Plan SetEROSION AND SEDIMENTATION CONTROL NOTES
(ALSO REFER TO CITY OF PORT ORCHARD STANDARDS AND SPECIFICATIONS CHAPTER 9 SURFACE WATER DRAINAGE):
27. APPROVAL OF THESE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLANS DOES NOT CONSTITUTE AN
APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G., SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS,
CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.).
28. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND
UPGRADING OF THESE TESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CESCL UNTIL ALL CONSTRUCTION IS
APPROVED.
29. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THESE PLANS SHALL BE CLEARLY FLAGGED BY A CONTINUOUS
LENGTH OF SURVEY TAPE (OR FENCING, IF REQUIRED) PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD,
NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY
THE APPLICANT/CESCL FOR THE DURATION OF CONSTRUCTION.
30. STABILIZED CONSTRUCTION ENTRANCES, IN ACCORDANCE WITH STANDARD DETAILS SHALL BE INSTALLED AT THE
BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH
AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE
KEPT CLEAN AND TRACK -OUT TO STREET RIGHT -OF- WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
31. THE TESC FACILITIES SHOWN ON THESE PLANS MUST BE CONSTRUCTED PRIOR TO ALL CLEARING AND GRADING TO
ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES
IS REDUCED TO REQUIRED LEVELS.
32. THE TESC FACILITIES SHOWN ON THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS.
DURING THE CONSTRUCTION PERIOD, THESE TESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED
STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL COVER MEASURES,
ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ADDITIONAL PERIMETER PROTECTION, ETC.), AS
DIRECTED BY THE CITY ENGINEER.
33. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CESCL AND MAINTAINED TO ENSURE CONTINUED
PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE TESC FACILITIES AND OF
SAMPLES TAKEN DURING THE WET SEASON (OCTOBER 1 TO APRIL 30) AND OF MONTHLY REVIEWS DURING THE DRY
SEASON (MAY 1 TO SEPTEMBER 30).
34. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS
DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE
APPROVED TESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
35. ANY AREA NEEDING TESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION SHALL BE ADDRESSED WITHIN SEVEN (7)
DAYS.
36. THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR
WITHIN TWENTY-FOUR (24) HOURS FOLLOWING A STORM EVENT.
37. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL
CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO FINAL INSPECTION. THE CLEANING OPERATION
SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO A
DOWNSTREAM SYSTEM.
38. ANY PERMANENT FLOW CONTROL FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE
NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE FACILITY IS TO
FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE GRADED SO THAT THE
BOTTOM AND SIDES ARE AT LEAST THREE (3) FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
39. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM
THICKNESS OF 2 TO 3 INCHES.
40. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY
WHICH AREAS CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN
ONE WEEK OF THE BEGINNING OF THE WET SEASON.
- A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO
THE CITY OF PORT ORCHARD CITY ENGINEER. THE INSPECTOR CAN REQUIRE SEEDING OF ADDITIONAL AREAS IN ORDER TO
PROTECT SURFACE WATERS, ADJACENT PROPERTIES, OR DRAINAGE FACILITIES.
SEDIMENTATION CONTROL NOTES
NTS
TESC MAINTENANCE REQUIREMENTS:
1. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE INSPECTED AFTER EACH
RAINFALL EVENT AND DAILY DURING PROLONGED RAINFALL.
2. NECESSARY REPAIRS OR REPLACEMENT OF FACILITIES SHALL BE ACCOMPLISHED PROMPTLY.
3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT OR WHEN THE LEVEL OF
DEPOSITION REACHES APPROXIMATELY ONE-HALF THE MAXIMUM POTENTIAL DEPTH.
4. SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE ESC FACILITIES ARE NO LONGER
REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED
5. TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE MAINTAINED BY
OWNER: BRANHAM DEVLOPMENT LLC
NAME: TONY BRANHAM
ADDRESS: P.O. BOX 1506
CITY,STATE,ZIP: GIG HARBOR WA, 98335
PHONE: (253) 973-3180
2 � TESC MAINTENANCE REQUIREMENTS
NTS
SEEDING:
1. SEED MIXTURE SHALL BE 10% REDTOP, 40% ANNUAL RYE, 40% CHEWING FESCUE, AND 10%
WHITE DUTCH CLOVER
MINIMUM TESC REQUIREMENTS:
1. STABILIZATION AND SEDIMENT TRAPPING. ALL EXPOSED AND UNWORKED SOILS INCLUDING
SOIL STOCKPILES, SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS WHICH PROTECT
SOIL FROM THE EROSIVE FORCES OF RAINDROP IMPACT AND FLOWING WATER. APPLICABLE
PRACTICES INCLUDE, BUT ARE NOT LIMITED TO VEGETATIVE ESTABLISHMENT, MULCHING,
PLASTIC COVERING, AND THE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED.
FROM OCTOBER 1 TO APRIL 30, NO SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN 2
DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS SHALL REMAIN UNSTABILIZED FOR MORE
THAN 7 DAYS.
2. AT ALL TIMES OF THE YEAR, THE CONTRACTOR SHALL HAVE SUFFICIENT MATERIALS,
EQUIPMENT AND LABOR ON -SITE TO STABILIZE AND PREVENT EROSION FROM ALL DENUDED
AREAS WITHIN 12-HOURS AS SITE AND WEATHER CONDITIONS DICTATE.
3. FROM OCTOBER 1ST TO APRIL 30TH, THE PROJECT ENGINEER SHALL VISIT THE DEVELOPMENT
SITE MINIMUM OF ONCE A WEEK FOR THE PURPOSE OF INSPECTING THE EROSION AND
SEDIMENTATION CONTROL FACILITIES, REVIEWING THE PROGRESS OF CONSTRUCTION, AND
VERIFYING THE EFFECTIVENESS OF THE EROSION CONTROL MEASURES BEING UNDERTAKEN.
THE PROJECT ENGINEER SHALL IMMEDIATELY INFORM THE CITY OF ANY PROBLEMS OR
POTENTIAL PROBLEMS OBSERVED DURING SAID SITE VISITS, AS WELL AS OF ANY
RECOMMENDED CHANGES IN THE EROSION CONTROL MEASURES TO BE UNDERTAKEN. WHEN
REQUESTED BY THE CITY, THE PROJECT ENGINEER SHALL PROVIDE THE CITY WITH WRITTEN
RECORDS OF SAID WEEKLY SITE VISITS, INCLUDING DATES OF VISITS AND NOTED SITE
OBSERVATIONS.
4. IN THE EVENT THAT GROUND ON A PROJECT SITE IS LEFT BARE AFTER SEPTEMBER 30TH, THE
COUNTY MAY ISSUE A STOP WORK ORDER FOR THE ENTIRE PROJECT UNTIL SATISFACTORY
CONTROLS ARE PROVIDED.
