: HVAC background noise, sound
Notes
Next Steps
transmission, or reverberation time. Acoustic engineer likely needed.
Acoustic engineer available for this project
Will send info to architect for review by AE 9-Jan ArchE
Port Orchard Community Events Center Page 2q8 of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
Back to Agenda
I Innovation Possible Points:
1 _JIn 1.1 1Low mercury lamps D Attempting Sider+Byers 1
Requirement Provide LED lamps
Notes 100% LEDs will comply.
Next Steps Generate light fixture schedule 9-Jan Sider+Byers
In 1.2 All -Gender Restrooms (Pilot) D Attempting RFM Arch 1
Requirement Provide single or multi -stall restroom facilities to be used by every occupant. The quantity of stalls
planned for and provided shall not be less than the total quantity of stalls in restrooms of a
Notes
Must meet LEED Indoor Water Use Reduction Prerequisite requirements.
Next Steps
Verify restroom plans 9-Jan RFM Arch
In 1.3
Exemplary Performance in Acoustic Perform.*
D
Attempting
ArchE
Requirement
(v4.1) For all occupied spaces, meet all three of the following criteria: HVAC background noise;
sound transmission; or reverberation time.
Notes
Acoustic engineer available for this project
Next Steps
Will send info to architect for review by AE 9-Jan ArchE
In 1.4
Green Building Education
D
Attempting
ArchE 1
Requirement
Provide actively instructional public education about green building strategies and solutions used in
the project including two out of the three following elements: a comprehensive educational signage
program, development of a manual, guideline, or case study to inform future building design, and
Notes Include supporting documentation for two chosen elements
Next Steps Verify owner's interest in pursuing 18-Jan ArchE
In 1.5 PBT Source Reduction
D Attempting
ArchE
Requirement Lead, Cadmium and Copper reduction in materials.
Notes May be attainable.
Next Steps I Provide information to GC 9-Jan ArchE
In 2 LEED Accredited Professional
D
Attempting
ArchE
1 1 2 Regional Priori threshold Possible Points: 4
1 RP 1 Demand Response 1 1
1 RP2 Renewable Energy Production 2 1
RP3 BPDO - EPDs 1 1
RP4 BPDO - Sourcing 1 1
Port Orchard Community Events Center Page 2EY of 307 Arch Ecology LLC
LEED v4 Checklist 01/23/2023
CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT
THIS Agreement is made effective as of the 29th day of July 2020, by and between the City of Port
Orchard, a municipal corporation, organized under the laws of the State of Washington, whose address is:
CITY OF PORT ORCHARD, WASHINGTON (hereinafter the "CITY")
216 Prospect Street
Port Orchard, Washington 98366
Contact: Mayor Robert Putaansuu Phone: 360.876.4407 Fax: 360.895.9029
and Rice Fergus Miller, Inc., a corporation, organized under the laws of the State of Washington,
doing business at:
275 Fifth Street, Suite 100
Bremerton, WA 98337
(hereinafter the "CONSULTANT")
Contact: Steven M. Rice Phone: 360-377-3778 Fax:
for professional services in connection with the following Project:
The Port Orchard Downtown Community Event Center Project
TERMS AND CONDITIONS
1. Services by Consultant.
A. The Consultant shall perform the services described in the Scope of Work attached to this
Agreement as Exhibit "B." The services performed by the Consultant shall not exceed the Scope of Work
without prior written authorization from the City. In performing such services, the Consultant shall at all
times comply with all Federal, State, and local laws and regulations applicable to the performance of such
services. The Consultant shall perform the services diligently and completely in accordance with
professional standards of conduct and performance for Consultant's profession.
B. The City may from time to time require changes or modifications in the Scope of Work.
Such changes, including any decrease or increase in the amount of compensation, shall be agreed to by the
parties and incorporated in written amendments to the Agreement.
2. Schedule of Work.
A. The Consultant shall perform the services described in the Scope of Work in accordance
with the tasks identified within Exhibit `B" and the terms of this Agreement. If delays beyond the
Consultant's reasonable control occur, the parties will negotiate in good faith to determine whether an
extension is appropriate.
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FfNAL.docx Rev 7/18/2019
1 of 10
Page 288 of 307
B. The Consultant is authorized to proceed with services upon receipt of a written Notice to
Proceed.
3. Terms. This Agreement shall commence on July 29, 2020 ("Commencement Date") and shall
terminate March 31, 2022 unless extended or terminated in writing as provided herein. The City
reserves the right to offer two (2) one-year extensions prior to contract expiration to retain
the selected company's services.
4. Compensation.
LUMP SUM. Compensation for these services shall be a Lump Sum of $400,000.00.
5. Payment.
A. The Consultant shall maintain time and expense records and provide them to the City
monthly after services have been performed, along with monthly invoices in a format acceptable to the City
for work performed to the date of the invoice.
B. All invoices shall be paid by City warrant within thirty (30) days of receipt of a proper
invoice. If the City objects to all or any portion of any invoice, it shall so notify the Consultant of the same
within fifteen (15) days from the date of receipt and shall pay that portion of the invoice not in dispute, and
the parties shall immediately make every effort to settle the disputed portion.
