Loading...
08 August 1, 2023, Planning Commission Meeting-Additional DocCity of Port Orchard Six -Year Transportation Improvement Program For 2024-2029 TIER 1 (Reasonably Constrained) Proj# Road Name Total Federal State (TIF Begin Termini Project Total Est. Spent Prior Future Phase Funding Fund Fund Proj#) Project Title/Project Description End Termini Length Cost to 2023 2023 Expenditures 2024 2025 2026 2027 2028 2029 Start Year Status Phase Code Federal Funds Code State Funds Local Funds 1.1 Bay Street Ped. Pathway ROW Phase PO Shoreline: Add 14-ft Multi -Modal (bikes & pedestrians) Sidney Ave. Foot 1.2 2,280,000 1,140,000 1,140,000 0 0 0 0 0 0 0 2013 S ROW STP(U) 1,923,590 0 300,212 waterfront pathway & cantilevered retaining wall Ferry to Annapolis 3,000,000 3,000,000 0 0 0 0 0 0 0 2018 P ROW 0 581,000 following historic Mosquito Fleet trail and pedestrian Foot Ferry N/A bridge across Black Jack Creek. 1.2 Bay Street Pedestrian Pathway Construction (S#1, S#6-11) The CN phase for the 14-ft Multi -Modal (bike & ped) 1.2 1,115,000 650,000 465,000 0 0 0 0 0 0 0 2018 S CN waterfront pathway/cantilevered retailing wall 3,000,000 0 3,000,000 0 0 0 0 0 0 0 2024 S CN following the historic Mosquito Fleet trail. Includes the demolition/removal of (5) overwater structures. N/A Inrinrlpc Cpa tt4 Ad Rpnrly nnr Prpn 1.3 Bay Street Pedestrian Pathway West Port Orchard Blvd Situational study and Bay St: Ft Ferry 1.5 566,474 0 2023 490,000 0 76,474 to Tremont 0 566,474 0 0 0 0 0 0 P PL N/A 1.4 Old Clifton/Anderson Hill Intersection Improvements Old Clifton Rd / Intersection Improvements (roundabout) as identified Anderson Hill Rd. 0 258,000 0 0 258,000 0 258,000 0 0 2027 S PE 0 258,000 in the McCormick Urban Village Trans Plan and Intersection 1,738,000 0 0 1,738,000 0 0 0 1,738,000 0 2028 P CN Grant? 1,213,000 525,000 TIF 1.4 partially funded by Bayside Mit Funds. 1.5 Old Clifton Rd Non -Motorized Improvements Old Clifton Road: Rodway Improvements identified in the McCormick Campus PKWY to 0.75 450,000 150,000 0 450,000 0 450,000 0 0 0 2026 P PE 0 450,000 Urban Village Trans Plan. Design and Construction. Anderson Hill Rd. 2,000,000 2,700,000 2027 P CN STP(U), TIB/CS TIF 1.5, 2.07 Seperated pathway and shoulder facilities. RCO 1.7 Bethel/Sedgwick Phase 5a - Bethel/Lincoln RAB Bethel/Lincoln/Lunb erg/ Mitchell Safety and capacity improvements to intersection and 0 3,674,000 326,000 474,000 2021 S PE 800,000 reconfiguration of approaches. 0 0 3,200,000 3200000 2022 S CN HSP 1,500,000 TIB UAP 1,100,000 700,000 TIF 2.04e 1.8 Bethel/ Sedgwick Cooridor Phase la - Blueberry RAB Bethel Road: blueberry Intersection Phase la. Bethel/ Blueberry RAB 60% PE in 2022 and start ROW for Phase la/b. 0 3,341,000 0 250,000 285,000 160,000 125,000 2022 S PE 0 0 535,000 268,000 134,000 134,000 2024 S ROW 0 268,000 2,788,000 2788000 2026 P CN TIB/ 0 2,788,000 UAP/CS IF 2.04a I I I et e e gwlc orrl or ase - a mon erry Bethel Road: Salmonberry intersection Phase 1b. Bethel/ Salmonberry RAB Round and roadway segment design from Blueberry to Salmonberry. 60% PE in 2022. 