045-23 - Puget Sound Energy - Contract Exhibit ADocuSign Envelope ID: 08FD5628-C425-4014-8F4C-CA051AE0930E
UST TO CLE R
UT SHRUBS
/
P01 619773
154629
619772
154646
12
40T
2/18
8
SW # T89610
25
B
2/17
— — — —
— T
336.4 MCMACSR I U
-rl•T. -
619772
EXIST
---
MO 1
154654
1 00T
GATE
EXIST
GATE
I 13-943
Vol 619767
154639
500 kV 277/480V (ABC)
1535 EXIST
Ap
O
SHOP
/
1525
1545
1441
CIRCUIT F ET ADDED: 65'
Sq. Footage: /A - EV CHARGING STATION
Panel Size: 4 0 AMPS 1435
Heat Type: N/
Est. Demand: 13 KW
LRC: 339A
• V. Drop: 1. %
• Flicker: 2.7 0
500kVA 277/480v
Fault Current: 26,100
R/X:0.2 %Z:2.30
SITE PLAN
SCALE: 1" = 100'
— 1-
5'
MIN 3'
MIN
H
Z
W
W
Q
OE
SW COOK RD /
T --- _
I
I
I �
U
Z
g
>
1515
Z Z
W H
J i
(9 Z
WWg
O
WW
1 J
oQ
Ca Call
DLL
C)
ILL 3' MIN Q Z Lu 3' MIN
o 0- <�
l-°d� 5'MIN
w00
n n
/ \ I Q
i
U H �Q�
i 5' MIN - <
5' MIN rn Of rn C) 0 Y
UQ 10- MIN UQ o
Q Q
ROAD OR
PARKING AREA
L —
MINUMUM CLEARANCES FOR PSE EQUIPMENT (V01)
SCALE: NONE
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material
contains rocks up to 10" in diameter.
- A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material
contains rocks no larger than 8" in diameter.
Excavated Dirt Pile
ROADSIDE 18" 24" Min
\\\\\\\\\\\
Final Grade Typical To Excavated Dirt Pile
\i rBackfill for DB 120 Conduit/Direct Buried Cable
36 �� 12" Min (No Rocks over 10" Diameter)
48„ % Separation
Max Min ��
Cover
\� 6" or 12" of sand, 5/8" minus
\� or clean backfill shading
3" of sand, 5/8" minus, or clean backfill bedding
Phone & TV Primary Power Cable
Direct Buried or in PSE provided DB120 Grade Conduit
CUSTOMER -SUPPLIED TRENCH FOR PRIMARY CABLE(P01 TO V01
SCALE: NONE
LUMSDEN RD
SITE SPECIFIC NOTES
P01 GRID #619773-154629:
-PSE OWNED 65' TRANSMISSION POLE TO REMAIN
-INST 1/0 AL 3PH PRI TERM ON FG ARM
-INST L/B C/O & SURGE ARRESTER FUSE @40T
-INST SW #T89610
-INST (3) STIRRUPS & HOT CLAMPS
-INST 4" PRI RISER ON S/O BRACKETS, (ACTUAL= ')
-INST CABLE #'S AO-AFK878, BO-AFK879, CO-AFK880
V01 GRID #619767-154639:
-INST TX 7' X 4' W/ 60" X 24" ACCESS W/ 8' SQ COVER
-SET 500KVA, 277/480V PM XFMR
-INST (3) 1/0 CS PRI TERMS
-INST CABLE #'S AO-AFK878, BO-AFK879, CO-AFK880
-INST GRID #619767-154639
-CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS
(2 RUNS OF 4/0 UG WIRE)
SPAN SPECIFIC NOTES
6043.1000, TSU3L1 F
6042.1000, RIS4CSS
6045.5000, PM3P15M
MID:6259250
6041.1000, ELB10J
P01-V01:
-INST 14" DB120 CONDUIT ±65', (ACTUAL= ')
IN CUSTOMER PROVIDED TRENCH
-INST (3) 1/0 AL SOL JACKETED PRI CABLE, ±100', (ACTUAL= ')
2-36(60') DED FAC
2-55(60') DED FAC
3-19B
"NOTE: CITY OF PORT ORCHARD WILL BE RESPONSIBLE 100% ALL EXCAVATION & RESTORATION.