C. The Consultant shall keep cost records and accounts pertaining to this Agreement available
for inspection by City representatives for three (3) years after final payment unless a longer period is
required by a third -party agreement. Copies shall be made available on request.
D. On the effective date of this Agreement (or shortly thereafter), the Consultant shall comply
with all federal and state laws applicable to independent contractors, including, but not limited to, the
maintenance of a separate set of books and records that reflect all items of income and expenses of the
Consultant's business, pursuant to Revised Code of Washington (RCW) 51.08.195, as required by law, to
show that the services performed by the Consultant under this Agreement shall not give rise to an employer -
employee relationship between the parties, which is subject to Title 51 RCW, Industrial Insurance.
E. If the services rendered do not meet the requirements of the Agreement, the Consultant will
correct or modify the work to comply with the Agreement. The City may withhold payment for such work
until the work meets the requirements of the Agreement.
6. Discrimination and Compliance with Laws
A. The Consultant agrees not to discriminate against any employee or applicant for
employment or any other person in the performance of this Agreement because of race, creed, color,
national origin, marital status, sex, age, disability, or other circumstance prohibited by federal, state, or
local law or ordinance, except for a bona fide occupational qualification.
B. Even though the Consultant is an independent contractor with the authority to control and
direct the performance and details of the work authorized under this Agreement, the work must meet the
approval of the City and shall be subject to the City's general right of inspection to secure the satisfactory
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FfNAL.docx Rev 7/18/2019
2of10
Page 289 of 307
completion thereof. The Consultant agrees to comply with all federal, state and municipal laws, rules and
regulations that are now effective or become applicable within the term(s) of this Agreement to the
Consultant's business, equipment and personnel engaged in operations covered by this Agreement or
accruing out of the performance of such operations.
C. The Consultant shall obtain a City of Port Orchard business license prior to commencing
work pursuant to a written Notice to Proceed.
D. Violation of this Paragraph 6 shall be a material breach of this Agreement and grounds for
cancellation, termination, or suspension of the Agreement by the City, in whole or in part, and may result
in ineligibility for further work for the City.
7. Relationship of Parties. The parties intend that an independent contractor -client relationship will
be created by this Agreement. As the Consultant is customarily engaged in an independently established
trade which encompasses the specific service provided to the City hereunder, no agent, employee,
representative or sub -consultant of the Consultant shall be or shall be deemed to be the employee, agent,
representative or sub -consultant of the City. In the performance of the work, the Consultant is an
independent contractor with the ability to control and direct the performance and details of the work, the
City being interested only in the results obtained under this Agreement. None of the benefits provided by
the City to its employees, including but not limited to compensation, insurance, and unemployment
insurance, are available from the City to the employees, agents, representatives or sub -consultants of the
Consultant. The Consultant will be solely and entirely responsible for its acts and for the acts of its agents,
employees, representatives and sub -consultants during the performance of this Agreement. The City may,
during the term of this Agreement, engage other independent contractors to perform the same or similar
work that the Consultant performs hereunder.
8. Suspension and Termination of Agreement
A. Termination without cause. This Agreement may be terminated by the City at any time for
public convenience, for the Consultant's insolvency or bankruptcy, or the Consultant's assignment for the
benefit of creditors.
B. Termination with cause. This Agreement may be terminated upon the default of the
Consultant and the failure of the Consultant to cure such default within a reasonable time after receiving
written notice of the default.
C. Rights . Upon Termination.
1. With or Without Cause. Upon termination for any reason, all finished or unfinished
documents, reports, or other material or work of the Consultant pursuant to this Agreement shall
be submitted to the City, and the Consultant shall be entitled to just and equitable compensation for
any satisfactory work completed prior to the date of termination, not to exceed the total
compensation set forth herein. The Consultant shall not be entitled to any reallocation of cost,
profit or overhead. The Consultant shall not in any event be entitled to anticipated profit on work
not performed because of such termination. The Consultant shall use its best efforts to minimize
the compensation payable under this Agreement in the event of such termination. Upon
termination, the City may take over the work and prosecute the same to completion, by contract or
otherwise.
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FfNAL.docx Rev 7/18/2019
3of10
Page 290 of 307
2. Default. If the Agreement is terminated for default, the Consultant shall not be
entitled to receive any further payments under the Agreement until all work called for has been
fully performed. Any extra cost or damage to the City resulting from such default(s) shall be
deducted from any money due or coming due to the Consultant. The Consultant shall bear any extra
expenses incurred by the City in completing the work, including all increased costs for completing
the work, and all damage sustained, or which may be sustained, by the City by reason of such
default.
D. Suspension. The City may suspend this Agreement, at its sole discretion. Any
reimbursement for expenses incurred due to the suspension shall be limited to the Consultant's reasonable
expenses, and shall be subject to verification. The Consultant shall resume performance of services under
this Agreement without delay when the suspension period ends.
E. Notice of Termination or Suspension. If delivered to the Consultant in person, termination
shall be effective immediately upon the Consultant's receipt of the City's written notice or such date as
stated in the City's notice of termination, whichever is later. Notice of suspension shall be given to the
Consultant in writing upon one week's advance notice to the Consultant. Such notice shall indicate the
anticipated period of suspension. Notice may also be delivered to the Consultant at the address set forth in
Section 15 herein.
