048-20 - CONSOR North America, Inc. - Contract Amendment 5DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
CITY OF PORT ORCHARD
Authorization for Amendment No. 5
Date: July 11, 2023
Project: McCormick Woods Well No. 11
Site Improvement Project
Contract / Job # C048-20
Contractor: Consor North America, Inc
600 University Street, Suite 300
Seattle, WA 98101
THIS CHANGE ORDER AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT:
Section 4 Compensation of the Agreement is hereby amended to read as follows:
TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed $1,014,506, inclusive of all
amounts paid prior to the execution of Amendment No. 5 to this Agreement, without written authorization and
will be based on the list of billing rates and reimbursable expenses attached hereto as Exhibit B (as revised)
In all other respects the Underlying Agreement between the parties shall remain in full force and effect, amended
as set forth herein, but only as set forth herein.
The amendment provides engineering services during construction for the McCormick Woods Well 11 Site
Improvements Project.
Contract History
Amount Sales Tax Total Date Appvd b
Original Contract
$94,673.00
$0.00
$94,673.00
26-Ma -20
Council
Amendment 1
$0.00
$0.00
$0.00
25-Nov-20
PW Director
Amendment 2
$628,733.00
$0.00
$628,733.00
27-Jul-21
Council
Amendment 3
$0.00
$0.00
$0.00
01-Se -21
PW Director
Amendment 4
$0.00
$0.00
$0.00
17-Nov-22
PW Director
Amendment 5
$291,100.00
$0.00
$291,100.00
11-Jul-23 Council
Total Contract $1,014,506.00 $0.00 $1,014,506.00
I have reviewed the Amendment information above and certifv that to the best of my knowledge
descriptions and costs are true and accurate.
a'�- �* L .
Contractor Approval Signature
Erika Schuyler, PE, PMP; Vice President
Printed Name & Title
��--
Public Works Director
Tony Lang
Printed Name
Change Orders that do not exceed 10%, with a maximum of
$50,000, of either legally authorized budget limit or contract Approved
amount established by City Council can be approved by the Public
Works Director.
Change Orders that do not exceed 10%, with a maximum of Attest
$100,000, of either legally authorized budget limit or contract
amount established by City Council are to be approved by the
Mayor.
Change Orders over $100,000 or exceed a total of 10% require
Council Action.
�DocuSigned by:
�b P IM iS &A-SWA,
17byy::
6o':S'�1 UJAUAGt,
City Clerk
July 11, 2023
Council Approval Date
Page 1 of 19
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Amendment No. 5 to Contract No. C048-20
CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH
Consor North America, Inc
THIS AMENDMENT No. 5 to Contract No. C048-20 ("Amendment") is entered into between the City of Port
Orchard, a Washington municipal corporation ("City" or "Port Orchard") and Consor North America, Inc, an
Oregon corporation ("Consultant"). City and Consultant are each a "Party" and together "Parties" to this
Amendment.
RECITALS:
WHEREAS, on the May 26, 2020, the City executed a Professional Services Agreement for Well 11
Site Improvements ("Underlying Agreement"); and
WHEREAS, on November 25, 2020, July 27, 2021, September 1, 2021, and November 17, 2022
respectively, Amendments 1, 2, 3 and 4 were approved, extending the Underlying Agreement's termination
date to December 31, 2024, and increasing the Agreement Time and Materials Not to Exceed to $723,406;
and
WHEREAS, continued engineering services through construction of the McCormick Woods Well 11
Site Improvements are required by the City, as described in Exhibit A attached hereto, that will exceed the
current value of the Underlying Agreement; and
WHEREAS, the Consultant and the City have conferred and agreed to increase the "Time and
Materials Not to Exceed" amount, Section 4 (Compensation), of the agreement, as amended, from
$723,406 to $1,014,506 in anticipation of the additional work; and
WHEREAS, the parties wish to memorialize their agreement and so modify the Underlying
Agreement;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by and between
the parties thereto as follows:
FIFTH AMENDMENT TO AGREEMENT:
1. Amendment.
a. Section 4 Compensation of the Agreement is hereby amended to read as follows:
TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed
$1,014,506, inclusive of all amounts paid prior to the execution of Amendment No. 5 to this
Agreement, without written authorization and will be based on the list of billing rates and
reimbursable expenses attached hereto as Exhibit B (as revised).