5. IN THE EVENT THAT GROUND ON A PROJECT SITE IS LEFT BARE AFTER SEPTEMBER 30TH, AND
THE CITY IS UNSUCCESSFUL IN CONTACTING THE OWNER OR HIS/HER DESIGNATED
EMERGENCY CONTACT PERSON, THE CITY MAY ENTER THE PROJECT SITE AND INSTALL
TEMPORARY GROUND COVER MEASURES AND BILL THE OWNER FOR ALL EXPENSES INCURRED
BY THE CITY. THESE COSTS WILL BE IN ADDITION TO ANY MONETARY PENALTIES LEVIED
AGAINST THE OWNER.
6. DELINEATION OF CLEARING AND EASEMENT LIMITS. CLEARING LIMITS, SETBACKS, BUFFERS,
AND SENSITIVE OR CRITICAL AREAS SUCH AS STEEP SLOPES, WETLANDS AND RIPARIAN
CORRIDORS SHALL BE CLEARLY MARKED IN THE FIELD AND INSPECTED BY CITY OF PORT
ORCHARD PRIOR TO COMMENCEMENT OF LAND CLEARING ACTIVITIES.
7. PROTECTION OF ADJACENT PROPERTIES. ADJACENT PROPERTIES SHALL BE PROTECTED FROM
SEDIMENT DEPOSITION BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT
BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND
OTHER APPROPRIATE BMPS.
8. TIMING AND STABILIZATION OF SEDIMENT TRAPPING MEASURES. SEDIMENT PONDS AND TRAPS,
PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER BMPS INTENDED TO TRAP SEDIMENT
ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP IN GRADING. THESE BMPS SHALL BE
FUNCTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE. EARTHEN STRUCTURES
SUCH AS DAMS, DIKES, AND DIVERSION SHALL BE STABILIZED ACCORDING TO THE TIMING
INDICATED IN ITEM (1)ABOVE.
9. SLOPE STABILIZATION. CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT
WILL MINIMIZE EROSION. ROUGHENED SOIL SURFACES ARE PREFERRED TO SMOOTH
SURFACES. INTERCEPTORS SHOULD BE CONSTRUCTED AT THE TOP OF LONG, STEEP SLOPES
WHICH HAVE SIGNIFICANT AREAS ABOVE THAT CONTRIBUTE RUNOFF. CONCENTRATED
RUNOFF SHOULD NOT BE ALLOWED TO FLOW DOWN THE FACE OF A CUT OR FILL SLOPE
UNLESS CONTAINED WITHIN AN ADEQUATE CHANNEL OR PIPE SLOPE DRAIN. WHEREVER A
SLOPE FACE CROSSES A WATER SEEPAGE PLANE, ADEQUATE DRAINAGE OR THE PROTECTION
SHOULD BE PROVIDED. IN ADDITION, SLOPES SHOULD BE STABILIZED IN ACCORDANCE WITH
ITEM (1) ABOVE.
10. CONTROLLING OFF -SITE EROSION. PROPERTIES AND WATERWAYS DOWNSTREAM FROM
DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE
VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE
DEVELOPMENT SITE BY THE IMPLEMENTATION OF APPROPRIATE BMPS TO MINIMIZE ADVERSE
DOWNSTREAM IMPACTS.
4 � MINIMUM EROSION AND SEDIMENT CONTROL REQUIREMENTS
NTS
300
285
EXISTING MAJOR CONTOUR 23.2%
EXISTING MINOR CONTOUR SLOPE
PROPOSED MAJOR CONTOUR ■
PROPOSED MINOR CONTOUR
APPLICANTS PARCEL LINES
NEIGHBORING PARCELS
11. STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY
ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO
PREVENT EROSION FROM THE EXPECTED FLOW VELOCITY FROM A 2-YEAR FREQUENCY,
24-HOUR DURATION STORM FOR THE POST CONDITION. STABILIZATION ADEQUATE TO PREVENT
EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM REACHES
SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS.
12. STORM DRAIN INLET PROTECTION. ALL STORM DRAIN INLETS MADE OPERABLE DURING
CONSTRUCTION SHALL BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER
THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO
REMOVE SEDIMENT. AFTER PROPER WRITTEN APPLICATION, THE REQUIREMENT FOR INLET
PROTECTION MAY BE WAIVED BY THE DIRECTOR ON A SITE SPECIFIC BASIS WHEN THE
CONVEYANCE SYSTEM DOWNSTREAM OF THE INLET DISCHARGES TO AN APPROPRIATE
SEDIMENT CONTAINMENT BMP AND THE CONVEYANCE SYSTEM CAN BE ADEQUATELY CLEANED
FOLLOWING SITE STABILIZATION.
13. UNDERGROUND UTILITY CONSTRUCTION. THE CONSTRUCTION OF UNDERGROUND UTILITY
LINES SHALL BE LIMITED, WHERE FEASIBLE, TO NO MORE THAN 500 FEET OF OPEN TRENCH AT
ANY ONE ONE TIME. WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS,
EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF THE TRENCH. DEWATERING
DEVICES SHALL DISCHARGE TO AN APPROPRIATE SEDIMENT TRAP OR POND, PRECEDED BY
ADEQUATE ENERGY DISSIPATION, PRIOR TO RUNOFF LEAVING THE SITE
14. CONSTRUCTED ACCESS ROUTES. WHEREVER CONSTRUCTION VEHICLE ACCESS ROUTES
INTERSECT PAVED ROADS, PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF
SEDIMENT (MUD) ONTO PAVED ROAD BY USE OF APPROPRIATE BMP-S SUCH AS A STABILIZED
CONSTRUCTION ENTRANCE. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE
ROADS SHALL BE CLEANED THOROUGHLY, AS A MINIMUM, AT THE END OF EACH DAY.
SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE
TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. STREET WASHING SHALL BE
ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
15. REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS
SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER
THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR
STABILIZED ON -SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL OF TEMPORARY
BMPS SHALL BE PERMANENTLY STABILIZED. THE REMOVAL OF TEMPORARY EROSION AND
SEDIMENT CONTROL BMPS MAY NOT BE REQUIRED FOR THOSE PROJECTS, SUCH AS SINGLE
FAMILY PLATS, THAT WILL BE FOLLOWED BY ADDITIONAL CONSTRUCTION UNDER A DIFFERENT
PERMIT. IN THESE CIRCUMSTANCES, THE NEED FOR REMOVING OR RETAINING THE MEASURES
WILL BE EVALUATED ON A SITE -SPECIFIC BASIS.
16. DEWATERING CONSTRUCTION SITES. DEWATERING DEVICES SHALL DISCHARGE INTO AN
APPROPRIATE SEDIMENT TRAP OR POND, DESIGNED TO ACCEPT SUCH A DISCHARGE,
PRECEDED BY ADEQUATE ENERGY DISSIPATION, PRIOR TO RUNOFF LEAVING THE SITE.
17. CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES. ALL POLLUTANTS
OTHER THAN SEDIMENT THAT OCCUR ON -SITE DURING CONSTRUCTION SHALL BE HANDLED
AND LEGALLY DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM
OR SURFACE WATERS. POLLUTANTS OF CONCERN INCLUDE, BUT ARE NOT LIMITED TO, FUELS,
LUBRICANTS, SOLVENTS, CONCRETE BYPRODUCTS AND CONSTRUCTION MATERIALS.
18. MAINTENANCE. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMPS
SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF
THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN
ACCORDANCE WITH THE MANUAL. THE APPLICANT SHALL BE RESPONSIBLE FOR ASSURING
THAT ANY SUCH FACILITIES DAMAGED DURING FLOODS, STORMS OR OTHER ADVERSE
WEATHER CONDITIONS ARE IMMEDIATELY RETURNED TO NORMAL OPERATING CONDITION.
19. FINANCIAL LIABILITY. A PERFORMANCE COVENANT OR PERFORMANCE SURETY, SHALL BE
REQUIRED FOR ALL PROJECTS TO TO ENSURE COMPLIANCE WITH THE APPROVED EROSION
AND SEDIMENT CONTROL PLAN
2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION AND OTHER
MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE.
EXISTING DITCH
3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE SEED BED
- - STREAM CENTERLINE (ESTIMATED)
o
WILL BE NECESSARY. (E.G., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING).
BUILDABLE AREA
4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT
TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS AND SEDIMENT BASINS.
UTILITY/ ACCESS EASEMENT
5. THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE
WATER SERVICE
ROUGHENING. PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE.
POWER SERVICE
SL1
6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS USED
SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS.
JT COMM SERVICE
&
3 1 SEEDING NOTES
NTS
ONE -CALL (# 1-800-424-5555):
BURIED UTILITIES ARE SHOWN AS INDICATED ON RECORD MAPS FURNISHED BY
OTHERS AND VERIFIED WHERE POSSIBLE BY FEATURES LOCATED IN THE FIELD.
WESTSOUND ENGINEERING, ASSUMES NO LIABILITY FOR THE ACCURACY OF THOSE 1766
RECORDS, OR FOR THE FINAL LOCATION OF EXISTING UTILITIES IN AREAS CRITICAL
TO DESIGN.
MONUMENT REMOVAL PERMIT PROCESS in
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
EXISTING SURFACE DRAINAGE
PROPOSED SURFACE DRAINAGE
ELECTRIC TRANSFORMER
WATER METER
PROPOSED SEPTIC TANK
CATCH BASIN
PROPOSED DOWNSPOUT
INFILTRATION TRENCH
FILTER STRIP
SOIL LOG
ADA VAN PARKING
PROPOSED GRAVEL
PROPOSED CONCRETE EV PARKING
PROPOSED STRUCTURE
=� POWER POLES AND GUY WIRE
PROPOSED LANDSCAPING
PROPOSED LAWN Igl Fp WATER TEE AND 90 DEGREE ELBOW
NATIVE VEGETATION pd WATER GATE VALVE
MODERATE EROSION HAZARD AREA
FIRE HYDRANT
WETLAND BUFFER
CATEGORY I AQUIFER RECHARGE AREA
OS EXISTING SANITARY SEWER MANHOLE
CATEGORY I AQUIFER RECHARGE AREA
PROPOSED SANITARY SEWER MANHOLE
0 TYPE 1 CATCH BASIN
A PORTION OF SECTION 34, TOWNSHIP 24 NORTH, RANGE 1 E, W.M.
KITSAP COUNTY, WASHINGTON
P.O. IND. PARK LOT 18
PROJECT N0: 3083
LEGAL DESCRIPTION (FROM KITSAP COUNTY ASSESSOR'S PROPERTY DATA):
PORT ORCHARD INDUSTRIAL PARK DIV. 1
LOT 12, PORT ORCHARD INDUSTRIAL PARK DIV. 1 ACCORDING TO THE PLAT RECORDED JULY 27, 1998 IN
VOLUME 30 OF PLATS, PAGES 10, 11, 12 AND 13 UNDER KITSAP COUNTY AUDITOR'S FILE NO. 3106119;
SITUATE IN KITSAP COUNTY, WASHINGTON.
TAX PARCEL NUMBER: SHEET INDEX
SHEET 1 - COVER SHEET
5392-000-018-0005 SHEET 2 - SITE PLAN
1.4 (APPROX. 60,984 SF SQ. FT.) SHEET 3 - EXISTING SITE CONDITIONS
SHEET 4 - GRADING PLAN
SHEET 5 - GRADING CROSSECTIONS
SHEET 6 - UTILITY PLAN
SHEET 7 - TESC PLAN
SHEET 8 - PROFILE AND CROSS SECTIONS STA: 0+00.00-0+20.61
SHEET 9 - CROSS SECTIONS STA: 0+50.00-4+50.00
SHEET 10 - CROSS SECTIONS STA: 4+95.69-5+71.78
SHEET 11 - NOTES AND DETAILS
SHEET 12 - NOTES AND DETAILS (CONTINUED)
TOPOGRAPHY NOTE: SHEET 13 - NOTES AND DETAILS (CONTINUED)
THE TOPOGRAPHIC INFORMATION SHOWN IS A OF KITSAP COUNTY LIDAR. ALL
DATA PRESENTED IS BASED ON THE NAVD88 DATUM.
*BUILDABLE AREA:
USEABLE AREA OF SITE FOR STRUCTURES.
AREA IS BASED ON MINIMUM SETBACK DISTANCE PRESCRIBED IN
APPLICABLE CODES. SETBACKS FOR PRIMARY STRUCTURES AND
SPECIAL CIRCUMSTANCES MY BE GREATER.