9. Standard of Care. The Consultant represents and warrants that it has the requisite training, skill
and experience necessary to provide the services under this Agreement and is appropriately accredited and
licensed by all applicable agencies and governmental entities. Services provided by the Consultant under
this Agreement will be performed in a manner consistent with that degree of care and skill ordinarily
exercised by members of the same profession currently practicing in similar circumstances.
10. Ownership of Work Product.
A. All data, materials, reports, memoranda, and other documents developed under this
Agreement whether finished or not shall become the property of the City, shall be forwarded to the City at
its request and may be used by the City as it sees fit. Upon termination of this Agreement pursuant to
paragraph 8 above, all finished or unfinished documents, reports, or other material or work of the Consultant
pursuant to this Agreement shall be submitted to the City. Any reuse or modification of such documents,
reports or other material or work of the Consultant for purposes other than those intended by the Consultant
in its scope of services under this Agreement shall be at the City's risk.
B. All written information submitted by the City to the Consultant in connection with the
services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at
least the same extent as the Consultant safeguards like information relating to its own business. If such
information is publicly available or is already in the Consultant's possession or known to it, or is rightfully
obtained by the Consultant from third parties, the Consultant shall bear no responsibility for its disclosure,
inadvertent or otherwise. The Consultant is permitted to disclose any such information only to the extent
required by law, subpoena or other court order.
11. Work Performed at the Consultant's Risk. The Consultant shall take all precautions necessary
and shall be responsible for the safety of its employees, agents and sub -consultants in the performance of
the work hereunder, and shall utilize all protection necessary for that purpose. All work shall be done at
the Consultant's own risk, and the Consultant shall be responsible for any loss of or damage to materials,
tools, or other articles used or held by the Consultant for use in connection with the work.
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FfNAL.docx Rev 7/18/2019
4of10
Page 291 of 307
12. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials,
employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits,
including all legal costs and attorneys' fees, arising out of or resulting from the acts, errors or omissions of
the Consultant in performance of this Agreement, except for injuries or damages caused by the sole
negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then,
in the event of liability for damages arising out of bodily injury to persons or damages to property caused
by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials,
employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the
Consultant's negligence. The provisions of this section shall survive the expiration or termination of this
Agreement.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES
OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
13. Insurance. The Consultant shall procure and maintain for the duration of this Agreement,
insurance against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Consultant, its agents, representatives, or
employees.
A. Minimum Scope of Insurance
Consultant shall obtain insurance of the types described below:
1. Automobile Liability insurance covering all owned, non -owned, hired and leased
vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01
or a substitute form providing equivalent liability coverage. If necessary, the policy
shall be endorsed to provide contractual liability coverage.
2. Commercial General Liability insurance shall be written on ISO occurrence form CG
00 01 or a substitute form providing equivalent liability coverage and shall cover
liability arising from premises, operations, independent contractors and personal injury
and advertising injury. The City shall be named by endorsement as an additional
insured under the Consultant's Commercial General Liability insurance policy with
respect to the work performed for the City.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of the
State of Washington.
4. Professional Liability insurance appropriate to the Consultant's profession.
B. Minimum Amounts of Insurance
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FfNAL.docx Rev 7/18/2019
5of10
Page 292 of 307
Consultant shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident.
2. Commercial General Liability insurance shall be written with limits no less than
$1,000,000 each occurrence, $2,000,000 general aggregate.
3. Workers' Compensation Employer's Liability each accident $1,000,000, Employer's
Liability Disease each employee $1,000,000, and Employer's Liability Disease —
Policy Limit $1,000,000.
4. Professional Liability insurance shall be written with limits no less than $1,000,000
per claim and $1,000,000 policy aggregate limit.
C. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions for
Automobile Liability, Professional Liability (as to Sections C.2 and CA), and Commercial
General Liability insurance:
1. The Consultant's insurance coverage shall be primary insurance as respect the City.
Any insurance, self-insurance, or insurance pool coverage maintained by the City shall
be excess of the Consultant's insurance and shall not contribute with it.
2. The Consultant shall provide the City with written notice of any policy cancellation,
within two business days of their receipt of such notice.
3. The City will not waive its right to subrogation against the Consultant. The
Consultant's insurance shall be endorsed acknowledging that the City will not waive
their right to subrogation. The Consultant's insurance shall be endorsed to waive the
right of subrogation against the City, or any self-insurance, or insurance pool coverage
maintained by the City.
4. If any coverage is written on a "claims made" basis, then a minimum of a three (3) year
extended reporting period shall be included with the claims made policy, and proof of
this extended reporting period provided to the City.
D. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII.
E. Verification of Coverage
The Consultant shall furnish the City with original certificates and a copy of the amendatory
endorsements, including but not necessarily limited to the additional insured endorsement,
evidencing the insurance requirements of the Consultant before commencement of the work.
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FfNAL.doex Rev 7/18/2019
6of10
Page 293 of 307
Back to Agenda
F. Personal Liability:
Owner further agrees that, to the fullest extent permitted by law, no shareholder,
officer, director, partner, principal or employee of Rice Fergus Miller shall have
personal liability under this Indemnification provision, under any provision of the
Agreement, or for any matter in connection with the services provided in connection
with the Project.