Amendment No. 5 to Agreement between City of Port Orchard and Consor North America Inc.
Contract No. C048-20
Updated 4/2022 IBDR
Page 2 of 19
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
2. Severability. The provisions of this Amendment are declared to be severable. If any provision
of this Amendment is, for any reason, held to be invalid or unconstitutional by a court of competent jurisdiction,
such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other provision.
3. Entire Agreement. The written provisions and terms of this Amendment shall supersede all
prior verbal statements of any officer or other representative of the parties, and such statements shall not
be effective or be construed as entering into or forming a part of or altering in any manner whatsoever, this
Amendment. The entire agreement between the Parties with respect to the subject matter hereunder is
contained in the Agreement and exhibits thereto, any prior executed amendments and this Amendment.
Should any language in any of the Exhibits to the Agreement or prior amendments conflict with any
language contained in this Amendment, then this Amendment shall prevail. Except as modified by this
Amendment, all other provisions of the original Agreement and any amendments thereto not inconsistent
with this Amendment shall remain in full force and effect.
4. Effective date. This Amendment shall be effective as of July 11, 2023.
DATED this 11th day of July, 2023.
lbQ&iFQ T- ORCHARD, WASHINGTON
�b� �InIQA.bt,SIA.U.
ss4 L1
Robert Putaansuu, Mayor
T UTOENTICATED:
Brandy Wallace, MMC, City Clerk
®J)�FQA� TO FORM:
Charlotte A. Archer, City Attorney
C(INCi II TANT
Signature
Erika Schuyler, PE, PMP; Vice President
Printed Name and Title
Amendment No. 5 to Agreement between City of Port Orchard and Consor North America Inc.
Contract No. C048-20
Updated 4/2022 IBDR
Page 3 of 19
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
EXHIBIT A
SCOPE OF SERVICES
McCORMICK WOODS WELL 11 SITE IMPROVEMENTS
ENGINEERING SERVICES DURING CONSTRUCTION
(ESDC)
CITY OF PORT ORCHARD
Background
This Scope of Services includes engineering services during construction (ESDC) for the City of Port
Orchard's (City) McCormick Woods Well 11 Improvements project, which was designed by Consor North
America, Inc. (Connor). The scope and fee estimate have been developed based on Consor's understanding
of the project needs.
Consor services are expected to commence in July 2023. ESDC as part of this contract are expected to be
completed by July 2024.
Scope of Services
The Scope of Services consists of the following major tasks.
➢ Task 1— Project Management and Coordination
➢ Task 2 — Engineering Services During Construction
➢ Task 3 — Contingency
A detailed breakdown of the tasks and subtasks that comprise the Scope of Services follows and aligns with
the tasks included in the Fee Estimate (Exhibit B).
Task 1 — Project Management and Coordination
Provide team guidance aligned with City objectives. Coordinate, monitor, and control the project resources
to meet the technical, communication, and contractual obligations required for providing the engineering
support service activities included in this contract.
Subtask 1.1 Coordination with City
Coordinate with City staff regarding construction work activities, project needs and issues through e-mails
and phone calls.
Subtask 1.2 Invoices and Budget Oversight
Prepare invoice and monthly progress reports that include work completed, costs incurred, budget status,
amendments, variances between planned and actual performance, tasks issues, approved out of scope
items and associated costs, and issues that may result in an increase in the total Consor contract price.
Page 4 of 19 Consor • May 2023 • City of Port Orchard
Well 11 ESDC • 1
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
Subtask 1.3 Pre -Construction Meeting
Attend the Pre -Construction Meeting with up to four (4) consultant team members in attendance. Provide
input on meeting notes following the meeting.
