049-23 - Resolution - Contract and Easement with Puget Sound Energy for EV Charging ProjectDocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 RESOLUTION NO. 049-23 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, AUTHORIZING THE MAYOR TO EXECUTE A COMMERCIAL ELECTRIC FACILITIES CONTRACT AND NONEXLUSIVE PERPETUAL EASEMENT WITH PUGET SOUND ENERGY FOR THE ELECTRIC VEHICLE CHARGING STATIONS PROJECT. WHEREAS, to lessen the City's carbon footprint, as older vehicles in the City's fleet age out of useful condition, the City has chosen, whenever feasible, to purchase Electric Vehicles (EV) for the fleet; and WHEREAS, the growing EV fleet requires charging stations to ensure the vehicles are continuously charged and ready for service; and WHEREAS, staff identified the need for the EV Charging Station project (the "Project"), to be designed and constructed by Public Works Staff and located at the Public Works Shop facility; and WHEREAS, the Project requires the installation of a Puget Sound Energy (PSE) primary line extension, transformer, and commercial service onto City property to meet the power requirements of the new charging stations; and WHEREAS, PSE has provided the City with a Commercial Electric Facilities Contract that includes an approved design and the associated costs for the required electrical improvements; and WHEREAS, funding for this project was authorized during the 2023-2024 Biennial Budget process; and WHEREAS, PSE has also requested a nonexclusive Power Easement (Easement No. 1), and a Vault Easement (Easement No. 2) from the City of Port Orchard, necessary for continued maintenance and continuity of service for the Project; and WHEREAS, the grant of easements over and across City -owned property is necessary for the Project, and requires authorization by the City Council; and WHEREAS, the City Council finds that the execution of a contract and the grant of the requested easements are in the best interests of the City and the residents of Port Orchard; now therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 Resolution No. 049-23 Page 2 of 2 THAT: It is the intent of the Port Orchard City Council that the recitals set forth above are hereby adopted and incorporated as findings in support of this Resolution. THAT: The City Council authorizes the Mayor to execute a contract with Puget Sound Energy for the installation of a primary line extension, transformer, and commercial service for the Electric Vehicle Charging Stations Project. THAT: The City Council grants and authorizes the Mayor to execute the nonexclusive perpetual Power Easement (Easement No. 1), and a Vault Easement (Easement No. 2) with Puget Sound Energy, necessary for the Electric Vehicle Charging Stations Project. A copy of the easement is attached hereto as Exhibit A and incorporated herein by this reference. THAT: The Resolution shall take full force and effect upon passage and signatures hereon. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the City Clerk in authentication of such passage on this 23rd day of May 2023. Er DocuSigned by: 6btJ'f P4M&SWuL 3B96492E3F5847D... Robert Putaansuu, Mayor ATTEST: DocuSigned by: �va�n UJAUL 46ASA5466D00418... Brandy Wallace, MMC, City Clerk DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 ruuc l COMMERCIAL ELECTRIC FACILITIES CONTRACT ' SOUND ENERGY Date 05/03/2023 Contract is subject to revision after 90 days CUSTOMER (OWNER) NAME CITY OF PORT ORCHARD CO-OWNER NAME (IF APPLICABLE) SERVICE ADDRESS 1535 VIVIAN CT # EV CHRGERS CITY PORT ORCHARD STATE ZIP 98367 WA BILLING ADDRESS 216 PROSPECT ST CITY PORT ORCHARD STATE WA ZIP 98366 PHONE 360-876-7019 EMAIL psaltsgaver@portorchardwa.gov PSE WORKORDER NO. 105102908 Summary of Charges: Construction Costs: Transformation Charges: Less Applicable Margin Allowance Sub -Total (Potential Refundable Costs) Permitting Fees*: Relocation/Removal of Existing Facilities: Other Non -Refundable Construction Charges: Sub -Total (Non -Refundable Costs): Brief Description of Work: OH-UG PRIMARY LINE EXTENTION, INSTALL UG TRANSFORMER AND COMMERCIAL SERVICE. $ 23,729.04 $ 13,306.16 $ 0 $ 37,035.20 $ 0 $ 0 Brief Description of Other Costs: $ 26,009.82 FLAGGERS $ 26,009.82 Total Amount to be Billed Under This Contract: $ 63,045.02 Customer Initials *If the above Permitting Fees are associated with service work only, those costs will be billed with the applicable service charges below after the service is energized. SECONDARY SERVICE CHARGES (PERMANENT AND TEMPORARY) ARE NOT INCLUDED IN THE SUMMARY OF CHARGES ABOVE Any applicable Secondary Service Type charges listed below will be billed after your service line installation, based on the actual work performed. Base Costs, in the table below, include Schedule 87 tax and are current costs effective 3/1/2023. These charges also do not include permitting fees, trenching and other excavation related work that is your responsibility. The Secondary Service Type charges from the list below that apply to your project will be invoiced on a second bill. Seconda Service Type 480 Voltage or Below Cost w/Schedule 87 tax effect Single wire run to handhole or transformer $637.12 Each additional run of wire per circuits $147.07 Each additional trip beyond 1" trip due to customer requirements $436.79 per trip Hourly rate for additional engineering $190.20 Underground Temporary Service Charge $203.00 Overhead Temporary Service Charge $295.00 Overhead Permanent Service Charge $982.74 Customer Initials: By signing this contract you are authorizing PSE to continue with all the needed elements to complete your project. Upon receipt of a signed contract, PSE will bill you for the amount indicated on the "Total Amount to Be Billed Under This Contract' line. The bill will sent to the billing address listed on this contract. PSE requires payment of these line extension charges prior to scheduling construction. Payments can be made via pse.com (fees may apply), by mail, or at a PSE Pay Station. Delaying payment may result in a construction delay for your project. Customer requested changes in the scope of the project may result in additional charges, and/or delays to your project. �ZLnedDby: ROber't Putaansuu Signaturer S Name: TONY LANG JIpr 5/2�' *?3 DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 TERMS AND CONDITIONS PROJECT INFORMATION 1. The PSE drawing shows the proposed scope of your project including the location of permanent, above ground electrical facilities required to provide electrical service to your project. Fault current information for transformers associated with your project is noted on the work sketch drawing. Please review this drawing as soon as possible to ensure there are no unforeseen conflicts between PSE's design and your project. If you determine there are conflicts or if you identify a discrepancy while reviewing the drawing for your project, please contact me at the number below. This is attached as Exhibit A. 2. Additional construction -related information and information on metering and service entrance requirements areprovided in PSE's Electric Service handbook for commercial projects. If you would like a copy of the handbook please contact me at the number below. It is your responsibility to provide your project manager, site superintendent, and/or subcontractors with any relevant information from this correspondence that apply to their work in support of your project. 