14. Assigning or Subcontracting. The Consultant shall not assign, transfer, subcontract or encumber
any rights, duties, or interests accruing from this Agreement without the express prior written consent of
the City, which consent may be withheld in the sole discretion of the City.
15. Notice. Any notices required to be given by the City to the Consultant or by the Consultant to the City
shall be in writing and delivered to the parties at the following addresses:
Robert Putaansuu
Mayor
216 Prospect Street
Port Orchard, WA 98366
Phone: 360.876.4407
Fax: 360.895.9029
CONSULTANT
Steve Rice, Principal
Rice Fergus Miller, Inc.
275 5th Street, Suite 100 Bremerton, WA 98337
Phone: 360-377-8773
Fax:
16. Resolution of Disputes and Governing Law.
A. Should any dispute, misunderstanding or conflict arise as to the terms and conditions
contained in this Agreement, the matter shall first be referred to the Mayor, who shall determine the term
or provision's true intent or meaning. The Mayor shall also decide all questions which may arise between
the parties relative to the actual services provided or to the sufficiency of the performance hereunder.
B. If any dispute arises between the City and the Consultant under any of the provisions of
this Agreement which cannot be resolved by the Mayor's determination in a reasonable time, or if the
Consultant does not agree with the Mayor's decision on a disputed matter, jurisdiction of any resulting
litigation shall be filed in Kitsap County Superior Court, Kitsap County, Washington.
C. This Agreement shall be governed by and construed in accordance with the laws of the
State of Washington. In any suit or action instituted to enforce any right granted in this Agreement, the
substantially prevailing party shall be entitled to recover its costs, disbursements, and reasonable attorneys'
fees from the other party.
17. General Provisions.
A. Non -waiver of Breach. The failure of either party to insist upon strict performance of any
of the covenants and agreements contained herein, or to exercise any option herein contained in one or more
instances, shall not be construed to be a waiver or relinquishment of said covenants, agreements, or options,
and the same shall be in full force and effect.
City of Port Orchard and Rice Fergus Miller
Public Works Project No. n/a 066-20
Professional Service Agreement Contract No.
SA2020002 South Kitsap Community Event Center\2-Admiu\Contract\RFM Agreement\MASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FINAL. docx Rev 7/18/2019
7of10
Page 294 of 307
B. Modification. No waiver, alteration, modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and
the Consultant.
C. Severability. The provisions of this Agreement are declared to be severable. If any
provision of this Agreement is for any reason held by a court of competent jurisdiction to be invalid or
unconstitutional, such invalidity or unconstitutionality shall not affect the validity or constitutionality of
any other provision.
D. Entire Agreement. The written provisions of this Agreement, together with any Exhibits
attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City,
and such statements shall not be effective or be construed as entering into or forming a part of or altering
in any manner whatsoever, the Agreement or the Agreement documents. The entire agreement between
the parties with respect to the subject matter hereunder is contained in this Agreement and the Exhibits
attached hereto, which may or may not have been dated prior to the execution of this Agreement. All of
the above documents are hereby made a part of this Agreement and form the Agreement document as fully
as if the same were set forth herein. Should any language in any of the Exhibits to this Agreement conflict
with any language contained in this Agreement, then this Agreement shall prevail.
18. Title VI
The City of Port Orchard, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252,
42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation
subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the
Department of Transportation issued pursuant to such Act, must affirmatively insure that its contracts
comply with these regulations.
Therefore, during the performance of this Agreement, the Consultant, for itself, its assignees, and
successors in interest agrees as follows:
1. Compliance with Regulations: The Consultant will comply with the Acts and the Regulations
relative to Nondiscrimination in Federally -assisted programs of the U.S. Department of
Transportation, Federal Highway Administration (FHWA), as they may be amended from time to
time, which are herein incorporated by reference and made a part of this Agreement.
2. Nondiscrimination: The Consultant, with regard to the work performed by it during this
Agreement, will not discriminate on the grounds of race, color, national origin, sex, age,
disability, income -level, or LEP in the selection and retention of subcontractors, including
procurements of materials and leases of equipment. The Consultant will not participate directly or
indirectly in the discrimination prohibited by the Acts and the Regulations as set forth in
Appendix A, attached hereto and incorporated herein by this reference, including employment
practices when this Agreement covers any activity, project, or program set forth in Appendix B of
49 C.F.R. part 21.
3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all
solicitations, either by competitive bidding, or negotiation made by the Consultant for work to be
performed under a subcontract, including procurements of materials, or leases of equipment, each
potential subcontractor or supplier will be notified by the Consultant of the Consultant's
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FINAL.doex Rev 7/18/2019
8of10
Page 295 of 307
Back to Agenda
obligations under this Agreement and the Acts and the Regulations relative to Non-discrimination
on the grounds of race, color, national origin, sex, age, disability, income -level, or LEP.
4. Information and Reports: The Consultant will provide all information and reports required by
the Acts, the Regulations and directives issued pursuant thereto and will permit access to its
books, records, accounts, other sources of information, and its facilities as may be determined by
the City or the FHWA to be pertinent to ascertain compliance with such Acts, Regulations, and
instructions. Where any information required of the Consultant is in the exclusive possession of
another who fails or refuses to furnish the information, the Consultant will so certify to the City
or the FHWA, as appropriate, and will set forth what efforts it has made to obtain the information.
