Loading...
048-20 - CONSOR North America, Inc. - Contract Amendment 5DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 CITY OF PORT ORCHARD Authorization for Amendment No. 5 Date: July 11, 2023 Project: McCormick Woods Well No. 11 Site Improvement Project Contract / Job # C048-20 Contractor: Consor North America, Inc 600 University Street, Suite 300 Seattle, WA 98101 THIS CHANGE ORDER AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT: Section 4 Compensation of the Agreement is hereby amended to read as follows: TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed $1,014,506, inclusive of all amounts paid prior to the execution of Amendment No. 5 to this Agreement, without written authorization and will be based on the list of billing rates and reimbursable expenses attached hereto as Exhibit B (as revised) In all other respects the Underlying Agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. The amendment provides engineering services during construction for the McCormick Woods Well 11 Site Improvements Project. Contract History Amount Sales Tax Total Date Appvd b Original Contract $94,673.00 $0.00 $94,673.00 26-Ma -20 Council Amendment 1 $0.00 $0.00 $0.00 25-Nov-20 PW Director Amendment 2 $628,733.00 $0.00 $628,733.00 27-Jul-21 Council Amendment 3 $0.00 $0.00 $0.00 01-Se -21 PW Director Amendment 4 $0.00 $0.00 $0.00 17-Nov-22 PW Director Amendment 5 $291,100.00 $0.00 $291,100.00 11-Jul-23 Council Total Contract $1,014,506.00 $0.00 $1,014,506.00 I have reviewed the Amendment information above and certifv that to the best of my knowledge descriptions and costs are true and accurate. a'�- �* L . Contractor Approval Signature Erika Schuyler, PE, PMP; Vice President Printed Name & Title ��-- Public Works Director Tony Lang Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. �DocuSigned by: �b P IM iS &A-SWA, 17byy:: 6o':S'�1 UJAUAGt, City Clerk July 11, 2023 Council Approval Date Page 1 of 19 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Amendment No. 5 to Contract No. C048-20 CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH Consor North America, Inc THIS AMENDMENT No. 5 to Contract No. C048-20 ("Amendment") is entered into between the City of Port Orchard, a Washington municipal corporation ("City" or "Port Orchard") and Consor North America, Inc, an Oregon corporation ("Consultant"). City and Consultant are each a "Party" and together "Parties" to this Amendment. RECITALS: WHEREAS, on the May 26, 2020, the City executed a Professional Services Agreement for Well 11 Site Improvements ("Underlying Agreement"); and WHEREAS, on November 25, 2020, July 27, 2021, September 1, 2021, and November 17, 2022 respectively, Amendments 1, 2, 3 and 4 were approved, extending the Underlying Agreement's termination date to December 31, 2024, and increasing the Agreement Time and Materials Not to Exceed to $723,406; and WHEREAS, continued engineering services through construction of the McCormick Woods Well 11 Site Improvements are required by the City, as described in Exhibit A attached hereto, that will exceed the current value of the Underlying Agreement; and WHEREAS, the Consultant and the City have conferred and agreed to increase the "Time and Materials Not to Exceed" amount, Section 4 (Compensation), of the agreement, as amended, from $723,406 to $1,014,506 in anticipation of the additional work; and WHEREAS, the parties wish to memorialize their agreement and so modify the Underlying Agreement; NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by and between the parties thereto as follows: FIFTH AMENDMENT TO AGREEMENT: 1. Amendment. a. Section 4 Compensation of the Agreement is hereby amended to read as follows: TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed $1,014,506, inclusive of all amounts paid prior to the execution of Amendment No. 5 to this Agreement, without written authorization and will be based on the list of billing rates and reimbursable expenses attached hereto as Exhibit B (as revised). Amendment No. 5 to Agreement between City of Port Orchard and Consor North America Inc. Contract No. C048-20 Updated 4/2022 IBDR Page 2 of 19 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 2. Severability. The provisions of this Amendment are declared to be severable. If any provision of this Amendment is, for any reason, held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other provision. 