0 11,467,000 0 375,000 891,000 497,000 394,000 2023 P PE 0 0 1,272,000 3,206,000 1,603,000 1,603,000 0 2024 P ROW 0 3,206,000 7,370,000 7,370,000 2026 P CN TIB/UAP/ 0 7,370,000 IF 2.04a CS 1.10 Vallair Ct Connector Bethel Road / Road extension and intersection improvements Walmart Drive 0.25 1,000,000 0 0 1,000,000 0 0 0 0 1,000,000 0 2027 P PE & ROW 0 0 1,000,000 previously included in the Bethel Road Corridor ROW Intersection 1,000,000 0 0 1,000,000 0 0 0 0 0 1,000,000 2028 P CN 0 TIB 0 1,000,000 & Construction project. TIF 1.7 1.11 Sidney Road SW Design - 60% Sedgwick Rd. to Berry Lake Rd. Sidney Avenue is currently two lanes wide, it needs to be widened to three lanes (additional TWTL) including 0.95 500,000 0 0 500,000 0 0 0 0 0 500,000 2027 P PL 0 0 500,000 TIB bike lanes, sidewalks, traffic calming, and stormwater TIF 2.05 system improvements. (COMPLETE STREET). 8/1/2023 Page 1 of 9 C:\Users\jfisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP. 7_28_2023.draft City of Port Orchard Six -Year Transportation Improvement Program For 2024-2029 TIER 1 (Reasonably Constrained) Proj# Road Name Total Federal State (TIF Begin Termini Project Total Est. Spent Prior Future Phase Funding Fund Fund Proj#) ProiectTitle/Project Description End Termini Length Cost to 2023 2023 Expenditures 2024 2025 2026 2027 2028 2029 Start Year Status Phase Code Federal Funds Code State Funds Local Funds 1.12 Sedgwick Road West Study - 30% Design SR16 to Sidney Rd. Establish alignments and cross sections. Develop 300,000 0 0 300,000 300,000 2023 P Study BuildAm 300,000 mitigation alternatives and identify right-of-way TIF needs for roadway and identify potential sites to accommodate stormwater run off and mitigation for TIF 2.02,2.03 filling wetlands. Include stormwater element for epair ADA ramp and driveway retrofits, sidewalk reparis, Pottery 0.95 35,000 PE 35,000 9 pavement repairs, stormwater retrofit. In house des 778,000 CN CDBP 244,000 544,000 ,consulted survey & basemap J 1 1.14 Sidney Road Sidewalk Sidney Glen Address gap in sidewalk along school frontage Elementary Sidewalk 0.95 1,895,000 0 0 0 235,000 2023 P PE 173,000 62,000 1,660,000 2024 P CN SRTS 1,222,000 438,000 TIF 2.05 1.15 Pottery Avenue Non Motorized Improvements SR16 to Lippert Dr. Address sidewalk gap from Sunset to Clay near Tremont. Road diet and road widening to provide 0.95 840,000 0 35,000 0 2022 P PE 35,000 150,000 2022 P 150,000 bikeable shoulders and sidewalk improvements. Safety enhancement at Pottery Lippert Intersection 655,000 655,000 2024 S CN TIB CS 644,000 0 TIF 2.14 and School Crossing. 1.16 SR166/ Bay Street Reconstruction SR166 from Geiger to Frederick Raise street to address sea level rise and improve to current standard in accordance with redevelopment plans. Amount shown does not include water and 3,891,000 200,000 0 1,135,000 1,135,000 0 0 2022 P PE CDS 1,000,000 135,000 2,649,000 2,649,000 2026 P CN KRCC 2,000,000 649,000 sewer utility improvments. N/A 1.17 Street Lighting Improvements City wide corridors, highest priority locatoins Currently funded work includePottery, Sidney Rd. Future applications to be submitted for Tremont 1,100,000 0 0 100,000 0 100 2023 P PE HSIP 0 0 210,000 1,000,000 0 0 1,000,000 2024 P CN HSIP 210,000 0 N/A mont Phase 2 and 3 Port Orchard Blvd to Sidney Ave. Non motorized connectivity study and design of elements for future ROW and/or CN application 732,000 0 0 732,000 732,000 2023 P PE Ped Bike 732,000 0 P ROW 0 2.12 & 2.30 1.19 SR160/Sedgewick Phase 2a New Round About mid way between SR16 and Bethel Rd. Needed to support development on the corridor. City to compelte 