5. Sanctions for Noncompliance: In the event of the Consultant's noncompliance with the Non-
discrimination provisions of this Agreement, the City will impose such contract sanctions as it or
the FHWA may determine to be appropriate, including, but not limited to:
1. withholding payments to the Consultant under the Agreement until the contractor
complies; and/or
2. cancelling, terminating, or suspending the Agreement, in whole or in part.
6. Incorporation of Provisions: The Consultant will include the provisions of paragraphs one
through six in every subcontract, including procurements of materials and leases of equipment,
unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The Consultant
will take action with respect to any subcontract or procurement as the City or the FHWA may
direct as a means of enforcing such provisions including sanctions for noncompliance. Provided,
that if the Consultant becomes involved in, or is threatened with litigation by a subcontractor, or
supplier because of such direction, the Consultant may request the City to enter into any litigation
to protect the interests of the City. In addition, the Consultant may request the United States to
enter into the litigation to protect the interests of the. United States.
IN WITNESS WHEREOF, the parties have executed this Agreement on the day and year set forth
above.
CITY OF PORT ORCHARD, CONSULTANT
WASHINGTON �
By: By:
Robert Putaansuu, Mayor
Name: Steven M. Rice
ATTEST/AUmrsotL
ell Title: Principal
By:
r C
City Clerk.
APPP, V� FORM:
By:
Otte A. Archer, CityAttorney-,--__
City nf'Port Orchard and Kice i-ergus iwiier
Public Works Project No. N A
PrgfessionalService Agreement Contract No. 066-20
S:12020002 South Kitsap Community Evmt Cmtart2-AdmndC'ontractVtfAf AgrarnerAWASTER 2018 Prof Svcs Agreemaa SEC 129.18 (%ith SEC wile) 7 18,19 - STAN EDITS (Charlotte
A. Archer) PENAL. docz Rev 7/ 18/2019
9of10
Page 296 of 307
APPENDIX A
During the performance of this Agreement, the Consultant, for itself, its assignees, and successors in
interest agrees to comply with the following non-discrimination statutes and authorities; including but not
limited to:
Pertinent Non -Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 C.F.R. Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42
U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been
acquired because of Federal or Federal -aid programs and projects);
• Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the
basis of sex);
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits
discrimination on the basis of disability); and 49 C.F.R. Part 27;
• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits
discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 USC§ 471, Section 4 7123), as amended,
(prohibits discrimination based on race, creed, color, national origin, or sex);
• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs
or activities" to include all of the programs or activities of the Federal -aid recipients, sub -
recipients and contractors, whether such programs or activities are Federally funded or not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis
of disability in the operation of public entities, public and private transportation systems, places
of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as
implemented by Department of Transportation regulations at 49 C.P.R. parts 37 and 38;
• The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits
discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low -Income Populations, which ensures discrimination against minority
populations by discouraging programs, policies, and activities with disproportionately high and
adverse human health or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English
Proficiency, and resulting agency guidance, national origin discrimination includes discrimination
because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take
reasonable steps to -ensure that LEP persons have meaningful access to your programs (70 Fed.
Reg. at 74087 to 74100);
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from
discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).
City of Port Orchard and
Public Works Project No.
Professional Service Agreement Contract No.
S:A2020002 South Kitsap Community Event Center\2-AdminAContractARFM AgreementAMASTER 2018 Prof Svcs Agreement SEC 1.29.18 (with SEC edits) 7.18.19 - STAN EDITS (Charlotte
A. Archer) FINAL.docx Rev 7/18/2019
10 of 10
Page 297 of 307
Back to Agenda
RIC(ergusmILLER 275 Fifth Street, Suite 100 Bremerton, WA 98337
(360) 377-8773 rfmarch.com
ARCHITECTURE INTERIORS PLANNING VIZLAB EXHIBIT B - REVISED 7/29/20
SOUTH KITSAP COMMUNITY EVENT CENTER
DRAFT SCOPE OF WORK PREPARED BY RFM
PRESENTED TO CITY OF PORT ORCHARD JULY 1, 2020
This document is in response to TASK 1 and TASK 2 of the "PFD ILA Third Draft (with NB and
SEC edits) 10.30.19 (2).
ILA TASK 1 + ILA TASK 2 = "PHASE I" SCOPE OF WORK PER RFQ
RFM PHASE 1A RFM PHASE 1B
• Provides road map for logical sequence of scope pieces -- site selection, programming
for space needs, and concept building design
• Identifies logical midpoint of combined consultant -supplied design services in response
to City's desire to proceed sequentially.
• Provides the ability to explore and potentially augment space needs with beneficial
uses not currently identified in ILA.