3. The Excavation Requirements & Final Grade Certification must be signed by the project owner or designee and returned to me along with a signed copy of this contract. This is attached as Exhibit B. 4. Transformers have been sized for diversified commercial loads only, and shall not be used for high load factor (continuous) temporary power uses, such as electric heaters for dry -out. Fault currents for non- residential transformers in your project are noted on the attached PSE design drawing. Please notify the PSE representative listed on this contract immediately if you believe there are conflicts between this design and your project. It is your responsibility to provide your project manager, site superintendent, and subcontractors with any information from this correspondence and it's attachments that apply to their work. 5. The requirements for trenching by customers on public right-of-ways and/or on Puget Sound Energy easements must be signed by the project owner or designee and returned along with a signed copy of this contract. This is attached as Exhibit C. POTENTIAL REFUNDS Margin Allowance: If PSE has not provided a Margin Allowance or if your Margin Allowance exceeds $75,000, PSE agrees to calculate and refund the Margin Allowance, subject to Schedule 85. Refund requests must be made within six (6) years of the date on which the facilities installed under this contract are energized. Customers are responsible for making the one-time refund request. DIM Refund: Other refunds associated with the line extension charge may be available if additional permanent service hook- ups are made to your line extension. These service hook-ups must be made within five (5) years of the date on which your project is initially energized Customers are responsible for making all refund requests. A refund may be requested one (1) time within six (6) years of the date on which your line extension is initially energized. It is the customer's responsibility to make the refund request. Your refund request should be directed to PSE's Customer Accounting Coordinators at Schedule85refundrequests@pse.com. RATE SCHEDULE 85 All terms and conditions, costs, and refunds are in accordance with PSE's Rate Schedule 85, and any discrepancies between this contract and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in this contract. The entirety of Rate Schedule 85 can be viewed at PSE's website www.pse.com. This cost information is valid for 90 days from the date of this contract. Should we receive your contract after this period, the costs will be subject to changes. The amount noted on this contract is an estimated cost; however PSE's Schedule 85 line extension tariff requires customers to pay the actual cost of construction. PSE will determine the actual cost of the job once construction is complete. If the actual cost of the job is more than 10% above or below the estimated cost, an additional billing or refund will result to account for the difference. DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 VCV UC 1 SOUND ENERGY REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT-OF-WAYS AND/OR ON PUGET SOUND ENERGY, INC. EASEMENTS The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way or Puget Sound Energy, Inc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE permit or easement must comply with these requirements. 1. All trench construction must be performed by a Washington State licensed and bonded contractor. 2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated representative, and receive on -site approval by that representative, and local jurisdiction. 3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction is the responsibility of Potelco, Inc. Customer shall notify Potelco Project Manager three working days prior to trenching. Penalties for failure to comply with this requirement will be borne by the customer. 4. If the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements. 5. PSE, all participating utilities, and One -Call Locate, must be notified a minimum of 72 hours in advance of the date and time for right-of-way trenching and facility placement. The One -Call Locate number is 1-800-424-5555. State law requires locating service notification. 