037-23 - Resolution - Adopting Asset Management Policy and Management ProgramDocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 RESOLUTION NO. 037-23 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, PERTAINING TO ASSET MANAGEMENT, ADOPTING AN ASSET MANAGEMENT POLICY AND ASSET MANAGEMENT PROGRAM. WHEREAS, the City's assets, including facilities, infrastructure and associated equipment, are essential to the City's ability to deliver services to residents, and maintain a high quality of life, health, and safety for residents; and WHEREAS, the City Council desires to enhance the tools that allow the City to meet its responsibility to safeguard and maintain public assets through an asset management policy and associated procedure to provide heightened oversight and control of the short-term and long-term maintenance, repair, and replacement of these assets for continued performance and reduced life cycle costs; and WHEREAS, the City worked with consultant KCI Technologies to develop an asset management policy and associated program that implements best practices and aligns with existing City policy and the Comprehensive Plan; and WHEREAS, the City Council finds that adoption of the asset management policy and program attached hereto as Exhibit A is in the best interests of the residents of Port Orchard by providing guidelines that will ensure good stewardship over City resources through a uniform method of accountability and inventory of the assets of the City; now, therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: It is the intent of the Port Orchard City Council that the recitals set forth above are hereby adopted and incorporated as findings in support of this Resolution. THAT: The City Council adopts the Asset Management Policy and Asset Management Program attached hereto as Exhibit A and incorporated herein by this reference. The Mayor or designee is delegated authority to modify the Asset Management Program, consistent with the Asset Management Policy, as needed to meet best practices and the needs of the City and its residents without further action of the City Council, provided modifications are reported to the City Council prior to December 31 of the corresponding year. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the City Clerk in authentication of such passage on this 251h day of April 2023. FDcuSigned by: raIn 1NAUAU- Brandy Wallace, MMC, City Clerk DocuSigned by: Icy' P4..-S.A. EIF5 B... Robert Putaansuu, Mayor RT ti: 2G a sFAL .��o N>9Te�USER; .� 4 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Exhibit A Strategic Asset Management Plan March 2023 Flmv edfur_ W6 D City cyf Part Omhard, WA -Prepar-ed by KD Feobnukgkp s I n o 3-27.2023 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Table of Contents EXECUTIVE SUMMARY.......................................................................................................................... 3 ACRONYMS AND DEFINITIONS............................................................................................................ 4 Acronyms.................................................................................................................................................. 4 Definitions................................................................................................................................................. 4 INTRODUCTION........................................................................................................................................ 6 Asset Management Guidance and Best Practices..................................................................................... 7 Strategic Asset Management Plan (SAMP) Framework........................................................................... 7 Envisioned Asset Management Outcomes................................................................................................ 8 ASSET MANAGEMENT POLICY............................................................................................................. 9 Scope......................................................................................................................................................... 9 Purpose...................................................................................................................................................... 9 Context...................................................................................................................................................... 9 Principles.................................................................................................................................................. 9 Alignment...............................................................................................................................................10 ASSET MANAGEMENT OBJECTIVES..................................................................................................11 Purpose....................................................................................................................................................11 Process.................................................................................................................................................... I I STRATEGIC ROADMAP..........................................................................................................................12 Objective A: Asset Management Programmatic Development..............................................................13 A1. Asset Management Team (AMT)................................................................................................13 A2. CMMS Implementation Team.....................................................................................................14 A3. Asset Inventory and Hierarchy Development..............................................................................15 A4. Asset Management Program — Strategic Funding Plan................................................................16 A5. Asset Management Training Goals Document............................................................................17 A6. Asset Management Plan (AMP) Development - Utility System..................................................18 A7. Asset Management Plan (AMP) Development - Transportation System.....................................19 Objective (B): CMMS Implementation & Training Services.................................................................21 B1. RFP — CMMS Implement Wastewater System and Training...................................................... 21 B2. Procure — CMMS Implementation& Training Services - Wastewater System ............................ 22 B3. Contract Implementation & Training Services - Utility System..................................................22 B4. Contract Implementation & Training Services — Transportation System .................................... 23 2023 CITY OF PORT ORCHARD - SAMP I 1 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Recommended Actions — 5-Year Timeline............................................................................................. 25 LIFECYCLE MANAGEMENT STRATEGY........................................................................................... 26 Desktop Assessment of Data.................................................................................................................. 26 BusinessRisk Exposure......................................................................................................................... 28 Probability of Failure (Condition)....................................................................................................... 28 Consequence of Failure....................................................................................................................... 30 Business Risk Exposure Calculated.................................................................................................... 30 Section Summary — Utility System......................................................................................................... 36 REFERENCED DOCUMENTS................................................................................................................. 37 Port Orchard Comprehensive Plan..........................................................................................................37 Introduction(Chapter 1)...................................................................................................................... 37 Utilities(Chapter 7)............................................................................................................................ 37 Transportation(Chapter 8).................................................................................................................. 37 City of Port Orchard — Shared Files........................................................................................................ 37 Dataand Documents........................................................................................................................... 37 APPENDICES............................................................................................................................................ 38 Appendix A. Asset Management Policy (Draft)..................................................................................... 38 Appendix B. Asset Management Objectives..........................................................................................42 Appendix C. Business Risk Exposure Maps........................................................................................... 44 AppendixD. Data Memo........................................................................................................................47 Appendix E. City Project Team & Stakeholders.................................................................................... 50 Appendix F. Project Meetings Workshops Interviews........................................................................... 51 Appendix G. AMT Agenda Example..................................................................................................... 52 AppendixH. CMMS Demo Scripts........................................................................................................ 54 Appendix I. CMMS Technical Requirements Example......................................................................... 63 Appendix J. Vendor Cost Worksheet...................................................................................................... 82 2023 CITY OF PORT ORCHARD - SAMP 12 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) EXECUTIVE SUMMARY In August 2022, the City of Port Orchard, WA, hired KCI Technologies, Inc. to provide Asset Management Program Strategic Planning consulting services. The City needed guidance to understand its current Asset Management (AM) practices and develop a strategic plan to support staff and resource allocation. The City also needed to procure a computerized maintenance management system (CMMS) software tool to track asset lifecycle costs. The Strategic Asset Management Plan (SAMP) provides recommendations to support and meet the City's needs. The City faces challenges with rapid growth and increasing demands for services from its 15,000 citizens and surrounding community. The City has made progress in developing a foundation for an Asset Management Program, but staff and resources are stretched. The SAMP provides a roadmap for improving processes and procedures applied to Utility and Transportation Systems. The SAMP also outlines a path for the acquisition of a CMMS to optimize work activities towards critical assets and those approaching the end of their life expectancy. The City requested an immediate focus on building an asset management foundation and supporting technologies for the Utility Systems' level of service goals. The Wastewater system was identified as the first system to be implemented in preparation for the procurement of CMMS software. The Transportation System planning and lifecycle strategies were excluded from this version of the SAMP due to the existence of the Pavement Management Analysis Report developed by Infrastructure Management Service in December 2016. The SAMP identifies two primary objectives for the City: Asset Management Programmatic Development and CMMS Implementation and Training Services. Each objective includes recommended actions to achieve the objective over five years, benefiting the Transportation and Utility Systems. See the summarized timeline in the table below. Year I - A3*1 Program Year'_ - -klI Year 3 - A%I Year 4 - A-lI Year $ - A -NI I Development Program Program Progr; Program l l l LONG-TERM ACTION C -2o23 ❑3-2023 Q4-2023 ZD24 2625 2026 2027 4Z = EL -> 7 Q N O 081" O JQ1 JQ21Q3 Q4 ;' a O' a O' 70,-% C! a 0 a Objective A. Asset Management Programmatic Development Objective B. CMMS Implementation and Training Services Figure I- Summary of a five year timeline of Asset Management Objectives for the City of Port Orchard In conclusion, this document provides the City with a strategic roadmap to the foundational development of an Asset Management Program. The recommendations provided will prepare the Public Works Department, Finance Department, Information Technology Department, and other supporting groups for the Asset Management journey the City has begun. The City now has context, strategies, and recommended actions to take the next step toward the goals, objectives, and outcomes in the Port Orchard Comprehensive Plan Adopted in June 2016 and revised in July 2018. 2023 CITY OF PORT ORCHARD - SAMP 13 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) ACRONYMS AND DEFINITIONS Table 1 contains a list to clarify and inform readers unfamiliar with acronyms used frequently in this document. Acronyms Table I - Acronyms 7AM Asset Management SAMP Strategic Asset Management Plan AMP Asset Management Plan LOS Levels of Service GIs Geographic Information System ISO International Organization for Standardization CMMS Computerized Maintenance Management System Remaining Useful Life RUL LMS Lifecycle Management Strategy Definitions Asset Management Program: is an organization's development and continued commitment to following AM principles and concepts with the implementation of the organizational structure required to support planning, funding, allocation of resources, alignment with AM best practices, and continual improvement of all AM processes, procedures, and methodologies. SAMP: documented information that specifies how organizations' objectives are to be converted into asset management objectives, the approach for developing asset management plans, and the role of the asset management system/program in supporting the achievement of the asset management objectives. ISO 55000 definitions 3.3.2. CMMS: an enterprise software system that centralizes maintenance information and facilitates the processes tracking of assets and work actives performed. GIS: a computer system for capturing, storing, checking, and displaying data related to positions on Earth's surface. Asset Register: A list of fixed assets that belong to an entity. Asset Inventory: a critical underlying component of all the other aspects of a system's asset management plan. As such, it is crucial for systems to have an inventoried list or survey of all system assets. Asset Hierarchy: a logical index of all an organization's assets — spatial and non -spatial Condition: the state of something about its appearance, quality, or working order. t 2023 CITY OF PORT ORCHARD - SAMP 14 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) RUL: the time remaining until an asset ceases to provide the required service level or economic usefulness. Risk: Consequence of Failure * Probability of Failure Business Risk Exposure: like a risk but has a financial component to it. What is the "cost' of not meeting a Level of Service? Probability of Failure (PoF): a quantitative measure and description of the probability or frequency of asset failure. Consequence of Failure (CoF): the outcome of an event or situation expressed qualitatively, being a loss, injury, disadvantage, or gain. (SIMPLE, 2005) Level of Service (LOS): the characteristics of system performance, such as "how much," "of what nature," and "how frequently," with regard to the system's service. (EPA, 2014) Performance Measure: a type of performance indicator expressed as a ratio or combination of items, described with compound units such as $/ton, person-hours/job, or operating hours per year. Preventative Maintenance (PM): the regular and routine maintenance of equipment and assets to prevent costly unplanned downtime or unexpected failure. Lifecycle: time intervals that commence with the identification of the need for an asset and terminate with decommission of the asset or any liabilities thereafter. Asset Management Policy: a high-level statement of an organization's principles and approach to asset management. (IPWEA, 2015) 2023 CITY OF PORT ORCHARD - SAMP 15 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) INTRODUCTION The City of Port Orchard has begun its asset management journey. As the City matured, members of Public Works Operations, Engineering, Information Technology, and Finance recognized that it was time to move from a reactive approach to asset management and develop a strategic asset management program and implement a proactive strategic approach in the City's significant investment in infrastructure. The City's plan was to develop a SAMP and then implement a new CMMS to capture data and actions for better management of built infrastructure. The City hired KCI Technologies, Inc (KCI) to assist in the development of a Strategic Asset Management Plan (SAMP) that includes recommended actions aligned with industry best practices along with technical requirements, included in a City RFP for the procurement of a CMMS. KCI has developed a deeper understanding of the City's vision, goals, objectives, and desired outcomes by facilitating multiple in -person, informative, educational asset management workshops and City provided documents and data along with interviews with key City staff. The outcome of this valuable input and information provided shaped the development, documentation, and delivery of the City's draft AM Policy and AM Objectives. The development of a Strategic Asset Management Plan (SAMP) provides the City guidance and aligns with the City's vision, goals, and objectives. SAMP document is to be considered a living document. It will need periodic updating as the City's processes, procedures, and methods are implemented over time. The Lifecycle Management Strategy section of this document will evolve quickly, and updates to the SAMP will become clear as the recommended actions and associated work activities are implemented. The major sections contained within this SAMP are as follows: • Introduction • Asset Management Policy (Draft) • Asset Management Objectives • Strategic Roadmap (Recommended Actions) • Asset Management Lifecycle Management Strategies • Reference Documents • Appendices As the City completes the recommended actions detailed within this document, multiple benefits are anticipated, such as. The improved tracking of infrastructure assets and asset lifecycle provides operations and maintenance staff the ability to increase the frequency of inspections and match preventative maintenance activities to extend the assets' life. Another benefit is the timely planned replacement of assets identified as critical to the system to avoid untimely or unanticipated asset failure, delay, or interruption in the delivery of service. The anticipated benefits show up when tracking and measuring service delivery performance against established performance targets, giving staff the ability to apply decision -making criteria and analysis when addressing service delivery performance. 