Assumptions
➢ Coordinate with the City via phone for up to ten (10), 30-minute coordination calls
➢ Contractor's schedule governs the work performed
➢ Anticipated construction notice -to -proceed is July 2023
➢ Up to twelve (12) months of invoicing and progress reporting are included
➢ Two (2) consultant staff members to attend Pre -Construction Meeting
➢ Pre -Construction Meeting will be up to six (6) hours in duration, including travel
Deliverables
➢ Monthly invoice with project status reports
➢ Correspondence, e-mails, and other documentation
➢ Pre -Construction Meeting Notes Review and Input
Task 2 — Engineering Services During Construction (ESDC)
Work under this task includes engineering services to support the construction phase of the project.
Subtask 2.1 Construction Meetings
Attend up to ten (10) virtual construction meetings when requested by the City's Construction
Management (CM) Representative.
Subtask 2.2 Design Modifications
Provide up to four (4) design modifications and accompanying plan changes to support required field
modifications to maintain design intent and functionality.
Subtask 2.3 Submittal Reviews
Review and comment on up to one hundred -twenty (120) total submittals, shop drawings, and other
technical submittals from the Contractor for general conformance with the requirements of the Contract
Documents.
Subtask 2.4 Requests for Information
Prepare responses for up to fifty (50) Contractor requests for information (RFls).
Subtask 2.5 Change Order Review
Provide review of up to four (4) Contractor proposed change orders.
Consor • May 2023 • City of Port Orchard
Well 11 ESDC • 2 Page 5 of 19
H:\EVT_Projects\20\2839.01- Port Orchard -Well 11 Amendment 2\_Project Management\ESDC Scope and Fee\Exhibit A -Port Orchard Well 11 ESDC Scope_V3.docx
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
Subtask 2.6 Construction Observation Site Visits
Attend up to ten (10) construction observation site visits.
Subtask 2.7 Review of Operations and Maintenance (O&M) Manuals
Review equipment C&M Manuals.
Subtask 2.8 Commissioning Site Visit
Attend one (1) commissioning site visit with City operations staff.
Subtask 2.9 Record Drawings
Prepare record drawings based on Contractor and field inspector markups.
Subtask 2.10 Construction Special Inspections
Provide materials testing and special inspections during construction.
Assumptions
➢ Meetings will be attended virtually by up to two (2) Consultant team members and will be up to
one (1) hour in duration
➢ Meeting notes will be produced by the City's CM Representative
➢ An average design modification is anticipated to require up to four (4) hours of effort for the project
engineer, with up to two hours of review for QA/QC
➢ Not all submittals will require Consor review; submittals will be sent to Consor by the City's CM
Representative when design engineer input is desired
➢ An average of four (4) hours of review time is assumed per submittal (three hours for first round
review, and one hour for resubmittal review). Up to one re -submittal is anticipated per submittal.
Submittals requiring more than one resubmittal review require additional effort beyond this scope
of services and will require additional budget.
➢ Submittal review comments will be submitted to the City's CM Representative.
➢ Not all RFls will require Consor input, RFls will be sent to Consor by the City's CM Representative
when design engineer input is desired.
➢ An average of two (2) hours will be required to respond to each RFI
➢ RFI responses will be submitted to the City's CM Representative.
➢ Not all change orders will require Consor input; change orders will be sent to Consor by the City's
CM Representative when design engineer input is desired.
➢ An average of four (4) hours will be required per change order review
➢ Change order review comments will be submitted to the City's CM Representative
➢ Each site visit will be up to four (4) hours in duration, including travel time
Consor • May 2023 • City of Port Orchard
Page 6 of 19 Well 11 ESDC • 3
H:\EVT_Projects\20\2839.01 -Port Orchard -Well 11 Amendment 2\Project Management\ESDC Scope and Fee\Exhibit A - Port Orchard Well 11 ESDC Scope_V3.docx
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
➢ Site visit observation report will be developed in Word or similar format and will be submitted to
the City's CM Representative.
