024-22 - Sascon, LLC - Supplement / Change Order 5CITY OF PORT ORCHARD Authorization for Change Order No. 5 Date: 6/12/2023 Contractor: Sascon, LLC Lippert Dr. Pavement Repair Project: and Sidewalk Retrofit 20211 SE 2101h St. Contract / Job # CO24-22 Maple Valley, WA 98038 THIS CHANGE ORDER AUTHORIZES (add description). Additional work for reworking the driveway at 200 W Lippert Dr. to properly drain to the Type I CB and creating a 3:1 Slope at back of sidewalk fronting 151 W. Lippert Dr. Credit for Bid Items: A-2 (Minor Changes), A-11(Crack Sealing), B-1(Minor Changes), B-9 (HMA for Approach) See attached Cost Summary Sheet for break down. Final Pay Request. Contract History Amount Sales Tax Total Date Appvd by Original Contract $557,313.00 $0.00 $557,313.00 24-May-22 Council Change Order 1 $0.00 $0.00 $0.00 03-Oct-22 PW Director Change Order 2 $0.00 $0.00 $0.00 31-Oct-22 PW Director Change Order 3 $42,388.20 $0.00 $42,388.20 22-Nov-22 PW Director Change Order 4 $13,342.80 $0.00 $13,342.80 03-Jan-23 Mayor Change Order 5 -$11,438.72 $0.00 -$11,438.72 26-Jun-23 PW Director Total Contract $601,605.28 $0.00 $601,605.28 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. T�e�2GClPi �Cr� Contractor Approval Signature Derrick Sas - Owner Printed Name & Title '/'Z' z '�< Pu lic Works Director an Printed Warne Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Cnimcil can hp arrrnvPd by tha Piihlir Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: 1100,000, of either legally authorized budget limit or contract amount established by City Council are to be appruved by Lhe Mayor Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date pair&SidewalkRetrofit\1.0 Financial Administration\1.6 Change Orders\Change Order No. 5\Change Order No, 5 Drafl.doc Page 1 Cost Summary Sheet Change Order#5 Additional ITEM NO. ITEM DESCRIPTION EST. QTY UNITS UNIT PRICE BID AMOUNT A-7 Roadway Ex.. Incl. Haul 220 CY 115.00 $ 25,300.00 A-8 Crushed Surfacing Top Course 140 TN 45.00 $ 6,300.00 A-9 HMA CI. 1/2 In. PG58-22 700 TN 145.00 $ 101,500.00 A-10 Planing Bitumous Pavements 1,390 SY 12.00 $ 16,680.00 B-4 Removing Cement Conc. Sidewalk 470 SY 18.00 $ 8,460.00 B-8 Crushed Surfacing Top Course 30 TN 57.00 $ 1,710.00 B-17 Cement Conc. Pedestrian Curb 145 SY 43.00 $ 6,235.00 B-18 Cement Conc. Traffic Curb and Gutter 1,500 LF 40.00 $ 60,000.00 B-20 Cement Conc. Rolled Curb and Gutter 20 LF 60.00 $ 1,200.00 B-24 Cement Conc. Driveway Enterance Type 2 40 SY 99.00 $ 3,960.00 B-27 Cement Conc. Sidewalk 575 SY 82.00 $ 47,150.00 B-28 Cement Conc. Bus Pad 6 SY 217.00 $ 1,302.00 FA Work Force Account Work- Redesigned Storm Line COff3 0 FA Work Force Account Work- Reworked driveway and slope COriS 0 Bid Total $ 279,797.00 Credit ITEM NO. ITEM DESCRIPTION EST. QTY UNITS UNIT PRICE BID AMOUNT A-2 Minor Changes 1 CALC 10,000.00 $ 10,000.00 A-11 Crack Sealing 1 FA 3,000.00 $ 3,000.00 A-12 Extra Excavtion and Backfill 1 FA 15,000.00 $ 15,000.00 B-1 Minor Changes 1 FA 5,000.00 $ 5,000.00 B-6 Structural Excavation 180 CY 35.00 $ 6,300.00 B-7 Shoring Extra Excavation 1,330 SF 2.00 $ 2,660.00 B-9 HMAfor Approach CI 1/2 In. PG 581-1-22 40 TN 200.00 $ 8,000.00 B-10 HDPE Pipe 12" 280 LF 95.00 $ 26,600.00 B-12 Catch Basin Type 1 3 EA 1,600.00 $ 4,800.00 B-14 Gravel Backfill for Pipe Zone Bedding 80 CY 30.00 $ 2,400.00 B-21 Cement Conc. Transition Curbs 10 LF 80.00 $ 800.00 B-22 Cement Conc. Driveway Enterance Type B 40 SY 99.00 $ 3,960.00 B-23 Cement Conc. Driveway Enterance Type 1 130 SY 99.00 $ 12,870.00 Bid Total $ 101,390.00 Total Contract $ 601,605.28 Actual QTY UNITS UNIT PRICE AMOUNT 0.00 CALC 10,000.00 $ 0.19 FA 3,000.00 $ 581.10 0 FA 15,000.00 $ 0 FA 5,000.00 $ 159 CY 35.00 $ 5,556.60 1,173.1 SF 2.00 $ 2,346.12 12.0 TN 200.00 $ 2,400.00 247 LF 95.00 $ 23,465.00 2 EA 1,600.00 $ 3,200.00 0 CY 30.00 $ 6 LF 80.00 $ 480.00 33 SY 99.00 $ 3,237.30 108 SY 99.00 $ 10,692.00 Actual Total $ 51,958.12 $ 6,900.00 $ 2,038.05 $ 29,788.80 $ 4,020.00 $ 540.00 $ 15,368.91 $ 3,010.00 $ 2,200.00 $ 690.00 $ 93,724.16 $ 49.50 $ 3,450.56 $ 651.00 $ 18,903.16 $ 6,114.18 Additional Total 1 $ 93,724.16 $10,000.00 $2,418.90 $15,000.00 $5,000.00 $313.88 $3,135.00 $1,600.00 $1,600.00 $2,400.00 $44,688.48 $320.00 $722.70 $2,178.00 Credit Total I$49,431.88 Difference $ 44,292.28