• Tailors public outreach and acknowledges need for outreach to master plan
stakeholders
• Adds activities and deliverables desired by the City now:
o Test multiple site options (up to three) with conceptual design for suitability
and quality of outcomes at each site
o Produce one schematic design (not three) based on agreed upon space program
at selected site
o Provide Preliminary CEC Monetary Operational Feasibility Report
o Coordinate project attributes to City of Port Orchard's consultant performing
Downtown Subarea Plan
This draft scope does not (yet) address required deliverables for the purposes of this
discussion but assumes they are pursuant to how activities are split between RFM
Phase 1A and Phase 1 B
1of5
Page 298 of 307
Back to Agenda
South Kitsap Community Center
RFM Scope of Work -DRAFT
July 2, 2020 EXHIBIT B - REVISED 7/29/20
RFM PHASE 1A:
CONCEPTUAL DESIGN
DEFINE THE PROJECT IN BASIC TERMS & REACH PRELIMINARY DESIGN PACKAGE
(APPROX. 15% OVERALL; APPROX 30% SCHEMATIC DESIGN)
Draft Management Plan
• Assist City to produce Draft Management Plan.
• Determine design team level of responsibility for project management; fit for City
• Discuss preliminary project budget creation and responsibility for maintenance.
• Discuss project timeline and milestone deliverables
• Determine frequency of meetings and get them scheduled ahead on calendars
Establish Goals and Objectives
• City of Port Orchard (COPO)
• Kitsap Regional Library (KRL)
• Kitsap Public Facilities District (KPFD)
• Other Key Stakeholders (Kitsap Bank, Port Of Bremerton, Sound West Group,
Kitsap Transit, etc.)
Public Outreach & Communication
Initiate public outreach for site attributes and for space needs
Restart continuous communication platforms
Get public outreach meetings scheduled ahead on calendars
Space Programming/Needs Assessment
• Conduct space & site programming
o With Kitsap Regional Library for library
o With Columbia Hospitality for event center
o With other identified key stakeholders (Kitsap Bank, City Of Port Orchard,
etc.)
o With public and user groups via outreach
o For other uses the design team may promote
Prepare Draft Space Programming Report
Site Analysis & Selection
• Identify approximately three sites for consideration
• Conduct factfinding: utilities, preliminary geotechnical, preliminary environmental,
zoning, shorelines, etc.
Prepare comparison matrix: ownership, opportunities and restrictions, attributes
for CEC program, developable envelope, ability to catalyze other development,
ability to boost property values and merchant business, parking, access and
transportation, etc.
2 of 5
Page 299 of 307
Back to Agenda
South Kitsap Community Center
RFM Scope of Work -DRAFT EXHIBIT B - REVISED 7/29/20
July 2, 2020
• Develop preliminary design scheme (building and site concept) in order to test
each site; describe and contrast outcomes (performance vs. goals and objectives,
layout, function, other benefits); determine preferred alternative.
3 of 5
Page 300 of 307
Back to Agenda
South Kitsap Community Center
RFM Scope of Work -DRAFT
July 2, 2020
RFM PHASE 113:
SCHEMATIC DESIGN
EXHIBIT B - REVISED 7/29/20
FURTHER DEFINE THE PROJECT, PROVIDE PRELIMINARY OPERATIONAL
FEASIBILITY & REACH SCHEMATIC DESIGN PACKAGE (APPROX. 25% OVERALL;
xx% SCHEMATIC DESIGN)
Market Analysis, Financial Viability, and Risk Assessment
• Conduct event center analysis with market information and preliminary
operational feasibility report
• Produce City Of Port Orchard portion of the feasibility study report.
Public Outreach & Communication
• Continue public outreach for preferred alternative
• Maintain continuous communication platforms
Space Programming/Needs Assessment
• Review Kitsap Public Facilities District feasibility study report findings; finalize
space programing as needed.
• Verify/confirm space needs and shared use scenarios with building users and key
stakeholders.
• Provide Preliminary CEC Monetary Operational Feasibility Report
Site Analysis
• Prepare technical report to inform architectural and site design.
o Final geotechnical, final utilities capacity, preliminary storm drainage report
o Level 2 environmental, if needed
o Biological Evaluation
o Topographic Survey
o Archeological and Cultural Resources Report including inadvertent
discovery plan
• Provide shorelines mitigation and preliminary engineering report.
Property Ownership/Master Plan
• Assist City to work with public and private entities to determine ownership of the
CEC property and proposed building.
• Update proposed Master Plan (?)
• Coordinate project attributes to City Of Port Orchard's consultant performing
Downtown Subarea Plan.
Schematic Design
• Based on updated program information and feedback from the public and City
Council, further develop preferred alternative preliminary design scheme (building
and site) to approximate __% schematic level
4 of 5
Page 301 of 307
Back to Agenda
South Kitsap Community Center
RFM Scope of Work -DRAFT
July 2, 2020 EXHIBIT B - REVISED 7/29/20
• Provide schematic level cost estimate and present to the City Council.
Task 2 City Council Action. City to review preferred alternative with public entities and
decide whether to accept additional $600,000 (estimated) for Task 3.
Notes:
Design Team fees support inherent management responsibilities, including meetings.
