Loading...
06/27/2023 - Regular - Additional Docs-Sroufe COCITY OF PORT ORCHARD Authorization for Change Orders No. 5 Date: 6/27/2023 Contractor: Project: Sroufe Water Main Replacement Contract / Job # C125-22 KR Homes, LLC PO Box 856 Winlock, Wei 98596 THIS CHANGE ORDER AUTHORIZES THE FOLLOWING CHANGES TO THE CONTRACT: Extension of contract C125-22 by four working days to accommodate additional work for a total of 72 working days. An old storm pipe was found during excavation that conflicts with new fire hydrant installation. To alleviate this conflict, the old storm pipe will be plugged and abandoned in place and replaced with a culvert crossing Portland Ave. Stormwater will be conveyed from the west side of Portland in a new drainage swale along the south side of Sroufe to the drainage culvert. In all other respects the Underlying agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. Contract History Amount Sales Tax Total Date Appvd b original Contract $290,790.00 $26,752.68 $317,542.68 28-Mar-23 Council Change Order 1 $8,249.82 $767.23 $9,017.05 19-Ma -23 PW Director Change Order 2 $7,021.32 $943.77 $7,965.09 22-Ma -23 PW Director Change Order 3 $7,830.71 $728.26 $8,558.97 01-Jun-23 PW Director Chan a Order 4 $17,936.36 $1,668.0§L $19,604.44 13-Jun-23 council Chan a Order 5 $28,122.37 $2,615.38 $30,737.75 27-1un-23 council Total Contract $359,950.58 $33,475.40 $393,425.98 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Contractor Approval S nature Public Works Director V0X+ PQd-CA Oil ag*, _Tony Lang Printed Name & Ti le Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Mayor City Clerk Council Approval Date Sroufe Watermain Extension KR HOMES LLC Request For Compensation June 20, 2023 Kurt Reddig Date of Request offfice@krhomes.org 360-864-5500 Office COR # 6 To : City of Port Orchard Attention: Christian Williams Reason for Compensation: Remedy for the Stormline conflict at Portland and Sroufe near new hydrant. With time for field incident delay and working alongside existing pipe in our new trench working our way to the West. Request for additional days 4 Day / s Materials and Equipment Totals Column Yds Rate Pipe, Basin, Grout 1 LS $ 3,040.00 $ 3,040.00 Import Gravel Borrow 19.5 Tons $ 16.00 $ 312.00 Garbage -Dump fees 1 Tons $ 135.00 $ 135.00 Quarry Spalls 2 Tons $ 46.00 $ 92.00 Export Spoils Fluffed 67 yds $ 5.00 $ 335.00 Seed n Fertilizer 1 LS $ 150.00 $ 150.00 Compost 11 yds $ 43.00 $ 473.00 Topsoil Type A (GArden Mix) 36 yds $ 55.00 $ 1,980.00 A/C Removal 5 Tons $ 13.00 $ 65.00 Hours Rate Kubota 55 Excavator 23 $ 75.00 $ 1,725.00 1D 35G Excavator 8 $ 65.00 $ 520.00 Attachment Hammer/Breaker 2 $ 27.00 $ 54.00 Skid Steer 4 $ 65.00 $ 260.00 Pipe Truck/Pickup 35 $ 24.00 $ 840.00 Trailer for Pickup 5 $ 23.00 $ 115.00 Dump Truck 27 $ 100.00 $ 2,700.00 Small Tools/Supplies 35 $ 11.00 $ 385.00 Materials and Equipment Cost $ 13,181.00 Labor Flaggers Labor Cost Mobilization Hours Wage Rate Tax/WC/Tri Safety $ 51.00 $ 11.00 $ 3.00 $ $ 51.00 $ 11.00 $ 3.00 $ - Trucker 27 $ 70.86 $ 11.00 $ 3.00 $ 2,291.22 Labor 40 $ 56.81 $ 11.00 $ 3.00 $ 2,832.40 Operator 35 $ 75.51 $ 11.00 $ 3.00 $ 3,132.85 Supervisor 6 $ 85.00 $ 11.00 $ 3.00 $ 594.00 Labor Cost $ 8,850.47 Mobilize Equipment Each $ $ Mobilization Cost $ - Subcontractors Evergreen Sawcutting 1 LS $ 625.00 $ 625.00 Subcontract Cost $ 625.00 Costs w/ Markup Materials and Equipment Labor Mobilization Subcontractors Authorized Signature Cost Mark Up $ 13,181.00 0% 21% $ 8,850.47 0% 29% $ - 0% 0% $ 625.00 0% 21% Total Compensation Requested For KR HOMES, LLC Totals $ 15,949.01 $ 11,417.11 t 75f, ?5 5 28,122.37