3. Entire Agreement. The written provisions and terms of this Amendment shall supersede all prior verbal statements of any officer or other representative of the parties, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner whatsoever, this Amendment. The entire agreement between the Parties with respect to the subject matter hereunder is contained in the Agreement and exhibits thereto, any prior executed amendments and this Amendment. Should any language in any of the Exhibits to the Agreement or prior amendments conflict with any language contained in this Amendment, then this Amendment shall prevail. Except as modified by this Amendment, all other provisions of the original Agreement and any amendments thereto not inconsistent with this Amendment shall remain in full force and effect. 4. Effective date. This Amendment shall be effective as of July 11, 2023. DATED this 11th day of July, 2023. lbQ&iFQ T- ORCHARD, WASHINGTON �b� �InIQA.bt,SIA.U. ss4 L1 Robert Putaansuu, Mayor T UTOENTICATED: Brandy Wallace, MMC, City Clerk ®J)�FQA� TO FORM: Charlotte A. Archer, City Attorney C(INCi II TANT Signature Erika Schuyler, PE, PMP; Vice President Printed Name and Title Amendment No. 5 to Agreement between City of Port Orchard and Consor North America Inc. Contract No. C048-20 Updated 4/2022 IBDR Page 3 of 19 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A EXHIBIT A SCOPE OF SERVICES McCORMICK WOODS WELL 11 SITE IMPROVEMENTS ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) CITY OF PORT ORCHARD Background This Scope of Services includes engineering services during construction (ESDC) for the City of Port Orchard's (City) McCormick Woods Well 11 Improvements project, which was designed by Consor North America, Inc. (Connor). The scope and fee estimate have been developed based on Consor's understanding of the project needs. Consor services are expected to commence in July 2023. ESDC as part of this contract are expected to be completed by July 2024. Scope of Services The Scope of Services consists of the following major tasks. ➢ Task 1— Project Management and Coordination ➢ Task 2 — Engineering Services During Construction ➢ Task 3 — Contingency A detailed breakdown of the tasks and subtasks that comprise the Scope of Services follows and aligns with the tasks included in the Fee Estimate (Exhibit B). Task 1 — Project Management and Coordination Provide team guidance aligned with City objectives. Coordinate, monitor, and control the project resources to meet the technical, communication, and contractual obligations required for providing the engineering support service activities included in this contract. Subtask 1.1 Coordination with City Coordinate with City staff regarding construction work activities, project needs and issues through e-mails and phone calls. Subtask 1.2 Invoices and Budget Oversight Prepare invoice and monthly progress reports that include work completed, costs incurred, budget status, amendments, variances between planned and actual performance, tasks issues, approved out of scope items and associated costs, and issues that may result in an increase in the total Consor contract price. Page 4 of 19 Consor • May 2023 • City of Port Orchard Well 11 ESDC • 1 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A Subtask 1.3 Pre -Construction Meeting Attend the Pre -Construction Meeting with up to four (4) consultant team members in attendance. Provide input on meeting notes following the meeting. Assumptions ➢ Coordinate with the City via phone for up to ten (10), 30-minute coordination calls ➢ Contractor's schedule governs the work performed ➢ Anticipated construction notice -to -proceed is July 2023 ➢ Up to twelve (12) months of invoicing and progress reporting are included ➢ Two (2) consultant staff members to attend Pre -Construction Meeting ➢ Pre -Construction Meeting will be up to six (6) hours in duration, including travel Deliverables ➢ Monthly invoice with project status reports ➢ Correspondence, e-mails, and other documentation ➢ Pre -Construction Meeting Notes Review and Input Task 2 — Engineering Services During Construction (ESDC) Work under this task includes engineering services to support the construction phase of the project. Subtask 2.1 Construction Meetings Attend up to ten (10) virtual construction meetings when requested by the City's Construction Management (CM) Representative. Subtask 2.2 Design Modifications Provide up to four (4) design modifications and accompanying plan changes to support required field modifications to maintain design