2023 CITY OF PORT ORCHARD - SAMP 16 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Asset Management Guidance and Best Practices For this project, KCI used a combination of the American Public Works Association (APWA), Environmental Protection Agency (EPA), the Institute of Asset Management IAM, and the ISO 550OX series of standards for guidance and best practices. The EPA summarizes asset management as `Asset management is maintaining a desired level of service for what you want your assets to provide at the lowest life cycle cost. The lowest life cycle cost refers to the best appropriate cost for rehabilitation, repairing, or replacing an asset. Asset management is implemented through an asset management program and typically includes a written asset management plan ". (EPA, Document Display I NEPIS I US EPA - Asset Management: A Best Practices Guide, 2008) The standards are designed to guide owners, managers, and operators of valuable infrastructure assets through the complex journey of planning, maintaining, and operating assets throughout their entire lifecycle. Often organizations following established concepts benefit by identifying inefficiencies and reducing costs to realize the best value for infrastructure assets. Organizations new to asset management frequently learn that AM is not a one-time project but a management framework that informs business operations for asset stewardship over the long term and centers on the concept of continuous improvement. r ■. m - = C r Figure 2 - Strategic Asset Management Plan Workflow Strategic Asset Management Plan (SAMP) Framework The SAMP framework provides a structured approach to managing assets that enables organizations to optimize their use, reduce costs, and minimize risks. It is commonly used in industries such as transportation, utilities, and public infrastructure. The Institute of Asset Management (IAM) offers the following explanation of a SAMP for context. "What it is: the SAMP is essentially a planning tool that clarifies intentions, priorities and certain practices that will be adopted. It takes a long-term view, and considers the combination of organization needs, stakeholder expectations, and the realities of existing assets and asset management capabilities. This guidance is designed to help construct and maintain such a strategicplan, such that itprovides real and positive impact on the organization, shaping what takes place. " (IAM, 2017) 2023 CITY OF PORT ORCHARD - SAMP 17 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Envisioned Asset Management Outcomes The City has made the decision to strategically align with the Asset Management (AM) concepts and principles by requesting the strategic planning of an asset management program. KCI has facilitated onsite and in -person workshops to provide the City's Project Team with relatable terms, concepts, and best practices of Asset Management. Through workshops, meetings, and interviews, KCI has noted and discussed the City's previous steps, motivation, and current asset management gaps. Listed below are a blending of asset management terminology and the envisioned outcomes stated by the City's project team. • Strategically focused Capital investment in projects on maintaining existing levels of services. • Adopting new processes and procedures to capitalize on efficiencies and targeted activities to do more with existing staffing levels. • Efficient and effective preventative maintenance strategies to maximize and extend the lifecycle of existing infrastructure. • Minimize reaction to asset failures and their associated consequences. • Tracking assets' full lifecycles, from as-builts to disposal. • Transparency of decision -making processes, prioritization, and anticipated valued outcomes. • APWA Accreditation - The City's SAMP is in alignment with AM best practices and meets APWA's accreditation requirements, Chapter 10, section 10.1 AM Policy, and 10.2 AM Objectives if the Public Works Department decides to apply for APWA accreditation. The previous sections provided an AM knowledge foundation consisting of asset management terminology, concepts, guidance, strategic framework, aligning vision, and envisioned outcomes. Building on this knowledge and understanding of AM, the next step is the development of an organizational policy that documents the link and alignment between the City's goals and objectives with asset management objectives and actions to achieve them. An Asset Management Policy is a document formalizing the organizational commitment to Asset Management. 2023 CITY OF PORT ORCHARD - SAMP 18 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) ASSET MANAGEMENT POLICY An AM Policy is a high-level statement of an organization's principles and commitment to asset management concepts, principles, and best practices. An AM policy links the asset management objectives to an organization's vision, mission, goal, values, and strategic planning objectives. It provides an organization's employees direction as to the appropriate focus and the anticipated levels of asset management practice and engagement. The City's Asset Management Policy is clear and concise, providing accessible terminology, content, and context. Following is a little more than the first page of Port Orchard's draft AM Policy. Scope The Asset Management (AM) Policy provides guiding principles, a foundational framework to achieve goals and objectives with the development of an asset management program, and alignment with Port Orchards (City)'s Comprehensive Plan(s). Purpose The purpose of this policy is to document the commitment of leadership to the development and implementation of an asset management program. Guiding the City in the consistent use of asset management best practices in the decision -making process to maximize the useful life of assets and minimize reactive and unplanned replacement and maintenance of existing assets. Context The City aims to develop an Asset Management (AM) program. The AM program consists of the alignment of current business units, standard operating procedures, and technology solutions, all in support of the documented strategies and the City's comprehensive plan. By developing an asset management policy, the City is following international asset management standards, ISO 55000. ISO 55000 standards are internationally accepted as best practices for developing AM principles and concepts in the development of an organization's AM Program foundation and the continual and consistent improvement of the AM Program into the future. Principles The City makes engineering, operational and financial decisions to optimize its long-term financial position. The City is committed to the asset management fundamentals: value, alignment, leadership, and assurance. These AM principles are accomplished through an alignment with asset management principles (maximizing asset lifespan and lowering lifecycle costs) and best practices (AM Objectives reflect and align with the organization's vision, mission, and goals). These apply to: • Alignment with the City's Guiding Principles o Are we raising the bar? o Are we honoring the past but not living in the past? o Are we building connections with outside partners? o Is the decision -making process positively impacting diversity, equity, and inclusion? 2023 CITY OF PORT ORCHARD - SAMP 19 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) • Consistent and reliable services, meeting levels of service provided to the citizens in the stewardship of its assets. • Transparency of the decision -making process to maintain trust in the capital investments selection process and improve confidence in services provided to stakeholders and the public. • System reliability and sustainability. • Ensuring the importance of minimizing the City's impact on the environment. • Meeting all legal and regulatory requirements. • A proactive approach taken by the City in the management of assets minimizes costly reactive actions and lower risk exposure. Alignment The City's AM Policy aligns asset management objectives with the City's Comprehensive Plan goals. The City's plan lays out the vision of the future, and below are two key priorities in alignment with the AM objectives: • Guided decision -making by the City, ensuring that ordinances, regulations, programs, and projects are developed in accordance with community values and goals. • Measurable and achievable actions that most effectively utilize limited resources retain the small-town character of Port Orchard and build an even stronger community. The full AM Policy document is included in Appendix A. 2023 CITY OF PORT ORCHARD - SAMP 110 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) ASSET MANAGEMENT OBJECTIVES The definition of an Asset Management Objective is the transformative organizational outcomes into achievable actions. AM objectives should reflect an organization's high-level objectives and strategic vision and goals. AM Objectives also measure the organization's progress in pursuit of an organization's strategic goals and objectives. Purpose The City is currently experiencing significant growth in population and the accompanying challenges it must overcome. The City addresses these challenges by preparing for the impacts and the demands its infrastructure will have to support today and into the future. The City's Comprehensive Plan is a strategic document that conveys the vision, goals, and outcomes the City envisions for its future. A very symbolic paragraph of the Comprehensive Plan is from (Chapter 1, Section 1 Subsection 1.1.1) Statement of Purpose and Intent) "The Port Orchard Comprehensive Plan establishes a framework for taking on the challenges of today and the future. The Plan integrates the desires of the community and best practices in contemporary city planning, making the government more responsive to the needs of the community and more connected with residents. Used properly, this document will guide decision -making and development in the City by ensuring that ordinances, regulations, programs, and projects are developed in accordance with community values and goals. The goals and policies of the Plan speck measurable, achievable actions that most effectively utilize limited resources, retain the small-town character of Port Orchard, and build an even stronger community. "(Port.Orchard.Comprehensive.Plan, 2018) The paragraph was frequently referenced and guided the formative development of the City's Asset Management Policy and Asset Management Objectives Process KCI's process and approach began with a request to the City for relevant strategic and planning documents to be reviewed and discussed with the City's project team in a workshop setting. Revelvent sections and statements within The City's `Port Orchard Comprehensive Plan.' (Chapter 1, Section 1.2) `2023 Targeted Outcomes' influenced the development of the Asset Management Objectives. The AM objectives developed align with the Plan's `2036 Targeted Outcomes.' (Port.Orchard.Comprehensive.Plan, 2018) The City's AM Objectives are listed below (A and B). Each objective has an associated table with the actions needed to achieve it and align with the City's targeted outcomes. KCI facilitated and guided the City's Project Team through a collaborative process to develop the City's Asset Management Objectives: • A — Asset Management Programmatic Development • B — CMMS Implementation & Training 2023 CITY OF PORT ORCHARD - SAMP 111 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) STRATEGIC ROADMAP The City of Port Orchard invests a significant amount of tax dollars annually. The capital funds improve the City's infrastructure and replace capital assets that have failed, reached the end of their useful life, or need replacement due to regulatory requirements. All fall under their Capital Improvement Plan (CIP). Another significant City investment is for the Operations and Maintenance (O&M) of the City's infrastructure investment. The City and its project team are new to the asset management principles and concepts. They are learning that an AM program is not a one-time project but a management framework that informs business operations for asset stewardship over the long term and depends on continuous improvement. Asset management objective strategic initiatives/recommended actions are the AM Objectives developed with input and comments from the City. KCI facilitated discussion workshops and collaborated with the City's project team. Each AM Objective in the table below has an over -arching Strategic Roadmap timeframe for developing an Asset Management Program. Table 2 - Asset A Asset Management Programmatic Development Q1-23 Q3-26 B CMMS Implementation and Training Services Q1-23 Q3-27 The following tables Al-A7 and 131-134, provide the City with a recommended action Strategic Roadmap aligned with AM best practices and the actions required to achieve the asset management objectives in developing the City's Asset Management Program. Each table describes an action(s), provides an estimated time frame, the completion of prerequisite action(s) before initiation, and identifies City staff that are responsible for tracking and shepherding the action(s) from start to completion. The associated action "Estimated Timeframes" are as follows: • Immediate Action (Current month — Q3 2023) • Near -term Action (Q4 2023 — Q4-2024) • Long-term Action (Q1-2025- Q4-2027) 2023 CITY OF PORT ORCHARD - SAMP 112 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Objective A: Asset Management Programmatic Development Developing an Asset Management Program is a significant step forward for the City by informing and guiding City staff in effectively and efficiently using well-defined and documented processes and procedures to reduce potentially avoidable asset failures. AM Objective (A) AM Programmatic Development and the associated actions below provide the City with a strategic roadmap to achieve the benefits and outcomes of applied asset management principles and best practices. Al. Asset Management Team (AMT) Action Description: Formation and formalization of an Asset Management Team (AMT). The AMT is responsible for centralized coordination of asset management activities across Public Works, managing and tracking the implementation and completion of recommended actions, QA/QC oversite, and aligning with AM best practices. The AMT identifies and selects Asset Management Consulting firms to assist the City in pursuing the continual development of an AM Program. The AMT also leads the selection process of a CMMS software vendor and supports the CMMS vendor by providing implementation and training services. The AMT should include the following roles: • Public Works Director • Finance Director • City Engineer • Utility Manager • PW Operations Manager • PW Foreman • Deputy Finance Director • IT Manager • GIS representative (external GIS consultant when necessary) • Office Assistant II Current State: Public Works has an informal team that meets to discuss system issues, operations and maintenance, staff allocation, and capital investments. However, this casual team focuses primarily on day-to-day tasks and high -priority repairs and replacements. Benefits: A coordinated effort of an AMT will reduce costly asset failure occurrence, provide targeted and strategic inspections and preventative maintenance activities, and proactive planning and continual improvement of processes and procedures. 