Well 11 Specifications 6-13-2023
McCormick Woods – Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 1 SECTION 00 01 10 – TABLE OF CONTENTS FOR MCCORMICK WOODS – WELL NO. 11 SITE IMPROVEMENT PROJECT FOR CITY OF PORT ORCHARD Person Section Responsible Title Page 00 01 01 PBC Fly Sheet 1-1 00 01 07 PBC Seals Page 1-1 00 01 10 PBC Table of Contents 1-6 BIDDING DOCUMENTS Advertisement for Bids 1 Notice to Prospective Bidders 4 Information and Checklist for Bidders 5 Proposal 13 Schedule of Contract Prices 15 Bidder’s Qualification Form 21 Bid Security 24 Certification of Compliance with Wage Payment Statutes 26 Supplemental Criteria Information Form 27 Subcontractor List 34 CONTRACT DOCUMENTS Contract 37 Exhibit C – 5% Retainage Investment Option 51 Saving Account Agreement 52 Escrow Agreement 54 Performance and Payment Bond 57 Acknowledgment 60 Surety Acknowledgement 57 Maintenance/Warranty Bond 61 Form P-1 / Notary Block 64 Form P-2 / Notary Block 65 Form P-2 / Notary Block 66 APWA GENERAL SPECIAL PROVISIONS 1-01.3 Definitions 1-02.1 Qualifications of Bidder 1-02.2 Plans and Specifications 1-02.5 Proposal Forms 1-02.7 Bid Deposit 1-02.9A Delivery of Proposal McCormick Woods – Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 2 1-02.10 Withdrawing, Revising, or Supplementing Proposal 1-02.13 Irregular Proposals 1-02.14A Disqualification 1-02.15 Pre Award Information 1-03.1 Consideration of Bids 1-03.3 Execution of Contract 1-03.4 Contract Bond 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1-04.4(1) Minor Changes 1-05.7 Removal of Defective and Unauthorized Work 1-05.11 Final Inspection 1-05.16 Water and Power 1-05.18 Record Drawings 1-07.1 Laws to be Observed 1-07.2 State Sales Tax 1-07.11 Requirements for Nondiscrimination 1-07.18 Public Liability and Property Damage Insurance 1-07.23 Construction Under Traffic 1-07.24 Rights of Way 1-08.0 Preliminary Matters 1-08.0(1) Preconstruction Conference 1-08.1 Subcontracting 1-08.3(2)A Type A Progress Schedule 1-08.4 Notice to Proceed and Prosecution of the Work 1-09.6 Force Account 1-09.7 Mobilization TECHNICAL SPECIFICATIONS Division 01 - General Requirements 01 10 00 PBC Summary of Work 1-20 01 12 16 PBC Work Sequence 1-5 01 22 20 PBC Unit Price Measurement & Payment 1-8 01 33 00 PBC Submittal Procedures 1-13 01 41 20 PBC Seismic Requirements for Non-Structural Components 1-5 01 45 00 PBC Quality Control 1-5 01 50 00 PBC Temporary Facilities and Controls 1-8 01 56 39 PBC Temporary Tree & Plant Protection 1-4 01 66 00 PBC Delivery, Storage, and Handling 1-3 01 70 00 PBC Execution and Closeout Requirements 1-14 01 75 00 PBC Testing, Training, and Commissioning 1-7 01 78 23 PBC Operation and Maintenance Data 1-18 McCormick Woods – Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 3 Division 02 - Existing Conditions 02 30 00 PBC Subsurface Investigation 1-2 02 41 00 PBC Demolition 1-7 Division 03 - Concrete 03 00 00 JJG Concrete General Requirements 1-14 03 05 10 JJG Cold Weather Concreting 1-4 03 05 20 JJG Hot Weather Concreting 1-3 03 11 00 JJG Concrete Formwork 1-5 03 15 00 JJG Concrete Accessories 1-2 03 15 13 JJG Waterstops 1-6 03 20 00 JJG Concrete Reinforcement 1-7 03 30 00 JJG Cast-In-Place Concrete 1-12 03 31 00 JJG Concrete Mixtures 1-13 03 62 00 JJG Non-Shrink Grout 1-4 Division 04 - Masonry 04 10 00 JJG Mortar and Grout 1-9 