intent and functionality. Subtask 2.3 Submittal Reviews Review and comment on up to one hundred -twenty (120) total submittals, shop drawings, and other technical submittals from the Contractor for general conformance with the requirements of the Contract Documents. Subtask 2.4 Requests for Information Prepare responses for up to fifty (50) Contractor requests for information (RFls). Subtask 2.5 Change Order Review Provide review of up to four (4) Contractor proposed change orders. Consor • May 2023 • City of Port Orchard Well 11 ESDC • 2 Page 5 of 19 H:\EVT_Projects\20\2839.01- Port Orchard -Well 11 Amendment 2\_Project Management\ESDC Scope and Fee\Exhibit A -Port Orchard Well 11 ESDC Scope_V3.docx DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A Subtask 2.6 Construction Observation Site Visits Attend up to ten (10) construction observation site visits. Subtask 2.7 Review of Operations and Maintenance (O&M) Manuals Review equipment C&M Manuals. Subtask 2.8 Commissioning Site Visit Attend one (1) commissioning site visit with City operations staff. Subtask 2.9 Record Drawings Prepare record drawings based on Contractor and field inspector markups. Subtask 2.10 Construction Special Inspections Provide materials testing and special inspections during construction. Assumptions ➢ Meetings will be attended virtually by up to two (2) Consultant team members and will be up to one (1) hour in duration ➢ Meeting notes will be produced by the City's CM Representative ➢ An average design modification is anticipated to require up to four (4) hours of effort for the project engineer, with up to two hours of review for QA/QC ➢ Not all submittals will require Consor review; submittals will be sent to Consor by the City's CM Representative when design engineer input is desired ➢ An average of four (4) hours of review time is assumed per submittal (three hours for first round review, and one hour for resubmittal review). Up to one re -submittal is anticipated per submittal. Submittals requiring more than one resubmittal review require additional effort beyond this scope of services and will require additional budget. ➢ Submittal review comments will be submitted to the City's CM Representative. ➢ Not all RFls will require Consor input, RFls will be sent to Consor by the City's CM Representative when design engineer input is desired. ➢ An average of two (2) hours will be required to respond to each RFI ➢ RFI responses will be submitted to the City's CM Representative. ➢ Not all change orders will require Consor input; change orders will be sent to Consor by the City's CM Representative when design engineer input is desired. ➢ An average of four (4) hours will be required per change order review ➢ Change order review comments will be submitted to the City's CM Representative ➢ Each site visit will be up to four (4) hours in duration, including travel time Consor • May 2023 • City of Port Orchard Page 6 of 19 Well 11 ESDC • 3 H:\EVT_Projects\20\2839.01 -Port Orchard -Well 11 Amendment 2\Project Management\ESDC Scope and Fee\Exhibit A - Port Orchard Well 11 ESDC Scope_V3.docx DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A ➢ Site visit observation report will be developed in Word or similar format and will be submitted to the City's CM Representative. ➢ 0&M Manual review will take up to forty-eight (48) hours in duration ➢ Commissioning site visit will take up to twelve (12) hours in duration, including travel time, and does not include any commissioning services ➢ Record drawing markups will be provided to Consor by the City in a single, consolidated set. Record drawings will be prepared in AutoCAD format using the latest version of Civil 3D. ➢ Special inspections and material testing will include the following: Foundation & Slab Subgrade Compaction I VS] Utility Tr=ch C ompaoion Site Subgrade & Rock Course Compaction- all paved areas and Proof Rolls Asphalt Paving includes IZOW work Sarnplc Pickup if Required (AIjowance) Footings StemwalIs and CIP Nulls Interior Slab on Grade and Pads Structural Masonry & Brick Veneer Anchorage Structural Wood Framing - Seismic Resistant Construction Epoxy &. Expansion Anchors Allowance Moisture Density Relationship/Proctor with Sieve Rice Density Conorete Compression Test Cylinders - 4" x V - Sets of Masonry Prism Compression Test Deliverables ➢ Design modifications, stamped by a Professional Engineer licensed in the state of Washington ➢ Submittal reviews ➢ RFI responses ➢ Change