CUST IS 100% RESPONSIBLE TO CLEAR -OUT SHRUBS AT P01.
PRE -CON WILL BE REQUIRED BEFORE ANY EXCAVATION ON -SITE."
FOREMAN MUST FILL IN
CABLE #: AFK878
CABLE #: AFK879
CABLE #: AFK880
MANUFACTURER-
MANUFACTURER-
MANUFACTURER-
YEAR MANUFACT:
YEAR MANUFACT:
YEAR MANUFACT:
COMPOUND:
COMPOUND:
COMPOUND:
Primary Cable & Conduit Table (Foreman to Complete)
POSSIBLE CUSTOMER
ENTRY LOCATION
I I
PSE FROM P01---//
CABLE INSTALLATION DIAGRAM R
Not to scale
P01 619773
154629
40T
SW #T89610 90°
2/17
PULL F=91lbs R=358lbs
90, A
619767 V01
154639
500 kVA 277/480V (ABC)
CONDUIT DIAGRAM
SCALE: NONE
TRANSFORMER INSTALLATION (PM)
Installed at site: Vol
Grid Number: 619767-154639
kVA Rating: 500kVA 277/480y
Material ID#: 6259250
Foreman to redline the following information
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
POWER GENERAL NOTES - COMMERCIAL PROJECT
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
CUSTOMER NOTES
Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy
Standards & Local Municipality (See PSE Electric Service Handbook for more details).
1. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to
commencing work to get the underground facilities located.
2. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole,
sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the
Project Manager.
3. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or
construction materials which would restrict construction and/or equipment access, before work can begin.
4. Roads shall be paved or have a compacted , crushed rock base in place.
5. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or
guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away
from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when
crossing them.
6. All work is to be done in accordance with local municipal and county permit requirements as applicable.
7. Inclement weather conditions may cause delays in construction times and dates.
8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The
customer will provide any and all shoring or they will side slope the trench to 1:1.
9. EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice
0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction
requirements. (Local jurisdiction may have additional requirements including notes detailing where
erosion or sediment control structures are to be installed, cross section details of the typical erosion
structures, & special requirements for work in sensitive areas.)
10. Customer is required to have meter inspected and approved by L&I/City prior to construction.
LOCATION
PSE PROVIDE CONDUIT
PRIMARY CABLE
QTY OF LUBE (gal.)
AS BUILT INFORMATION
Design
Actual
TYPE
BENDS
PULL
PULL
Cable
Design
Actual
CABLE NUMBERS
MANUFACTURING INFORMATION
From
To
Size
Qty
Length
Length
(Ibs)
Rev
Size
Length
Length
(in)
(ft)
(ft)
DB120
HDPE
SCH 80
90°
45°
22°
11 °
(Ibs)
(ft)
(ft)
A
B
C
Manufacturer
Compound
Year
Design
As Built
Actual Amount Installed
(Conduit &Cable)
P01
V01
4"
1
65'
X
2
91
358
1/0
100,
AFK878
AFK879
AFK880
1 GAL
CITY OF PORT ORCHARD IS RESPONSIBLITLY TO PROVIDE GUARD POST
5' S'MAPAINTED
MAX X YELLOW
5' N MIN 9 3'-6•
MAX MAX LENGTH
64r
MIN MIN l
TYPICAL
5 PAD 8 5
MAX XFMR MAX
FRONT CONCRETE 7-6•
5 GUARD
MAX POSTS MIN 3 5' MAX �I
5• i. MIN -- X
MAX MAX
GUARD POST INSTALLATION
GUARD POST LOCATIONS
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a. minimum compressive strength of 3000 psi after 28 days -
The exposed portion of the post shall be painted traffic yellow.