2023 CITY OF PORT ORCHARD - SAMP 113 K C I DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) I able 3- AM Ubiective A: Asset IMMEDIATE ACTION Primary Utility Manager NA 3/1/2023 to 3/31/2023 2 *LM 12-18 t (Action I Support PW Operations Manager March 31, 2023 24-36 Total Hrs. The 1 st AMT Meeting should be held in early April of 2023. The 1 st AMT Meeting's final agenda item should be to schedule the 2nd AMT Meeting for July of 2023. Then, Implemented Action is Complete. Lead 11t Meeting — Utility Manager Duration 2 Hr. Meeting Annual Mtgs. 4 Quarterly and # Attendees 6-10 24-40 1011 a/ Tot H,, 96-160 NA AMT Meetings are held on a quarterly basis. A2. CMMS Implementation Team Action Description: The CMMS Implementation Team supports the CMMS vendor before, during, and throughout the implementation of the CMMS software and staff training. Provide the CMMS vendor with all available and required processes, procedures, methodology documentation, and associated data. The implementation team will also coordinate the scheduling of staff and identification of the required resources to shepherd the project from start to finish successfully. It is recommended that the implementation team include key staff associated with the `System' being implemented. For example, the Wastewater System was identified as the first to be implemented. Therefore, the following roles are recommended to be on the implementation team: • Utility Manager • IT Manager • PW Operations Manager • PW Foreman • GIS representative • and other Staff associated with the System Implementation Current State: The current executive team realizes the need for a way to track work activities associated with assets to track the allocation of resources and the future replacement cost. There is also agreement that implementing a CMMS will require existing staff time, support, and input. Without the formation of the implementation team, the City may struggle to allocate staff collectively effectively, with 2023 CITY OF PORT ORCHARD - SAMP 114 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) potential downstream effects on inspection, preventative maintenance, repairs, and reporting timeliness and the required frequency to meet regulation requirements or standards. Benefits: An implementation team will ensure focused planning, appropriate stakeholder input and involvement, and buy -in to the new CMMS software. The implementation team members will gain essential knowledge about the impacts on their existing duties and staff, adequate allocation of staff time in CMMS training, and the net outcome in efficiencies and performance effectiveness. Also, the process documents lessons learned to reduce the time and costs when implementing the system. The implementation team will start with Wastewater, leaving time to work through new processes and procedures. In the near -term, implement the remaining Utilities System (Water and Stormwater), and the long-term plan is to implement the Transportation System. Table 4 - A.11 Objective A: Asset Management Programmatic Development (Action 3) ec-fm— Priority IMMEDIATE ACTION IMII i • • Primary Utility Manager Support PW Operations Manager • Al 4/1 — 5/31 to 7/1-8/31 of 2023 by Prior to the new CMMS Implementation ActionInternal (City) 6 8 Hours 48 Total Hrs. External • NA to Weeks to complete Internal Support External • of NA FTE Hours Weeks Implemented Action The Action is considered complete once the City's CMMS Implementation Completion Indicator Team has met for the second meeting. The frequency and duration of meetings are up to the Primary Lead and the Public Works Director. Annual Action LOE Lead Utility Manager Duration 1-Hour • Lead and Duration •. Frequency Annually TBD When TBD and TBD •. Attendees # Attendees TBD Hrs. TBD Tot. FTE Hrs. TBD AMT Approval When required The implementation team will meet one to two months before implementing Recurring Action the next System (Water, Stormwater, and Transportation). The number of FTEs and time needed to prepare for and Implementation depends on the System and its complexity. A3. Asset Inventory and Hierarchy Development Action Description: Leverage the GIS as an authoritative/system of record for each asset class and hierarchy. Implement data management policies and procedures with embedded quality control checks for consistent and accurate datasets. Verify a GIS-centric platform to ensure the City can be software agnostic and unimpeded in selecting a future CMMS/EAM platform. Standardize asset attributes and fully document design and data processes to ensure sustainability. Classify assets in a hierarchy so that cost and condition role up from components to sub -systems and then to the larger systems. 2023 CITY OF PORT ORCHARD - SAMP 115 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Current State: Currently, the location of the majority of the City's assets is based on CAD drawings, with a small portion coming from paper or Microfiche. A complete account of the City's asset inventory is reviewed so that data sources can be identified and documented to understand the accuracy of the data fully. With years of experience operating and maintaining the system, operations and maintenance staff have added data based on institutional knowledge. Also, facility data on vertical assets such as Lift Stations and Wet Wells will need to be normalized and categorized in an asset hierarchy; currently, essential data is only found as attributes of the vertical asset class. Understanding how costs and conditions roll up will be necessary for decision -making on these facilities. Benefits: The benefits of developing an asset inventory and hierarchy are significant. Most CMMS software requires a location, usually a GPS-collected coordinate, to associate work activities performed on an asset. As the City utilizes the CMMS over time, asset performance and lifecycle analysis cost data to improve decision -making to extend the life of an asset and reduce unanticipated asset failure. Table 5 - AM Objective A: Asset Management Programmatic Development (Action 3) • C0 RITNTol • • - • • • IMMEDIATE ACTION • • Primary Utility Manager Support PW Operations Manager • Al 4/1/2023 9/31/2023 by Beginning of Q4-2023 Level of Effort Internal (City) 3 12 MW 24 External (Consultant) $11,000 to $23,000 8 Weeks Internal Support of External (Consultant) 2 FTE 8 Hours 8 Weeks A comprehensive and representative inventory of spatial assets is available within the GIS with attribution that aligns with industry best practices and Implementedmeets the future CMMS requirements as well as the asset hierarchy. The Completionoption of assistance from an External Consultant is available; however, the effort and associated costs are dependent on the level of accuracy and required asset data population requested by the City. A4. Asset Management Program — Strategic Funding Plan Action Description: Development of an AM Program 5-Year Funding Strategy for consistently allocating resources and budget to meet the funding needs of necessary actions to achieve the identified asset management objectives within the stated period. Driven by the AM Policy, and should outline a five-year AM Program development budget to meet the immediate, near -term, and long-term recommended actions to complete and achieve each Asset Management Objective. Current State: The current funding is adequate based on the City's first asset management project. Future funding is based on assumptions and a general idea of what budget dollars may meet the future needs required to develop an Asset Management Program. These are based on various discussions with the Finance Director and assumptions because of the sensitivity of disclosing budgets to the current consulting firm. 2023 CITY OF PORT ORCHARD - SAMP 116 K C I DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Benefits: The City Council, Mayor, Finance Director, Public Works Director, and key management staff will have the ability to align budgets and the allocation of resources strategically, programmatically, and in a timely manner to develop the Asset Management Program. It also provides flexibility to the City if budgets need to be tightened or loosened Table 6 - AM Objective A: Asset Management Programmatic Development (Action 4) Action (A4) Asset ,•- •. - -• PriorityIMMEDIATE ACTION • • Primary Finance Director Support Utility Manager • Al A2 qdP1 3/2023 to 6/2023 6/30/2023 3 FTE 16-24 Hours 12 Weeks to Complete • A final document aligns the Funding Strategy with the Recommended • Actions lead Finance Director Duration 2 Hr. Meeting •.. Frequency Annually 1 When September and First week •Attendees Attendees 3-5 I H 6-10 Hrs 6-10 AMT Approval AMT Review and Comment Recurring Action Annual meeting — the first week of September. A5. Asset Management Training Goals Document Action Description: Develop an `Asset Management Training Goals document for the City's management and staff. It should define obtainable performance goals and targets with consistent and measurable methods applied in staff training and their progress. The primary reasons for an AM Training Goals document should be clearly stated objectives, rational, and identification of the intended audience of stakeholders. The AM Training Goals document needs identified timelines. If applicable, other AM training includes CMMS User Training, User Group Meetings, Asset Management related conferences, sessions, training, and certifications. Current State: An Asset Management Training Goals document does not currently exist. Benefits: Managers and staff will develop, reinforce, and advance AM best practices to promote, enhance, and advance the development of the Asset Management Program at the City. Deeper buy -in by management and staff will improve effectiveness and efficiencies as consistent and continual training and education are achieved. 2023 CITY OF PORT ORCHARD - SAMP 117 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) T able /- AM Ubjeetive A: Asset t Action J NEAR -TERM ACTION Primary Utility Manager Support PW Operations Manager A2 A4 B2 Oct-23 Dec-23 t January 1, 2024 2 32-48 Hour- 64-96 Total Hrs. $9,000 to $18,000 4 Weeks 2 FTE 16-24 Hours 32-48 Total Hrs. Once the AMT has reviewed and accepted the AM Training Goals document, the Action is complete. Lead TBD Annually 1 # Attendees 5 When September Hrs. 2 Duration 1 hour and 3rd Week Tot. FTE Hrs. 10 Required Review, update, and improve the AM Training Goals document each year. A6. Asset Management Plan (AMP) Development - Utility System Action Description: The AMP for the Utility System provides a document/plan to formalize system - specific processes, procedures, methodologies, mandatory requirements, and reporting. The AMP also documents an Asset Inventory, Condition Assessment, Business Risk Exposure, Lifecycle Management Strategies, and a 10-year Replacement Schedule. The development of the Utilities System AMP is guided by the City's SAMP and staff s knowledge of the Utility System. The SAMP provides the strategic vision and overarching framework to provide guidance and consistency to all supporting System AMPS. An AMP is considered a living document, continually reviewed and updated on a consistent basis. Traditionally organizations updated their AMPS annually. Current State: There is documentation currently being used by the City; however, additional documentation is needed to align with industry best practices and to ensure consistency in work performed to meet delivery standards and regulatory requirements. The SAMP will provide a consistent strategic framework guiding the development of the Utility System AMP. Benefits: The Utility System AMP provides transparency to management and the governing body by clearly documenting the System's Asset Inventory, inspection and condition rating methodologies, Business Risk Exposure, Lifecycle Management Strategies, and a 10-year Utility System Replacement Schedule. It provides guidance to the process of succession (retirement, promotion, and newly hired staff) 2023 CITY OF PORT ORCHARD - SAMP 118 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) and centralizes the decision -making process for consistency and the opportunity to improve as asset lifecycle data grows. Table 8- AM Ob'ective A: Asset Management Pro rammatic Development Action 6 • -ment Plan (AMP) Develop PriorityAction (A6) Asset Utility System NEAR -TERM ACTION • • Utility Manager Support PW Operations Manager Prior91 Al A3 B3 Time Frame Q1-2024 to Q2-2024 The beginning of Q3-24 • NA Hourso—MMI Total Hrs. • $65,000 to $80,000 8 Weeks to complete • • • • 4-8 FTi� 32-64 Hrs. gOEM&Otal Hrs. • IL 1 The Wastewater system is considered phase 1, and phase 2 will include the Water and Stormwater Systems. Once phase 2 has been completed and • phases 1 and 2 are consolidated into the AMP for the Utility System. And the • formalized AMP - Utility System has been recognized by the City and Public Works Director. Lead Utility Manager Duration 2 Hr. Meeting •. Frequency Annually 1 When TBD and TBD • - • - - # Attendees 3-5 Hrs. 6-10 Tot. FTE Hrs. 6-10 AMT Approval Required Recurring Action Annual Utility System AMP Review and Improvement Meeting (TBD) A7. Asset Management Plan (AMP) Development - Transportation System Action Description: The AMP for the Transportation System provides a document/plan to formalize system -specific processes, procedures, methodologies, mandatory requirements, and reporting. The AMP also documents an Asset Inventory, Condition Assessment, Business Risk Exposure, Lifecycle Management Strategies, and Replacement Schedule. The development of the Transportation System AMP is guided by the City's SAMP and is considered a living document to be updated annually. Current State: Staff follows established processes and procedures when performing work activities. There is documentation, and additional documentation is needed to align with industry best practices and to ensure consistency in work performed to meet delivery standards and regulatory requirements. Benefits: The Transportation System AMP provides transparency to management and the governing body by clearly documenting the System's Asset Inventory, inspection and condition rating methodologies, Business Risk Exposure, Lifecycle Management Strategies, and a 10-year Transportation System Replacement Schedule. It provides guidance to the process of succession (retirement, promotion, 2023 CITY OF PORT ORCHARD - SAMP 119 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) and newly hired staff) and centralizes the decision -making process for consistency and the opportunity to improve as asset lifecycle data grows. L able 9- AM Ubjective A: Asset LONG-TERM ACTION Primary City Engineer Al A3 B4 Q1-2026 to Q2-2026 NA FTE $50,000 to $90,000 5-8 FTE 40-64 Support PW Operations Mgr. by The beginning of Q4-26 Hours Total Hrs. 8-10 Weeks Hours 80-128 Total Hrs. The action is complete when the City accepts the final Transportation System AMP System. Lead City Engineer Duration 2 Hr. Meeting Annually 1 When TBD and TBD # Attendees 4-6 Hrs. 8-12 Tot. FTE Hrs. 8-12 Required Annual Transportation System AMP Review and Improvement Meeting 2023 CITY OF PORT ORCHARD - SAMP 120 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) i Objective (B): CMMS Implementation & Training Services In developing an Asset Management Program, CMMS software is essential tool organizations use to track and schedule work activities and track the lifecycle costs of assets. A CMMS also allows system managers to establish processes and procedures that ensure consistent data input and the allocation of resources to operate and maintain the system they oversee. The historical data collected can be analyzed. Quantitative data -based decision -making results are accessible and transparent. The training of staff on the new CMMS ensures consistency. B1. RFP — CMMS Implement Wastewater System and Training Action Description: Review the consultant (KCI) provided CMMS technical requirements and demo script document. Integrate this document into a City of Port Orchard RFP. Current State: The City does not have CMMS in place and has challenges in tracking asset performance tracking and associated costs. Benefits: Upon complete implementation of the CMMS software, the City staffs proficiency in utilizing the software is anticipated to yield noticeable benefits such as reduced reactive responses and increased utilization of proactive approaches. The CMMS software will enable the staff to track asset -associated O&M costs, and staff performance, generate standardized and consistent reports, and make data -driven decisions and analyses. As a result, the delivery of services to customers will become more transparent, defendable, and efficient. Table 10- AM Objective B: CMMSImplementation & Training Services (Action 1) r rr PriorityIMMEDIATE ACTION Responsibility Orimary Utility Manager Support PW Operations Manager PriorMR Al Time Frame 3/10/2023 to 4/31/2023 by 5/31/2023 Level of 3. 12 Total 36 Total Hrs. Internal (City) Hours External (Consultant) NA to NA NA Weeks Internal Support of External • NA mr NA Hours NA Total Hrs. nsultant) _A4 Implemented Action Release of the RFP to CMMS vendors/Asset Management Consulting Firms. Completion Indicator 2023 CITY OF PORT ORCHARD - SAMP 121 K C I DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) B2. Procure — CMMS Implementation& Training Services - Wastewater System Action Description: The City has expressed a desire to select a CMMS vendor that best aligns with and meets the functional requirements requested by the City and procure the CMMS software, implementation, and training services from the selected CMMS vendor. The Wastewater System is considered phase 1. Phase 2 is the implementation and training of the Water and Stormwater Systems. Current State: The City does not have CMMS software. Benefits: A CMMS software that has been implemented and staff trained on using the software effectively should become evident as reactive responses decrease and proactive approaches are applied. An ability to track costs, asset and staff performance, standardized and consistent reporting, and an increase in data -based decision -making and analysis should lead to clear, transparent, and defendable methods and approaches in delivering service to customers. Table ]]-AM Objective B: CMMS Im lementation & Training Services Action 2 rocure CMMS Software. the Implementation Training Services for NEAR -TERM ACTION Utility Manager Support PW Operations Manager - • • A2 Time frame May-23 July-23 by July 31, 2023 Level of Effort NA NA Total NA Weeks Internal (City) Hours Depends on Bids External • from CMMS Weeks Vendors Internal External Support of 6-10 r- I � 220-320 T ott. 10-12 Weeks Implemented Action This Action is considered completed once the new CMMS is fully Completion Indicator implemented for the Wastewater System and relevant management and staff have been fully trained by the CMMS vendor. B3. Contract Implementation & Training Services - Utility System Action Description: Wastewater System will be complete by this time (Phase 1 is complete) — This action is to contract services to implement the Water and Stormwater Systems (Phase 2). Completing the Utility System (Wastewater, Water, and Stormwater Systems) implementation and staff training. Current State: The City does not have CMMS software; however, once the action is initiated, a new CMMS has been implemented, and staff has been trained for the Wastewater System. Benefits: The City has significant benefits once a new CMMS is procured and fully implemented. Tracking of costs, work activities, work, and asset performance data reporting, increase in data -based decision -making, and transparency to management, staff, and the public. 