order reviews ➢ Site visit observation report documenting conditions, activities, and summary of discussions and any issues noted. ➢ As -built plan markups ➢ O&M Manuals review ➢ Commissioning site visit report ➢ Record drawings Consor • May 2023 • City of Port Orchard Well 11 ESDC • 4 Page 7 of 19 H:\EVT_Projects\20\2839.01- Port Orchard -Well 11 Amendment 2\_Project Management\ESDC Scope and Fee\Exhibit A -Port Orchard Well 11 ESDC Scope_V3.docx DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A ➢ Inspection and testing reports Task 3 — Contingency Project contingency includes budget for additional, unanticipated labor and/or expenses not specifically identified in the scope of services defined above. Such work items will be undertaken only after written authorization has been provided by the City's Project Manager. Assumptions To be determined. Deliverables To be determined. Proposed Schedule Work will begin upon receipt of a signed contract and notice to proceed, or other agreeable written authorization. The project duration is based on the contractor's schedule and an anticipated completion date twelve (12) months from notice to proceed is assumed. Fee Estimate The detailed fee estimate is provided as Exhibit B. Payment will be made at the Billing rates for personnel working directly on the project, which will be made at the Consultant's Hourly Rates, plus Direct Expenses incurred. Subconsultants, when required by the Consultant, will be at actual costs plus a 10 percent fee to cover administration and overhead. Direct expenses will be paid at the rates shown in the table below. Direct Expenses Expenses incurred in-house that are directly attributable to the project will be invoiced at actual cost. These expenses include the following. Computer Aided Design and Drafting $18.00/hour GIS and Hydraulic Modeling $10.00/hour Mileage Current IRS Rate Postage and Delivery Services At Cost Printing and Reproduction At Cost Travel, Lodging, and Subsistence At Cost Consor • May 2023 • City of Port Orchard Page 8 of 19 Well 11 ESDC • 5 H:\EVT_Projects\20\2839.01- Port Orchard -Well 11 Amendment 2\_Project Management\ESDC Scope and Fee\Exhibit A -Port Orchard Well 11 ESDC Scope_V3.docx DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A C � ENGINEERING May 01, 2023 civil & structural engineering & planning Consor Erika Schuyler, PE, PMP, Vice President 600 University Street, Suite 300 Seattle, WA 98101 206.462.7030 erika.schuyler@consoreng.com Proiect City of Port Orchard Well 11 Facility Improvements Port Orchard, WA 98378 Scope of Work CG Engineering provided the structural engineering design of a single -story CMU building with a light framed roof. The proposed building will house pumps, a filtration system, mechanical and electrical equipment, and chemical storage. For this scope of work, CG Engineering will provide construction support related to the structural engineering documents. We anticipate this effort to include the review of shop drawings and submittals (such as rebar drawings), substitution requests, instruction and interpretation of the drawings, periodic site visits, and responses to contractor's questions & RFI's. At the end of construction, we will prepare as -built drawings based on red -lines from the contractor. We have included participation in the preconstruction meeting, attendance at up to (5) virtual construction meetings, and up to (3) site visit during construction. Structural CA Fee = $16,320.00 (NTE) 250 4th Avenue South, Suite 200 Edmonds, WA 98020 Page 9 of 19 ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A City of Port Orchard Well 11 Facility Improvements May 1, 2023 CG Engineering Page 2 of 2 2023 Schedule of Charges Personnel Charges Hourly Rate Managing Principal $250.00 Principal $230.00 Associate Principal $205.00 Project Manager $185.00 Structural Engineer III $155.00 Structural Engineer II $135.00 Structural Engineer 1 $115.00 Civil Engineer 111 $155.00 Civil Engineer 11 $135.00 Civil Engineer 1 $115.00 Planner $145.00 CAD Drafter 111 $120.00 CAD Drafter II $105.00 CAD Drafter 1 $90.00 Clerical $90.00 Rates are subject to change on a yearly basis. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ENGINEERING Page 1 f.425.778.5536 Page 10 of 19 www.cgengineering.com DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A CITY OF PORT ORCHARD WELL 11 IMPROVEMENTS STRUCTURAL ENGINEERING CA LEVEL OF EFFORT CG ENGINEERING wl LABOR CLASSIFICATION (HOURS) ESTIMATED FEES Principal SE III SE II CAD Drafter II Clerical Total Hours Total Cost $230 $155 $135 $105 $90 Construction Support Preconstruction Meeting / Site Visits (Assume 3) 4 16 20 $3,400.00 Virtual Construction Meetings (Assume 5) 6 6 12 $2,310.00 Submittal Review (Assume 6) 1 2 18 21 $2,970.00 Response to RFI's (Assume 6) 1 2 12 15 $2,160.00 Clarification Sketches (Assume 2) 1 2 4 6 13 $1,710.00 Structural Observation Reports (Assume 3) 1 2 6 9 $1,350.00 Preparation of Record Drawings 2 2 6 8 18 $2,420.00 OTAL ANTICIPATED CA EFFORT 16 32 14 0 jr108 $16,320.00 Page 11 of 19 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A INDUSTRIAL SYSTEMS, Inc. PROJECT DESIGN ESTIMATE Industrial PROJECT NO.: CLIENT: Consor Systems Inc. DATE: May 4, 2023 ROJECT: Port Orchard PS CA PREPARED BY: T.Collison FEE CALCULATIONS AND SUMMARY MANHOURS STAFF CLASS HOURS RATE COSTS PROJECT TASKS P PM SE E El T D CL TOTAL (P) $210.00 (PM) 32.5 $190.00 $6,175.00 (SE) 99 $168.00 $16,632.00 (E) $156.00 (EI) $128.00 (T) $112.00 (D) 12 $84.00 $1,008.00 (CL) 22.5 $67.00 $1,507.50 TOTAL FEE: $25,322.50 MISC. EXPENSES: 5.0 % $1,266.13 AIR: mileage 1280 0.655 $838.40 hotel 4 $250.00 $1,000.00 rental car meals 8 $25.00 $200.00 OTHER: OTHER: OTHER: SUBTOTAL EXPENSES: $3,304.53 TOTAL COSTS: $28,627.03 CONTINGENCY: 5.00% $1,431.35 TOTAL BUDGET: $30,060.00 PRINT DATE: 5/4/2023 Submittal Reviews 3 18 4.5 $3,896 RFIs (3 ea) 3 9 9 $2,685 In person pre con 1 16 $2,878 In person site visit (3) 16 32 $8,416 Virtual progress meetings (5 ea) 7.5 5 $1,760 Record Drawings 1 12 12 $3,214 O&M Manual Review 1 12 4 $2,474 TOTALS: 32.5 99 12 22.5 STAFF CLASSIFICATIONS: P: PRINCIPAL PM: PROJECT SE: SENIOR E: ENGINEER/SENIOR T: TECHNICIAN D: DRAFTING CL: CLERICAL MANAGER ENGINEER TECHNICIAN IS Estin ate-PoxtC=haad PS -CA -Rev 1.0 ;T" I Page 12 of 19 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Erika Schuyler, P.E. Consor 600 University Street — Suite #300 Seattle, WA 98101 Subject: City of Port Orchard — Well #11 — E, I&C CA - Rev 1.0 — 21.55.01 Dear Ms. Schuyler, Exhibit A May 4, 2023 Industrial Systems, Inc. is pleased to provide you with the following proposal for Electrical and Control System Design Services. As always, we look forward to working with you on this project. Summary: Consor and Industrial Systems recently completed design of a reservoir, well and booster pump station for the City of Port Orchard, WA. This project was initially scoped a little over two years ago and was expected to be completed in short order but was for various reasons delayed repeatedly. The project scope underwent many changes during design and was finally issued for bid within the past month. Our scope in 2021 included a nominal scope and fee for services during construction; however, those services were struck from the Task Order issued at that time. We have now been asked to provide more involved scope that provides a significant amount of time onsite and ongoing participation in construction coordination in addition to the traditional submittal reviews and RFI responses. This proposed scope of services is to provide the electrical, instrumentation and control design construction services for the subject project as requested last week via email. Scope of Work: Provide construction services for the subject project. This includes submittal reviews and RFI responses but does not include reissuance of any design components to accommodate changes to the project. 2. Participate in an onsite pre -construction coordination meeting 3. Participate in occasional site visits to observe progress and workmanship with an eye toward contract document compliance. 4. Participate in ongoing virtual coordination meetings as defined herein. 5. Provide project closeout assistance with updating drawings to include contractor marks and review of submitted O&M Manuals. 12119 NE 991h St. Suite 2090 Vancouver, WA 98682 Voice: (360) 718-7267 Fax: (360) 952-8958 OR CCB# 19 810 �43lDUSSl880K9 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 May 4, 2023 Exhibit A P20.28: City of Port Orchard — Well #11 — E, I&C CA - Rev 1.0 21.55.01 Page 2 of 4 Deliverables: 1. Submittal Reviews of electrical and instrumentation related components. a. No more than 2 reviews for any one product 2. Respond to RFIs (3 ea.) 3. Attend in -person preconstruction meeting. 