Addendum-5_7-21-2023_v2.1ADDENDUM NO. 5
TO THE
CONTRACT DOCUMENTS
FOR
City of Port Orchard, Washington
MCCORMICK WOODS WELL 11 SITE IMPROVEMENT PROJECT
THIS ADDENDUM IS HEREBY MADE A PART OF THE CONTRACT DOCUMENTS TO THE
SAME EXTENT AS THOUGH IT WERE ORIGINALLY INCLUDED THEREIN.
BIDDERS MUST ACKNOWLEDGE RECEIPT OF ALL ADDENDA ON THE BID PROPOSAL
FORM. BID PROPOSALS THAT FAIL TO ACKNOWLEDGE ALL ADDENDA MAY BE
CONSIDERED IRREGULAR AND MAY BE REJECTED.
THE DATE AND TIME OF THE BID OPENING HAS BEEN CHANGED TO TUESDAY, JULY
25, 2023 AT 10:30 AM.
ISSUED THIS 21ST DAY OF JULY 2023.
CONSOR
600 University Street, Suite 300
Seattle, WA 98101
McCormick Woods Well 11 Site Improvement Project Addendum No. 5
ITEM NO. 1 — Specifications
1. REPLACE the first sentence of the first paragraph of Advertisement for Bids with the following:
Notice is hereby given that sealed bids will be received at the office of the City Clerk for the City
of Port Orchard, 216 Prospect Street, Port Orchard, WA 98366 until 10:30 AM on Tuesday July
25, 2023, at 10:30 am, for construction of the McCormick Woods — Well No. 11 Site Improvement
Project, Public Works Project No. 023-010
ITEM NO. 2 — Schedule of Contract Prices
1. REPLACE the Schedule of Contract prices with the attached form.
END OF ADDENDUM NO. 5
McCormick Woods Well 11 Site Improvement Project Addendum No. 5
Page 2 of 2
SCHEDULE OF CONTRACT PRICES
MCCORMICK WOODS WELL NO. 11 SITE IMPROVEMENT PROJECT
NOTE: Unit prices for all items and the total amount bid must be shown. The Project must be bid
in its entirety, including all bid items as specifically listed in the Proposal, in orderto be considered
a responsive bid. Where conflict occurs between the unit price and the total amount named for
any items, the unit price typed or printed and entered in ink shall prevail. The Contracting Agency
reserves the right to award all work bid according to the lowest qualified responsive bid tendered,
available funds, and as it best serves the interest of the Contracting Agency. All work awarded
will be made to the same Contractor/bidder.
Item Estimated Description of Item/ Total Amount in Unit Price Total Amount
No. Quantity Words
Base Bid
1 Lump Sum
2 Lump Sum
3 Lump Sum
4 Lump Sum
5 Lump Sum
6 80
7 330
8 90
9 80
Mobilization, Bonds, Insurance, and
Demobilization
(Total Amount in Words)
Traffic Control
(Total Amount in Words)
Surveying and Construction Staking
(Total Amount in Words)
Erosion and Sedimentation Control
(Total Amount in Words)
Sheeting, Shoring, and Bracing
(Total Amount in Words)
DI Pipe for Water Main, 8 In. Diam.
(Total Amount in Words)
DI Pipe for Water Main, 10 In. Diam.
(Total Amount in Words)
DI Pipe for Water Main, 12 In. Diam.
(Total Amount in Words)
PVC Pipe for Drain, 4 In. Diam.
(Total Amount in Words)
10 220 PVC Pipe for Drain, 10 In. Diam.
Per Lump Sum
Per Lump Sum
Per Lump Sum
Per Lump Sum
Per Lump Sum
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Item Estimated Description of Item/ Total Amount in Unit Price Total Amount
No. Quantity Words
(Total Amount in Words)
Per Lineal Foot
11
35
DI Pipe for Storm, 8 In. Diam.
(Total Amount in Words)
Per Lineal Foot
12
45
DI Pipe for Storm, 12 In. Diam.
(Total Amount in Words)
Per Lineal Foot
13
600
PVC Pipe for Gravity Sewer, 8 In. Diam.
(Total Amount in Words)
Per Lineal Foot
Piping, Fittings, Valves, and
Appurtenances inside Pump Station
14
Lump Sum
Building
(Total Amount in Words)
Per Lump Sum
15
4
48-inch Concrete Manholes
(Total Amount in Words)
Per Each
16
1
60-inch Concrete Dechlorination Manhole
(Total Amount in Words)
Per Each
17
Lump Sum
Pump Station Building
(Total Amount in Words)
Per Lump Sum
18
1
Well No. 11 Pump
(Total Amount in Words)
Per Each
19
2
Booster Pumps
(Total Amount in Words)
Per Each
20
Lump Sum
Chlorination System
(Total Amount in Words)
Per Lump Sum
21
Lump Sum
Fluoridation System
(Total Amount in Words)
Per Lump Sum
22 Lump Sum Water Sampling Station
Item Estimated Description of Item/ Total Amount in Unit Price Total Amount
No. Quantity Words
(Total Amount in Words)
Per Lump Sum
23
Lump Sum
Electrical and Instrumentation
(Total Amount in Words)
Per Lump Sum
24
Lump Sum
Generator Set
(Total Amount in Words)
Per Lump Sum
Testing, Flushing, and Disinfection of
25
Lump Sum
Water Mains
Per Lump Sum
Well Decommissioning, Abandoning
26
Lump Sum
Existing Pipe, and Site Demolition
(Total Amount in Words)
Per Lump Sum
27
Lump Sum
Clearwell Rehabilitation
(Total Amount in Words)
Per Lump Sum
28
350
Hot Mix Asphalt
(Total Amount in Words)
Per Ton
29
390
Crushed Surfacing Top Course
(Total Amount in Words)
Per Ton
30
260
Crushed Surfacing Base Course
(Total Amount in Words)
Per Ton
Final Site Grading, Surface Restoration,
31
Lump Sum
and Site Clean -Up
(Total Amount in Words)
Per Lump Sum
32
Lump Sum
Bioswale
(Total Amount in Words)
Per Lump Sum
Item Estimated Description of Item/ Total Amount in Unit Price Total Amount
No. Quantity Words
33 Force Account Minor Changes
$100,000 $ 100,000
(Total Amount in Words) Per Force Account
34 1 8-inch Piping Vault
(Total Amount in Words) Per Each
35 1 10-inch Valve Vault
(Total Amount in Words) Per Each
Total Base Bid $
Tax 9.3% $
TOTAL BID I
SALES TAX
Retailing/Retail Sales Tax Rule WAC 458-20-170: Washington State Retail sales tax added as percent (%)
in addition to contract bid price; sales tax shown as separate line item.