2023 CITY OF PORT ORCHARD - SAMP 122 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) I able 12- AM Ubiective B: CMMJ Implementation & I raining J'ervices (Action I PriorityNEAR-TERM ACTION Respons.ibility Utility Manager Support PW Operations Manager PriorA2 132 A5 A6 Time Frame Q3-24 to Q4-24 bil June 30, 2024 Level of NA NA Hours NA Weeks Internal (City) External (Consultant) It depends on Bid 24 Weeks from Vendor Internal External Support 6-8 t- i c 180-240 Hours 24 Weeks • Once the Water and Stormwater Systems are implemented and staff has • been trained on the CMMS, the action is considered completed. • • Required Recurring NA B4. Contract Implementation & Training Services — Transportation System Action Description: This point has completed the Utility System in time. This action is to contract services to implement all the asset classes under the Transportation System umbrella, including Roads, Bridges, Signs and Signals, and other relevant Right -of -Way (ROW) groups. The contractor should fully implement the Transportation System asset classes, training management, and staff. Current State: The City does not have CMMS software. Benefits: The City has significant benefits once a new CMMS is procured and fully implemented. Tracking costs, work activities, work, and asset performance data reporting, increased data -based decision -making, and transparency to management, staff, and the public. 2023 CITY OF PORT ORCHARD - SAMP 123 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) 2023 CITY OF PORT ORCHARD - SAMP 124 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Recommended Actions — 5-Year Timeline Table 14 - Recommended Actions by Asset Management Obiective City of Port Orchard, WA A R TIMELINE RECOMMENDED TION BY AM OBJECTIVE Asset Management Program Year 1 - AM Program Year 2 - AM Year 3 - AM Year 4 - AM Year 5 - AM Strategic Planning Project Required Development Program Program Program Program Actions) 1 ► ! ►� LONG-TERM ACTION March 2023 Prior to Action Q2-2023 Q3-2023 Q4-2023 2024 2025 2026 2027 Strategic Roadmap of Recommended Actions 5-Year Timeline a s 'a >>>, u o w Q1 Q2 Q3 Q4 0 U c1 0Ld U d c1 U cJ U c1 cJ a� O z o ' i � Start F�7nventoiry Management Team (AMT) Al S Implementation Team Al Iand Hierarchy Al vA4: Asset Management Program - Funding Strategy Plan NA A A5: Asset Management Training Goals Document A2 A4 B2 0 aUtility A6: Asset Management Plan (AMP) Development System (Phase 1 - Wastewater System and Phase 2 - Water & Stormwater Systems) Al A4 B2 A7: Asset Management Plan (AMP) Development Transportation System I A4 A6 B3 Finish 131: RFP-CMMS Implement Wastewater System and O0 Training Services Al d 132: Procure CMMS Software Implementation and d Training Services Wastewater System A2 B1 C 133: Contract Implementation & Training Services B2 a Utility System (Water and Stormwater) A3 A4 A5 114: Contract Implementation & Training Services B3 Transportation System A3 A4 A7 2023 CITY OF PORT ORCHARD — SAW 125 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 LIFECYCLE MANAGEMENT STRATEGY Lifecycle Management is about how an asset is managed at each phase of its life to realize its maximum value. During an asset's life, each stage, as seen in Figure 3, has actions that need to take place so that the asset can be managed in a programmatic fashion. This active management of an asset is the essence of Programmatic Asset Management. When developing an asset management strategy, KCI typically starts by answering the following questions: 1) What do we want to actively manage? The results of that question inform the asset register/asset inventory 2) How do we operate and maintain assets once they are built? A risk -based approach helps agencies with data -driven decision support so that assets perform at a designated level of service (goals). Performance measures should be developed so that performance against goals can be measured. 3) How do we retire assets and plan for future assets? This stage is where capital plans are developed so that future renewal needs inform funding and deferred capital gets more attention from Operations & Maintenance. Under the current scope of work of the SAMP, KCI performed a small lifecycle analysis with recommendations for data (loot GOALS L�11L IMPROVE 49t MEASURE m ANALYZE Figure 3 - Outlines the stages of an asset's life. Each stage should be managed as part of the Lifecycle Management. improvements so that improvements can be made as a follow on to this report. KCI Leveraged the data we developed to demonstrate how data can inform decisions in the field. This methodology can and should be further developed in individual Asset Management Plans for each asset class and is outlined as part of the City's asset management objectives — recommended actions A6 and AT Desktop Assessment of Data The City has developed a data source using GIS, and is hosted on ArcGIS online, and data models have been standardized and are generally accepted as the industry standard. City has a Geographic Information System (GIS) that provides a comprehensive asset inventory. That said, several database attributes do not fully support asset management, are incomplete, are captured in a related system, or have a low confidence level. To support asset management and systems integration, KCI looks for the following information in a relational database format: 2023 CITY OF PORT ORCHARD - SAW 126 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Table l i — CIS Data Fields Required to support Asset Management Field Name e in AM Data Typei Asset_ID* A unique id that can be UniqueID / This field is necessary for propagated across systems for Auto integrations with other systems integration Number and should never change. In conversations, we agree that this should be an auto number. KCI suggests a "prefix" so there are no duplications in numbers across asset classes. An example would be SS000001 for Sanitary Sewer Asset 000001. Installed Used to determine a rough Date Time This field can be used to Date* estimate of the remaining estimate the remaining useful useful life expectancy of an life on assets that don't have asset. regular condition assessments. We estimate the remaining useful life based on the install in date and material. Material* The material type helps Domain with Age and Material are used to calculate an asset's remaining Material calculate the remaining useful useful life expectancy. Varied Type life on assets that do not have materials have different life regular condition assessments. expectancies, and we base this estimation on EPA -published Engineering Standards of Asset Material Life Expectancies. Pipe_Size Size plays a role in Integer The size of the pipe can be used determining the Consequence as a variable in consequence of of Failure Ratings. Failure calculations. Condition Condition is one of the factors Domain Condition is part of the formula needed to calculate Business for calculating risk. Risk. Consequence The consequence of failure is Domain The consequence is part of the one of the factors needed to formula for calculating risk. calculate Business Risk. Business Product of Condition and Calculated Risk is used to make O&M and Risk Consequence Field Capital decisions. 2023 CITY OF PORT ORCHARD - SAMP 127 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Field Name j& Role Confidence Rating is based on how Domain Confidence score allows the end accurate and dependable the user an opportunity to data sources used to gather understand fully information on the assets. Status Operational, Spare, and Domain The status of the asset. Data Abandoned tells a story of the should never be removed from actual life of an asset and if it the database; it should be is in the planning stage or in archived. storage as a spare. After the data analysis portion of this project, KCI developed a Data Memo with recommendations, Appendix D. Data Memo, which described data gaps preventing the City from data -driven lifecycle management decisions. The City, KCI, and a data consultant, Flow Analytics, worked to capture critical data in most of the fields, as outlined in Table 17. The data developed was mostly the date of install based on the age of the parcel. Developing an estimated install date allowed KCI to calculate the remaining useful life of assets based on EPA's estimates for Age and Material. This low -confidence analysis helped us calculate Business Risk Exposure to demonstrate data -driven lifecycle management in this SAMP. Business Risk Exposure To make data -driven decisions, agencies typically look at the Business Risk Exposure to inform decisions and/or support decisions. Criticality or Risk is commonly referred to as the product of Probability of Failure * the Consequence of Failure. Since Criticality is often ambiguous with Risk, KCI uses the term Business Risk Exposure (BRE) as the product of Probability of Failure (Condition) x Consequence of Failure. Probability of Failure (Condition) Calculating the Probability of Failure (PoF) is directly related to failure modes. As asset classes are added, failure modes should be considered to determine how to calculate the PoF. Typical failure modes are highlighted in Table 17. Definitions for failure modes typically come from agreed -upon failure modes and are stored in the CMMS, a Relational Database Management System, or in -field observations stored in a Geographic Information System (GIS). For this study, we used a Mortality Failure Mode that was based on the age and the material of the asset as stored in the GIS unless and observation was made and stored in the condition field of the GIS. The data that was estimated based on parcel age was given a low confidence score so that decision -making could be made with a level of confidence in the data. In the end, failure modes need to be defined in conjunction with a `consequence of failure' so that the City can better define BRE across all asset classes, including those with moving parts like motors and pumps. When developing failure modes, the use of Table 16 is a recommended starting point, but it is not comprehensive. The differences between vertical assets like lift stations and horizontal assets like wastewater lines should be considered along with the infrastructure these assets serve. Failure Modes around Capacity and Efficiency are more common in "vertical" assets, where motors and pumps are 2023 CITY OF PORT ORCHARD - SAMP 128 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) common asset classes. For this analysis, the focus was on "horizontal" assets like pipes, so we used a mortality failure mode. Table 16 - Mortality Failure Mode Failure Mode Definition Capacity Capacity Volume of demand Redesign exceeds design capacity Level of Service Functional requirements exceed &M optimization, renewal design capacity Mortality Consumption of assets reduces O&M optimization, renewal performance below an acceptable level Efficiency Efficiency Operations costs Replace exceed that of feasible alternatives An asset inventory is a critical tool that wastewater systems can utilize to manage and maintain aging assets effectively and sustainably. The City has an asset inventory that details many different asset classes. Details such as model and serial number, size, material, year installed, age, useful life, condition, consequence, and business risk should be recorded for each asset, as available. Of the four horizontal asset classes City wishes to actively manage, minimal data was initially provided for condition ratings and age. `Condition' was calculated based on remaining useful life (mortality failure mode) so that business risk exposure could be calculated. The estimated life remaining is a more conservative lifespan parameter. It is the difference between the age of the asset and the EPA's expected useful life for the asset. Scoring was on a scale of 1 to 5, where 5 represents the highest probability of failure. Table 17 — Utility System Assets * is an attribute that is not necessary fbr this asset class F1_ Material 7"r ii IL Sewer Lift 20 Capacity / None None None Station Efficiency Structure 1617 Mortality None None None Valves Sewer 4072 Capacity / 4072/4072 4072/4072 4072/4072 Flushing Efficiency Sewer Mains 4072 Mortality 105/4072 139/4072 4072/4072 Water 9 Capacity / N/A* 7/9 None Storage Efficiency Reservoirs Water -Fire 470 Capacity N/A* Flow (99/470) 389/470 Hydrant PSI (103/470) Water Well 10 Capacity N/A* N/A* None 2023 CITY OF PORT ORCHARD - SAMP 129 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Water Valves 1295 Efficiency N/A* AL None None COPO Water 2685 Mortality Derived Derived 2685/2685 Mains Water BO 46 Mortality Derived Derived None Main Storm 5880 Mortality 2278/5880 3761/5880 34/5880 Conveyance Main Consequence of Failure Rated based on the size of the water or sewer asset and its proximity to high consequence facilities and/ or users should play a significant role in determining the consequence of failure that goes into scoring Business Risk Exposure. The GIS becomes and instrumental tool in developing proximity -based criteria as well. High consequence users that should be identified could include shopping malls, hospitals, rehabilitation centers, medical centers, golf courses, industries, schools, education centers, and trailer parks. These areas need to be in the GIS and identified as high `consequence of failure' influencers. Consequence of Failure was scored on a scale of 1 to 5, where 5 represents the highest consequence of failure. Business Risk Exposure Calculated All the water and sewer assets were scored and weighted for each of the identified factors above; the weighted factors for each asset were scored and given an overall `BRE" score by multiplying the Probability of Failure by the Consequence of Failure. The higher this score, the more urgent the asset should be considered for capital replacement or increased monitoring. For storm assets, KCI used a straight condition score since there was no defined consequence of failure. Capital Replacement Based on the Business Risk Exposure calculations, KCI chose to assess and categories assets into three categories. If the BRE score is above 20, we consider those assets for Capital Replacement. Capital Projects across asset classes can be aggregated by proximity to developing efficiencies in construction. The following risk map shows that many of the assets that have high BRE are in the Northeast section of the City. In many cases, Water and Wastewater Systems have high Business Risk Scores, an example of this is Kitsap St. This is a perfect candidate for a capital project since efficiencies can be gained by replacing both asset classes and the road at the same time. A detailed Capital Project analysis was not part of the scope of this project, but it could be considered part of an Asset Management Plan. 2023 CITY OF PORT ORCHARD - SAMP 130 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) J; F R1 fl&ffap. 410REMENT. P?Rd"&Fi T I. EsFi Chine ijl ):EBFi Ge, FsFi {Thailand}, N00C, jc) er qqfimu n Figure 4 — City of Port Orchard — Map of Business Risk Exposure - Utility System 2023 CITY OF PORT ORCHARD - SAMP 131 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Operations & Maintenance Optimized operations and maintenance begin with understanding when and where to place resources based on Business Risk Exposure. Ideally, most resources are placed where Capital Projects have been deferred. These assets can be seen in the "immediate work" quadrant. Assets that are not candidates for capital should receive more aggressive monitoring, as seen in the "aggressive monitoring" quadrants. Finally, assets in the "sample monitoring" can receive the least number of resources. 