➢ 0&M Manual review will take up to forty-eight (48) hours in duration
➢ Commissioning site visit will take up to twelve (12) hours in duration, including travel time, and
does not include any commissioning services
➢ Record drawing markups will be provided to Consor by the City in a single, consolidated set. Record
drawings will be prepared in AutoCAD format using the latest version of Civil 3D.
➢ Special inspections and material testing will include the following:
Foundation & Slab Subgrade Compaction I VS]
Utility Tr=ch C ompaoion
Site Subgrade & Rock Course Compaction- all paved areas and
Proof Rolls
Asphalt Paving includes IZOW work
Sarnplc Pickup if Required (AIjowance)
Footings
StemwalIs and CIP Nulls
Interior Slab on Grade and Pads
Structural Masonry & Brick Veneer Anchorage
Structural Wood Framing - Seismic Resistant Construction
Epoxy &. Expansion Anchors Allowance
Moisture Density Relationship/Proctor with Sieve
Rice Density
Conorete Compression Test Cylinders - 4" x V - Sets of
Masonry Prism Compression Test
Deliverables
➢ Design modifications, stamped by a Professional Engineer licensed in the state of Washington
➢ Submittal reviews
➢ RFI responses
➢ Change order reviews
➢ Site visit observation report documenting conditions, activities, and summary of discussions and
any issues noted.
➢ As -built plan markups
➢ O&M Manuals review
➢ Commissioning site visit report
➢ Record drawings
Consor • May 2023 • City of Port Orchard
Well 11 ESDC • 4 Page 7 of 19
H:\EVT_Projects\20\2839.01- Port Orchard -Well 11 Amendment 2\_Project Management\ESDC Scope and Fee\Exhibit A -Port Orchard Well 11 ESDC Scope_V3.docx
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
➢ Inspection and testing reports
Task 3 — Contingency
Project contingency includes budget for additional, unanticipated labor and/or expenses not specifically
identified in the scope of services defined above. Such work items will be undertaken only after written
authorization has been provided by the City's Project Manager.
Assumptions
To be determined.
Deliverables
To be determined.
Proposed Schedule
Work will begin upon receipt of a signed contract and notice to proceed, or other agreeable written
authorization. The project duration is based on the contractor's schedule and an anticipated completion
date twelve (12) months from notice to proceed is assumed.
Fee Estimate
The detailed fee estimate is provided as Exhibit B.
Payment will be made at the Billing rates for personnel working directly on the project, which will be made
at the Consultant's Hourly Rates, plus Direct Expenses incurred. Subconsultants, when required by the
Consultant, will be at actual costs plus a 10 percent fee to cover administration and overhead. Direct
expenses will be paid at the rates shown in the table below.
Direct Expenses
Expenses incurred in-house that are directly attributable to the project will be invoiced at actual cost. These
expenses include the following.
Computer Aided Design and Drafting $18.00/hour
GIS and Hydraulic Modeling $10.00/hour
Mileage Current IRS Rate
Postage and Delivery Services At Cost
Printing and Reproduction At Cost
Travel, Lodging, and Subsistence At Cost
Consor • May 2023 • City of Port Orchard
Page 8 of 19 Well 11 ESDC • 5
H:\EVT_Projects\20\2839.01- Port Orchard -Well 11 Amendment 2\_Project Management\ESDC Scope and Fee\Exhibit A -Port Orchard Well 11 ESDC Scope_V3.docx
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
C �
ENGINEERING
May 01, 2023
civil & structural
engineering & planning
Consor
Erika Schuyler, PE, PMP, Vice President
600 University Street, Suite 300
Seattle, WA 98101
206.462.7030
erika.schuyler@consoreng.com
Proiect
City of Port Orchard Well 11 Facility Improvements
Port Orchard, WA 98378
Scope of Work
CG Engineering provided the structural engineering design of a single -story CMU building with a light framed
roof. The proposed building will house pumps, a filtration system, mechanical and electrical equipment, and
chemical storage.