BRANHAM DEVELOPMENT LLC
P.O. BOX 1506
GIG HARBOR, WA 98335
TONY BRANHAM: (253) 973-3180
a���-� WestSound
Engineering, Inc
ENGINEERING, PLANNING AND SURVEYING
217 S.W. Wilkins Drive Port Orchard, Wa. 98366
Phone (360) 876-3770 Fax (360) 876-0439
E-mail: wse@wsengineering.com http://www.wsengineering.com
P.O. IND. PARK LOT 18
N
C
O
J
M
N
O
N
O
M
O
N
f0
0
Z
Q
J
a
w
H
Z5
5
0
T
co
J
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
Site Plan
PARKING CALCULATIONS
USES:
WAREHOUSE - 2 PER 1,000 SF 3,840 SF= 7.6
MANUFACTURING - 1 PER 1,000 SF 15,000 SF= 15
OFFICE - 2 PER 1,000 SF 2,000 SF= 4
20,840 SF = 27
COMPACT ALLOWED (40%) =11
PARKING SPACES:
14 STANDARD 9'x20(STD)' (1 ELECTRIC)
1 ADA 9'x20'
1 ADA VAN 1 Vx20'
11 COMPACT (C) 8'x16'
27 TOTAL PROVIDED
27 REQUIRED
0' 10, 20' 30'
20' SCALE
COMPACT= C
STANDARD= STD
P.O. IND. PARK LOT 18
x
6
i7
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
SITE EXISTING CONDITIONS
0' 10, 20' 30'
20' SCALE
P.O. IND. PARK LOT 18
GRADING PLAN
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
GRADING QUANTITIES
CUT: 3,356.47 Cu. Yd.
FILL: 1,251.48 Cu. Yd.
NET: 2,105.00 Cu. Yd.
EXISTING LIGHT POLE TO BE PROTECTED.
20' 30'
KALE
0
0
J
N
O
N
aU
M
N
O
N
O
M
O
Iai
U)
z
O
L)
U
W
co
O
U
C�
Z
Q
0
0
a
m
J
3
a
vi
z
O
H
U
W
U)
O
Of
U
O
Z_
Q
K
00
0
M
H
W
co
W
W
2
c
N
d
O
J
Y
c6
d
C
0
M
00
O
co
O
O
0
U
g
0
a
X
d
ii
P.O. IND. PARK LOT 18
GRADING CROSS SECTIONS
CROSS SECTION A -A
ALIGNMENT N. LOT-18
EXISTING GROUND
270
_-
---
---------- ----
--
�
PROPOSED
265
--- -
77
260
DATUM ELEV 25�+
255.000 00 0+25
0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+753+84
HORIZONTAL: 1 "=30'
VERTICAL: 1"= 10'
PROPOSED RETAINING
WALL (MSE)
270
265
260
255
DATUM ELEV 25&00 0+25 0+50 0+75
250.000
HORIZONTAL: 1 "=30'
VERTICAL: 1 "= 10'
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
CROSS SECTION B-B
ALIGNMENT S. LOT-18
/-- FF= 269.5
EXISTING GROUND
1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 34m63
n
11
FINISHED GRADE (TYP)
FINISHED GRADE (TYP)
CROSS SECTION C-C
ALIGNMENT W. LOT-18
275
270
265
DATUM ELEV 26
PROPOgEC
WALL ( SE
260.000 D+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 1+90
HORIZONTAL: 1 "=30'
VERTICAL: 1"= 10'
CROSS SECTIN D-D
ALIGNMENT E. LOT-18
275
270
265
260
255
DATUM ELEV 25
250.000 b+00 0+25 0+50 0+75
HORIZONTAL: 1 "=30'
VERTICAL: 1"= 10'
1 +00 1 +25 1 +50 1 +75 1 +97
ED
SE)
RETAINING
RETAINING
c
J
0
N
N
O
N
O
0
0
ai
J
CL
z
EL
M
c
0
Lu
w
co
w
W
0
a
J
Y
C6
d
C
0
M
c
O
co
O
O
0
U
g
0
a
X
d
ii
]0 I
W 1\ I
EXISTING 12" 0
SD CULVERT
I E=265.63'
I I III
U
z
Q
LOCATE AND EXTEND
EXISTING 12" 0 SD CULVERT
EXTEND 7.5' S OF DRIVEWAY
�l
PROP 12" 0
SD CULVERT —
I E=265.50'±
N
N
�I
I I
266
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
I
P.O. IND. PARK LOT 18
UTILITY PLAN
---------------------------------------------
____________________
1515 VIVIAN CT
PORT ORCHARD WA, 98367
i
C
—co270 �D _>O
TRENCH DRAIIN 2 6 N
' 348.44' �O
270_ ram' 7�� N 88°1T00" W -
270
- — )r-n
LVJ ----
N
u�
cl F57Kof
d r�
c� L 6" 0 TRENCHDRAIN OUTFALL
\\ ��
265.728
8
1420 LUMSDEN RD
PORT ORCHARD WA 98367
A
I WATER BACKFLOW ASSEMBLY 6
TO BE LOCATED IN UTILITY ROOM 13
A I
d�
la
d
A
A —
A 's. a
----------
p , u OA A G
C 4� A A d A O
267 A
- - _ 266
265 _ 51 LF 8" 0 PVC
�— --- &
,3 264.756 - - - -
-- 13 @ 2% MIN—264.064
S 88°17'00"—
.27'
263.673— -lj
A /
o I p
A I
1 /
i
I
J
1
1
1
d
A
IA
263.446— I t'
I I
I
0 1
o I
I
I I
I I
1
A I II
I
I
w
� N
L0 Zo
o
CD
?S6 z
TYPE 2 CB
WITH BEEHIVE
512 GRATE
263.153 RIM=263.50'±
--- --- ___ IE=248.88'
00
0
LUMSDEN
(,v PROPOSED EXISTING 18" 0 PIPE
%-V y WATER -LINE W/ BROKEN TRASH RACK
`v �S� IE=250 61'
S6
SSCO PROPOSED 111
WATER SERVICE N \
1410 LUMSD D \
PORT ORCH WA 98367
RELOCATE EXISTING FIRE
- - - — HYDRANT 48.30' SOUTH
10LF PROPOSED
12" 0 SD CULVERT
H �
WATER AND SEWER
SEPERATION
24 LF 12" 0 SD PIPE @ 1.9%
TYPE 1 CB
CONNECT TO
EXISTING SD
2 RIM=252.00'± 0
12" 0 PIPE
EX I E= 248.418'
j
i
w
C) CV
coI
i °� w
I0
z
i c'
i
i
i
i
0' 10, 20' 30'
20' SCALE
P.O.
IND. PARK LOT 18
TESC PLAN
— — (N) 12" IE=
264.48'
_
(E) 8" IE =
264.72'
-- - -----------------
❑ � (S) 15" IE
= 264.56'
�
-- ----- - - - ----- --- -
-- ------ -----
CW
END CHAINLINK FENCE
\
CO I
CLEARING
12 PIPE
270
LIMITS
��
/
I-
IE = 999.334
CHAINLINK FENCE
CHAINLINK FENCE
v
26N
z
270
348.44'
I
271 N 88° 1 T00" W
-
_�
>
I
270
`
I ASSUMED PIPE LOCATION
��
RE
DRY WELL N
OVE EXISTING CB
VISIBLE INVERTS
END GAURDRAIL
CONSTR CTIO
BMP C105
11
�� INVERT NOT VISABLE
i
I
RIM ELV= 269.309'
---..�-
ENTRANCE
-
III
-0.5%
�..., I
J
cCONSTR�
—
1
—N—
a
��
U ON BMP C105
CKDENTRAIN
C
N
LOT 18
��"
�t
O c I cro
°
1 N
-1.2%
o r ,
,�
�9 �'
s
A
)
° I /
258
`�
N
' I
G 1
� �
I
0' 10, 20' 30'
I �
a
�I
I
-2.3% /
w
20' SCALE
0�
o
p A
o
l9�
i I
L0 N
c9
N
I i
n
a
2 O
S6
I
,
°
I
z BEGIN GAURDR
, 1
I
I
I
I
n
z
° I I z _
0 Q
18" PIPE W/ TRASH RACK
IE = 264.35'
I' I
f—_Q
I z °
266
a
z
-C
h�
ti
2.i-iii 484 LF s SI
FENCE BMP C233
a
I I w
a , ' Q
° I U.I
„ PIPE
°
---------'
66.76'
��?�5�.