04 22 00 JJG Concrete Masonry Unit 1-14 Division 05 - Metals 05 12 00 JJG Structural Steel 1-4 05 50 00 JJG Metal Fabrications 1-6 Division 06 - Wood and Plastics 06 05 00 JJG Fasteners and Adhesives 1-2 06 10 00 JJG Rough Carpentry 1-10 06 16 00 JJG Sheathing 1-3 06 18 00 JJG Glued-Laminated Construction 1-5 06 61 00 PBC FRP Fabrications Molded Grating 1-5 Division 07 - Thermal and Moisture Protections 07 19 00 PBC Water Repellents 1-4 07 21 00 PBC Thermal Insulation 1-2 07 41 13 PBC Metal Roof Panels 1-4 07 60 00 PBC Flashing and Sheet Metal 1-6 07 72 33 PBC Roof Hatches 1-3 07 92 00 PBC Sealants and Caulking 1-3 Division 08 - Doors and Windows 08 10 00 PBC Metal Doors and Frames 1-5 08 71 00 PBC Door Hardware 1-10 08 91 19 PBC Fixed Louvers 1-5 McCormick Woods – Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 4 Division 09 - Finishes 09 20 10 PBC Gypsum Wallboard 1-6 09 90 00 PBC Painting and Coating 1-21 09 97 23.24 PBC Concrete Water Storage Tank Painting 1-11 Division 10 - Specialties 10 14 10 PBC Identifying Devices 1-6 10 44 16 PBC Fire Extinguishers 1-2 Division 11 - Equipment 11 05 11 PBC Common Work Results for Equipment 1-9 Division 12 - Furnishings NOT USED Division 13 - Special Construction NOT USED Division 21 – Fire Suppression NOT USED Division 22 - Plumbing 22 00 00 PBC Plumbing 1-3 22 05 29 PBC Hangers and Supports for Plumbing Piping and Equipment 1-20 22 07 00 PBC Plumbing Insulation 1-9 22 10 00 PBC Plumbing Piping 1-22 22 40 00 PBC Plumbing Fixtures 1-7 Division 23 – Heating, Ventilation, and Air Conditioning (HVAC) 23 05 93 PBC Testing, Adjusting, and Balancing for HVAC 1-4 23 09 13 PBC Instrumentation and Control Devices for HVAC 1-5 23 31 13 PBC Metal Ducts and Accessories 1-15 23 34 00 PBC HVAC Fans 1-6 23 37 00 PBC Air Outlets and Inlets 1-2 23 81 40 PBC Heat Pumps 1-7 Division 25 – Integrated Automation NOT USED Division 26 - Electrical 26 05 00 MEW General Requirements for Electrical Work 1-21 26 05 19 MEW Low Voltage Conductors, Wires and Cables 1-31 26 05 26 MEW Grounding System 1-9 26 05 29 MEW Hangers and Supports for Electrical Systems 1-5 26 05 33 MEW Raceway, Boxes and Fittings 1-21 McCormick Woods – Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 5 26 05 43 MEW Underground Ducts and Raceways for Electrical Systems 1-20 26 05 53 MEW Identification for Electrical Systems 1-15 26 05 73 MEW Power System Studies 1-8 26 08 00 MEW Commissioning of Electrical Systems 1-5 26 22 13 MEW Low Voltage Distribution Transformers 1-6 26 24 16 MEW Panelboards 1-6 26 24 19 MEW Motor Control Centers 1-11 26 27 00 MEW Service and Distribution 1-5 26 27 1 MEW Cabinets and Enclosures 1-7 26 27 26 MEW Wiring Devices 1-7 26 28 16.13 MEW Enclosed Circuit Breakers 1-9 26 28 16.16 MEW Enclosed Switches 1-8 26 29 24 MEW Active Front End Variable-Frequency Controllers 1-13 26 32 13 MEW Diesel-Engine Generators 1-22 26 36 23 MEW Automatic Transfer Switches 1-7 26 43 13 MEW Surge Protective Devices for Low-Voltage Electrical 1-10 Power Circuits 26 50 00 MEW Luminaires 1-6 Division 27 - Communications NOT USED Division 28 – Electronic Safety and Security NOT USED Division 31 - Earthwork 31 05 13 PBC Soils for Earthwork 1-5 31 05 16 PBC Aggregates for Earthwork 1-5 31 10 00 PBC Site Clearing 1-8 31 22 13 PBC Rough Grading 1-5 31 23 16 PBC Excavation 1-9 31 23 17 PBC Trenching 