5 of 5
Page 302 of 307
Back to Agenda
EXHIBIT B
SOUTH KITSAP COMMUNITY EVENT CENTER
FEES PER KPFD-CPO INTERLOCAL AGREEMENT
JULY 10, 2020
ILA
RFQ
RIM
PROPOSED
CONSULTANTS
DURATION
TASKS
DELIVERABLES
TASK
TASK
PHASE
FEE
CONCEPTUAL
DESIGN
ARCH
TRANSPORTATION
PROJECT PLANNING
STRUCTURAL
ESTABLISH GOALS AND OBJECTIVES
PROFESSIONAL SERVICE CONTRACT
CIVIL
COORDINATE EXISTING MASTER
DRAFT MANAGEMENT PLAN
SURVEY
PER ILA/RFQ
PLANNING EFFORTS
PUBLIC OUTREACH REPORT
1.1
SHORELINE
9-12 MONTHS
REVIEW HISTORICAL PUBLIC INPUT
SPACE PROGRAMMING REPORT
1
1.2.1
1A
GEOTECH
$200 000
PUBLIC OUTREACH
(3) SITE ASSESSMENT ALTERNATIVES WITH
1.2.2
ENVIRONMENTAL
PROPOSED
SPACE PROGRAMMING
DESIGN CONCEPT FOR EACH
NEEDS ASSESSMENT
HIGH LEVEL TRAFFIC, GEOTECH, STRUCTURAL,
BIOLOGIST
7 MONTHS
CONCEPT PLANNING
SURVEY, SHORELINE, GEOTECH,
HOSPITALITY
HIGH LEVEL SITE ASSESSMENT
ENVIRONMENTAL AND BIOLOGIST
NARRATIVES FOR EACH SITE ALTERNATIVE
1.4 1.2.3 CITY COUNCIL & KPFD SITE SELECTION: MARKET ANALYSIS, FINANCIAL VIABILITY & RISK ASSESSMENT
SCHEMATIC DESIGN
ARCH
INVESTIGATIVE REPORTS FOR SELECTED SITE:
LANDSCAPE
ENVIRONMENTAL ASSESSMENT
STREETSCAPE
PRELIM STORMWATER DRAINAGE REPORT
TRANSPORTATION
PRELIM GEOTECH REPORT
STRUCTURAL
BIOLOGICAL EVALUATION
CIVIL
TOPOGRAPHICAL SURVEY & CRITICAL AREAS
SURVEY
REVIEW KPFD'S FEASIBILITY REPORT
SHORELINE CODE ANALYSIS
1.2.4
SHORELINE
PER ILA/RFQ
PUBLIC OUTREACH
ARCHAEOLOGICAL & CULTURAL RESOURCES
SPACE PROGRAMMING
REPORT (INCLUDING INADVERTENT
1.2.5
GEOTECH
6-9 MONTHS
2
1.2.6
1 B
HOSPITALITY
$200 00�
NEEDS ASSESSMENT
DISCOVERY PLAN)
1.2.7
MECHANICAL
PROPOSED
INVESTIGATION OF SELECTED SITE
PROPERTY OWNERSHIP/MASTER PLAN
UTILITIES CAPACITY EVALUATION
(WATER/SEWER)
1.2.8
ELECTRICAL
9 MONTHS
SCHEMATIC DESIGN
TRAFFIC REPORT
ENVIRONMENTAL
DETERMINE SCOPE FOR ILA TASK 3
PRELIMINARY SCHEMATIC DESIGN
BIOLOGIST
CONCEPT PLANS
ARCHAEOLOGICAL
COST ESTIMATE
CULTURAL
SPACE PROGRAMMING & PUBLIC OUTREACH
COST ESTIMATING
REPORT
SCHEMATIC DESIGN AND SITE PLAN
DRAFT SCOPE FOR ILA TASK 3
2 1.2.9 CITY COUNCIL ACTION: FEASIBILITY STUDY TO START ILA TASK 3
Page 303 of 307
Back to Agenda
EXHIBIT B
RIC eYgusmILLER
ARCHITECTURE INTERIORS PLANNING VIZLAB
275 Fifth Street, Suite 100
Bremerton, WA 98337
Phone: (360) 377-8773
rfmarch.com
2020 Hourly Billing Rates
Date of Proposal:
Project:
Project No.:
The hourly billing rates shall be annually adjusted in accordance with normal salary review practices
of Rice Fergus Miller.