26268
269 268
e a e
a a
//
18" PIPE W/ BROKEN TRASH RACK
IE = 250.61'
- ---
266
--- ---
---
---
--- --- --- ---
-
88°17'00" E
--- ------ ---
�170.27'
252 pit.
S
5 6" PVC STANDPIPE
°000'O'
4 FT. TALL UNKNOWN USE
784
/>/
�3OR338
PRO ECT EXISTING 18"0 2.-iil
ITH SILT FENCING
J^
00 S
LUMSDEN D
SSMH #1789
2.i-iii
"O
253 RIM ELEV. = 250.78'
cy
PROT 11 12 PIPE
(N) 8" IE = 240.47' (IN)
SSMH #1777
y
c'°
ITH SIL IE = 248.42'
(S) 8" IE = 246.34' (OUT)
RIM ELEV. = 1000.09'
N �S
—
— (W) 8" IE = 260.06' (IN)
(N) 8" IE = 260.01' (IN)
—
—
6
— �— —
w
(E) 8" IE = 259.81(OUT)
STORM BOX #1780 SSCO
— —
STORM MH #1784
o
M
STORM
MH #1779 SOLID LID ELEV.
= 262.66'
4
RIM
ELEV. = 266.58' (W) 15" IE - 259.51' (IN)
RIM ELEV. = 254.08'
(W) 15" IE = 250.67' (IN)
N
\
o
(S) 16"
IE= 262.62' (IN) (S) 8" IE = 259.84' (IN)
4�Iz
(E) 16" IE
= 262.40' (OUT)
(E) 15" IE = 259.18'
(OUT)
(NE) 18" IE = 250.57' (IN)
(OUT)
/ (SE) 15" IE = 250.44' OUT
SSMH #1786 `L�v
\
WATER
LEVEL = 262.40
RIM ELEV. = 254.07
NOT ABLE TO SEE
NW SIDE OF
COULD NOT SEE SOUTH SIDE OF MH
(W) 8" IE = 247.75' (IN)
MH. PROBABLE
INLET PIPE TO
I
(SE) 8" IE = 247.56' (OUT)
THE NORTH
AND NW.
z
I
�
T n9
TITLE
P.O. IND. PARK LOT 18
a
DESIGNED BY
MJM
♦1^
We S `S O u n
�+ `S
e1 J .
TESC PLAN
MONUMENT REMOVAL PERMIT PROCESS 1
Engineering Inc
G a Icy
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
ATB
7
��O
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
DRAWN BY
ENGINEERING, PLANNING AND SURVEYING
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
R217
7777
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
S.W. Wilkins Drive Port Orchard, Wa. 98366
CLIENT
BRANHAM DEVELOPMENT LLC
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
CHECKED BY
MJM.00
Phone (360) 876-3770 Fax (360) 876-0439
6066
P.O. BOX 1506
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
E-mail: wse@wsengineering.com http://www.wsengineering.com
,,
Po �E'C1STERE° w¢
�SSIrnvAL
GIG HARBOR, WA 98335
SEC 34 TWN
24 R E
E��l
TONY BRANHAM
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
�"='" 2�SCALE
SCALE
3083 7 13
REV.
DESCRIPTION DATE
BY
DATE SEALED 06-22-2023 JOB No.
SHT OF SHTS
d
w
c
0
0
J
O
�N_\
V
M
N
O
N
O
M
O
N
f0
U7
Z
O
L)
U
W
U)
O
Of
O
0
0
J
O)
3
a
0
N
0
0
O
0
U7
Z
O
L)
U
W
U7
O
Of
O
od
W
J
LL
O
0_
00
M
0
M
H
W
co
H
W
W
2
U7
c
N
d
a2
O
J
Y
c6
d
C
0
M
00
O
co
O
O
0
U
g
0
a
X
d
ii
P.O. IND. PARK LOT 18
WALL PROFILE & CROSSECTION 0+00.00 - 0+20.61
WALL PROFILE
WALL PROFILE
WALL PROFILE
Station=1 +44.47
Station=2+52.91
Station=3+58.95
elev = 267.853
elev = 266.519
elev = 265.530
WALL PROFILE
WALL PROFILE
WALL PROFILE
Station=0+00.01
Station= 1 +44.47
WALL PROFILE
Station=3+58.95 WALL PROFILE
elev = 267.853
elev = 266.511
Station=2+52.91
elev = 264.200 Station=5+71.78
elev = 265.519
-
270
0.0 11.1
0.