60% DN and ROW acquisition for two New Intersection 1,500,000 0 0 600,000 600,000 2027 P PE BuildAm 600,000 900,000 900,000 2028 P ROW BuildAm 900,000 TIF lane RAB that will be innitially constructed as one 2.046 Iane Total Capital 444bU4/4 L4bb000 1UQ5 i4/4 35UL5000 6551000 4bbb1UU 1bbU/UUU bbbuuu SbJZ5000 1500000 1U1JZ55 U LSISUUU L54//bbb Maintenance Projects Total 2,023 Future Exp 2024 2025 2026 2027 2028 2029 1.51 Annual Pavement Maintenance Includes patching, crack -sealing, striping, and other 666,000 53,000 56,500 556,500 56,500 100,000 100,000 100,000 100,000 100,000 On going S CN 556,500 activities 1.52 * Annual Sidewalk & ADA Upgrade Program 8/1/2023 Page 2 of 9 C:\Users\jfisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP. 7_28_2023.draft City of Port Orchard Six -Year Transportation Improvement Program For 2024-2029 TIER 1 (Reasonably Constrained) Proj# Road Name Total Federal State (TIF Begin Termini Project Total Est. Spent Prior Future Phase Funding Fund Fund Proj#) Project Title/Project Description End Termini Length Cost to 2023 2023 Expenditures 2024 2025 2026 2027 2028 2029 Start Year Status Phase Code Federal Funds Code State Funds Local Funds Repair and replace concrete sidewalks and curb 976,000 38,000 38,000 900,000 180,000 180,000 180,000 180,000 180,000 0 On going S CN 900,000 ramps as identified in the program 1.53 ** Annual Pavement Management System Paving Projects Pavement replacement projects as identified in the 2,935,000 300,000 535,000 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000 On going S CN 2,100,000 pavement management system program 1.55 Overlay Pavement preparation and overlay. Tremont: PO Tremont Str./ Lund 1.2 1,000,000 0 0 1,000,000 0 0 1,000,000 0 0 0 2025 P PE,CN KRCC 865,000 135,000 Blvd. to Bridge, Old Clifton: SR16 to City Limits, Old Ave./ Old Clifton Rd. Clifton Anderson Hill to McCormick Woods Dr. 865,000 Total Maintenance Projects 5,577,000 391,000 629,500 4,556,500 586,500 630,000 1,630,000 630,000 630,000 450,000 0 3,691,500 * Per 2016 ADA transition plan: $180,000 annually over 20 years to comply on arterial streets. ** Per 2016 Pavement Management Analysis Report: $1.45 million annually to maintain network condition (PCI of 70), $500k to keep network PCI above 65 after 5 years. 8/1/2023 Page 3 of 9 C:\Users\ fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TI P.7_28_2023.d raft City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Capital Projects 2.01 Sidney Avenue (North of SR 16) Tremont Street to 1 3,750,000 3,750,000 0 2029 P PE/RW STP(U) 0 0 3,750,000 The design, permitting, right-of-way acquisition Fireweed 6,750,000 6,750,000 0 2031 P CN STP(U) 0 0 6,750,000 and construction for this project with bike lanes, storm drainage and sidewalks. (COMPLETE TIF 2.01 STREET) 2.02A Sedgwick Road West - Design, Permitting & ROW SR 16 Interchange to 0.4 462,428 462,428 0 2029 P PE STP(U) 400,000 0 62,428 The design, permitting and right-of-way Sidney Avenue 693,642 693,642 0 2030 P RW STP(U) 600,000 0 93,642 acquisition phase for this widening project with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) TIF 2.02 2.02B Sedgwick Road West - Construction SR 16 Interchange to 0.4 3,468,208 3,468,208 0 2031 P CN STP(U) 3,000,000 0 468,208 The construction phase for this widening project Sidney