Loading...
Well 11 Specifications 6-13-2023SECTION 00 0110 — TABLE OF CONTENTS FOR MCCORMICK WOODS — WELL NO. 11 SITE IMPROVEMENT PROJECT FOR CITY OF PORT ORCHARD Person Section Responsible Title Page 00 01 01 PBC Fly Sheet 1-1 00 01 07 PBC Seals Page 1-1 00 01 10 PBC Table of Contents 1-6 :1191011►142916Z4111N1a►1M Advertisement for Bids 1 Notice to Prospective Bidders 4 Information and Checklist for Bidders 5 Proposal 13 Schedule of Contract Prices 15 Bidder's Qualification Form 21 Bid Security 24 Certification of Compliance with Wage Payment Statutes 26 Supplemental Criteria Information Form 27 Subcontractor List 34 CONTRACT DOCUMENTS Contract 37 Exhibit C— 5% Retainage Investment Option 51 Saving Account Agreement 52 Escrow Agreement 54 Performance and Payment Bond 57 Acknowledgment 60 Surety Acknowledgement 57 Maintenance/Warranty Bond 61 Form P-1 / Notary Block 64 Form P-2 / Notary Block 65 Form P-2 / Notary Block 66 APWA GENERAL SPECIAL PROVISIONS 1-01.3 Definitions 1-02.1 Qualifications of Bidder 1-02.2 Plans and Specifications 1-02.5 Proposal Forms 1-02.7 Bid Deposit 1-02.9A Delivery of Proposal McCormick Woods — Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 1 1-02.10 Withdrawing, Revising, or Supplementing Proposal 1-02.13 Irregular Proposals 1-02.14A Disqualification 1-02.15 Pre Award Information 1-03.1 Consideration of Bids 1-03.3 Execution of Contract 1-03.4 Contract Bond 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1-04.4(1) Minor Changes 1-05.7 Removal of Defective and Unauthorized Work 1-05.11 Final Inspection 1-05.16 Water and Power 1-05.18 Record Drawings 1-07.1 Laws to be Observed 1-07.2 State Sales Tax 1-07.11 Requirements for Nondiscrimination 1-07.18 Public Liability and Property Damage Insurance 1-07.23 Construction Under Traffic 1-07.24 Rights of Way 1-08.0 Preliminary Matters 1-08.0(1) Preconstruction Conference 1-08.1 Subcontracting 1-08.3(2)A Type A Progress Schedule 1-08.4 Notice to Proceed and Prosecution of the Work 1-09.6 Force Account 1-09.7 Mobilization TECHNICAL SPECIFICATIONS Division 01 - General Requirements 01 10 00 PBC Summary of Work 1-20 01 12 16 PBC Work Sequence 1-5 01 22 20 PBC Unit Price Measurement & Payment 1-8 01 33 00 PBC Submittal Procedures 1-13 01 41 20 PBC Seismic Requirements for Non -Structural Components 1-5 01 45 00 PBC Quality Control 1-5 01 5000 PBC Temporary Facilities and Controls 1-8 01 56 39 PBC Temporary Tree & Plant Protection 1-4 01 66 00 PBC Delivery, Storage, and Handling 1-3 01 70 00 PBC Execution and Closeout Requirements 1-14 01 75 00 PBC Testing, Training, and Commissioning 1-7 01 78 23 PBC Operation and Maintenance Data 1-18 McCormick Woods — Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 2 Division 02 - Existing Conditions 02 30 00 PBC Subsurface Investigation 1-2 02 41 00 PBC Demolition 1-7 Division 03 - Concrete 03 00 00 JJG Concrete General Requirements 1-14 0305 10 JJG Cold Weather Concreting 1-4 03 05 20 JJG Hot Weather Concreting 1-3 03 1100 JJG Concrete Formwork 1-5 03 1500 JJG Concrete Accessories 1-2 03 15 13 JJG Waterstops 1-6 03 2000 JJG Concrete Reinforcement 1-7 03 3000 JJG Cast -In -Place Concrete 1-12 03 3100 JJG Concrete Mixtures 1-13 03 6200 JJG Non -Shrink Grout 1-4 Division 04 - Masonry 04 10 00 JJG Mortar and Grout 1-9 04 22 00 JJG Concrete Masonry Unit 1-14 Division 