For this scope of work, CG Engineering will provide construction support related to the structural engineering
documents. We anticipate this effort to include the review of shop drawings and submittals (such as rebar
drawings), substitution requests, instruction and interpretation of the drawings, periodic site visits, and
responses to contractor's questions & RFI's. At the end of construction, we will prepare as -built drawings
based on red -lines from the contractor. We have included participation in the preconstruction meeting,
attendance at up to (5) virtual construction meetings, and up to (3) site visit during construction.
Structural CA Fee = $16,320.00 (NTE)
250 4th Avenue South, Suite 200
Edmonds, WA 98020
Page 9 of 19 ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
City of Port Orchard Well 11 Facility Improvements May 1, 2023
CG Engineering Page 2 of 2
2023 Schedule of Charges
Personnel Charges
Hourly Rate
Managing Principal
$250.00
Principal
$230.00
Associate Principal
$205.00
Project Manager
$185.00
Structural Engineer III
$155.00
Structural Engineer II
$135.00
Structural Engineer 1
$115.00
Civil Engineer 111
$155.00
Civil Engineer 11
$135.00
Civil Engineer 1
$115.00
Planner
$145.00
CAD Drafter 111
$120.00
CAD Drafter II
$105.00
CAD Drafter 1 $90.00
Clerical $90.00
Rates are subject to change on a yearly basis.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGINEERING Page
1 f.425.778.5536
Page 10 of 19 www.cgengineering.com
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
CITY OF PORT ORCHARD WELL 11 IMPROVEMENTS
STRUCTURAL ENGINEERING CA
LEVEL OF EFFORT
CG ENGINEERING
wl
LABOR CLASSIFICATION (HOURS)
ESTIMATED FEES
Principal
SE III
SE II
CAD
Drafter II
Clerical
Total Hours
Total Cost
$230
$155
$135
$105
$90
Construction Support
Preconstruction Meeting / Site Visits (Assume 3)
4
16
20
$3,400.00
Virtual Construction Meetings (Assume 5)
6
6
12
$2,310.00
Submittal Review (Assume 6)
1
2
18
21
$2,970.00
Response to RFI's (Assume 6)
1
2
12
15
$2,160.00
Clarification Sketches (Assume 2)
1
2
4
6
13
$1,710.00
Structural Observation Reports (Assume 3)
1
2
6
9
$1,350.00
Preparation of Record Drawings
2
2
6
8
18
$2,420.00
OTAL ANTICIPATED CA EFFORT
16
32
14
0
jr108
$16,320.00
Page 11 of 19
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
INDUSTRIAL SYSTEMS, Inc.
PROJECT DESIGN ESTIMATE Industrial
PROJECT NO.: CLIENT: Consor Systems Inc.
DATE: May 4, 2023 ROJECT: Port Orchard PS CA
PREPARED BY: T.Collison FEE CALCULATIONS AND SUMMARY
MANHOURS
STAFF
CLASS HOURS RATE COSTS
PROJECT TASKS
P
PM
SE
E
El
T
D
CL
TOTAL
(P) $210.00
(PM) 32.5 $190.00 $6,175.00
(SE) 99 $168.00 $16,632.00
(E) $156.00
(EI) $128.00
(T) $112.00
(D) 12 $84.00 $1,008.00
(CL) 22.5 $67.00 $1,507.50
TOTAL FEE: $25,322.50
MISC. EXPENSES: 5.0 % $1,266.13
AIR:
mileage 1280 0.655 $838.40
hotel 4 $250.00 $1,000.00
rental car
meals 8 $25.00 $200.00
OTHER:
OTHER:
OTHER:
SUBTOTAL EXPENSES: $3,304.53
TOTAL COSTS: $28,627.03
CONTINGENCY: 5.00% $1,431.35
TOTAL BUDGET: $30,060.00
PRINT DATE: 5/4/2023
Submittal Reviews
3
18
4.5
$3,896
RFIs (3 ea)
3
9
9
$2,685
In person pre con
1
16
$2,878
In person site visit (3)
16
32
$8,416
Virtual progress meetings (5 ea)
7.5
5
$1,760
Record Drawings
1
12
12
$3,214
O&M Manual Review
1
12
4
$2,474
TOTALS:
32.5
99
12
22.5
STAFF CLASSIFICATIONS:
P: PRINCIPAL
PM: PROJECT
SE: SENIOR
E: ENGINEER/SENIOR
T: TECHNICIAN
D: DRAFTING
CL: CLERICAL
MANAGER
ENGINEER
TECHNICIAN
IS Estin ate-PoxtC=haad PS -CA -Rev 1.0 ;T" I
Page 12 of 19
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Erika Schuyler, P.E.