6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris shall be removed off -site each day, in accordance with local regulatory requirements. All erosion control requirements in accordance with local regulatory requirements are the responsibility of the customer. 7. Material excavated from the shoulder of the right-of-way shall be properly disposed, and replaced with select backfill material in accordance with local regulatory requirements. 8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction testing, the cost of said testing is the responsibility of the customer. 9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications and satisfaction. 10. In the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the company for costs should PSE perform the trenching. DS Customer In 11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable attorneys' fees) arising out of, or in connection with, the above signed trenching activities. Custome Is: I AGREE TO ADHERE TO THE ABOVE CONDITIONS Service Address: 1535 VIVIAN CT # EV CHRGERS PORT ORCHARD 98367 Work Order Number: 105102908 C.Abbe"'f DOCUSigned by: Sig PlnrM_t&SWti , 3B96494-524;^... Robert Putaansuu Name: TONY LANG Mayor 5/26/2023 Title: Date: DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 PV CJt ' SOUND ENERGY PSE ELECTRICAL FACILITIES EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFICATION PURPOSE This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction. EXCAVATION REQUIREMENTS The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a condition of receiving electrical service for your project. If you need additional information, please call the PSE contact person listed below. Developer is responsible for acquiring utility locates by calling One -Call, 1-800-424-5555 at least 48 hours (two full working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative Code and Safety Standards. 2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation. 3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical facilities and other utilities within a joint trench. 4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages caused by improper backfill or compaction. 5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and any foundation on Developer's property. 6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid level bottom with a 6 inch deep layer of crushed rock bedding. 7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify and provide final grade, property lines, and utility easements prior to installation of PSE's electrical facilities. 8. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages resulting from dig -ins due to changes or variations in grade that are made after the installation of PSE's facilities. FINAL GRADE CERTIFICATION By my signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate within easement areas or rights -of -way, or from digging without adequate rights on adjoining properties. Service Address: 1535 VIVIAN CT # EV CHRGERS DocuSigneDdby- PORT ORCHARD 98367 Robert Putaansuu Name: TONY LANG Work Order Number: 105102908 Tillpyor 5/6e023 2806 08/15 DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 UST TO CLE R UT SHRUBS / P01 619773 154629 619772 154646 12 40T 2/18 8 SW # T89610 25 B 2/17 — — — — — T 336.4 MCMACSR I U -rl•T. - 619772 EXIST --- MO 1 154654 1 00T GATE EXIST GATE I 13-943 Vol 619767 154639 500 kV 277/480V (ABC) 1535 EXIST Ap O SHOP / 1525 1545 1441 CIRCUIT F ET ADDED: 65' Sq. Footage: /A - EV CHARGING STATION Panel Size: 4 0 AMPS 1435 Heat Type: N/ Est. Demand: 13 KW LRC: 339A • V. Drop: 1. % • Flicker: 2.7 0 500kVA 277/480v Fault Current: 26,100 R/X:0.2 %Z:2.30 SITE PLAN SCALE: 1" = 100' — 1- 5' MIN 3' MIN H Z W W Q OE SW COOK RD / T --- _ I I I � U Z g > 1515 Z Z W H J i (9 Z WWg O WW 1 J oQ Ca Call DLL C) ILL 3' MIN Q Z Lu 3' MIN o 0- <� l­-°d� 5'MIN w00 n n / \ I Q i U H �Q� i 5' MIN - < 5' MIN rn Of rn C) 0 Y UQ 10- MIN UQ o Q Q ROAD OR PARKING AREA L — MINUMUM CLEARANCES FOR PSE EQUIPMENT (V01) SCALE: NONE Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter. - A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Excavated Dirt Pile ROADSIDE 18" 24" Min \\\\\\\\\\\ Final Grade Typical To Excavated Dirt Pile \i rBackfill for DB 120 Conduit/Direct Buried Cable 36 �� 12" Min (No Rocks over 10" Diameter) 48„ % Separation Max Min �� Cover \� 6" or 12" of sand, 5/8" minus \� or clean backfill shading 3" of sand, 5/8" minus, or clean backfill bedding Phone & TV Primary Power Cable Direct Buried or in PSE provided DB120 Grade Conduit CUSTOMER -SUPPLIED TRENCH FOR PRIMARY CABLE(P01 TO V01 SCALE: NONE LUMSDEN RD SITE SPECIFIC NOTES P01 GRID #619773-154629: -PSE OWNED 65' TRANSMISSION POLE TO REMAIN -INST 1/0 AL 3PH PRI TERM ON FG ARM -INST L/B C/O & SURGE ARRESTER FUSE @40T -INST SW #T89610 -INST (3) STIRRUPS & HOT CLAMPS -INST 4" PRI RISER ON S/O BRACKETS, (ACTUAL= ') -INST CABLE #'S AO-AFK878, BO-AFK879, CO-AFK880 V01 GRID #619767-154639: -INST TX 7' X 4' W/ 60" X 24" ACCESS W/ 8' SQ COVER -SET 500KVA, 277/480V PM XFMR -INST (3) 1/0 CS PRI TERMS -INST CABLE #'S AO-AFK878, BO-AFK879, CO-AFK880 -INST GRID #619767-154639 -CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS (2 RUNS OF 4/0 UG WIRE) SPAN SPECIFIC NOTES 6043.1000, TSU3L1 F 6042.1000, RIS4CSS 6045.5000, PM3P15M MID:6259250 6041.1000, ELB10J P01-V01: -INST 14" DB120 CONDUIT ±65', (ACTUAL= ') IN CUSTOMER PROVIDED TRENCH -INST (3) 1/0 AL SOL JACKETED PRI CABLE, ±100', (ACTUAL= ') 2-36(60') DED FAC 2-55(60') DED FAC 3-19B "NOTE: CITY OF PORT ORCHARD WILL BE RESPONSIBLE 100% ALL EXCAVATION & RESTORATION. CUST IS 100% RESPONSIBLE TO CLEAR -OUT SHRUBS AT P01. PRE -CON WILL BE REQUIRED BEFORE ANY EXCAVATION ON -SITE." FOREMAN MUST FILL IN CABLE #: AFK878 CABLE #: AFK879 CABLE #: AFK880 MANUFACTURER- MANUFACTURER- MANUFACTURER- YEAR MANUFACT: YEAR MANUFACT: YEAR MANUFACT: COMPOUND: COMPOUND: COMPOUND: Primary Cable & Conduit Table (Foreman to Complete) POSSIBLE CUSTOMER ENTRY LOCATION I I PSE FROM P01---// CABLE INSTALLATION DIAGRAM R Not to scale P01 619773 154629 40T SW #T89610 90° 2/17 PULL F=91lbs R=358lbs 90, A 619767 V01 154639 500 kVA 277/480V (ABC) CONDUIT DIAGRAM SCALE: NONE TRANSFORMER INSTALLATION (PM) Installed at site: Vol Grid Number: 619767-154639 kVA Rating: 500kVA 277/480y Material ID#: 6259250 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage POWER GENERAL NOTES - COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. CUSTOMER NOTES Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy Standards & Local Municipality (See PSE Electric Service Handbook for more details). 1. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 2. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 3. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 4. Roads shall be paved or have a compacted , crushed rock base in place. 5. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 6. All work is to be done in accordance with local municipal and county permit requirements as applicable. 7. Inclement weather conditions may cause delays in construction times and dates. 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 9. EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice 0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction requirements. (Local jurisdiction may have additional requirements including notes detailing where erosion or sediment control structures are to be installed, cross section details of the typical erosion structures, & special requirements for work in sensitive areas.) 