1-24 31 23 19 PBC Dewatering 1-4 31 23 23 PBC Fill 1-8 31 23 24 PBC Flowable Fill 1-7 31 25 00 PBC Erosion and Sediment Controls 1-5 31 50 00 PBC Excavation Support and Protection 1-6 Division 32 - Exterior Improvements 32 11 23 PBC Aggregate Base Courses 1-6 32 12 16 PBC Asphaltic Concrete Pavement 1-5 32 91 13 PBC Soil Preparation 1-12 32 91 21 PBC Finish Grading and Seeding 1-4 32 93 00 PBC Planting 1-12 McCormick Woods – Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 6 Division 33 - Utilities 33 05 13 PBC Manholes 1-13 33 05 17 PBC Precast Concrete Valve Vaults 1-8 33 05 50 PBC Existing Pipe Abandonment 1-4 33 11 10 PBC Water Utility Distribution and Transmission Piping 1-24 33 12 16 PBC Water Utility Distribution Valves 1-7 33 13 00 PBC Testing and Disinfection of Water Utility Piping 1-10 33 13 13 PBC Disinfection of Water Utility Storage Tanks 1-4 33 13 19 PBC Disinfection of Water Supply Wells 1-3 33 30 10.13 PBC Sewer and Manhole Testing 1-8 33 31 10 PBC Sanitary Utility Sewerage Piping 1-12 33 41 10 PBC Storm Utility Drainage Piping 1-12 Division 34 - Transportation NOT USED Division 40 - Process Integration 40 05 13 PBC Common Work Results for Process Piping 1-21 40 05 51 PBC Common Work Results for Process Valves 1-8 40 05 51.15 PBC Gate Valves 1-5 40 05 51.24 PBC Check Valves 1-4 40 05 67.39 PBC Pressure Relief / Sustaining Valves 1-7 40 05 71.13 PBC Duckbill Check Valves 1-5 40 05 78 PBC Miscellaneous Valves 1-6 40 06 70 MEW Schedule of Instrumentation for Process Systems 1-1 40 61 13 MEW Process Control System General Provisions 1-14 40 61 21 MEW Process Control System Testing 1-6 40 61 26 MEW Process Control System Training 1-4 40 62 63 MEW Operator Interface Terminals 1-4 40 63 43 MEW Programmable Logic Controllers 1-4 40 66 53 MEW Radio Equipment 1-4 40 66 63 MEW Antennas 1-5 40 67 16 MEW Control Panels 1-12 40 67 33 MEW Panel Wiring 1-6 40 71 13 MEW Magnetic Flow Meters 1-6 40 72 13 MEW Ultrasonic Level Meters 1-5 40 72 43 MEW Pressure Level Measurement Devices 1-5 40 73 13 MEW Pressure Gauges 1-6 40 75 05 PBC Multi-Parameter Analyzer Systems 1-6 40 75 21 PBC Chlorine Analyzers 1-6 40 78 16 MEW Indicating Lights 1-4 40 78 19 MEW Switches and Push Buttons 1-4 40 78 53 MEW Relays/Terminal Blocks 1-7 40 78 56 MEW Isolators, Intrinsically-Safe Barriers, and Surge Suppressors 1-9 McCormick Woods – Well No. 11 Site Improvement Project Table of Contents 20-2839.01 00 01 10 - 7 40 78 59 MEW Power Supplies 1-5 40 80 00 MEW Commissioning of Process Systems 1-6 Division 41 – Material Processing and Handling Equipment NOT USED Division 43 – Process Gas & Liquid Handling 43 21 00 PBC Liquid Pumps 1-8 43 21 10 PBC Vertical Turbine Pumps 1-7 43 21 39 PBC Deep Well Submersible Pumps 1-11 Division 46 – Water and Wastewater Equipment 46 20 00 PBC Miscellaneous Chemical Feed Equipment 1-9 46 30 00 PBC Chemical Feed Pumps 1-6 46 33 13 PBC On-Site Electrolytic Hypochlorite Generation System 1-7 46 33 14 PBC Self-Contained Fluoride Upflow Saturator and Feed System 1-7 DRAWINGS See Sheet G-1 for Drawing Index SUPPLEMENTARY INFORMATION Appendix A – Geotechnical Report Appendix B – Permits (LDAP and SDP to be Issued during Bid Period) Appendix C – Washington State Department of Health DWSRF Contract Documents Appendix D – Asbuilts Appendix E – Davis Bacon Act Wage Determination END OF SECTION