- 6 It x 9 in. diameter precast steel -reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
GUARD POST INSTALLATION REQ FOR V01
Not to scale 0700.1600-03
8'-0"
8'-0" 8"
or 10'-0"
4'-2"
3'-6"
7'-0" i T-0"
TOP VIEW
0111,
000
SIDE VIEW
Excavation - 20 cubic yards
VAULT & EXCAVATION DETAIL (V01)
Not to scale 6045.5000
CIRCUIT LOADING TABLE
CIRCUIT: EPO-12
AS OF 4/17/2023 A PHASE
B PHASE C PHASE
EXIST. PEAK LOAD
123
172
152
EST. NEW LOAD
12
12
12
TOTAL 135 183 163
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Deviations noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Quadrant
Foreman's Signature
4' x 4' Work Pit
Field Face \ (Pole Butt Must Be Exposed) Print Name Date
Quadrant 5" Min
Climbing
Space / 619772 619774
Standoff Bracket Conduit \ 1546047619773
154645
15" Min Length
Conduit Clamp — Z
619772
154629 2/17 154646 2/18
\ P01 25 kVA (B)
2"
6"
Crushed 4'-6"
Rock
Direction of Vehicular Traffic
Climbing
Space
Zoad Face,
PROJECT PHASE
NOTIF#
ORDER#
PWR Superior
Perm. Service
Metering
Removal
Temporary
Job Order
513819438
105102908
513965511
104352382
3002208608
N/A
N/A
N/A
N/A
N/A
N/A
GAS Distribution
Service Stubs
HP Svc/MSA
N/A
N/A
N/A
N/A
N/A
N/A
CABLE TV
PHONE
// Project Manager Contact Information:
Manager: Victor Ibarra
Cell Phone: 425-429-4574
TOP VIEW E-Mail: victor.ibarra@pse.com
CONDUIT RISER PLACEMENT DETAIL (P01) PRIMARY ONE -LINE & UG MAP: BEFORE PSE Locates Required NO
SCALE: NONE SCALE: NONE Customer Locates Required YES
0 /
is JOB SITE /
A Ar 30:
SW
R�\25T 125T % T86112 A EPO
100T c 12
WE
17 C 1-94
25T 13 1003; ' 30 (CROSS COUNTR
I r-
I-
3 0: n o
3 0: ...............A 1g
-:
....
3Sb : • '3;:
..........40T 30 30
13-792g.... B.
..Iii:E::
13-707
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
619773
POI
154629
40T
619774
SW #T89610
154645
2/17
6197727
�
619772
154604
I 154646 2/18
2/16
A
25 kVA (B)
AO—AFK878
619767 Vol
BO—AFK879
15-4639
CO—AFK880
500 kVA 277/480V (ABC)
L_
PRIMARY ONE -LINE & UG MAP: AFTER
SCALE: NONE
Vicinity Map
JOB SITE
34
27
5�
- Owner / Develoner Contact Info
V t
0
O
00
City of Port Orchard
216 Prospect St
Port Orchard, WA 98366
ATTN: Tony Lang 360-876-7019 office
For contacts below dial 1-888-CALL PSE (225-5773)
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
Outages Required NO
Flagging Required YES
REAL ESTATE/EASEMENT
ROW REVIEW / EASEMENT
PERMIT
N/A
3
FUNCTION
CONTACT
PHONE NO
DATE
2
PROJECT MGR
Victor Ibarra
425-429-4574
4/17/23
1
ENGR - POWER
Helene Sparks
360-475-7001
4/17/23
REV#
DATE
BY
DESCRIPTION
ENGR - GAS
N/A
N/A
N/A
COUNTY
KITSAP
Emer Sect
N/A
Gas Wk Ctr
N/A
POWER WK CTR
QSSPE
DRAWN BY
Helene Sparks
360-475-7001
4/17/23
CHECKED BY
1/4 SEC
SE SEC34 T24 R1 E
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY
425-495-0703 5
2/2023
FOREMAN #1
NO (POWER)
2401E136
-[--U-MAP
OH CKT MAP
2401E136
UG CKT MAP
2401E135
CIRCUIT NO
EPO-12
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A
N/A
N/A N/A
CONTACT
N/A
N/A
N/A N/A
PHONE#
N/A
N/A
N/A N/A
INCIDENT MAOP
PUGET CITY OF PORT ORCHARD EV STATION N/A N/A
SOUND Elect Order
COMMERCIAL INST 30 OH-UG PRI L/E GaNOrder 105102 08
ENERGY 1535 VIVIAN CT # EV CHRGERS PORT ORCHARD, WA 98367 SCALE FGE
PSE AS NOTED 1/1