4. Participate in up to 3 in -person site visits during construction. a. Site visits are anticipated to provide approximately 4 hours on site for each. 5. Participate in periodic virtual construction progress and coordination meetings. (5 ea.) 6. Prepare Record Drawings a. Based on contractor marks 7. Review and comment on O&M Manual Assumptions: 1. A mutually agreeable schedule will be negotiated for completion of this work. 2. Where end user contract with Consor requires insurance beyond the current certificate Industrial Systems has on file with Consor, Consor will notify us of additional requirements prior to submitting an estimated fee. Exclusions: 1. PLC and SCADA programming. 2. Photometric calculations and plan drawings. 3. Permitting assistance. 4. Utility coordination. 5. Deliverables not defined herein. 6. Services not specifically listed herein. 7. Site visits other than listed above. Page 14 of 19 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 May 4, 2023 Exhibit A P20.28: City of Port Orchard — Well #11 — E, I&C CA - Rev 1.0 21.55.01 Page 3 of 4 Fee Proposal: Industrial Systems, Inc. proposes to provide the services and materials listed above on a T&M — basis. The fees shall be as listed in the summary below and include an estimate for Travel & Expenses. Estimated Cost........................................................................................ $ 30,060.00 Terms shall be as stated in the November 22, 2022, Master Services Subconsultant Agreement No. W22064068 between Consor and Industrial Systems, Inc. For the purpose of time and material work and any hourly work agreed to beyond this scope, the enclosed billing rates shall be considered as our standard rates. Our standard rates shall be subject to annual revision. Multi -year projects are subject to annual rate increases and contract amount escalations of up to 5% per year. Please feel free to call with any questions that you might have. Again, we look forward to working with you on this project. V" 2 gww'd 5/4/2023 Minh Q. Huynh Date Enclosures: Rate Schedule & Estimated Hours Page 15 of 19 DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A 12119 NE 991h Street Suite #2090 Vancouver, WA 98682 Phone: (360) 718-7267 Fax: (360) 952-8958 Email: is(@is-inc.com 2023 RATE SCHEDULE PRINCIPAL........................................................................$210 /HR PROJECT MANAGER.........................................................$190 /HR SENIOR DESIGN/PROGRAMMING STAFF.............................$168 /HR DESIGN / PROGRAMMING STAFF........................................$156 /HR JUNIOR DESIGN/PROGRAMMING STAFF..............................$128 /HR TECHNICIAN....................................................................$112 /HR DRAFTING..........................................................................$84 /HR CLERICAL...........................................................................$67 /HR MILEAGE AND OTHER EXPENSES............................................COST PLUS 20% (The 2023 IRS allowable mileage rate is assumed to be $0.655/mile) Expires: 12/31/23 - Subject to revision after this date DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A MATERIALS TESTING & CONSULTING, INC. Date: May 22, 2023 Client Name: Consor Contact: Erika Schuyler, PE, PMP Address: 600 University Street, Suite #300, Seattle, WA 98101 Phone: in: +1.206.354.7353 Email: Erika. Schuyler(&consoreng com Geotech of Record: NA ENG. CG Based on Plans Dated: Mar 01, 2023 Project: Name / City of Port Orchard Well 11-5171 St.Andrews Drive, Port Orchard, WA 98367 Materials Testing & Consulting, Inc. (MTC) thanks you for the opportunity, and respectfully submits the following proposal to provide materials testing and special inspection services during construction of the above -referenced project. Combined with our past experience with projects of similar size and scope, we estimate the total cost of our services for this project to be: gill Code Item / Description Unit Quantity Rate Total 'DS Foundation & Slab Subgrade Compaction / VSI Hour 24 $ 80.00 $ 1,920.00 3DS Utility Trench Compaction Hour 18 $ 80.00 $ 1,440.00 Site Subgrade & Rock Course Compaction- all paved areas and 14 80.00 1,120.00 ?DS Proof Rolls Hour $ $ ?DA Asphalt Paving includes ROW work Hour 18 $ 80.00 $ 1,440.00 AMPU Sample Pickup if Required (Allowance) Hour 1 $ 80.00 $ 80.00 .0 Footings Hour 18 $ 85.00 $ 1,530.00 .0 Stemwalls and CIP Walls Hour 24 $ 85.00 $ 2,040.00 .0 Interior Slab on Grade and Pads Hour 15 $ 85.00 $ 1,275.00 M Structural Masonry & Brick Veneer Anchorage Hour 60 $ 85.00 $ 5,100.00 WD Structural