Consor
600 University Street — Suite #300
Seattle, WA 98101
Subject: City of Port Orchard — Well #11 — E, I&C CA - Rev 1.0 — 21.55.01
Dear Ms. Schuyler,
Exhibit A
May 4, 2023
Industrial Systems, Inc. is pleased to provide you with the following proposal for Electrical and
Control System Design Services. As always, we look forward to working with you on this project.
Summary:
Consor and Industrial Systems recently completed design of a reservoir, well and booster pump
station for the City of Port Orchard, WA. This project was initially scoped a little over two years
ago and was expected to be completed in short order but was for various reasons delayed
repeatedly. The project scope underwent many changes during design and was finally issued for
bid within the past month.
Our scope in 2021 included a nominal scope and fee for services during construction; however,
those services were struck from the Task Order issued at that time. We have now been asked to
provide more involved scope that provides a significant amount of time onsite and ongoing
participation in construction coordination in addition to the traditional submittal reviews and RFI
responses.
This proposed scope of services is to provide the electrical, instrumentation and control design
construction services for the subject project as requested last week via email.
Scope of Work:
Provide construction services for the subject project. This includes submittal
reviews and RFI responses but does not include reissuance of any design
components to accommodate changes to the project.
2. Participate in an onsite pre -construction coordination meeting
3. Participate in occasional site visits to observe progress and workmanship with an
eye toward contract document compliance.
4. Participate in ongoing virtual coordination meetings as defined herein.
5. Provide project closeout assistance with updating drawings to include contractor
marks and review of submitted O&M Manuals.
12119 NE 991h St. Suite 2090 Vancouver, WA 98682
Voice: (360) 718-7267 Fax: (360) 952-8958
OR CCB# 19 810 �43lDUSSl880K9
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
May 4, 2023 Exhibit A
P20.28: City of Port Orchard — Well #11 — E, I&C CA - Rev 1.0
21.55.01
Page 2 of 4
Deliverables:
1. Submittal Reviews of electrical and instrumentation related components.
a. No more than 2 reviews for any one product
2. Respond to RFIs (3 ea.)
3. Attend in -person preconstruction meeting.
4. Participate in up to 3 in -person site visits during construction.
a. Site visits are anticipated to provide approximately 4 hours on site for each.
5. Participate in periodic virtual construction progress and coordination meetings. (5
ea.)
6. Prepare Record Drawings
a. Based on contractor marks
7. Review and comment on O&M Manual
Assumptions:
1. A mutually agreeable schedule will be negotiated for completion of this work.
2. Where end user contract with Consor requires insurance beyond the current
certificate Industrial Systems has on file with Consor, Consor will notify us of
additional requirements prior to submitting an estimated fee.
Exclusions:
1. PLC and SCADA programming.
2. Photometric calculations and plan drawings.
3. Permitting assistance.
4. Utility coordination.
5. Deliverables not defined herein.
6. Services not specifically listed herein.
7. Site visits other than listed above.
Page 14 of 19
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
May 4, 2023 Exhibit A
P20.28: City of Port Orchard — Well #11 — E, I&C CA - Rev 1.0
21.55.01
Page 3 of 4
Fee Proposal:
Industrial Systems, Inc. proposes to provide the services and materials listed above on a T&M —
basis. The fees shall be as listed in the summary below and include an estimate for Travel &
Expenses.