05 - Metals 05 1200 JJG Structural Steel 1-4 05 50 00 JJG Metal Fabrications 1-6 Division 06 - Wood and Plastics 06 05 00 JJG Fasteners and Adhesives 1-2 06 10 00 JJG Rough Carpentry 1-10 06 16 00 JJG Sheathing 1-3 06 18 00 JJG Glued -Laminated Construction 1-5 06 61 00 PBC FRP Fabrications Molded Grating 1-5 Division 07 - Thermal and Moisture Protections 07 19 00 PBC Water Repellents 1-4 07 21 00 PBC Thermal Insulation 1-2 07 41 13 PBC Metal Roof Panels 1-4 07 60 00 PBC Flashing and Sheet Metal 1-6 07 72 33 PBC Roof Hatches 1-3 07 92 00 PBC Sealants and Caulking 1-3 Division 08 - Doors and Windows 08 10 00 PBC Metal Doors and Frames 1-5 08 71 00 PBC Door Hardware 1-10 08 91 19 PBC Fixed Louvers 1-5 McCormick Woods — Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 3 Division 09 - Finishes 09 20 10 PBC 09 90 00 PBC 09 97 23.24 PBC Division 10 - Specialties 10 14 10 PBC 10 44 16 PBC Division 11 - Equipment 1105 11 PBC Division 12 - Furnishings NOT USED Division 13 - Special Construction NOT USED Division 21— Fire Suppression NOT USED Division 22 - Plumbing 22 00 00 PBC 22 05 29 PBC 22 07 00 PBC 22 1000 PBC 22 40 00 PBC Gypsum Wallboard 1-6 Painting and Coating 1-21 Concrete Water Storage Tank Painting 1-11 Identifying Devices 1-6 Fire Extinguishers 1-2 Common Work Results for Equipment 1-9 Plumbing 1-3 Hangers and Supports for Plumbing Piping and Equipment 1-20 Plumbing Insulation 1-9 Plumbing Piping 1-22 Plumbing Fixtures 1-7 Division 23 — Heating, Ventilation, and Air Conditioning (HVAC) 23 05 93 PBC Testing, Adjusting, and Balancing for HVAC 23 09 13 PBC Instrumentation and Control Devices for HVAC 23 31 13 PBC Metal Ducts and Accessories 23 34 00 PBC HVAC Fans 23 3700 PBC Air Outlets and Inlets 23 81 40 PBC Heat Pumps Division 25 — Integrated Automation NOT USED Division 26 - Electrical 26 05 00 MEW 2605 19 MEW 26 05 26 MEW 26 05 29 MEW 26 05 33 MEW General Requirements for Electrical Work Low Voltage Conductors, Wires and Cables Grounding System Hangers and Supports for Electrical Systems Raceway, Boxes and Fittings 1-4 1-5 1-15 1-6 1-2 1-7 1-21 1-31 1-9 1-5 1-21 McCormick Woods — Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 4 26 05 43 MEW Underground Ducts and Raceways for Electrical Systems 26 05 53 MEW Identification for Electrical Systems 26 05 73 MEW Power System Studies 26 08 00 MEW Commissioning of Electrical Systems 2622 13 MEW Low Voltage Distribution Transformers 26 24 16 MEW Panelboards 26 24 19 MEW Motor Control Centers 26 27 00 MEW Service and Distribution 2627 1 MEW Cabinets and Enclosures 26 27 26 MEW Wiring Devices 2628 16.13 MEW Enclosed Circuit Breakers 2628 16.16 MEW Enclosed Switches 26 29 24 MEW Active Front End Variable -Frequency Controllers 2632 13 MEW Diesel -Engine Generators 26 36 23 MEW Automatic Transfer Switches 2643 13 MEW Surge Protective Devices for Low -Voltage Electrical Power Circuits 26 50 00 MEW Luminaires Division 27 - Communications NOT USED Division 28 — Electronic Safety and Security NOT USED Division 31 - Earthwork 3105 13 PBC 3105 16 PBC 31 1000 PBC 3122 13 PBC 3123 16 PBC 3123 17 PBC 3123 19 PBC 31 23 23 PBC 31 23 24 PBC 31 25 00 PBC 31 50 00 PBC Soils for Earthwork Aggregates for Earthwork Site Clearing Rough Grading Excavation Trenching Dewatering Fill Flowable Fill Erosion and Sediment Controls Excavation Support