Loading...
Notice of ApplicationCITY OF PORT ORCHARD Public Works Department Permit Center 216 Prospect Street, Port Orchard, WA 98366 Ph.: (36o) 874-5533 • permitcenter@portorchardwa.gov NOTICE OF APPLICATION This is a public notice of a development proposal that may interest you. You have the right to comment on this application, receive notice, request a copy of the decision once made and appeal the project decision. Included in this notice is a summary of the proposal, code reference for associated permits that may be required, and the targeted timeframe for City review and decision. Please be aware there are deadlines for comments and appeal; if you do not adhere to these deadlines, your comments may not be considered and/or you may lose your right of appeal. Please read this notice carefully and call the Staff Contact listed in this notice if you have questions. Date of Issuance: September 1, 2023 File Number: PW23-050, PW23-051, PW23-054 Project Name: Lot 18 Port Orchard Industrial Park Type of Application: Major Land Disturbing Activity, Storm Drainage Permits & Concurrency Review (Type II) Assessor Parcel Number: 5392-000-018-0005 Applicant: Tony Branham, Branham Development LLC, PO BOX 1506 Gig Harbor, WA 98335 Applicant Representative: Tony Branham, Branham Development LLC, PO BOX 1506 Gig Harbor, WA 98335 Date of Application: July 24 2023 Date Application was Determined Technically Complete: August 212023 Site Description: Location: Between Vivian Ct & Leader International Dr Nearest road intersection: Vivian Ct & Lumsden Rd & Leader International Dr & Lumsden Rd Size: 1.4 Acres Zoning District: Light Industrial Shoreline Designation: N/A Project Permits included with Application: None. Description of Proposed Project: The proposal is for the construction of new light -industrial facility for GTR technologies. Preliminary State Environmental Policy Act (SEPA) Determination: The City of Port Orchard SEPA Responsible Official has not issued a SEPA Determination at this time. Existing Studies and Environmental Documents Evaluating the Proposal: Storm Drainage Report, Geotechnical Report, SEPA Checklist Other Applicable Codes Which May Require Additional Project Review / Permits: Port Orchard Municipal Code Title 12, Title 13, Title 20. Public Comment Period and Appeals: Any interested person may comment on this application. The comment period will remain open for 14 days. The deadline to submit comments is September 15, 2023. Any interested person may request notification of any hearings or meetings and request a copy of the decision once made. Requests must be addressed to City of Port Orchard Permit Center, Attn: Public Works Permit Clerk, 216 Prospect Street, Port Orchard, WA 98366. Any interested party may appeal a Type II decision to the Hearing Examiner within 14 calendar days of the Notice of Decision. The Notice of Decision will be provided to all parties of record. Examination of File: The application file may be examined at the Permit Center, 720 Prospect Street, Port Orchard, WA 98366, by appointment between the hours of 8 AM and 4 PM, Monday through Friday, except holidays. To schedule an appointment please call 360-874-5533 and indicate the Permit Number and Project Name for the file you would like to examine. Staff Contact for this Application: Ian Smith, PE Assistant City Engineer ismith@portorchardwa.gov 360-876-4991 Review Authority: The Public Works Director. A Type II permit is an administrative decision and shall be reviewed consistent with the requirements of POMC 20.24. Project Site Plan: Attached. Page 2 of 2 P.O. IND. PARK LOT 18 N C O J M N O N O M O N f0 0 Z Q J a w H Z5 5 0 T co J MONUMENT REMOVAL PERMIT PROCESS 0 NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES (DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH. Site Plan PARKING CALCULATIONS USES: WAREHOUSE - 2 PER 1,000 SF 3,840 SF= 7.6 MANUFACTURING - 1 PER 1,000 SF 15,000 SF= 15 OFFICE - 2 PER 1,000 SF 2,000 SF= 4 20,840 SF = 27 COMPACT ALLOWED (40%) =11 PARKING SPACES: 14 STANDARD 9'x20(STD)' (1 ELECTRIC) 1 ADA 9'x20' 1 ADA VAN 1 Vx20' 11 COMPACT (C) 8'x16' 27 TOTAL PROVIDED 27 REQUIRED 0' 10, 20' 30' 20' SCALE COMPACT= C STANDARD= STD