Rd. with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) TIF 2.02 Bethel/Sedgwick Corridor Phase 1b - DN, ROW and Bethel Road: Sedgwick to 2.04A.1 CN Blueberry Final segment of Bethel Phase 1. To be 0.75 2,100,000 400,000 0 2029 P DN 0 0 400,000 completed with Sedgewick Bethel RAB 700,000 2030 RW 1,000,000 0 2032 P CN 9,124,000 0 0 TIF 2.04A 2.04A.2 Ramsey Road Widening Sedgwick Road to Widen road to two travel lanes with bike lanes, Salmonberry Road 0.5 2,500,000 0 2,500,000 2029 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.04A Bethel/Sedgwick Corridor Phase 2 - Sedgwick Road: SR-16 2.04E Design, ROW and Construction interchange to Bethel 1,110,000 1,110,000 0 2030 P PE 0 0 1,110,000 Design, ROW acquisition and construction of the 0.7 2,802,000 2,802,000 0 2031 P RW 0 0 2,802,000 second phase of the street improvements per the 12,757,000 12,757,000 0 2032 P CN 12,725,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04E Bethel/Sedgwick Corridor Phase 3 - Bethel Road: Blueberry 2.04C Design, ROW and Construction to Sedgwick 422,000 422,000 0 2032 P PE 0 0 422,000 Design, ROW acquisition and construction of the 0.25 541,000 541,000 0 2033 P RW 0 0 541,000 third phase of the street improvements per the 4,859,000 4,859,000 0 2034 P CN 4,859,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04C Bethel/Sedgwick Corridor Phase 4 - Bethel Road: Lund to 2.04D Design, ROW and Construction Salmonberry 616,000 0 616,000 2034 P PE 0 0 616,000 Design, ROW acquisition and construction of the 0.5 1,041,000 0 11041,000 2035 P RW 0 0 1,041,000 fourth phase of the street improvements per the 7,087,000 0 7,087,000 2036 P CN 7,087,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04D 8/1/2023 Page 4 of 9 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP.7_28_2023.draft City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Bethel/Sedgwick Corridor Phase 5 - Bethel Road: Mile Hill 2.04E Design, ROW and Construction Drive to Lund 720,000 0 720,000 2036 P PE 0 0 720,000 Design, ROW acquisition and construction of the 1.1 1,532,000 0 1,532,000 2037 P RW 0 0 1,532,000 fifth phase of the street improvements per the 8,283,000 0 8,283,000 2038 P CN 8,283,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04E 8/1/2023 Page 5 of 9 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP.7_28_2023.draft City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds 2.05 Sidney Road SW Widening Sidney Road SW: Sidney Avenue is currently two lanes wide, it SR 16 Overpass to 0.95 500,000 500,000 0 2028 P PE 0 0 500,000 needs to be widened to three lanes (additional Sedgwick Road 5,761,850 5,761,850 0 2029 P CN STP(U) 3,600,000 TIB 1,600,000 561,850 TWTL) including bike lanes, sidewalks, traffic calming, and stormwater system improvements. TIF 2.05 (COMPLETE STREET). 2.06 Pottery Avenue Widening Pottery Avenue: Widen road to two travel lanes with bike lanes, Tremont Place to 0.22 1,600,000 1,600,000 0 2029 P ALL 0 0 1,600,000 sidewalks and stormwater system improvements. Melcher Street TIF 2.06 2.07 Old Clifton Rd Shoulder & Pedestrian Improvements Old Clifton Road: Design and construction of shoulder widening, Anderson Hill to 1.35 2,700,000 2,700,000 0 2028 P CN 0 0 2,000,000 street lighting, watermain extension and grade- Westerly City Limits seperated Pedestrian Path as identified in the TIF 2.07 McCormick Urban Village Trans Plan. 2.08 