and Protection Division 32 - Exterior Improvements 32 1123 PBC Aggregate Base Courses 32 12 16 PBC Asphaltic Concrete Pavement 32 91 13 PBC Soil Preparation 32 91 21 PBC Finish Grading and Seeding 32 93 00 PBC Planting 1-20 1-15 1-8 1-5 1-6 1-6 1-11 1-5 1-7 1-7 1-9 1-8 1-13 1-22 1-7 1-10 1-6 1-5 1-5 1-8 1-5 1-9 1-24 1-4 1-8 1-7 1-5 1-6 1-6 1-5 1-12 1-4 1-12 McCormick Woods — Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 5 Division 33 - Utilities 3305 13 PBC Manholes 1-13 3305 17 PBC Precast Concrete Valve Vaults 1-8 33 05 50 PBC Existing Pipe Abandonment 1-4 33 11 10 PBC Water Utility Distribution and Transmission Piping 1-24 33 12 16 PBC Water Utility Distribution Valves 1-7 33 1300 PBC Testing and Disinfection of Water Utility Piping 1-10 33 13 13 PBC Disinfection of Water Utility Storage Tanks 1-4 33 13 19 PBC Disinfection of Water Supply Wells 1-3 33 30 10.13 PBC Sewer and Manhole Testing 1-8 33 31 10 PBC Sanitary Utility Sewerage Piping 1-12 3341 10 PBC Storm Utility Drainage Piping 1-12 Division 34 - Transportation NOT USED Division 40 - Process Integration 4005 13 PBC Common Work Results for Process Piping 1-21 40 05 51 PBC Common Work Results for Process Valves 1-8 40 05 51.15 PBC Gate Valves 1-5 40 05 51.24 PBC Check Valves 1-4 4005 67.39 PBC Pressure Relief / Sustaining Valves 1-7 40 05 71.13 PBC Duckbill Check Valves 1-5 40 05 78 PBC Miscellaneous Valves 1-6 40 06 70 MEW Schedule of Instrumentation for Process Systems 1-1 4061 13 MEW Process Control System General Provisions 1-14 40 61 21 MEW Process Control System Testing 1-6 40 61 26 MEW Process Control System Training 1-4 40 62 63 MEW Operator Interface Terminals 1-4 40 63 43 MEW Programmable Logic Controllers 1-4 40 66 53 MEW Radio Equipment 1-4 40 66 63 MEW Antennas 1-5 40 67 16 MEW Control Panels 1-12 40 67 33 MEW Panel Wiring 1-6 40 71 13 MEW Magnetic Flow Meters 1-6 4072 13 MEW Ultrasonic Level Meters 1-5 40 72 43 MEW Pressure Level Measurement Devices 1-5 4073 13 MEW Pressure Gauges 1-6 40 75 05 PBC Multi -Parameter Analyzer Systems 1-6 4075 21 PBC Chlorine Analyzers 1-6 40 78 16 MEW Indicating Lights 1-4 4078 19 MEW Switches and Push Buttons 1-4 40 78 53 MEW Relays/Terminal Blocks 1-7 4078 56 MEW Isolators, Intrinsically -Safe Barriers, and Surge Suppressors 1-9 McCormick Woods — Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 6 40 78 59 MEW Power Supplies 1-5 40 80 00 MEW Commissioning of Process Systems 1-6 Division 41— Material Processing and Handling Equipment NOT USED Division 43 — Process Gas & Liquid Handling 43 21 00 PBC Liquid Pumps 1-8 43 21 10 PBC Vertical Turbine Pumps 1-7 43 21 39 PBC Deep Well Submersible Pumps 1-11 Division 46 — Water and Wastewater Equipment 46 20 00 PBC Miscellaneous Chemical Feed Equipment 1-9 46 30 00 PBC Chemical Feed Pumps 1-6 4633 13 PBC On -Site Electrolytic Hypochlorite Generation System 1-7 4633 14 PBC Self -Contained Fluoride Upflow Saturator and Feed System 1-7 DRAWINGS See Sheet G-1 for Drawing Index SUPPLEMENTARY INFORMATION Appendix A — Geotechnical Report Appendix B — Permits (LDAP and SDP to be Issued during Bid Period) Appendix C — Washington State Department of Health DWSRF Contract Documents Appendix D— Asbuilts Appendix E — Davis Bacon Act Wage Determination END OF SECTION McCormick Woods — Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 7