-
0.0%
265
�-
260
255
250
DATUM ELEV 24�+00
245.000
0+25 0+50 0+75
1+00 1+25 1+50 1+75 2+00
2+25 2+50 2+75 3+00 3+25 3+50
3+75 4+00 4+25 4+50 4+75 5+00 5+25 5+50 5+72
PROFILE AT FACE OF WALL
HORIZONTAL: 1 "=30'
VERTICAL: 1 "= 10'
290.00
280.00
270.00
260.00
250.00
24000
-0+00.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
290.00
280.00
270.00
260.00
250.00
24000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
HORIZONTAL: 1 "=30'
VERTICAL: 1"= 30'
n
0+04.99
290.a0
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
0+ 15.07
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
0+09.98
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
0+17.79
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
0+12.48
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
0+20.61
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
d
w
c
0
J
r
�O\
V
M
N
O
M
O
N
f6
0
0
C)
Lo
0
0
o
+
0
z
0
L)
U
W
U)
U7
U7
0
0_
U
J
J
>Q
0
O
M
0
Lo
0
0
o
0
U)
z
O
H
U
W
co
U)
O
U
co
oo
0
M
H
W
co
W
W
2
c
N
d
a2
0
J
Y
C6
d
C
0
M
c
o
co
O
O
0
U
g
0
a
x
6
i7
0+50.00
300.00
290.00
280.00
270.00
260.00
250.00
24000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
1 +50.00
300.00
290.00
280.00
270.00
260.00
250.00
24000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
2+52.95
300.00
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
300.00
290.00
280.00
270.00
260.00
250.00
240.00
230 00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
HORIZONTAL: 1 "=30'
VERTICAL: 1 "= 30'
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
80
0 n
OeYn
Ca�MM�wlt
P.O. IND. PARK LOT 18
CROSS SECTIONS 0+50.00 - 4+50.00
300.00
290.00
280.00
270.00
260.00
250.00
24000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
300.00
290.00
280.00
270.00
260.00
250.00
24000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
EXISTING FIRE HYDRANT TO BE MOVED
ELV=260.330
300.00
290.00
2W.00
270.00
260.00
2W.00
PROP FIRE HYD i
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00
290.00
280.00
270.00
260.00
250.00
240.00
230.00
220 00
2+55.55 EXIST WTVL
/-ELV=259.28
30.00 40.00 50.00 60.00 70.00 80.00
Offset=7.429
Source Elevation=257.820
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
1 +12.52
300.00
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
1 +64.46
300.00
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
3+00.00
300.00
290.00
280.00
270.00
260.00
2W.00
240.00
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
4+21.36
290.00
2W.00
270.00
260.00
250.00
240.00
230.00
220.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
1 +28.49
300.00
290.00
280.00
270.00
260.00
250.00
240.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
2+00.00
300.00
290.00
280.00
270.00
260.00
250.00
240.00
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
3+50.00
300.00
290.00
280.00
270.00
260.00
250.00
240.00
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
4+50.00
290.00
280.00
270.00
260.00
250.00 ----
240.00
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
c
0
0
J
O
N
M
N
N
O
M
O
O
m
co
r
r
C,
0
rn
v
Z
O
f-
U
W
U)
O
0_
U
J
J
>Q
7
O
T
3
a
ro
r
r
0
O
0)
co
Sri
rn
v
U)
Z
O
1-
U
W
v7
U)
U)
O
G:
U
co
oo
0
M
H
W
H
W
W
2
c
N
d
a2
0
Y
c6
d
a
C
0
M
00
o
co
O
0
0
U
g
0
1i
x
6
i7
290.00
280.00
270.00
260.00
250.00
240.00
230 00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
300.00
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
290.00
280.00
270.00
260.00
250.00
240.00
230 00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
HORIZONTAL: 1 "=30'
VERTICAL: 1"= 30'
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
80
0 n
OeYn
Ca�MM�wlt
P.O. IND. PARK LOT 18
CROSS SECTIONS 4+95.69 - 5+71.78
5+00.00
290.00
280.00
270.00
260.00
250.00
240.00
F-T
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
5+35.81
290.00
280.00
270.00
260.00
250.00
240.00
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
5+51.28
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
5+54.35
290.00
280.00
270.00
260.00
250.00
240.00
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
290.00
280.00
270.00
260.00
250.00
240.00
23000
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
5+63.06
290.00
280.00
270.00
260.00
250.00
240.00
230.00
-50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00
cu
roadsi
Notes
1. D
the requirements of the
permitting agency.
2. It is recommended that
the entrance be
crowned so that runoff
drains off the pad.
NOT TO SCALE
Provide full width
ofingress/egress
area
1 CONSTRUCTION ENTRANCE TYP.
NTS
1. FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL AND CUT TO THE LENGTH OF
THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL
BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6-INCH OVERLAP, AND
SECURELY FASTENED AT BOTH ENDS TO POSTS.
2. POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN SECURELY INTO THE
GROUND (MINIMUM OF 30 INCHES).
3. A TRENCH SHALL BE EXCAVATED - APPROXIMATELY 8 INCHES WIDE AND 12 INCHES DEEP
ALONG THE LINE OF POSTS AND UP SLOPE FROM THE BARRIER. THIS TRENCH SHALL BE
BACKFILLED WITH WASHED GRAVEL.
4. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE
FASTENED SECURELY TO THE UP SLOPE SIDE OF THE POSTS USING HEAVY-DUTY WIRE
STAPLES AT LEAST I INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE
TRENCH A MINIMUM OF 4 INCHES AND SHALL NOT EXTEND MORE THAN 24 INCHES ABOVE THE
ORIGINAL GROUND SURFACE.
5. THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND
20 INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT
EXTEND MORE THAN 24 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC
SHALL NOT BE STAPLED TO EXISTING TREES.
6. WHEN EXTRA -STRENGTH FILTER FABRIC AND CLOSER POST SPACING IS USED, THE WIRE MESH
SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR
WIRED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF ABOVE NOTES APPLYING.
7. FILTER FABRIC FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE AREA HAS BEEN
PERMANENTLY STABILIZED.
8. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT
LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE
IMMEDIATELY.
9. SILT FENCES WILL BE INSTALLED PARALLEL TO ANY SLOPE CONTOURS.
10. CONTRIBUTING LENGTH TO FENCE WILL NOT BE GREATER THAN 100 FEET.
11. DO NOT INSTALL BELOW AN OUTLET PIPE OR WEIR.
12. INSTALL DOWN SLOPE OF EXPOSED AREAS.
13. DO NOT DRIVE OVER OR FILL OVER SILT FENCES.
2.i SILT FENCING NOTE
NTS
2.ii
SILT F
NTS I
T_
2'
FILTER FABRIC MATERIAL IN CONTINUOUS
ROLLS USE STAPLES OR WIRE RINGS TO
ATTACH FABRIC TO WIRE
STANDARD OR BETTER
OR EQUIVALENT
CING DETAIL
2"X2" BY 14 GAUGE WIRE
OR EQUIVALENT, IF
STANDARD STRENGTH
FABRIC USED
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
FILTER FABRIC MATERIAL
PROVIDE WASHED
GRAVEL BACKFILL, 3/4" -
3" IN TRENCH AND ON
BOTH SIDES OF FILTER
FENCE FABRIC ON THE
SURFACE.
BURY BOTTOM OF FILTER
MATERIAL IN TRENCH
2.iii� SILT FENCING DETAIL II
NTS
3" THICK MULCH LAYER
P.O
12'
2'
_ IND. PARK LOT 18
DETAIL AND NOTES
MIN
WIRE MESH SUPPORT
FENCE. TO BE LOCATED
ON THE DOWNHILL SIDE
OF THE FILTER FABRIC.
GRAVEL BACKFILL MAY
BE OMITTED IF
5' INSTALLED AGAINST
NATIVE VEGETATION
SEE
RAINGARDEN
VARIES SEE CALLOUT ��' PLANTINGS
SCHEDULE
3,1
------ -----
18" ENGINEERED SOIL MIX
1. ALL BIORETENTION SYSTEMS SHALL HAVE UNCOMPACTED LEVEL BOTTOMS WITH 3:1 MAX SIDE SLOPES, UNLESS
OTHERWISE NOTED.