10. Customer is required to have meter inspected and approved by L&I/City prior to construction. LOCATION PSE PROVIDE CONDUIT PRIMARY CABLE QTY OF LUBE (gal.) AS BUILT INFORMATION Design Actual TYPE BENDS PULL PULL Cable Design Actual CABLE NUMBERS MANUFACTURING INFORMATION From To Size Qty Length Length (Ibs) Rev Size Length Length (in) (ft) (ft) DB120 HDPE SCH 80 90° 45° 22° 11 ° (Ibs) (ft) (ft) A B C Manufacturer Compound Year Design As Built Actual Amount Installed (Conduit &Cable) P01 V01 4" 1 65' X 2 91 358 1/0 100, AFK878 AFK879 AFK880 1 GAL CITY OF PORT ORCHARD IS RESPONSIBLITLY TO PROVIDE GUARD POST 5' S'MAPAINTED MAX X YELLOW 5' N MIN 9 3'-6• MAX MAX LENGTH 64r MIN MIN l TYPICAL 5 PAD 8 5 MAX XFMR MAX FRONT CONCRETE 7-6• 5 GUARD MAX POSTS MIN 3 5' MAX �I 5• i. MIN -- X MAX MAX GUARD POST INSTALLATION GUARD POST LOCATIONS The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a. minimum compressive strength of 3000 psi after 28 days - The exposed portion of the post shall be painted traffic yellow. - 6 It x 9 in. diameter precast steel -reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. GUARD POST INSTALLATION REQ FOR V01 Not to scale 0700.1600-03 8'-0" 8'-0" 8" or 10'-0" 4'-2" 3'-6" 7'-0" i T-0" TOP VIEW 0111, 000 SIDE VIEW Excavation - 20 cubic yards VAULT & EXCAVATION DETAIL (V01) Not to scale 6045.5000 CIRCUIT LOADING TABLE CIRCUIT: EPO-12 AS OF 4/17/2023 A PHASE B PHASE C PHASE EXIST. PEAK LOAD 123 172 152 EST. NEW LOAD 12 12 12 TOTAL 135 183 163 FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Quadrant Foreman's Signature 4' x 4' Work Pit Field Face \ (Pole Butt Must Be Exposed) Print Name Date Quadrant 5" Min Climbing Space / 619772 619774 Standoff Bracket Conduit \ 1546047619773 154645 15" Min Length Conduit Clamp — Z 619772 154629 2/17 154646 2/18 \ P01 25 kVA (B) 2" 6" Crushed 4'-6" Rock Direction of Vehicular Traffic Climbing Space Zoad Face, PROJECT PHASE NOTIF# ORDER# PWR Superior Perm. Service Metering Removal Temporary Job Order 513819438 105102908 513965511 104352382 3002208608 N/A N/A N/A N/A N/A N/A GAS Distribution Service Stubs HP Svc/MSA N/A N/A N/A N/A N/A N/A CABLE TV PHONE // Project Manager Contact Information: Manager: Victor Ibarra Cell Phone: 425-429-4574 TOP VIEW E-Mail: victor.ibarra@pse.com CONDUIT RISER PLACEMENT DETAIL (P01) PRIMARY ONE -LINE & UG MAP: BEFORE PSE Locates Required NO SCALE: NONE SCALE: NONE Customer Locates Required YES 0 / is JOB SITE / A Ar 30: SW R�\25T 125T % T86112 A EPO 100T c 12 WE 17 C 1-94 25T 13 1003; ' 30 (CROSS COUNTR I r- I- 3 0: n o 3 0: ...............A 1g -: .... 3Sb : • '3;: ..........40T 30 30 13-792g.... B. ..Iii:E:: 13-707 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE 619773 POI 154629 40T 619774 SW #T89610 154645 2/17 6197727 � 619772 154604 I 154646 2/18 2/16 A 25 kVA (B) AO—AFK878 619767 Vol BO—AFK879 15-4639 CO—AFK880 500 kVA 277/480V (ABC) L_ PRIMARY ONE -LINE & UG MAP: AFTER SCALE: NONE Vicinity Map JOB SITE 34 27 5� - Owner / Develoner Contact Info V t 0 O 00 City of Port Orchard 216 Prospect St Port Orchard, WA 98366 ATTN: Tony Lang 360-876-7019 office For contacts below dial 1-888-CALL PSE (225-5773) CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES Outages Required NO Flagging Required YES REAL ESTATE/EASEMENT ROW REVIEW / EASEMENT PERMIT N/A 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR Victor Ibarra 425-429-4574 4/17/23 1 ENGR - POWER Helene Sparks 360-475-7001 4/17/23 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KITSAP Emer Sect N/A Gas Wk Ctr N/A POWER WK CTR QSSPE DRAWN BY Helene Sparks 360-475-7001 4/17/23 CHECKED BY 1/4 SEC SE SEC34 T24 R1 E OP MAP N/A PLAT MAP N/A APPROVED BY 425-495-0703 5 2/2023 FOREMAN #1 NO (POWER) 2401E136 -[--U-MAP OH CKT MAP 2401E136 UG CKT MAP 2401E135 CIRCUIT NO EPO-12 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A INCIDENT MAOP PUGET CITY OF PORT ORCHARD EV STATION N/A N/A SOUND Elect Order COMMERCIAL INST 30 OH-UG PRI L/E GaNOrder 105102 08 ENERGY 1535 VIVIAN CT # EV CHRGERS PORT ORCHARD, WA 98367 SCALE FGE PSE AS NOTED 1/1 DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 RETURN ADDRESS: Puget Sound Energy, Inc. Attn: ROW Department 3130 S. 38t' Street Tacoma, WA 98409 MK * PUGET SOUND ENERGY EASEMENT REFERENCE # GRANTOR (Owner): CITY OF PORT ORCHARD GRANTEE (PSE): PUGET SOUND ENERGY, INC. SHORT LEGAL: LOT 15, PORT ORCHARD