Principal in Charge:
$ 275.00
Senior Planner:
$ 175.00
- $ 275.00
Project Manager:
$ 130.00
- $ 190.00
Project Architect:
$ 120.00
- $ 190.00
Staff Architect:
$ 125.00
- $ 160.00
Project Designer:
$ 115.00
- $ 190.00
Staff Designer:
$ 115.00
- $ 155.00
Interior Designer:
$ 90.00
- $ 160.00
Technical Designer:
$ 95.00
- $ 155.00
Production Support:
$ 85.00
- $ 155.00
Graphics Visualization:
$ 115.00
- $ 125.00
Project Coordinator:
$ 80.00
- $ 120.00
Administrative Support Staff:
$ 80.00
- $ 120.00
Page 304 of 307
Back to Agenda
SOUTH KITSAP COMMUNITY EVENTS CENTER
PHASE 1 PROPOSED SCHEDULE
YEAR 2020
20:
MONTH
JUL AUG �SEPOCT NOV DEC
JA
WEEK STARTING DATE
6 13 20 21 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 z3 30 7 14 21 28
4
•
MV-
ILA RFQ RFM
TASK TASK PHASE
1.1 PROJECT PLANNING
7/21
CITY STUDY SESSION -CONTRACT AMENDMENTS
7/28 CITY BUSINESS SESSION - CONTRACT APPROVAL
1 1A PUBLIC OUTREACH &
1.2.1
PROGRAMMING
SITE ASSESSMENT &
12 2
CONCEPT PLAN
12/15 CONCEPT DESIGN PRESENTATION
1.4 1.2.3 CITY/KPFD SITE SELECTION
F
REVIEW KPFD
L
1.2.4
FEASIBILITY REPORT
L
F
ASSESS SITE
c
1.2.5 ALTERNATIVES FOR
L
OWNERSHIP
C
2 1.2.6 1B FINAL SITE
INVESTIGATION
PRELIMINARY
12 7
SCHEMATIC DESIGN
COST ESTIMATES
PUBLIC OUTREACH
1.2.8 SCHEMATIC DESIGN
2 1.2.9 CITY FEASIBILITY STUDY TO START ILA TASK 3
DESIGN MEETINGS
EXHIBIT B
Page 305 of 307
Back to Agenda
City of Port Orchard
216 Prospect Street, Port Orchard, WA 98366
(360) 876-4407 • FAX (360) 895-9029
Agenda Staff Report
Agenda Item No.: Discussion Item 9A
Subject: Council Choice of RMSA Required Course
for 2023
Meeting Date: February 28, 2023
Prepared by: Debbie Lund
Atty Routing No.
Atty Review Date
HR Director
366922-0008
February 22, 2023
Summary: The City maintains liability coverage through the Association of Washington Cities Risk
Management Service Agency (RMSA). As part of the coverage, RMSA has standards for the members. One
of the standards is that all employees with direct reports, elected officials, and all department heads
complete at least one AWC RMSA approved training course per year on an employment practices topic.
This year, RMSA provided more detail on which class offerings qualify for the standard. This results in a
shortened list of options. The list is attached.
Annually, council is asked to choose one course for all councilmembers to take. Once chosen, Human
Resources will assign the class utilizing the online classroom provided by RMSA. The course is pre-
recorded, and must be completed by each councilmember by year end.
For the council's information, the managers group chose to complete the Workplace Bullying course for
2023. History of previously chosen classes is provided on the attached list.
Recommendation: N/A
Relationship to Comprehensive Plan: N/A
Motion for consideration: N/A. This decision can be made by consensus.
Fiscal Impact: If there is an employment claim against an elected official (or staff supervisor) and that
person has not taken the required annual one hour class, a $1,000 deductible will be applied.
Alternatives: Do not select a topic for 2023 and provide alternative guidance.
Attachments: List of class choices for 2023.
Page 306 of 307
RMSA Catalog of Possible Courses
to Satisfy Supervisor and Council Employment Standards
Training Requirement
1/3/2023
Anti Harassment in the Workplace
(Assigned to all new employees)
Harassment in the workplace is a serious
issue that requires a thorough understanding
to promote awareness and ultimately
prevention. Improper behavior in the
workplace may have significant
consequences for those involved, for
yourself as an employee, and your employer.
Recognizing the various types of harassment
will help you to identify potential warning
signs and take the necessary steps to report
harassment. I hour, Liked by 1064 users.
Discipline and Termination
(Completed in 2019 by Council &
Managers)
In every organization, employees are let go
for various reasons. The decision to
discipline or even terminate an employee is
not one that should be taken lightly, and
there is a right and wrong way to approach
the situation. In this course, learners will
explore ways to appropriately address issues
before termination is necessary, be able to
terminate employees confidently if
discipline fails, and for employees to
understand the need for a disciplinary
process and the rules and expectations that
inform them. I hour, liked by 50 users
Sexual Harassment for Managers
(Some took in 2013)
Sexual harassment in the workplace can
happen to anyone, male or female,
regardless of sexual orientation.
Recognizing what sexual harassment is a
leader, both the subtle cues as well as the
overt advances, will help you to identify
potential warning signs and take the
necessary steps to prevent sexual
harassment. There are a number of
preventive measures that can be employed
as well as recommendations of what to do if
you or one of your employees have been or
are the victim of sexual harassment. 2 hours,
liked by 159 users
Sexual Harassment in the
Workplace
Improper behavior in the workplace may
have significant consequences both for
yourself and your employer. If you are a
victim of sexual harassment, this may create
a hostile work environment which takes a
toll on your career, your personal life, and
your health. Recognizing what sexual
harassment is, both the subtle cues as well as
the overt advances, will help you to identify
potential warning signs and take the
necessary steps to report sexual harassment.
I hour, liked by 3192 users
Workplace Bullying
(To be completed in 2023 by Managers)
When we think of bullying, we immediately
associate it with the school yard, certainly
not something we face as an adult.
Unfortunately, bullying in the workplace
occurs more often than you think. In fact,
there are various forms of bullying, from
overt forms to those which are quite passive.
Workplace bullying may have significant
consequences for those involved, for
yourself as an employee as well as your
employer. A thorough understanding of
workplace bullying will help promote
awareness and ultimately prevention.
I hour, liked by 541 users
Page 307 of 307