2. THE ENGINEERED SOIL DEPTH SHALL BE A MINIMUM THICKNESS OF 18"
3. A 3" MULCH LAYER SHALL BE PLACED OVER THE ENGINEERED SOIL.
4. ENGINEERED SOILS SHALL NOT BE COMPACTED.
5. BIORETENTION SYSTEMS SHALL HAVE THE SOILS VERIFIED BY THE ENGINEER PRIOR TO PLACEMENT OF ENGINEERED
SOILS.
6. ENGINEERED SOILS SHALL MEET ONE OF THE FOLLOWING SPECIFICATIONS:
A. ON -SITE SOIL MIX
1. REUSES NATIVE SOILS.
2. 65% ON SITE SOIL, 35% COMPOST (SEE TABLE 5A.1.0 OF KITSAP COUNTY STORMWATER MANUAL).
3. MIX SHALL BE FREE OF DEBRIS, ROCKS, GARBAGE, AND ORGANIC MATERIAL.
4. ON SITE SOILS SHALL BE LOAM, SANDY LOAM OR LOAMY SAND PER FIGURE 5-14. SOILS MAY BE AMENDED
WITH SAND TO MEET THIS SPECIFICATION.
5. MIX SHALL BE WELL BLENDED AND COVERED TO PREVENT WETTING AND SATURATION.
B. OFF -SITE SOIL MIX
1. USES IMPORTED SOILS.
2. 65 TO 70% GRAVELLY SAND PER ASTM D 422
SIEVE SIZE % PASSING
US NO 4 100
US NO 6 88-100
US NO 8 79-97
US NO 50 11-35
US NO 200 5-15
3. 30 TO 35% COMPOST (SEE TABLE 5A.1.0 OF THE KITSAP COUNTY STORMWATER MANUAL).
4. CLAY CONTENT SHALL BE LESS THAN 5%.
5. MIX SHALL BE WELL BLENDED AND COVERED TO PREVENT WETTING AND SATURATION.
6. THIS BLEND IS AVAILABLE COMMERCIALLY AS "VEGETABLE GARDEN MIX" BY CEDAR GROVE COMPOSTING.
7. BIORETENTION SYSTEM SETBACK FROM PROPERTY LINES IS 5', FROM ONSITE SEPTIC SYSTEMS, 10', WHEN DOWN
GRADIENT.
8. DO NOT CONSTRUCT UNTIL SITE IS STABILIZED.
9. SOIL COMPACTION CAN LEAD TO FACILITY FAILURE; ACCORDINGLY, MINIMIZING COMPACTION OF THE BASE AND
SIDEWALLS OF THE BIORETENTION AREA IS CRITICAL. EXCAVATION SHOULD NOT BE ALLOWED DURING WET OR
SATURATED CONDITIONS. EXCAVATION SHOULD BE PERFORMED BY MACHINERY OPERATING ADJACENT TO THE
BIORETENTION FACILITY AND NO HEAVY EQUIPMENT WITH NARROW TRACKS, NARROW TIRES, OR LARGE LUGGED,
HIGH PRESSURE TIRES SHOULD BE ALLOWED ON THE BOTTOM OF THE BIORETENTION FACILITY. IF MACHINERY MUST
OPERATE IN THE BIORETENTION CELL FOR EXCAVATION, USE LIGHT WEIGHT, LOW GROUND -CONTACT PRESSURE
EQUIPMENT.
3 � BIOSWALE, TYP.
NTS
channel
Plan
place rock 1' above crown
both sides of chanel for "A" < 8'
one side of channel for "A" > 8'
1' min.
T I --v
discharge pipe
filter fabric liner 1' or 2' rock thickness
under rock see Table 4.5
Section A -A
I Required Dimensions
8' for rock lining
+ "B"
12' for rip rap
e Table "Rock Protection
at Outfalls"
4 � PIPE/CULVERT OUTFALL DISCHARGE PROTECTION
NTS
NOT TO SCALE
/--- BUILDING STRUCTURE
5 � DOWNSPOUT DETAIL AT BIORETENTION AREA
NTS
CONCRETE SLAB
MN PIPE
1 TYPICAL ASPHALT PAVING SECTION
NTS
STANDARD GRATE
UNLESS OTHERWIr
SPECIFIED
NOTES:
1. FOR USE WITH PIPES AND CULVERTS
UP TO 15" IN DIAMETER.
2. CONNECTION ONLY ALLOWED
THROUGH KNOCKOUTS AS PROVIDED
ON ALL FOUR SIDES.
3. MAX DISTANCE FROM RIM TO INVERT
SHALL BE 5'.
4. EXTENSION UNITS AVAILABLE TO
ADJUST OVERALL CATCH BASIN
HEIGHT.
5. SEE WSDOT STANDARD PLAN B-5.20-02.
2 TYPE 1 CATCH BASIN, TYP
NTS
�o1;ALwAcEs QEowLwAcEs
T__
O
20
21
2" COMPACTED DEPTH 1/2" PG 58-22
HOT MIX ASPHALT PER WSDOT
STANDARD SPECIFICATION 5-04 AND
09-03.8
2" MIN. COMPACTED DEPTH CSTC
PER WSDOT STANDARD
SPECIFICATION 9-03.9
6" MIN. COMPACTED BASE OVER
SUITABLE SUBGRADE PER WSDOT
STANDARD 2-06
42"
1. Bolt -down capability Is required on all frames, grates, and covers, unless
specified otherwise in the Contract. Provide 2 holes in the frame that are
vertically aligned with the grate or cover slots. The frame shall accept the
304 Stainless Steel (S.S.) 5/8" (in) - 11 INC . 2" (in) alien head cap screw,
bybeing tapped, or other approved mechanism. Location of bolt -down
holes varies d manufacturerer
SLOT - SEE DETAIL
AND NOTE 1
- --- --------
R. Refer to Standard Specification Section 8-05.15, and 8-05.15(Z)
for additional requirements.
_-_-_ _ ___
i. For frame details, see Standard Plan B-30.10.
_-_-_ _
) RECESSED ALLEN
HEAD CAP SCREW
Q
1 309 s s. "a" (IN) - 11
----_ -
' I Nc x 2" (IN)
1 GRATE
SECTION O
I FRAME
I
I
_
HOLE
BOLT -DOWN DETAILS
SEE NOTE 1
4 1 RECTANGULAR BI-DIRECTIONAL VANED GRATE, TYP.