55 A RE$$1VE M0141TORING L5 U, 4� SAMPLE o MOMTORING 2 0 V C ON DITI ON 5 RISK MAP 25 IMMEDIATE WORK AGGRESSIVE MION17ORING 5 Figure S: This is an example of a risk map. Assets in the top right quadrant need immediate work, often in the form of a Capital Project. Assets in the Aggressive Monitoring quadrants should have increased Operations and Maintenance, while assets in the Sample Monitoring quadrant can have reduced activities. Preventative Maintenance and Levels of Service Preventative Maintenance (PM) is the regular and routine maintenance of equipment and assets to keep them running to prevent any costly unplanned downtime from unexpected equipment failures. By performing PMs, the utility can better prioritize, plan for, and budget Operations and Maintenance (O&M) projects based on factors that are data -driven and goal -oriented. Performing PM allows the City to ensure the systems are continuing to meet the Level of Service required of them by the City and its customers.' ■ 2023 CITY OF PORT ORCHARD - SAMP 132 K C I DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Wastewater System - Level of Service Goals: Having routine preventative maintenance for the Wastewater collection system is a best practice and aligns with Levels of Service (LOS) goals. A strong Preventative Maintenance program includes regular inspections and cleaning of manholes, mainlines, force mains, lift stations, and grease traps. Grease trap inspections typically fall under a pretreatment program for Fats, Oils, and Grease (FOG), which is an overall part of the Preventative Maintenance Program. In discussions with City staff, KCI noted that the utility wishes to maintain a Level of Service as noted in each of the tasks below. The cost estimation to inspect, clean, and televise the manholes and mainlines is given, assuming an agreed -upon LOS per year. CCTV Gravity Lines Table 18 CCTV Gravitv Lines Level of Service Goal 20% 1 72113/360567 1 48_ City costs per day include two (2) operators and two (1) pieces of equipment. • Operator labor rate provided by City is $61.65/hr. And Jet/Camera Van rate $100.00/hr. • The total cost per day for (2) Operators and (1) piece of equipment equals $1,786.40. For cost calculations, KCI assumes an average of 1,500 feet per day being cleaned and televised. Please note that these estimates do not take into consideration the costs of inflation, annual raises, or any other equipment or material needed to perform repairs. The importance of PM is as follows: CCTV Wastewater systems using PACP or a standardized scoring methodology will allow the City the ability to plan Capital and prioritize Operations and Maintenance based on the condition of the system. Asset Management starts with an understanding of the condition of the system and the risk that condition presents to the City. Pump Station Inspections City costs per day include one (1) operator and one (1) piece of equipment (truck). • Operator labor rate provided by the City is $61.65/hr. Truck rate $20.00/hr. • The total cost per day for (1) Operator and (1) piece of equipment equals $245. For cost calculations, KCI assumes an average of 3 hrs. per day for inspection and periodic cleaning. Please note that these estimates do not take into consideration the costs of inflation, annual raises, or any other equipment or material needed to perform repairs. 2023 CITY OF PORT ORCHARD - SAMP 133 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) The importance of PM is as follows: Pump station inspections affords the opportunity to monitor motors and "rotating assets." Asset Management Starts with an understanding of the condition of the system and the risk that condition presents to the City. Wet Wells Cleaning 100% Monthly Table 20- Wet Wells 10 Level ofService Goal 120 $7,759 City costs per day include one (1) operator and one (1) piece(s) of equipment (truck). • Operator labor rate used is $61.65/hr. And Jet Truck rate $100.00/hr. • The total cost per day for (1) Operator(s) and (1) piece of equipment equals $646.00. For cost calculations, KCI assumes an avg. (4) hrs. per day for inspection and periodic cleaning. Please note that these estimates do not take into consideration the costs of inflation, annual raises, or any other equipment or material needed to perform repairs. The importance of PM is as follows: Wet Well inspections affords the opportunity to monitor motors and "rotating assets" as well as the overall asset. Asset Management Starts with an understanding of the condition of the system and the risk that condition presents to the City. Water Distribution System - Level of Service Goals A preventive maintenance program for the water distribution system can prevent problems by helping the City maintain its system properly. Knowing the ongoing needs of your system and taking action to meet those needs will enhance public health protection, improve the City's system's reliability, and reduce the costs of maintaining the water system. Strong preventative maintenance consists of regular hydrant inspections, hydrant flushing, tank inspections and cleaning, and valve inspections while exercising them. Routine water hydrant inspections and flushing help ensure the proper operation of distribution system hydrants. Distribution system flushing also allows operators to test and ensure that all fire hydrants are operational and have sufficient water pressure for firefighting. Routine flushing also helps reduce the amount of sediment that builds up in the distribution system pipes, especially near dead ends and older sections of pipes. The City has suggested that they wish to perform annual inspections and flow tests on all system hydrants. An estimated calculation for the maintenance cost/year at current operator wages and equipment costs is calculated as follows: Hydrant Flushing Table 21— Hydrant Flushing — Level o 'Service Goal LOS Goal Hydrant Count Days to Complete McCormick Woods System 132 13 $15,152 2023 CITY OF PORT ORCHARD - SAMP 134 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) (separate system) City Water System 338 34_ $38,748 City costs per day include two (2) operators and one (1) piece of equipment. • Operator labor rate used is $61.65/hr. And Crew truck is equal to $20.00/hr. • The total cost per day for (2) Operators and (1) piece of equipment equals $1,146.40. For cost calculations, KCI assumes an average of thirty (30) minutes per flush. Please note that these estimates do not take into consideration the drive time between hydrants or the costs of inflation, annual raises, or any other equipment or material needed to perform repairs. Hydrant Flow Testing Table 22 - Hvdrant Flow McCormick Woods System (separate system) City Water System — Level ofService Goal 132 338 26 $3,783 $9,687 • City costs per day include two (2) operators and one (1) piece of equipment. • Operator labor rate used is $61.65/hr. And Crew truck is equal to $20.00/hr. • The total cost per day for (2) Operators and (1) piece of equipment equals $1,146.40. • For cost calculations, KCI assumes an average of (8) Flow Tests per day. • Please note that these estimates do not take into consideration the drive time between hydrants or the costs of inflation, annual raises, or any other equipment or material needed to perform repairs. • It is recommended Flushing and Flow Testing at the same time. Reduce truck rolls and crew utilization. Valve Exercising Table 23- Valve 20% $2,866 City costs per day include two (2) operators and one (1) piece of equipment. • Operator labor rate used is $61.65/hr. And Crew truck is equal to $20.00/hr. • The total cost per day for (2) Operators and (1) piece of equipment equals $573.20. For cost calculations, KCI assumes the operators have an average of 30 valve inspections/exercises per day that are performed manually. Please note that these estimates do not take into consideration the drive time between valves or the costs of inflation, annual raises, or any other equipment or material needed to perform repairs. 2023 CITY OF PORT ORCHARD - SAMP 135 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Section Summary — Utility System Condition Assessment and PM Programs allow the utility to make better decisions on Optimized Maintenance Strategies and Capital Improvement Projects (CIPs). Please see below for estimated annual Operations and Maintenance per the Level of Service requested. Please note that the costs will fluctuate as The City raises or lowers its Level Of Service expectation. Table 24 — Annual Estimate of O&Mper Level o Service - Utility System Summary Sanitary Sewer Cleaning and CCTV Work 48 $85,882 Pump Station Inspection 365 $89,406 Clean Wet Wells 120 $7,749 Hydrant Flushing McCormick Woods (separate system) 13 $15,1 City Water System 34 $38,748 Hydrant Flow Testing McCormick Woods (separate system) 3 $3,783 City Water System 8 $9,687 Valve Exercising 5 $2,866 Grand Total iN Elli F 9r $253,265 Performing these critical and essential PM tasks will help the City gather the data needed for the City to better assess the overall condition of the system and its assets. 2023 CITY OF PORT ORCHARD - SAMP 136 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) REFERENCED DOCUMENTS The City provided a significant amount of the referenced documents, along with a few documents that were downloaded from the City's website. These City documents provided KCI with the needed information to develop the SAMP document. Port Orchard Comprehensive Plan Introduction (Chapter 1) Adopted: June 2016 Revised: July 2018 Document File Name: 1_JULY-2018-FINAL-ADOPTED.pdf Utilities (Chapter 7) Adopted: June 2016 Revised: July 2018, July 2020, December 2021, June 2022 Document File Name: 03_JUNE-2022-CLEAN-UTILITIES.pdf Transportation (Chapter 8) Adopted: June 2016 Revised: July 2018, July 2022 Document File Name: 8_JULY-2020-FINAL-ADOPTED-Transportation.pdf City of Port Orchard — Shared Files The City's IT set up a Port Orchard SharePoint folder for KCI and the City to share data. Location .../KCI Project/Shared Documents/ Subfolders Data and Documents GIs Data Shared Dated: September 1, 2022 Shared Method: CITY's SharePoint ■ Data File #1 Name: COPO_Utilities-2.mpk ■ Data File #2 Name: COPO Utilities-2.mxd ■ Data File #3 Name: New File Geodatabase.gdb.zip ■ Data File #4 Name: SQL Database_TV_Truck.bak Organizational Chart 2016 IMS Agreement 2023 CITY OF PORT ORCHARD - SAMP 137 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 APPENDICES Appendix A. Asset Management Policy Scope This Asset Management (AM) Policy provides guiding principles, which serve as a foundational framework to achieve City goals and objectives with the development of an asset management program that aligns with the Port Orchard's (City) Comprehensive Plan(s). Purpose The purpose of this policy is to document direction from the City Council, as the policy makers for the City of Port Orchard, for the development and implementation of an asset management program for the City. The City Council finds that an asset management program will ensure the consistent use of asset management best practices to maximize the useful life of assets and minimize reactive and unplanned replacement and maintenance of existing assets. Policy and Delegation of Authority The City shall develop an Asset Management (AM) program. The AM program should consist of the alignment of current business units, standard operating procedures, and technology solutions, all in support of the documented strategies and the City's Comprehensive Plan. The City is following international asset management standards, ISO 55000, which are internationally accepted as best practices for developing AM principles and concepts in the development of an organization's AM Program foundation and the continual and consistent improvement of the AM Program into the future. The asset management program will enable the City to make engineering, operational and financial decisions to optimize its long-term financial position. The City is committed to the asset management fundamentals: value, alignment, leadership, and assurance. The program will align asset management principles (maximizing asset lifespan and lowering lifecycle costs) and best practices (AM Objectives reflect and align with the organization's vision, mission, and goals). Further, the program will incorporate the following: • Alignment with the City's Guiding Principles o Are we raising the bar? o Are we honoring the past but not living in the past? o Are we building connections with outside partners? o Is the decision -making process positively impacting diversity, equity, and inclusion? • Consistent and reliable services, meeting levels of service provided to the citizens in the stewardship of its assets. • Transparency of the decision -making process to maintain trust in the capital investments selection process and improve confidence in services provided to stakeholders and the public. • System reliability and sustainability. • Ensuring the importance of the minimization City's impact on the environment. • Meeting all legal and regulatory requirements. K C I 2023 CITY OF PORT ORCHARD — SAMP 138 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 • A proactive approach taken by the City in the management of assets minimizes costly reactive actions and lower risk exposure. Alignment with Comprehensive Goals The City's AM program will align asset management objectives with the City's Comprehensive Plan goals. The City's program will incorporate two key priorities in alignment with the AM objectives: • Guided decision -making by the City, ensuring that ordinances, regulations, programs, and projects were developed in accordance with community values and goals. • Measurable and achievable actions that most effectively utilize limited resources, retain the small-town character of Port Orchard, and build an even stronger community. Signatures: • Community Development Director: • Finance Director: • Public Works Director: • IT Manager: Date: Date: Date: / / Date: K C I 2023 CITY OF PORT ORCHARD — SAMP 139 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Definitions Term: Definition: Asset Asset Management is the coordinated activity of an organization to realize value Management from assets. Asset An Asset Management Program is an organization's development and Management continued commitment to following AM principles and concepts with the Program implementation of the organizational structure required to support planning, funding, allocation of resources, alignment with AM best practices, and continual improvement of all AM processes, procedures, and methodologies. AM Policy A formal document for organizational leadership (Board of Directors and Executive Management) to signal their commitment and priorities for an asset management program and provide clear direction as to the appropriate focus and the anticipated levels of asset management practice and engagement. AM Objectives Asset Management Objectives are the refinement of asset management policy that applies to all assets and clearly provides specific direction. Objectives should be specific enough to minimize confusion on expectations. Objectives should be tied to existing organizational objectives in an agency's strategic plans or master plans. Objectives should be SMART: Specific, Measurable, Achievable, Realistic, and Time - bound. Strategic Asset SAMP: "documented information that specifies how organizations objectives are to Management be converted into asset management objectives, the approach for developing asset Plan (SAMP) management plans, and the role of asset management system/program in supporting the achievement of the asset management objectives." ISO 55000 definitions 3.3.2. CMMS Computerized Maintenance Management System: a CMMS is a software tool to track an organization's asset through its entire life cycle, from its acquisition through decommissioning/retirement. This includes Procurement, Maintenance, Resource Allocation (labor, equipment, and inventory), Repairs, and Decommissioning costs. AMT Asset Management Team: The team appointed by an organization to review and monitor the Asset Management Program and ensure the development of integrated AM information systems, processes, and plans consistent with an organization's goals and objectives. Implementation Implementation teams provide an internal support structure to move selected Team programs and practices through the stages of implementation. Asset Management Referenced Organizations Acronym Association Referenced Material(s) ISO International Standards Organization ISO 55000, 50001, 50002 IPWEA Institute of Public Works Engineering Australasia International Infrastructure Management Manual - 2015 IAM Institute of Asset Management IAM Policy Strategy Plans APWA American Public Works Association Asset Management Roadmap Referenced City Document: City of Port Orchard Current Comprehensive Plan K C j 2023 CITY OF PORT ORCHARD — SAMP 140 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Roles and Responsibilities The Asset Management Team (AMT) is responsible for the following: • Updating and improving this AM Policy • Communicating the AM Policy to City staff and stakeholders Program Development and Review The Asset Management Team will develop an Asset Management Program consistent with this Policy. The AMT will review and provide comments and proposed modifications as needed at least annually. The AMT may modify the Program consistent with the principles set forth in this Policy, and any modifications will be communicated to the City Council and all City staff. Administration of this Asset Management Policy Action Name Date Draft development Ben H. & Juston M. October 2022 Updated Ben H. November 16, 2022 Updated Ben H. December 9, 2022 Updated Ben H. December 20, 2022 Approval Status This policy has not been approved as of March, 2023. Approval History Action Name Date KCI 2023 CITY OF PORT ORCHARD — SAMP 141 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Appendix B. Asset Management Objectives (s1I I g2) 1[114I RFP -CMMS Procure CMMS (153} Contract Implementation of Software and Contract Implementation and Implementation and Tony Lang Wastewater System Implemenation and Training Services for Utility Tra i n i ng Servi ces for OBJECTIVE(B) and Training Training Services for System(W ater & Stormwater Transportation Services Wastewater System Systems) System Procure - CMMS M r, softare with c C3 Implementation Action ri .n Lead Support Lead Support Lead support Lead Support Cr Cr Utility PW Ops. utility PW PW ❑ps. PW Dps. PW and Training Lead/Support Mgr. Mgr. Mgr. Foreman Mgr. utility Mgr. Mgr. Foreman Servcies Action Tmeframe 1-Apr 3o-Apr 1-May 31-Jul 03-24 04-24 Q4-26 Q2-27 Action Level IMMEDIATE IMMEDIATE NEAR -TERM LONG-TERM 2023 CITY OF PORT ORCHARD — SAMP 142 K C t DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Appendix C. Business Risk Exposure Maps Sewer Mains Sewer Mains Business Risk Exposure 2 cidy 4 5 6 9 10 4 12 1 5.;., Aft( �L 20 4-- Pw 25 F7 M17 Thaw d Fr EsF i, HERE, C -Min, USCS, InfRrmap, REMEFl7 1-, NRCI-n, 8 Japan, METI, E-i China �Kcng K—g), Egri Korea, Fi iTha�.nd),NGVC, -".qd Open EttmWa p =tri butm, and the C IL User G munity 1 1 2023 CITY OF PORT ORCHARD — SAMP 144 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Port Orchard Water WaterMains Rusinoss Risk Fixpasure -2 4 a 12 15 -.20 f oelai 25 -1701 TIT I F K'. — ' I SbWERS: E56 HERE. C U-in. U5W. I REMENT P. 44fldr. E ri %MEw. Mfl. Et i chile ', Hckile "?, Ti jhllikMd. T44C. -j C4erfteeOep wrrDribqjbm. and the GES Usw Clun4:y 2023 CITY OF PORT ORCHARD - SAMP 145 K C I DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Storm Condition U —' Storm Conveyance Main , ">•.