INDUSTRIAL PARK, DIV. 1 / PTN NW'/4 SW'/4 34-24N-01E ASSESSOR'S PROPERTY TAX PARCEL: 5392-000-015-0008 For and in consideration of good and valuable consideration, the receipt and sufficiency of which are acknowledged, CITY OF PORT ORCHARD, a Washington municipal corporation, ("Owner" herein), hereby grants and conveys to PUGET SOUND ENERGY, INC., a Washington corporation ("PSE" herein), for the purposes described below, a nonexclusive perpetual easement over, under, along across and through the following described real property (the "Property" herein) in KITSAP County, Washington: LOT 15, PORT ORCHARD INDUSTRIAL PARK DIVISION 1, RECORDED JULY 27, 1998 UNDER AUDITOR'S FILE NO. 3106119, RECORDS OF KITSAP COUNTY, WASHINGTON. Except as may be otherwise set forth herein PSE's rights shall be exercised upon that portion of the Property ("Easement Area" herein) described as follows: EASEMENT NO. 1: AN EASEMENT AREA TEN (10) FEET IN WIDTH HAVING FIVE (5) FEET OF SUCH WIDTH ON EACH SIDE OF THE CENTERLINE OF PSE'S FACILITIES AS NOW CONSTRUCTED OR TO BE CONSTRUCTED, EXTENDED OR RELOCATED LYING WITHIN THE ABOVE DESCRIBED PROPERTY, EXCEPT WHERE BUILDING FOOTINGS, FOUNDATIONS, AND/OR SUBSURFACE STRUCTURES PRECLUDE. IN SUCH CASE, THE FOOTINGS, FOUNDATIONS, AND/OR SUBSURFACE STRUCTURES WILL BECOME THE BOUNDARY OF THIS EASEMENT. EASEMENT NO. 2: AN EASEMENT OVER THE ABOVE DESCRIBED PROPERTY FOR VAULTS, PEDESTALS AND RELATED FACILITIES ("VAULT EASEMENTS") ADJACENT TO EASEMENT AREA No. 1. THE VAULT EASEMENT MAY OCCUPY UP TO AN ADDITIONAL 2 FEET IN WIDTH FOR A TOTAL WIDTH OF 12 FEET) WITH THE LENGTH OF EACH VAULT EASEMENT EXTENDING 2 FEET FROM EACH END OF THE AS -BUILT VAULTS). UG Electric WO# 105102908 / RW-130364 / Not. 11936243 Page 1 of 3 DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 1. Purpose. PSE shall have the right to use the Easement Area to construct, operate, maintain, repair, replace, improve, remove, upgrade and extend one or more utility systems for the purposes of transmission, distribution and sale of electricity. Such systems may include: Underground facilities. Conduits, lines, cables, vaults, switches and transformers for electricity; fiber optic cable and other lines, cables and facilities for communications; semi -buried or ground -mounted facilities and pads, manholes, meters, fixtures, attachments and any and all other facilities or appurtenances necessary or convenient to any or all of the foregoing. Following the initial construction of all or a portion of its systems, PSE may, from time to time, construct such additional facilities as it may require for such systems. 2. Access. PSE shall have a reasonable right of access to the Easement Area over and across the Property to enable PSE to exercise its rights granted in this easement. 3. Easement Area Clearing and Maintenance. PSE shall have the right to cut, remove and dispose of any and all brush, trees or other vegetation in the Easement Area. PSE shall also have the right to control, on a continuing basis and by any prudent and reasonable means, the establishment and growth of brush, trees or other vegetation in the Easement Area. 4. Owner's Use of Easement Area. Owner reserves the right to use the Easement Area for any purpose not inconsistent with the rights herein granted, provided, however, Owner shall not perform the following activities without PSE's prior written consent: (1) excavate within or otherwise change the grade of the Easement Area; (2) construct or maintain any buildings, structures or other objects on the Easement Area; and/or (3) conduct any blasting within 300 feet of PSE's facilities. 5. Indemnity. PSE agrees to indemnify Owner from and against liability incurred by Owner as a result of PSE's negligence, or the negligence of PSE's employees, agents or contractors in the exercise of the rights herein granted to PSE, but nothing herein shall require PSE to indemnify Owner for that portion of any such liability attributable to the negligence of Owner, its employees, agents or contractors or the negligence of third parties. 