Estimated Cost........................................................................................ $ 30,060.00
Terms shall be as stated in the November 22, 2022, Master Services Subconsultant Agreement
No. W22064068 between Consor and Industrial Systems, Inc.
For the purpose of time and material work and any hourly work agreed to beyond this scope, the
enclosed billing rates shall be considered as our standard rates. Our standard rates shall be
subject to annual revision.
Multi -year projects are subject to annual rate increases and contract amount escalations of up to
5% per year.
Please feel free to call with any questions that you might have. Again, we look forward to working
with you on this project.
V" 2 gww'd 5/4/2023
Minh Q. Huynh Date
Enclosures: Rate Schedule & Estimated Hours
Page 15 of 19
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
12119 NE 991h Street
Suite #2090
Vancouver, WA 98682
Phone: (360) 718-7267 Fax: (360) 952-8958
Email: is(@is-inc.com
2023 RATE SCHEDULE
PRINCIPAL........................................................................$210 /HR
PROJECT MANAGER.........................................................$190 /HR
SENIOR DESIGN/PROGRAMMING STAFF.............................$168 /HR
DESIGN / PROGRAMMING STAFF........................................$156 /HR
JUNIOR DESIGN/PROGRAMMING STAFF..............................$128 /HR
TECHNICIAN....................................................................$112 /HR
DRAFTING..........................................................................$84 /HR
CLERICAL...........................................................................$67 /HR
MILEAGE AND OTHER EXPENSES............................................COST PLUS 20%
(The 2023 IRS allowable mileage rate is assumed to be $0.655/mile)
Expires: 12/31/23 - Subject to revision after this date
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
MATERIALS TESTING & CONSULTING, INC.
Date: May 22, 2023
Client Name: Consor Contact: Erika Schuyler, PE, PMP
Address: 600 University Street, Suite #300, Seattle, WA 98101 Phone: in: +1.206.354.7353
Email: Erika. Schuyler(&consoreng com Geotech of Record: NA
ENG. CG Based on Plans Dated: Mar 01, 2023
Project: Name / City of Port Orchard Well 11-5171 St.Andrews Drive, Port Orchard, WA 98367
Materials Testing & Consulting, Inc. (MTC) thanks you for the opportunity, and respectfully submits the following proposal to provide materials
testing and special inspection services during construction of the above -referenced project. Combined with our past experience with projects of
similar size and scope, we estimate the total cost of our services for this project to be:
gill Code
Item / Description
Unit
Quantity
Rate
Total
'DS
Foundation & Slab Subgrade Compaction / VSI
Hour
24
$
80.00
$ 1,920.00
3DS
Utility Trench Compaction
Hour
18
$
80.00
$ 1,440.00
Site Subgrade & Rock Course Compaction- all paved areas and
14
80.00
1,120.00
?DS
Proof Rolls
Hour
$
$
?DA
Asphalt Paving includes ROW work
Hour
18
$
80.00
$ 1,440.00
AMPU
Sample Pickup if Required (Allowance)
Hour
1
$
80.00
$ 80.00
.0
Footings
Hour
18
$
85.00
$ 1,530.00
.0
Stemwalls and CIP Walls
Hour
24
$
85.00
$ 2,040.00
.0
Interior Slab on Grade and Pads
Hour
15
$
85.00
$ 1,275.00
M
Structural Masonry & Brick Veneer Anchorage
Hour
60
$
85.00
$ 5,100.00
WD
Structural Wood Framing - Seismic Resistant Construction
Hour
12
$
95.00
$ 1,140.00
A
Epoxy & Expansion Anchors Allowance
Hour
12
$
85.00
$ 1,020.00
Subtotal - Special & Construction Inspection:
$ 18,105.00
,aboratory
lill Code
Item / Description
Unit
Quantity
Rate
Total
ROC
Moisture Density Relationship/Proctor with Sieve
Each
2
$
320.00
$ 640.00
.ICE
Rice Density
Each
3
$
100.00
$ 300.00
'ONC
Concrete Compression Test Cylinders - 4" x 8" - Sets of 5
Each
55
$
30.00
$ 1,650.00
RISM
Masonry Prism Compression Test
Each
3
$
105.00
$ 315.00
Subtotal -
Laboratory Testing:
S 2,905.00
Code Item / Description Unit Quantity Rate Total
- STR Project Management Hour 11 $ 95.00 $ 1,045.00
Subtotal - Project Management & Consulting Services: $ 1,045.00
• Soils inspection and testing services are proposed to measure compliance with project documents, including drawings, specifications and the recommendation of the
soils report. In the event that a test or tests fail to meet the soils report's recommendations or if project conditions differ from approved project documents, it shall be
referred to the Geotechnical Engineer of Record for resolution.