$go- rr Condition - Yara I 2r� r 3 4 P ! P. s1Y Um Rd 1 , � [raiartl � „lYrt 7 a J616 .J ri sr n»t, id ' '[4on.rrr ad BC :roar rc� � .4`alnnJ.. ad u ka x[ i s draik RBI } Saaces: Esri, HERE, Carmin, USCS, In4--p, Ir, REMENT P, NRC9n, E�Fi�'•'"" d Japan, METI, EsriChina ,Hung Kcng}. Egri Karea,. ri ,ThaiIsnd).N(*C, (c) v„ —I o OFen StreeNa p=tri hutch, and the CI�Usei C mundy 2023 CITY OF PORT ORCHARD - SAMP 146 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Appendix D. Data Memo MEMORANDUM KCI TO: Darren Podraza .FROMI: Ju56on Manville DATE: VV9112022 PsseI Management Program Strategic Planning SU13JECT: KCI Jab Order No. 182209214 The City of Port Orchard (City) has developed an authoritative data source using ArcGIS online, and data models have been standardized. Port Orchard has a robust Geographic Information System (GIS) that provides a comprehensive asset inventory. That said, several database attributes do not fully support asset management, are incomplete, or are captured in a related system. To support asset management and systems integration, KCI looks for the following information in the GIS: Table]: Required fields for Asset Management are identified by* next to field name. The remaining attributes are recommended, potentially in a related table. Field Name Role in A Data Type Notes Asset_ID* A unique id that can be UniqueID / This field is necessary for propagated across systems for Auto Number integrations with other systems integration and should never change. In conversations, we agree that this should be an auto number. KCI suggests a "prefix" so there are no duplications in numbers across asset classes. An example would be SS000001 for Sanitary Sewer Asset 000001. Installed Date* It is used to determine a rough Date Time This field can be used to estimate of the remaining estimate the remaining useful useful life expectancy of an life on assets that don't have asset. regular condition assessments. We estimate the remaining useful life based on the install date and material. Material* The material type helps Domain with Age and Material are used to calculate an asset's remaining Material calculate the remaining useful useful life expectancy. Type life on assets that don't have Different materials have regular condition assessments. different life expectancies, and we base this estimation on EPA -published Engineering 2023 CITY OF PORT ORCHARD - SAMP 147 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Field Name A Role in AM ata Type Notes Standards of Asset Material Life Expectancies. Pipe —Size Size plays a role in Integer The size of the pipe can be used determining the Consequence as a variable in consequence of of Failure Ratings. Failure calculations. Condition Condition is one of the factors Domain Condition is part of the formula needed to calculate Business for calculating risk. Risk. Consequence The consequence of failure is Domain The consequence is part of the one of the factors needed to formula for calculating risk. calculate Business Risk. Business Risk Product of Condition and Calculated Risk is used to make O&M and Consequence Field Capital decisions. Confidence Rating is based on how Domain Confidence score allows the end accurate and reliable the data user an opportunity to sources are used to gather understand fully information on the assets. Status Operational, Spare, and Domain The status of the asset. Data Abandoned all have different should never be removed from ratings. This rating is part of the database. the overall Condition Score. To move forward, KCI would recommend that CITY add the fields in Table 1 and establish a hierarchy for assets that are to be managed. By capturing the data attributes, the risk of providing service levels can be calculated. Currently, data around Business Risk Exposure (BRE) (condition x probability of failure) is not easily obtained in certain asset classes. Finally, a universal and unique asset id field is critical in assuring that systems can be integrated and assets can be identified across inventories and studies. The lack of a universal unique asset id in every data record is necessary for CITY to integrate with disparate systems. Condition Scoring An asset inventory is a critical tool that wastewater systems can utilize to manage and maintain aging assets effectively and sustainably. The CITY has an excellent asset inventory that details many different asset classes. Details such as model and serial number, size, material, year installed, age, useful life, condition, consequence, and business risk should be recorded for each asset, as available. Of the four horizontal asset classes CITY wishes to actively manage, minimal data is provided for condition ratings and age. Condition is essential because it is a primary factor when calculating business risk. Age data is important because it is used to determine useful life and is an overall factor of the condition score. The useful life of an asset is the estimated length of time an asset can deliver a given level of service. Obsolescence, changes in community expectations, increase in demand, and new regulatory requirements may also influence an assessment of an asset's useful life. Lifespan can be estimated using two methods: estimated life and estimated runtime remaining. The estimated life remaining is a more conservative lifespan parameter. It is the difference between the age of the asset and the EPA's expected useful life for the asset. Suppose the number of years an asset was used is greater 2023 CITY OF PORT ORCHARD - SAMP 148 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) than the expected lifespan. In that case, the estimated life remaining is zero —the estimated life remaining assigning estimated condition scores for the asset's condition when converted to a percentage of life remaining. Table 2: Identified by * is an attribute that is not necessary for this asset class. Class Coun Asset ID IF nstall Date Material Size Condition Sewer Lift 20 None None None None None Station Structure 1617 80/1617 None None None None Valves Sewer 4072 219/4072 None 105/4072 139/4072 857/4072 Flushing Sewer 4072 219/4072 None 105/4072 139/4072 857/4072 Mains Water 9 None 6/9 N/A* 7/9 None Storage Reservoirs Water -Fire 470 374/470 395/470 N/A* Flow 389/470 Hydrant (99/470) PSI 103/470 Water Well 10 None None N/A* N/A* None Water 1295 1178/1295 None N/A* None None Valves COPO 2685 None None Derived Derived None Water Mains Water BO 46 None None Derived Derived None Main Storm 5880 5830/5880 None 2278/5880 3761/5880 34/5880 Conveyance Main In conclusion, KCI will need to get more information on these assets before we can begin generating an estimated Business Risk Exposure (BRE) score for each asset and asset class. Once we get that information, we can start to analyze the data and create operational strategies and maintenance -related project recommendations based on operational reliability, performance, and anticipated problem assets. This will allow CITY to continue to serve its community better while providing a high level of service and the greatest value for its assets. Juston Manville Project Manager: BH Cc: Ben Hoffman 2023 CITY OF PORT ORCHARD - SAMP 149 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Appendix E. City Project Team & Stakeholders Jacki Brown Header Utility Manager Finance Director Deputy Finance Director Public Works Director City Engineer IT Manager Operations Manager Noah Crocker Rebecca Zick Tony Lang Chris Hammer Sean Dunham Jeff He lund Chris Es uerra Public Works Foreman Darren Podraza Inspector/ GIS Lead Melinda Lohre Office Assistant Zack Holt Stormwater Bryan McKinnon FOG & Backflow 2023 CITY OF PORT ORCHARD - SAMP 150 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Appendix F. Project Meetings Workshops Interviews Date 8/24/2022 WorkshopAttendees Project Kick-off Meeting AM Project Team Person Online In -Person 9/20/2022 Interview Darren Podraza 9/20/2022 Interview Tony Lang In -Person 9/20/2022 Project Kick -Starter Meeting AM Project Team In -Person 9/20/2022 Interview Chris Esguerra In -Person 9/21/2022 Current AM Practices Workshop AM Project Team In -Person 9/21/2022 Interview Steve Havert In -Person 9/21/2022 Interview Interview Asset Management Policy Workshop Noah Crocker & Rebecca Zick In -Person 9/21/2022 Chris Hammer Online 9/21/2022 AM Project Team In -Person 9/22/2022 Asset Management Objectives Workshop AM Project Team In -Person 9/22/2022 Levels of Service Workshop AM Project Team In -Person 9/22/2022 Interview Jacki Brown Online 9/22/2022 Interview Zack Holt In -Person Melinda Lohre & FOG In -Person Program Person AM Project Team Online 9/22/2022 Interview 12/15/2022 Client Review Meeting — Project Staff Input and Comments - Draft AM Policy & AM Objectives 2023 CITY OF PORT ORCHARD - SAMP 151 KCI DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 City of Port Orchard, WA - Strategic Asset Management Plan (March 2023) Appendix G. AMT Agenda Example Representative, staff member deemed relevant by the AMT, and administrative staff to coordinate meetings, track the progress of AM Program, AM objectives, and the recommended actions from initiation through completion. An example of an AMT agenda: 1. Asset Management Word and Definition (1-3 minutes) a. Starts off meeting - LOS, Asset Registry, LoF (likelihood of failure), criticality, etc. 2. Asset Management Presentation (5-10 minutes) a. 3 to 4 slides b. Each AMT member takes a turn in the rotation. c. Topics need to be related to Asset Management and could include. i. AM principle, AM concept and AM best practice ii. AM success (tracking, the system fully implemented utilizing the CMMS, etc.) iii. AM conference or chapter meeting attendance update AMT on takeaways. iv. AM -related organization publication or AM article summary (APWA, EPA, IPWEA, ISO, IAM) v. AM definition and terminology Asset Management Program Progress Updates (25-55 minutes) a. Deputy Finance Director (5-15 minutes) i. Accounting - Labor Rates, Equipment, Inventory changes ii. FEMA Reimbursement changes iii. Major Replacement/Renewal updates to communicate to the AMT. b. Public Works Operation Manager (10-20 minutes) i. Streets / Pavement ii. Signs & Signal iii. Right -of -Way, etc. Utilities Manager (10-20 minutes) i. Wastewater ii. Water iii. Stormwater 4. AMT Approval(s) (5 to 20 minutes) a. Comments and discussion of AM plans, processes, procedures, methodologies, reports, analysis, and AM periodic audits 5. Action Items Scheduling of the next AMT meeting. The 2nd week of odd -numbered months 2023 CITY OF PORT ORCHARD - SAMP 152 KC1 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Appendix H. CMMS Demo Scripts The following demo scripts were prepared to demonstrate a Computerized Maintenance Management System for The City of Port Orchard (City). The vendor may use demo data or data that the City has provided before the demo. The City will send four (4) shape files to help the vendor demonstrate the requirements in the demo script. Data Source: Demo Data Objectives: Asset Inventory Creation and Maintenance Test Case #: 1Description: Demo Steps: 1-1 Add assets into the system inventory. The Add a new Pressure Reducing Valve (PRV) to the system along a water line. goal is to see the added asset reflected both spatially and in a tabular fashion. We would 1) Enter the following attribute data: like to see the following: a. A unique id: i. Can your system provide a unique id, and how does • Add an asset spatially. that work? • Is the added data part of the water b. Elevation of the PRV in feet. network or not? c. Label in text format. • Does meta -data on the change d. Pressure in decimal. reflect who added the data and when e. Tracking who added the data. it was added/ edited? f. Tracking when the data was added /modified. g. Information on how the data was added. i. Can your system use domains or drop -downs? 2) Show the added record on a map. 3) Show the added record in a table. Demo Scripts Page 54 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 1-2 Modify attributes that are already in the Select a Pressure Reducing Valve (PRV) with the goal of changing attributes: system. We are looking to see the following: 1) Modify the elevation to 745' from the map. • Changes from a map. • Changes from a tabular display. • Does the "last edited date" change? • Does the "who edited" field change? • How are changes tracked? 1-3 We would like to see how spares in a parent- Create a work order to refurbish a valve, perform work on the valve, and parent -child relationship are handled. In this relocate the valve to a new location. scenario, a large valve is removed from one location, refurbished, and placed in another 1) Create a work order to refurbish a Pressure Reducing Valve (PRV). location. We want to track and maintain the 2) Open the work order, virtually do the work, and close the work order. work history and location of the valve as it 3) Place the refurbished valve in a new location. moves from one location to the other. We are 4) Show the complete history of the valve. looking to see the following: 5) Show the location history of the valve. • Does the work history follow the valve? • What happens to the useful life of the valve? • How are changes tracked? • Can we track location history? Demo Scripts Page 55 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 1-4 e would like to see how work is tracked on asset that is not in the asset inventory. In ,s script, we want to see how a flooding ,ident is handled. We would like to see the • The location of the work order • The resolution • Heat Mapping is flooding at the Intersection of Kitsap St. and Cline Ave. Port ird, WA. Send a crew out to explore what might be causing the flooding. 1) Create a work request to explore the flooding and assign it to a crew. 2) Show the work request on a map. 3) Query for all SSO work requests on the map. 4) Query for all SSO work requests in a tabular format. 5) Show potential duplicate work requests at the Intersection of Kitsay St. and Cline Ave. Port Orchard, WA Demo Scripts Page 56 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Data Source: Demo Data Objectives: Relationship between Work Requests and Work Orders Test Case #:2 Description: Demo Steps: 2-1 Build on Test Cases 1-4 and show how work Create a work request for flooding in the road. management takes place. We are looking to see the following: 1. Enter citizen information. 2. Enter information about the incident. • How a service request can be created • location of the call/incident from a citizen portal • Request code for the incident • How a service request can be input 3. Assign Crew(s) to investigate the call through a mobile application by a crew member • How a service request can be entered using mapping to highlight the location of the flood -2 Show an investigative Sanitary Sewer Close the work request for flooding on the road. Overflow (SSO) work request and a scenario here the work request gets closed since there 1) Enter citizen information. as no work to be performed. 2) Enter information about the incident. 3) Respond to the citizen the discovery of a "garden hose that wasn't shut • Show Equipment, Labor, and off." Material (ELM) tracking. 4) Enter Equipment, Labor, and Material (ELM) • Show a scenario where no work order is created "the call was a garden hose that wasn't shut off," but time and equipment were still tracked. Demo Scripts Page 57 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 -3 Show an investigative Sanitary Sewer Investigate the SSO Work Request incident into a work order that will Overflow (SSO) work request and a scenario eventually be turned into the DEQ for SSO Tracking here the work request gets turned into an SSO work order. 1) Turn the work request into a work order upon discovering that the flooding on the intersection of Kitsap St. and Kline Ave is actually an • Can water shut-off be automated by SSO that has dumped 6000 gallons of sewage into Sinclair Inlet. e-mail based on a citizen database? 2) Assign a priority to the work order. • We will show reporting of this SSO 3) Assign a Crew(s) to replace a collapsed clay pipe. in another script. 4) Notify Citizens that water will be shut off. • Can any work requests be aggregate 5) Assign Equipment, Labor, and Materials to the job. into one work order? 6) Assign failure codes and take notes on the job. 7) Close the work order. 2-4 Show the number of types of work requests Monthly Reporting: called in by citizens. 1) Create a report or dashboard where the number of citizen calls is tracked by work request code. 2) Show a spatial relationship between calls lata Source: Demo Data Objectives: Reoccurring Work Orders est Case #:3 Description: Pemo Steps: Demo Scripts Page 58 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3-1 Create a scheduled work order for instrument Create a reoccurring work order for instrument calibration that occurs every six calibration. months. 1) Assign labor and materials to the work order. 2) Track tasks on a work order. 3) Assure the work order reoccurs six months in the future 3-2 Report on work performed and upcoming Generate a .pdf report on the calibrations that have been completed and calibration activities. upcoming maintenance activities for instrument calibration Demo •n: Work Orderand Inspection Relationship Data Source: Demo Data Objectives: Show the relationship between work orders and inspections Test Case #:4 Description: Demo Steps: -1 Create a scheduled work order for sanitary Create a reoccurring work order for sanitary sewer CCTV that occurs every sewer CCTV for root control lines. year. • Can the work order be pushed to 1) Assign labor and materials to the work order. GraniteNet? 2) Track tasks on a work order. • Can the system add or delete to the 3) Add a root line to the inspection work order. root list 4) Delete a root line from the inspection work order. 