O. Clifton Rd & McC. Woods Dr. Intersection Old Clifton Rd/ Design and construction of intersecion McCormick Woods Dr. 0 250,000 0 250,000 2032 P PE 0 0 250,000 (roundabout) improvements including street Intersection 750,000 0 750,000 2033 P CN 0 0 750,000 lighting, as identified in the McCormick Urban TIF 2.08 Village Trans Plan. 2.09 Melcher Street Widening Melcher Street West is currently a narrow two- Melcher Street: 0.4 600,000 0 600,000 2032 P ALL 0 0 750,000 lane road. The reconstruction would widen the Pottery Avenue to road to allow two safe travel lanes, bike lanes, Sherman Avenue sidewalks and a stormwater system. TIF 2.09 2.10 Fireweed Road Widening Fireweed is currently a narrow two lane road. The Fireweed Road: 0.25 375,000 0 375,000 2035 P ALL 0 0 750,000 reconstruction would widen the road to allow for Sidney Avenue to safe travel lanes, bike lanes, sidewalks and a South Flower Avenue TIF 2.10 stormwater system. 2.11 Sherman Avenue Widening Sherman Avenue: Sherman Avenue is currently a narrow two-lane Fireweed Road to 0.35 525,000 0 525,000 2032 P ALL 0 0 750,000 road. The reconstruction would widen the road to Terminus at SR 16 allow two safe travel lanes, bike lanes, sidewalks and a stormwater system. TIF 2.12 2.12 Tremont St Widening - Port Orchard Blvd (Ph. 2) Port Orchard Blvd. Construct roundabouts at Tremont Street/PO Tremont Street to 1.1 809,250 0 809,250 2033 P PE STP(U) 700,000 0 109,250 Blvd. and Bay Street (SR166)/PO Blvd. and curb, Bay Street (SR166) gutter, bike lanes, sidewalks, street lighting, storm 520,231 0 520,231 2035 P RW STP(U) 450,000 0 70,231 drainage and Schedule 74 Undergrounding. 7,225,434 0 7,225,434 2037 P CN STP(U) 6,250,000 0 975,434 TIF 2.13 2.13 Pottery Avenue Widening Tremont to SR16 Pottery Avenue Pottery is currently a two-lane road, it needs to be Tremont Street 0.95 500,000 500,000 2030 P PE STP(U) 432,500 67,500 widened to a four -lane road, with sidewalks, SR 16 Overpass traffic calming and upgrades to the stormwater 750,000 750,000 2031 P RW STP(U) 648,750 101,250 TIF 2.14 system. 2,950,000 2,950,000 2033 CN STP(U) 2,292,250 0 657,750 8/1/2023 Page 6 of 9 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP.7_28_2023.draft City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds 2.14 Old Clifton Berry Lake Road Intersection 0 0 0 0 0 0 0 Intersection Improvement by Kitsap County 2.15 Blueberry Road Widening Geiger Road to Bethel Widen road to two travel lanes with bike lanes, Road sidewalks and stormwater system improvements. 2.16 Geiger Road Widening Sedgwick Road to Widen road to two travel lanes with bike lanes, Blueberry Road 0.25 375,000 0 375,000 2034 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.17 2.17 Salmonberry Road Widening Ramsey Road to Bethel Widen road to two travel lanes with bike lanes, Road 0.15 225,000 0 225,000 2028 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.18 2.18 Piperberry Way Extention Geiger Road to Ramsey Provide an extetion of Piperberry from Ramsey to Road 0.25 575,000 0 575,000 2034 P ALL 0 0 0 Geiger and a new street connection to the proposed round about on Sedgwick. TIF 2.19 2.19 Old Clifton & Feilgly Intersection Feigly intersection Complete streets improvemets indentified in the 0 2,800,000 0 2,800,000 2040 P ALL 0 0 0 McCormicks Urban Village Transportation Plan. Continuation of 