6. Attorneys' Fees. The prevailing party in any lawsuit brought to enforce or interpret the terms of this Easement shall be entitled to recover its reasonable attorneys' fees and costs incurred in said suit, including on appeal. 7. Successors and Assigns. This Easement is binding upon and will inure to the benefit of the successors and permitted assigns of the parties. PSE may not assign or otherwise transfer any of its rights, obligations or interest under this Easement without the prior written consent of Owner, which consent may not be unreasonably withheld. Notwithstanding the foregoing, PSE may assign this Easement to an affiliate or in connection with a merger, acquisition, corporate reorganization, sale of assets or other change in control. 8. Complete Agreement; Amendment; Counterparts. This Easement contains the entire agreement of the parties with respect to this subject matter and supersedes all prior writings or discussions relating to the Easement. This Easement may not be amended except by a written document executed by the authorized representatives of Owner and PSE. This Easement may be executed in counterparts, each of which shall be treated as an original for all purposes and all executed counterparts shall constitute one agreement. 9. Warranty and Representation of Authority. The parties each represent to the other that the person or persons executing this Easement have authority to do so and to bind the parties hereunder. All consents, permissions and approvals related to this Easement, and the obligations hereunder, have been obtained. Owner further warrants to PSE that it has the necessary right, title and interests in the Property to grant the easement rights set forth herein. 10. Severability. Invalidation of any of the provisions contained in this Easement, or of the application thereof to any person, by judgment or court order, shall in no way affect any of the other provisions thereof or the application thereof to any other person and the same shall remain in full force and effect. If a provision is found to be unenforceable or invalid, that provision shall be modified or partially enforced to the maximum extent permitted by law to effectuate the purpose of this agreement. UG Electric WO# 105102908 / RW-130364 / Not. 11936243 Page 2 of 3 DocuSign Envelope ID: 3COB79OD-F126-448E-992D-9AAOBA4D6D54 11. Non -Waiver. The failure of any party to insist upon strict performance of any of the terms, covenants or conditions hereof shall not be deemed a waiver of any rights or remedies which that party may have hereunder or at law or equity and shall not be deemed a waiver of any subsequent breach or default in any of such terms, covenants or conditions. DATED this day of 2023. OWNER: CITY OF PORT ORCHARD, a Washington municipal corporation BY: TITLE: STATE OF WASH INGTON ) ) ss COUNTY OF ) On this day of , 2023, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared to me known to be the person who signed as , of the CITY OF PORT ORCHARD, the Washington municipal corporation that executed the within and foregoing instrument, and acknowledged said instrument to be his/her free and voluntary act and deed and the free and voluntary act and deed of the CITY OF PORT ORCHARD for the uses and purposes therein mentioned; and on oath stated that he/she was authorized to execute the said instrument on behalf of said municipal corporation. IN WITNESS WHEREOF I have hereunto set my hand and official seal the day and year first above written. (Signature of Notary) (Print or stamp name of Notary) NOTARY PUBLIC in and for the State of Washington, residing at My Appointment Expires: Notary seal, text and all notations must not be placed within 1" margins UG Electric WO# 105102908 / RW-130364 / Not. 11936243 Page 3 of 3