• Prices are subject to change if this agreement is not executed within 90 days from the date of the bid.
• All services will be provided on a time and materials basis. The total is an estimate and the actual construction cost will be based on the project schedule and
sequencing. The estimate is not a guaranteed price. A four hour minimum charge applies to all work performed, billing is also based on a portal to portal basis. A
premium rate of 1.5 times the regular rate will be charge for overtime and 2 times the regular charge for Sunday's and holidays.
• MTC will utilize the laboratory based closest to the project site. MTC offers additional services upon request which will be billed at our regular fee schedule.
Acceptance of this proposal will constitute agreement to MTC standard general terms and conditions.
Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing
Burlington • Olympia • Bellingham • Silverdale • Tukwila
p: 360.755.1990 • £ 360.755.1980 • www.mtc-inc.net
P- geIT oH
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit A
MATERIALS TESTING & CONSULTING, INC.
Date: May 22, 2023
Client Name: Consor
Address: 600 University Street, Suite #300, Seattle, WA 98101
Email: Erika. Schuyler(cDconsoreng corn
Contact:
Phone:
Erika Schuyler, PE, PMP
Geotech of Record:
ENG. CG Based on Plans Dated.
Project: Name / City of Port Orchard Well 11-5171 St.Andrews Drive, Port Orchard, WA 98367
in: +1.206.354.7353
NA
Mar 01, 2023
• Invoices are due and payable upon receipt. Any invoice not paid within thirty (30) days of the date rendered may be assessed a finance charge of one -and -one-half
(1'/2%) percent per month, for each month beyond thirty (30) days past due. Invoices not paid within sixty (60) days of the date rendered may result in MTC stopping
work until such invoices are paid in full. Invoices not paid within ninety (90) days of the date rendered may be referred to an independent company for collection.
Client will be responsible for all expenses incurred by MTC for the collection of any unpaid invoice(s), including collection fees, actual attorneys' fees, and costs for
legal counsel as stated in RCW 19.16.250.21. Furthermore, Client acknowledges that MTC may elect to withhold a Final Letter of Compliance for the project, and/or
place a lien on any real property until all outstanding invoices and/or fees have been paid in full.
• As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of
statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
• In closing, our experienced inspection staff will ensure the highest level of quality is brought to your project. We believe that our local staff and vast experience on
projects of similar size and scope make MTC the clear team member of choice for this project. We look forward to working with you.
Respectfully Submitted,
DeaneRamsdell
360-508-6336
DHR2mtc-inc.net
Client Authorized Signature
Printed Name & Title
Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing
Date
Burlington • Olympia • Bellingham • Silverdale • Tukwila
p: 360.755.1990 • £ 360.755.1980 • www.mtc-inc.net
P- geI otf
DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021
Exhibit B
M<CORMICK WOODS WELL 11 SITE IMPROVEMENTS -ENGINEERING SERVICES DURING CONSTRUCTION
CITY OF PORT ORCHARD
PROPOSED FEE ESTIMATE
mom®®®®_-_®®®®®®
------------------
------------------
Page 19 of 19