5) Assure the work order reoccurs 12 months in the future Demo Scripts Page 59 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 -2 Report on work performed and upcoming root Generate a .pdf report on the root control lines that have been completed and control activities. upcoming maintenance activities for CCTV of problem areas. • Show how work can be assigned to a 1) Add a single root removal work order after the inspection. crew. 2) Assign the work order to a crew and schedule the maintenance for next • How does the crew get notified of week. that work for next week? • Is there a dashboard where a crew can see its weekly schedule? -4 Open inspection from work order Open a CCTV inspection from a work order and/or a map. • Show how to open an inspection from 1. Click on an asset to see the history of inspections. GIS. 2. Watch a video of the pipe inspection. • Show inspections on mobile devices. 3. Assign condition and review rating of the pipe segment. • Can inspections use PACP / MACP? • Do inspections integrate and sync with GraniteNet CCTV Software? Demo Scripts Page 60 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 ata Source: Demo Data Objectives: Show the relationship between work orders and inspections Test Case #:5 Description: Demo Steps: 5-1 Show specific maintenance done on a single Click through reporting: and then on an asset class. 1) Click on an asset on the map and get a history of the work completed on that asset. 2) Create a report of the work performed on PRVs in the last month. 5-2 Produce a report that shows progress on the Produce a report that shows progress on the value exercise program in a value exercise program. dashboard and/or PDF report. • Show progress in a pie chart or 1) Show a chart of the percentage completed of a PM Work Order dashboard as apercentage of PMs 2) Show a report of the work orders that didn't get completed in a given complete. time period. • Demonstrate how backlog is 3) Highlight PMs completed on a map. maintained. • Show what has been completed in the GIS Demo Scripts Page 61 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 ata Source: Demo Data Objectives: Decision Support, Reporting, and Asset Management Test Case #: 6Description: Demo Steps: 6-1 Show specific maintenance done on one or Create a report that documents the maintenance done on specific asset classes. ore asset classes. For instance, how many sewer lines have been CCTV'd this year? 6-2 Show the remaining useful life of sanitary Demo remaining useful life curves in your system: sewer lines so that a 5-year and a 10-year replacement budget can be created. 1) Use inspection data to adjust the remaining useful life curve. 2) Show how current lines are performing against a national average (family curve). 3) Create a CIP Budget for critical projects that need to happen in the next 5 and 10 years based on remaining useful life. Demo Scripts Page 62 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Appendix I. CMMS Technical Requirements Example ystem Technology YES 71o'perating Alternate Development .� Fr Not Available Clarification Platform (Server, Client, DBMS) 1.1.1 Support Windows Operating System? 1.1.2 Clarify the current Windows Version Build is supported. 1.1.3 Does your application be run on a virtualized server or in the cloud? 1.1.4 Do you support Windows Desktop? 1.1.5 How long does it take to certify your software with a new Windows version/build? 1.1.6 Do you support all current Windows Desktop critical updates? 1.1.7 Do you support Windows 10+? 1.1.8 If On-Prem is required, does you application require a dedicated server? 1.1.9 Clarify the interaction between client and server (e.g., client architecture). 1.2 Security/User Profile Management 1.2.1 Clarify how your application handles the authentication of users. 1.2.2 Does the application server need to be a member of Active Directory (either Local AD or AzureAD) 1.2.3 Are all Active Directory users and groups visible in your application? 1.2.4 Can permissions be assigned at the Active Directory group level? EXAMPLES Page 63 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 1.2.5 What domain permissions are required to administer your application? 1.2.6 What local server permissions are required to administer your application? 1.2.7 What are the minimum user permissions required for user access? 1.2.8 Can your application be administered through a remote desktop? 1.2.9 Does your application require file shares? 1.2.10 Are there any special requirements for disk or system file access? Advanced Configuration/Development Too 1.3.1 What Application Programming Interfaces (API) are available with your application? 1.3.2 Are your APIs language -independent? 1.3.3 Does your application accommodate the expansion of the data model? 1.3.4 Does your application support custom domains? 1.3.5 Does your application support customization of the user interface? Integration Dependencies 1.4.1 Does your application require the installation of 3rd party applications (e.g., java)? 1.4.2 Clarify required 3rd party installations. 1.4.3 Are there user permissions necessary to install or use the 3rd party applications? 1.4.4 Does your application integrate with Microsoft 365? 1.4.5 Does your application support Microsoft SQL Server? 1.4.6 Does your application support Microsoft SQL Server? EXAMPLES Page 64 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 ELVA V 1 i I no 1 MOO VendorsDeliverables 2 General CMMS Software Application Functions Yes Alternate Development Not Available Clarification 2.1 User Interface 2.1.1 Is the client interface web -based? 2.1.2 Single entry of data is preferred using a dashboard -style interface. 2.1.3 Is the client interface a desktop install? 2.1.4 Can the client interface be personalized by the end user (e.g., move views)? 2.1.5 Is the client a dashboard -style interface? 2.1.6 Does the client have a GIS viewer component? 2.1.7 Does the user interface modify based on workflow (e.g., object combinations)? 2.1.8 Does the interface have standard Windows menu items? 2.1.9 Does the interface support standard Windows navigation (keyboard and mouse)? 2.2 Administrative Interface 2.2.1 Clarify the administrative structure of the application. 2.2.2 Is the administrative tool an extension of the user interface (e.g., additional menus)? 2.2.3 2.3.1 Ability to associate a validation rule, domain, or list of values with any attribute. Data Import/Export Capability Use a find function using multiple user -selectable search criteria. 2.3.2 Use spatial search functions to identify records based on proximity, buffer, and overlay. EXAMPLES Page 65 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 2.3.3 Clarify the format(s) that data can be exported to (e.g., excel, shape file) 2.3.4 Can the system interface with surface water, transportation, wastewater, or water distribution models? 2.3.5 What is your company's protocol to retrieve data from the system if the City were to end relationships with your company? 2.4 Reporting and Analysis Capabilities (internal/external) 2.4.1 Provide a standard set of maintenance management, inventory control, and asset management reports. 2.4.2 Ability to create custom reports from any data within the asset management system and provide access to reports based on user profile (e.g., AD permissions). 2.4.3 Report financial information (e.g., beginning balance, ending balance, movement by fund). 2.4.4 Report usage information by part, tool, equipment, etc. 2.4.5 Work Order progress reports based on user, dates, and status. 2.4.6 Work Order attainment reports based on user -defined intervals (e.g., daily, weekly, annually, etc.) 2.4.7 Purchasing reports for invoiced requisition 2.4.8 Purchasing reports for order requisition 2.4.9 Purchasing reports for open account requisition 2.4.10 Purchasing reports for vendor invoices 2.4.11 Graphical reports on asset attributes; age, condition, rating, risk 2.4.12 Capital investment v. rating and criticality graphs (e.g., Nessie Curves) on asset and asset group 2.4.13 Labor Cost reports for; employee type, labor type, account code, project, and asset for definable time intervals EXAMPLES Page 66 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 2.4.14 Rollup reports for; task and activity level, asset, workgroup, and project. 2.4.15 Geographic reporting; cluster analysis, buffer, upstream/downstream by leveraging the functions of ArcGIS Enterprise Portal. 2.4.16 Create multiple print formats based on department layout requirements. 2.4.17 Ability to create on -screen filters and queries for data retrieval (interface menu item). 2.4.18 The ability to automate reporting, so that end users receive monthly reports. 2.5 Notification/Alert Management and Calendar 2.5.1 Ability to plan Work Orders through workflow, where assigned staff or work units are automatically notified through City email and text message to commence their assigned tasks associated with a work order. 2.5.2 Automatically notify all assigned workgroups through City email when in progress Work Orders are changed. 2.5.3 Includes 24/7 calendar for working days and hours by employee tracking availability, holidays, vacation, etc., for master schedule. 2.5.4 Tracks injury and safety records by resource and job. 2.5.5 Has a customizable calendar for specific facilities. 2.5.6 Provides Work Order scheduling calendar by a supervisor, resource, asset, tool, and equipment. 2.5.7 Ability to use Work Order calendar to forecast future workforce needs and standards. 2.6 NEEL- Interoperability and Data Integration EXAMPLES Page 67 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 2.6.1 Would the application support integration of an external (doc/image management)? 2.6.2 Does your application support wireless data entry and processing? 2.6.3 What minimum wireless bandwidth is recommended for field - level use? 2.6.4 What mobile devices are supported by your application? 2.6.5 Does your application have a data synchronization process for disconnected edits? 2.6.6 Can data model elements be freely indexed? 2.6.7 Does the asset database provide direct use of GIS modeling, analysis, and location tools (i.e., SQL Server Spatial, ESRI Geodatabase, ArcGIS Server, Google, or Bing Maps API )? Asset Management System Automation Support Operations (Reactive Maintenance): Development INot Available Work Orders are created to support a response to a complaint, service request, or event that will require City resources to install, repair, replace, or remove City owned or maintained assets. Work orders are issued for preventive maintenance, reactive maintenance, and capital projects. Work order management requires a holistic and integrated view of City resources, including staff availability, skills, costs, inventories, equipment, and location. Work order estimating and scheduling is a core function of the City's asset management system and drives the flow of information for decision -making. The automation of work orders through the definition of tasks and assignments will drive management reporting and metric building for support operation Citywide. .1.1 Support Work Order, Task, and Activity hierarchy or have multi- level relationships and roll -ups with unlimited resources assignment at each level. EXAMPLES Page 68 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.1.2 Work Orders and related tasks have definable priority values. 3.1.3 Work Orders and related tasks have definable status values (e.g., pre -planning, planning, waiting for approval, approved, current, hold, waiting parts, waiting for equipment, waiting for labor, work completed, closed. 3.1.4 Work Orders and related tasks have definable category values. 3.1.5 Work Orders and related tasks have definable type values. 3.1.6 Work Orders have pre -defined tasks, resources, and schedules based on type/category. 3.1.7 Unique identifier for all Work Orders. 3.1.8 Work Orders have cascade relationships to individual and group - assigned tasks. 3.1.9 Work Orders have a roll -up view of tasks (child) and related (other Work Orders) records. 3.1.10 Work Orders linked and identifiable to GIS-based features (map interface). 3.1.11 All Work Orders critical path and task items have date/time stamps (e.g., status, close); audit trail. 3.1.12 Work Order creation is not dependent on Service Requests records. 3.1.13 Work Orders can be linked to Service Requests. 3.1.14 Work Orders can be linked to other Work Orders. 3.1.15 Work Orders can be linked to Projects. 3.1.16 Tracks a group of Work Orders and tasks as a Project. 3.1.17 Multiple Work Orders or Project creation from a single Service Request. 3.1.18 Allows Work Order to be created without a Service Request. EXAMPLES Page 69 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.1.19 Allows a Work Order to be created without associating with an Asset. 3.1.20 Has the ability to create Work Orders for contract service. 3.1.21 Allow contract services to be monitored for on -time delivery, actuals, parts, equipment, labor, and service provider SLA/contract parameters. 3.1.22 Display Work Orders or task -related instructions (e.g., HazMat, special tools). 3.1.23 Has the ability to set "warning" (e.g., safety, inspection requirements) flags on Work Orders. 3.1.24 Allows re -assigning tasks left unfinished on Work Orders to new Work Orders 3.1.25 Allow reference documents, images, video, and audio to be linked to Work Orders. 3.1.26 Use GIS Interface to create/identify Work Orders based on feature (asset) location. 3.1.27 Use automation to create pre -defined Work Orders, tasks, and assignments. 3.1.28 Link Work Orders (task level) related to projects for account and payroll tracking. 3.1.29 Allows multiple and different users to be assigned per Work Order task. 3.1.30 Ability to refer to Service Requests or Work Orders at the location defined by the user, not a specific asset location or other defined GIS point or feature. 3.1.31 Ability to automate status and priorities based on Work Order type, prioritization, and assignment schema. 3.1.32 Must be able to assign a work order against any defined (e.g., part, tool, location) of an asset. EXAMPLES Page 70 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.1.33 Provide the ability to determine if a Work Order has already been issued for the same service request. 3.1.34 Ability to create parts, material, and tool lists for Work Order tasks. 3.1.35 Can view Work Orders by multiple criteria (e.g., user, group, assigner, asset, date, type, status). 3.1.36 Ability to "flash" warnings during Work Order data entry for safety or special considerations and requirements to complete or assign the work. 3.1.37 Ability to use any past or current Work Order as a template for future work (e.g., copy work order records and change attributes or components to meet the current situation). 3.1.38 Ability to enter staff timesheet data only once in order to meet Work Order close-out and payroll requirements. 3.1.39 Ability to enter all Work Order related attributes, tasks, activities, and associated work plan resources into a single-entry screen or dashboard. 3.1.40 Ability to develop and assign business rules to each Work Order status. 3.1.41 Can the system provide optimal driving directions for a field worker's daily activities (Work Orders, inspections, service requests)? .2 Support Operations (Preventative Maintenance): Preventative maintenance work includes regularly scheduled and periodic maintenance as directed by equipment and asset vendors, engineering specifications, environmental or planning requirements, and inspection regulations. All preventative maintenance work orders are scheduled in advance with completion due dates and pre -defined work tasks, equipment, parts, etc. 3.2.1 Ability to automatically schedule PM work orders based on unique criteria or the status of an asset. 3.2.2 Ability to schedule PM work orders against assets, groups of assets, or specific locations. EXAMPLES Page 71 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.2.3 PM must be able to be named and have a description (template picklists). 3.2.4 PM work orders should have parent/child relationships. 3.2.5 PM work orders should be interruptible and modifiable. 3.2.6 PM work orders should support downtime functionality (change asset status). 3.2.7 PM work orders not completed by the assigned date are clearly indicated as such (e.g., visible difference). 3.2.8 Ability to enable PM work order frequency to start at the next cycle (days, months, quarters, season, metered interval) or after the previous PM work order is closed. 3.2.9 Historic PM work orders are accessible, including notes/briefs during the current PM cycle. 3.2.10 Ability to report (dashboard) view on PM backlog. 3.3 Project Management and Resource Estimating and Scheduling: The City wishes to support activity -based annual planning in conjunction with capital improvement and preventative maintenance. Corrective maintenance and capital renewal work are typically project -based. Projects include resources from multiple organizations and require coordination among staff, management, and contractors. Additionally, the City needs to plan for the capital renewal of assets over the short and long term as assets approach the end of their useful life. 3.3.1 Ability to assign any staff to Work Orders and related tasks. 3.3.2 Ability to enter the estimated number of work units (accommodate two decimal points). 3.3.3 Ability to provide a default estimate of costs using average unit rates and estimated number of work units. 3.3.4 Ability to estimate Work Order and task requirements by listing out required staff, equipment, parts, materials, and contracts expected to be needed to complete the work; estimates can be given an estimate status for review prior to being issued as a work order or template. EXAMPLES Page 72 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.3.5 Ability to log notes/briefs on a work entry, automatically assigning a date/time stamp and user identification. 3.3.6 Work Order automation tool that systemically assigns status as the Work Order progresses through the stages from start to finish; filter and/or sort jobs by status. 3.3.7 Work Order automation tool to automatically maintain/display a timeline of work order components based on the work completion date. 3.3.8 Ability to assign Work Orders to alternative resources based on availability (e.g., over -allocated, vacation). 