125-22 - KR Homes, LLC - Supplement / Change Order 4DocuSign Envelope ID: 1E59BA13-OE57-4690-8680-4E3OBO41C6B3 CITY OF PORT ORCHARD Authorization for Change Order No. 4 Date: 6/13/2023 Project: Sroufe Water Main Replacement Contract / Job # C125-22 Contractor: KR Homes, LLC PO Box 856 Winlock, WA 98596 THIS CHANGE ORDER AUTHORIZES THE FOLLOWING CHANGES TO THE CONTRACT: Extension of contract C125-22 by one working day to accommodate additional work for a total of 68 working days. Materials and labor to provide separation between parallel water main and side sewer force main. The location of existing sewer was not known prior to design. Compensation for standby time during repair of unlocated water main that was broken during construction. This change will increase the contract by $19,604.44. Details for this contract increase are attached. In all other respects the Underlying agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. Contract History Amount Sales Tax Total Date Ap vd by Original Contract $290,790.00 $26,752.68 $317,542.68 28-Mar-23 Council Change Order 1 $8,249.82 $767.23 $9,017.05 19-Ma -23 PW Director Change Order 2 $7,021.32 $943.77 $7,965.09 22-Ma -23 PW Director Change Order 3 $7,830.71 $728.26 $8,558.97 01-Jun-23 PW Director Change Order 4 $17,936.36 $1,668.081 $19,604.44 13-Jun-23 Council Total Contract $331,828.21 $30,860.02 $362,688.23 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Contractor Approva'FS'ign1&re bC, Public Works Director Tony Lang Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. DocuSigned by: uuutp iuuirrhpri ���`'e \\,OR� �0& 0 , F 4y OGORP �77Y'' aesca-s��r-ssa�o Mavo DocuSigned by: AT SE / b v)djERJ; City Clerk 'rrruu i i i una� 6/13/2023 Council Approval Date DocuSign Envelope ID: 1E59BA13-OE57-4690-8680-4E3OBO41C6B3 Sroufe Watermain Extension KR HOMES LLC Request For Compensation May 31, 2023 Kurt Reddig Date of Request offfice@krhomes.org 360-864-5500 Office COR # 4 To: City of Port Orchard Attention: Christian Williams Reason for Compensation: CDF Divider for existing SS and new watermain near Tacoma and Sroufe. Request for additional days 1 Day / s Materials and Equipment Totals Column Yds Rate CDF 29 yds $ 140.00 $ 4,060.00 Export Soils 39 $ 5.00 $ 195.00 Hours Rate Kubota 55 Excavator $ 75.00 $ - 1D 35G Excavator 8 $ 65.00 $ 520.00 Attachment Hammer/Breaker $ 27.00 $ - Skid Steer 2 $ 65.00 $ 130.00 Pipe Truck/Pickup 8 $ 24.00 $ 192.00 Chain Saws, oil, gas, tools $ 26.00 $ - Dump Truck 8 $ 100.00 $ 800.00 Small Tools/Supplies 8 $ 11.00 $ 88.00 Materials and Equipment Cost $ 5,985.00 Labor Flaggers Hours Wage Rate Tax/WC/Tri Safety $ 51.00 $ 11.00 $ 3.00 $ - $ 51.00 $ 11.00 $ 3.00 $ - Labor Cost Trucker 8 $ 70.86 $ 11.00 $ 3.00 $ 678.88 Labor 16 $ 56.81 $ 11.00 $ 3.00 $ 1,132.96 Operator 10 $ 75.51 $ 11.00 $ 3.00 $ 895.10 Supervisor 3 $ 85.00 $ 11.00 $ 3.00 $ 297.00 Labor Cost $ 3,003.94 Mobilization Mobilize Equipment Each $ - $ - Mobilization Cost $ _ Subcontractors Subcontract Cost $ _ Costs w/ Markup Cost Mark Up Totals Materials and Equipment $ 5,985.00 0% 21% $ 7,241.85 Labor $ 3,003.94 0% 29% $ 3,875.08 Mobilization $ - 0% 0% $ - Subcontractors $ 0% 21% $ - Total Compensation Requested $ 11,116.93 For KR HOMES, LLC Authorized Signature DocuSign Envelope ID: 1E59BA13-OE57-4690-8680-4E3OBO41C6B3 Sroufe Watermain Extension KR HOMES LLC Kurt Reddig offfice@krhomes.org Request For Compensation May 31, 2023 Date of Request 360-864-5500 Office COR # 4 To: City of Port Orchard Attention: Christian Williams Reason for Compensation: Time for no production on 5-24&25. From unmarked waterline damaged. 24th. Noah 1.5 HR OP, Mark 10 HR OP, Spencer 9 HR Lab. 25th Mark 3.5 HR OP, Spencer 3.5 HR Lab Full labor and operator time for employees on -site during standby. Discount Rates added for equipment sitting during these hours. Mainline pipe install production was stopped by unmarked damaged line. Request for additional days 2 Day / s Materials and Equipment Totals Column Yds Rate Discounted Standby Rate Kubota 55 Excavator Discounted Standby Rate JD 35G Excavator Attachment Hammer/Breaker Discounted Standby Rate Skid Steer Pipe Truck/Pickup Chain Saws, oil, gas, tools Discounted Standby Rate Dump Truck Small Tools/Supplies Labor Hours Rate 13.5 $ 50.25 $ 678.38 14.5 $ 43.55 $ 631.48 $ 27.00 $ - 14.5 $ 43.55 $ 631.48 14.5 $ 24.00 $ 348.00 $ 26.00 $ - 14.5 $ 67.00 $ 971.50 $ 11.00 $ _ Materials and Equipment Cost $ 3,260.83 Flaggers Hours Wage Rate Tax WC ri Safety $ 51.00 $ 11.00 $ 3.00 $ - $ 51.00 $ 11.00 $ 3.00 S - Labor Cost Trucker 0 $ 70.86 $ 11.00 $ 3.00 $ - Labor 12.5 $ 56.81 $ 11.00 $ 3.00 $ 885.13 Operator 15 $ 75.51 $ 11.00 $ 3.00 $ 1,342.65 Supervisor 0 $ 85.00 $ 11.00 $ 3.00 $ Labor Cost $ 2,227 78 Mobilization Mobilize Equipment Each Mobilization Cost $ _ Subcontractors Subcontract Cost $ _ Costs w/ Markup Cost Mark Up Totals Materials and Equipment $ 3,260.83 0% 21% $ 3,945.60 Labor $ 2,227.78 0% 29% $ 2,873.83 Mobilization $ - 0% 0% $ DocuSign Envelope ID: 1E59BA13-OE57-4690-8680-4E30B041C6B3 Subcontractors Authorized Signature 0% 21% Total Compensation Requested For KR HOMES, LLC $ 6,819.43