1.5A TIF 2.21 2.20 Bay Street Pathway - West Tremont to Footferry Continuation of project following study in 1.8 0 4,000,000 4,000,000 0 2030 P ALL 0 0 0 2.21 Walmart to Salmonberry Connector Salmonberry Complete roadway connnection 0 800,000 0 800,000 2040 P ALL 0 0 0 TIF 2.04A 2.22 Downtown Bay Street Study Port Orchard Blvd to Study main street in downtown port orchard for Mile Hill Dr intersection 0 1,000,000 0 1,000,000 2033 P ALL 0 0 0 complete streets with bikelanes and streetscape with Bay Street. for pedestrians and storefronts. Study to address traffic cirulcation and raising streets for seal level rise and assocated stormwater and other utility imnrnvamants_ 2.23 Bay Street Improvements Port Orchard Blvd to Complete Street and utlitiy improvements. Refer Mile Hill Dr intersection 0 10,000,000 0 10,000,000 2040 P ALL 0 0 0 to Study. with Bay Street. 2.24 Bay St. & Port Orchard Blvd Intersection Bay Street at Port 8/1/2023 Page 7 of 9 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP.7_28_2023.draft City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Single Lane Round About to address safety and Orchard Bulivard 0 3,000,000 0 3,000,000 2040 P ALL 0 0 0 capacity. Bay Street Pathway crossing. Assumed creek is not impacted by project/ no major mitigation. 2.25 Bay St. & Kitsap Street Intersection Improvement Bay Street at Kitsap Re -align Kitsap intersection to addres safety and Street 0 2,000,000 0 2,000,000 2040 P ALL 0 0 0 capacity. Cline to end at Kitsap. Relocate flag pole. Signalized Intersection? 2.26 Bay St. & Mitchell and Wetzil Bay Street at Mitchell Reconfigure intersections to address safety and Avenue and Guy Wetzil 0 2,500,000 0 2,500,000 2040 P ALL 0 0 0 capacity. Rd. 2.27 Sidney Avenue Improvements Prospect St. to the Sidewalk and streetscape improvements. Waterfront 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Developer Imrpovements? 2.28 Harrison Avenue Improvements Bay Street to the Sidewalk and streetscape improvements. Signal Waterfront 0 1,000,000 0 1,000,000 2040 P ALL 0 0 0 replacement? Developer Project? 2.28 Fredrickson Ave Impr. Cline St. to Sidney Ave. Convert to two way street with angled parking. 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Provide sidewalk and streetscape impr. 2.29 New Waterfront Street Cline Street to Harrson Sidewalk and streetscape improvements. "Shared Avenue 0 2,500,000 0 2,500,000 2040 P ALL 0 0 0 Street" concept. Developer Improvement? Port Orchard Blvd. to 2.30 Tremont St Widening - Port Orchard Blvd (Ph. 3) Sidney Ave. Center median, bike lane, sidewalk, and 0 5,000,000 0 5,000,000 2041 P ALL STP(U) 0 -IB, Ped Bik, 0 0 streetscape improvements on Tremont and Sidney. Round about at the Tremont/ Sidney intersection for non -motorized safety. Total Tier 2 Capital Projects 89,086,043 54,477,128 34,608,915 60,451,500 1,600,000 30,201,543 8/1/2023 Page 8 of 9 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP.7_28_2023.draft City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Maintenance Project 2.51 Cline Avenue Repairs Replace sidewalk and parking strip. Cline Avenue: 0.13 200,000 0 0 P ALL 200,000 Kitsap Street to Dwight Street Total Tier 2 Maintenance Projects 200,000 0 0 0 0 200,000 8/1/2023 Page 9 of 9 C:\Users\fisk\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\MGWG4FAV\2022-2041 TIP.7_28_2023.draft