3.3.9 Work Order automation tool that will automatically "Close" Work Orders with no outstanding (pending) tasks or other related Work Orders, Service Requests. 3.3.10 Ability to view key employee attributes to enable the selection of appropriate labor. 3.3.11 Create license/certification renewal lists based on labor records (resource attributes) and time parameters. 3.3.12 Ability to create rotation/prioritization scheduling (e.g., schedule full-time employees ahead of temporary, rotating crews, volunteers). 3.3.13 Ability to constrain labor availability by hours, days, and months and notify of over -allocation. 3.3.14 Ability to create user -defined activities and associated information for work plans (e.g., accomplishment type, operational goals, sustainability parameters). 3.3.15 Track employee assignment by labor class, budget, fund, and labor distribution. 3.3.16 Ability to display unit cost by task and activity. EXAMPLES Page 73 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.3.17 Ability to define and track various employee attributes (e.g., hourly rates, operator certificates, professional certificates, special training, safety training). 3.3.18 Ability to define and track various employee attributes (e.g., hourly rates, operator certificates, professional certificates, special training, safety training). 3.4 Asset, Inventory, and Equipment Management: An asset is defined as the physical infrastructure or support component of a facility or infrastructure which has value, enables service delivery, and has an economic life spanning multiple years. Minor infrastructure, such as small tools and office furniture accessories, will not be considered individual assets. Minor infrastructure will be managed through operating and maintenance budgets. Additionally, assets require equipment, parts, and services that need to be inventoried and purchased. The AMS should have a comprehensive inventory (purchasing and receiving) capability that will enable the City to manage asset -related work requirements. 3.4.1 Asset identifier must be unique and flexible (user -definable); The City would like GIS to support the total or part of the asset inventory based on feature classes (infrastructure groups). 3.4.2 Can Assets be associated using unlimited relationship levels (e.g., assets, components, subcomponents)? 3.4.3 Can validation rules be applied to Asset relationships (e.g., a pump cannot be the parent of a pump station)? 3.4.4 Can linear relationships be applied to Assets based on geometric network or linear referencing rules in a GIS geodatabase? 3.4.5 Ability to assign owner(s) to an asset by account (e.g., BARS account). 3.4.6 Ability to assign a user/assignee to an asset separate from the owner by account or description. 3.4.7 Ability to move an asset or group of assets from one parent to another and maintain the asset's work and cost history from its previous parent/child relationships (e.g., move a pump from one station to another). 3.5 Condition Assessment/Asset Rating (Risk Assessment): EXAMPLES Page 74 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 The City needs a centralized information source to track the condition of major infrastructure and facilities to optimize preventative maintenance workflows and reduce the risk of failure. Assessing the probability and impact severity of single asset failure on City services and stakeholders provides a quantifiable measurement of risk versus assumed risk. The AMS should also support the impact on other related assets, AMSs, and services based on various failure scenarios. 3.5.1 Ability to identify crucial assets that must not be allowed to fail (e.g., pressurized mains) and assign a risk rating to individuals or groups of assets. 3.5.2 Ability to define multiple risk elements (domain) to associate with each asset. 3.5.3 Ability to assign notes/briefs on risk elements for each asset. 3.5.4 Has risk assessment guides and definitions to help users identify and use risk elements appropriately. 3.5.5 Has condition rating guides and definitions to help users identify and use rating and assessment values correctly and uniformly. 3.5.6 Ability to define relationships (quantifiable) between risk and condition ratings and other asset attributes as related to service lifecycle. 3.5.7 Ability to track measurement data and history associated with an asset and compare with user -defined warnings and action limits for an assortment of attributes (e.g., pump run times, burn hours, tire wear measurements). 3.5.8 Ability to trigger Work Order creation when a user -defined measurement threshold is reached (e.g., inspection after run-time is reached). 3.5.9 Ability to assign and modify a condition rating to each asset. 3.5.10 Ability to develop unique condition assessment functions based on templates for use with specific types of assets, which may monitor various assessment attributes to trigger actions or notifications. 3.5.11 Ability to assign notes/briefs on condition elements for each asset. EXAMPLES Page 75 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.6 Asset Lifecycle Management: The City needs to track asset maintenance history, assess conditions, and develop deterioration curves to predict future conditions and capital improvement projections/planning to optimize capital and operating expenditures. Additionally, the identification of problems before a failure will ultimately reduce reactive maintenance costs. When planning for asset renewal, different rehabilitation and renewal options need to be considered to ensure the selection of the option with the highest benefits to cost and life expectancy. 3.6.1 Assets should have a status or like function that accommodates expansion/ contraction of infrastructure or retirement, removal, or replacement from inventory. 3.6.2 Ability to predict lifecycle costs based on failure (excluding depreciation value). 3.6.3 Ability to predict lifecycle costs based on proactive rehabilitation and/or replacement. 3.6.4 Ability to predict lifecycle costs based on a straight-line depreciation. 3.6.5 Ability to create, reference, and modify formulas to describe the deterioration curve for each asset. 3.6.6 Ability to assign notes/briefs for deterioration formula on each asset. 3.6.7 Ability to graph deterioration curves (e.g., water main). 3.6.8 Ability to graph the roll -up deterioration curves for each asset group (e.g., all water mains). 3.6.9 Ability to calculate the predicted remaining life of an asset based on counting down from construction or in-service dates. 3.6.10 Ability to graph deterioration curves across any and all selected asset groups. 3.6.11 Ability to import data on options for alternative renewal technologies (e.g., open trench replacement vs. trenchless). 3.6.12 Ability to compare lifecycle costs for alternative renewal technologies. EXAMPLES Page 76 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 3.6.13 Ability to identify opportunities for optimized renewal options amongst different asset types through geographic coincidence (e.g., sewer and water trench work in conjunction with road replacement or other road work). 3.6.14 Ability to create and define input (asset renewal) parameters to a replacement analysis, including the time period for the analysis, future costs escalation, initial replacement fund balance, earnings rate, borrowing rate, and revenue sources. 3.6.15 Ability to create, define, and compile output (budget) parameters such as escalation rates, the timing of bond issues, and cash flows from surcharges for other revenue sources for the development of graphical diagrams, often referred to as Nessie Curves. 3.6.16 Ability to predict and plot individual assets "Nessie Curves." 3.6.17 Ability to change financial parameters such as discount rate. 3.6.18 Ability to model different scenarios for asset renewal. 3.6.19 Ability to compare asset renewal costs against budget. 3.6.20 Ability to model budget -dependent or renewal -dependent scenarios. 3.6.21 Ability to calculate the net present value of future renewal project requirements. 3.6.22 Ability to track the backlog of capital renewal work. 3.6.23 Ability to define parameters and criteria to calculate priorities for renewal projects. 3.6.24 Ability to constrain available renewal funding by year and re- generate recommended renewal projects with funding. 3.6.25 Prepare a timeline for planned renewal projects based on scenario outputs. .7 Financial Management (Asset and Work Costs): EXAMPLES Page 77 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 The AMS will be required to maintain a direct relationship between an asset and all associated cost transactions that will enable detailed activity -based costing as part of the City's capital depreciation and improvement process. Maintaining detailed activity cost transactions will also support summary reporting and data transfer to the City's financial record management AMS (SunGard Public Sector) for fiscal and budgetary reporting. The AMS is expected to utilize online tools for activity costs and budget management, as well as reporting functions that create, maintain, and compare monthly/annual budgets in comparison to actual costs (detailed transactions). 3.7.1 All asset cost -related data must be accounted for through the City's SunGuard Public Sector GMBA module and other modules (e.g., purchasing, payroll, AP chart of accounts, vendor info.). 3.7.2 Ability to define and track an unlimited number of user -definable asset cost attributes. 3.7.3 Ability to track historical purchases and install values. 3.7.4 Ability to track capital additions. 3.7.5 Ability to track individual maintenance events (work order history; value add). 3.7.6 Ability to track disposal/salvage value. 3.7.7 Ability to track repair parts. 3.7.8 Ability to track the cost of replacement. 3.7.9 Ability to track depreciated value (based on acquisition value). 3.7.10 Ability to track warranty parameters (contract details). 3.7.11 Ability to create unique vendors so that purchase orders can be associated with vendors or work orders. 3.7.12 Ability to create specific user -defined information on each vendor (e.g., contact information, work hours). 3.7.13 Ability to store and track vendor numbers, customer numbers, or other identification numbers. 3.7.14 Ability to assign and track costs against a work order for all labor costs based on resource usage and individual employee rates, EXAMPLES Page 78 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 including overtime, overhead, and premiums as defined in rate tables for each employee. 3.7.15 Ability to assign and track costs against a work order for stock parts and materials that are normal stock inventory. 3.7.16 Ability to assign and track costs against a work order for all non - stock parts and materials (special order), including notes/briefs on purchased items and use. 3.7.17 Ability to assign and track costs against a work order for all bulk materials based on material usage reported for the task (e.g., asphalt, salt, gravel). 3.7.18 Ability to assign and track costs against a work order for outside contracted services based on invoice entries. 3.7.19 Ability to assign and track costs against a work order for equipment used by tracking equipment usage through work order tasks and calculating cost based on equipment rate tables; equipment rates based on hours, task, and tool class. Ability to assign and track costs against a work order for overhead and/or billing factors for out -of -class rates or other 3.7.20 labor distribution factors using percentage or flat rate changes. Ability to assign and track costs against a work order for multiple 3.7.21 tax rates. Ability to indicate a work order as reimbursable or billable (e.g., 3.7.22 to other jurisdiction, homeowner, company). Ability to define labor classes and assign them to employees, 3.7.23 workgroups, crews, and rotations. 3.7.24 Ability to track and report fuel consumption data - each vehicle. 3.7.25 Ability to track claims against a vehicle (e.g., accidents). 3.7.26 Ability to record third -party repairs. Ability to track additional equipment or features added to 3.7.27 vehicles. EXAMPLES Page 79 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 I I I 'I11 1 MW 4 Professional Service and Application Support YES Alternate Development Not Available Clarification 4.1 Implementation Services 4.1.1 Does your company have a professional services organization? 4.1.2 Does your company partner with third -party service providers for implementation services (if so, who are your certified providers)? 4.1.3 Describe the services approach you use for implementation (e.g., traditional project management, mentoring, off-site/remote). 4.1.4 Describe the phases of work in a typical implementation project. 4.1.5 Describe the project management approach you take to organizing and managing your implementation services. 4.1.6 How do you report on project status and progress? 4.1.7 What types of training does your company offer (e.g., on -site, classroom, online)? 2 Technical Support .2.1 Does your company offer multiple support plans? .2.2 Clarify the levels of support plans. 4.2.3 Do you offer support via email, web, and phone? 4.2.4 What are your hours of support? 4.2.5 Do you automatically notify or provide links to service packs, updates, and releases? 4.2.6 Provide a list and description of the last 12-month release, update, and SP schedule. .3 Online Knowledge Base EXAMPLES Page 80 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 4.3.1 Do you have a searchable online knowledge base? 4.3.2 Is your knowledge base accessible to anyone? 4.3.3 Do you monitor the knowledge base; how often? 4.3.4 Does your development staff contribute to the knowledge base? 4.4 Developers Network 4.4.1 Do you have a developers' network site? 4.4.2 Who can access the developer's network? 4.4.3 Do you test the code published to the developer's network? 4.4.4 Do you monitor the developers' network; how often? 4.4.5 Does your development staff contribute to the developer's Network? .5 Corporate Outlook 4.5.1 How long has the company been in this market? 4.5.2 Is the company profitable? ".5-3Do you have an annual user conference? EXAMPLES Page 81 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Appendix J. Vendor Cost Worksheet The following describes the minimum information to be contained regarding the cost of the system. Recognize that it is the intent of this section to obtain a complete system cost. Therefore, if this installation could potentially incur other costs in delivering the system that is not included in this section, those must be added to the worksheet. If you are pricing different configuration options, please copy the Worksheet and fully price each option. Pricing Options: Explain your pricing options (i.e., per user, per device, concurrent site, etc.) and recommended training and consulting expenses. Example: Please provide an example/standard implementation timeline for delivery, data conversion, hardware/software installation, etc. Identify all costs associated with acquiring and modifying the specific solution. Please use an additional sheet but follow the outline as defined below. Base System: Identify the costs by the individual module associated with supplying the system that meets the City's basic requirements. Specify the number of users that are included or give us the structure (i.e., per user, per x number of users, etc.) for pricing the software, database, and any other licenses needed. Additional Modules: Identify any additional modules that are not part of the base requirements but may enhance the system to further meet our needs. Modifications to Meet Requirements: Identify the costs associated with completing modifications necessary to meet the basic functional and data requirements. Provide the cost estimate for each modification required. Interfaces Proposed: Identify examples and the method of costing interfaces to CAD, GIS, Payroll, and Accounting functions. Installation -Related Costs: Identify other charges to the City of Example as a result of the installation, including training and professional support. Please provide a list of classes with a maximum number of students allowed and target audience (i.e., clients, technical, etc.) Consulting: Recommended consulting services, including any and all proposed training for city staff on the application usage, configuration, reports development, estimated costs by function/hourly rate, and estimated hours needed. Include normal per diem and travel charges. Can the City be responsible for booking travel and hotels? Page 82 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Hardware Costs: Please identify any hardware costs associated with this installation (client PCs are already in place), such as a server and remote devices (as completely set up to process). Warranty Period: Identify warranty conditions and time period(s). Include any software, support, and/or equipment purchased directly from you. Annual License and Maintenance Costs: Identify the annual software system maintenance cost and any other annual costs for ongoing system operation and maintenance that would be provided by the vendor. Additional Client License Costs: Please identify the costs for additional licenses if purchased with or after the initial project (if units of 5, 10, etc., enhance pricing include that information). VENDOR PRICING WORKSHEET AND COST PROPOSAL Quantity Item Description Unit Price Extended Price Base System (server and client licensing if applicable): Additional Modules: Modifications to Meet Requirements (custom development): Page 83 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Interfaces Proposed (API costs): Professional Services (recommended consulting costs, training costs): Data Conversion Costs: Total Vendor Costs: DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 Sales Tax @ 9.5%: TOTAL COST PROPOSED: Annual License and Maintenance Costs: Additional Client License Costs (if applicable): Page 85 DocuSign Envelope ID: 55534C22-6271-4105-9D98-434D8D75BC95 2023 CITY OF PORT ORCHARD — SAW 186 KCI