Wood Framing - Seismic Resistant Construction Hour 12 $ 95.00 $ 1,140.00 A Epoxy & Expansion Anchors Allowance Hour 12 $ 85.00 $ 1,020.00 Subtotal - Special & Construction Inspection: $ 18,105.00 ,aboratory lill Code Item / Description Unit Quantity Rate Total ROC Moisture Density Relationship/Proctor with Sieve Each 2 $ 320.00 $ 640.00 .ICE Rice Density Each 3 $ 100.00 $ 300.00 'ONC Concrete Compression Test Cylinders - 4" x 8" - Sets of 5 Each 55 $ 30.00 $ 1,650.00 RISM Masonry Prism Compression Test Each 3 $ 105.00 $ 315.00 Subtotal - Laboratory Testing: S 2,905.00 Code Item / Description Unit Quantity Rate Total - STR Project Management Hour 11 $ 95.00 $ 1,045.00 Subtotal - Project Management & Consulting Services: $ 1,045.00 • Soils inspection and testing services are proposed to measure compliance with project documents, including drawings, specifications and the recommendation of the soils report. In the event that a test or tests fail to meet the soils report's recommendations or if project conditions differ from approved project documents, it shall be referred to the Geotechnical Engineer of Record for resolution. • Prices are subject to change if this agreement is not executed within 90 days from the date of the bid. • All services will be provided on a time and materials basis. The total is an estimate and the actual construction cost will be based on the project schedule and sequencing. The estimate is not a guaranteed price. A four hour minimum charge applies to all work performed, billing is also based on a portal to portal basis. A premium rate of 1.5 times the regular rate will be charge for overtime and 2 times the regular charge for Sunday's and holidays. • MTC will utilize the laboratory based closest to the project site. MTC offers additional services upon request which will be billed at our regular fee schedule. Acceptance of this proposal will constitute agreement to MTC standard general terms and conditions. Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing Burlington • Olympia • Bellingham • Silverdale • Tukwila p: 360.755.1990 • £ 360.755.1980 • www.mtc-inc.net P- geIT oH DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit A MATERIALS TESTING & CONSULTING, INC. Date: May 22, 2023 Client Name: Consor Address: 600 University Street, Suite #300, Seattle, WA 98101 Email: Erika. Schuyler(cDconsoreng corn Contact: Phone: Erika Schuyler, PE, PMP Geotech of Record: ENG. CG Based on Plans Dated. Project: Name / City of Port Orchard Well 11-5171 St.Andrews Drive, Port Orchard, WA 98367 in: +1.206.354.7353 NA Mar 01, 2023 • Invoices are due and payable upon receipt. Any invoice not paid within thirty (30) days of the date rendered may be assessed a finance charge of one -and -one-half (1'/2%) percent per month, for each month beyond thirty (30) days past due. Invoices not paid within sixty (60) days of the date rendered may result in MTC stopping work until such invoices are paid in full. Invoices not paid within ninety (90) days of the date rendered may be referred to an independent company for collection. Client will be responsible for all expenses incurred by MTC for the collection of any unpaid invoice(s), including collection fees, actual attorneys' fees, and costs for legal counsel as stated in RCW 19.16.250.21. Furthermore, Client acknowledges that MTC may elect to withhold a Final Letter of Compliance for the project, and/or place a lien on any real property until all outstanding invoices and/or fees have been paid in full. • As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. • In closing, our experienced inspection staff will ensure the highest level of quality is brought to your project. We believe that our local staff and vast experience on projects of similar size and scope make MTC the clear team member of choice for this project. We look forward to working with you. Respectfully Submitted, DeaneRamsdell 360-508-6336 DHR2mtc-inc.net Client Authorized Signature Printed Name & Title Environmental • Geotechnical Engineering • Special Inspection • Non -Destructive Testing • Materials Testing Date Burlington • Olympia • Bellingham • Silverdale • Tukwila p: 360.755.1990 • £ 360.755.1980 • www.mtc-inc.net P- geI otf DocuSign Envelope ID: D314F28C-3219-4908-98EC-75F556ED9021 Exhibit B M<CORMICK WOODS WELL 11 SITE IMPROVEMENTS -ENGINEERING SERVICES DURING CONSTRUCTION CITY OF PORT ORCHARD PROPOSED FEE ESTIMATE mom®®®®_-_®®®®®® ------------------ ------------------ Page 19 of 19