NTS
A 0J
1r�'♦ ��oiei's0°014`ro
xet. e�
rNECTANIGULAN
VANIEQ GIVATEL
OTANW1AR0 PLAN &W.411111i
MEET 1 OF 18HEET
APPROVE" FOR PIJaLICAT10N
MONUMENT REMOVAL PERMIT PROCESS 0
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
I
Q Q Z
275
bD
04
P.O. IND. PARK LOT 18
DETAIL AND NOTES
HANDHOL
48"
12" TYP
�o
I
I
I
i
I
I
I
I
24" MIN 1" MIN
"
2.5 MA.
4 `
�6+SEPARATE BASE
X
CX
R
12" MAX ZZ
12"
6'
CATCH BASIN FRAME
AND VANED GRATE OR
RING AND COVER
RECTANGULAR
ADJUSTMENT SECTION
OR CIRCULAR
ADJUSTMENT SECTION
FLAT SLAB TOP
MORTAR (TYP.)
EINFORCING STEEL
CAST IN PLACE INTEGRAL BASE
GRAVEL BACKFILL FOR X PRECAST WITH "O" RINGRISER f
12"
PIPE ZONE BEDDING CX
GRAVEL BACKFILL FOR X
PIPE ZONE BEDDING CX SEPARATE BASE
PRECAST
CATCH BASIN DIMENSIONS
CATCH
MAXIMUM
MINIMUM
BASE REINFORCING STEEL
BASIN
WALL
BASE
KNOCKOUT
DISTANCE
IN2/FT IN EACH DIRECTION
DIAMETER
THICKNESS
THICKNESS
SIZE
BETWEEN
KNOCKOUTS
INTEGRAL
SEPARATE
48"
4"
6"
36"
8"
0.23
0.15
NOTES:
1. NO STEPS ARE REQUIRED WHEN HEIGHT IS 4' OR LESS.
2. THE BOTTOM OF THE PRECAST CATCH BASIN MAY BE SLOPED TO FACILITATE CLEANING.
3. FRAME AND GRATE MAY BE INSTALLED WITH FLANGE DOWN OR CAST INTO ADJUSTMENT
SECTION.
4. KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2" MINIMUM TO 2.5" MAXIMUM. PROVIDE A 1.51,
MINIMUM GAP BETWEEN THE KNOCKOUT WALL AND THE OUTSIDE OF THE PIPE. AFTER THE
PIPE IS INSTALLED, FILL THE GAP WITH JOINT MORTAR IN ACCORDANCE WITH STD. SPEC. 9-04.3.
5 TYPE 2 CATCH BASIN, TYP
NTS
6 BEEHIVE GRATE DETAIL
NTS
Grate Lockd
FGF
FRAME/GRATE
SUSPENDED
1/4-20 INSTALL BAR
NUTS ` ALL THREAD
GRATE LOCK)
DOWN BAR Z886
TRENCH
ZURN.
Z886-FGF SPECIFICATION SHEET
5.50 [140] WIDE REVEALTRENCH DRAIN SYSTEM WITH
DUCTILE IRON FRAME AND SLOTTED GRATE TAG
Dimensional Data (inches and [ mm ]) are Subject to Manufacturing Tolerances and Change Without Notice
SPECIFYING ENGINEER IS RESPONSIBLE FOR
CONCRETE ENCASEMENT AND REINFORCING ® a=
BASED UPON APPLICATION AND LOCAL CODES
64 [159]
4 [102] MIN. 51 [140] 814 [2064]
4 [102] 80 [2032]
:INVERT
216 [53] Ain4:
14 [32] 4 [ 102] NOTE: + Actual Channel length is 81 1/4 [2064] to allow for overlap.
MIN.
ENGINEERING SPECIFICATION: Zurn Z886-FGF Channels shall be 80 [2032] long, 5.50 [140] wide reveal and have a 4 [102] throat. Modular channel
sections shall be made of 0%water absorbent High Density Polyethylene (HDPE). Shall have a positive mechanical connection between channel sections
that will not separate during the installation and shall mechanically lock into the concrete surround a minimum of every 10 [254]. Channels shall weigh
less than 2.31 Ibs.[1.05kg] per linear foot, have a smooth, 1.5 [38] radiused self cleaning bottom with a Manning's coefficient of 0.009 and 0.75% or
neutral 0% built in slope. Channels shall have rebar clips standard to secure trench in its final location. Shall be provided with standard FGF grates
that lock into the concrete surround during installation and is intended for dynamic traffic loadings. Zurn 5.5 [140] wide reveal Class F Grate and Frame
Ductile Iron slotted grate conforming to ASTM specification A536-84, Grade 80-55-06. The ductile iron grate is rated class F per the DIN EN1433 top
load classifications. Supplied in 20 [508] nominal lengths with 0.5 [13] wide slots, and 2.8 [71] bearing depth. Grate has an open area of 21.00 sq. in
per ft. [44,450 sq. Trim per meter].
PREFIX OPTIONS (Check/specify appropriate options)
Z Six-foot, Eight -inch High Density Polyethylene (HDPE)*
SUFFIX OPTIONS (Check/specify appropriate options)
Outlet Adapters Add/Each
-E1 Closed End Ca -U2 2 51 No -Hub Bottom Outlet
- P - [ 1
_ -E2 2 [51] No -Hub End Outlet _ -U3 3 [76] No -Hub Bottom Outlet
_ -E3 3 [76] No -Hub End Outlet _ -U4 4 [102] No -Hub Bottom Outlet
E4 4 [102] No -Hub End Outlet _ -U6 6 [152] No -Hub Bottom Outlet
-E6 6 [152] No -Hub End Outlet
Frame Options
SW Sidewall Extensions -High
-SW2 Sidewall Extensions - 18" [457] High
Grate Options (Load Classifications are per DIN EN1433)
ADD FOR _ -GFG Galvanized Ductile Iron Frame and Slotted Grate - Class F
STALL BAR
Miscellaneous Options
-JC Joint Connector
MADE in the U.S.A. (Load Classifications are per DIN EN1433)
-FGF-USA Ductile Iron Frame and Slotted Grate - Class F
,° ' ALL -THREAD
LENGTH 48"
C
ENGINEERING SPECIFICATION: Zurn Z886-FGF
Class F Ductile Iron Grate. Ductile Iron conforms to ASTM specification A536-84, Grade 80-55-06. Grate is designed to
withstand class F900 Loading per the DIN 19580 specification.
7 TRENCH DRAIN DETAIL
NTS
-GFG-USA Galvanized Ductile Iron Frame and
Slotted Grate - Class F
Trench
No.
'A'
Shallow Inv.
'B'
Deep Inv.
Flow
(cfs)
(gpm)
(Ips)
8601
5.59
[142]
6.19
[157]
0.21
93
6
8602
6.19
[157]
6.79
[172]
0.27
122
8
8603
6.79
[172]
7.39
[188]
0.34
152
10
8603N
7.39
188
7.39
188
-
-
-
8604
7.39
[188]
7.99
[203]
0.41
183
12
8605
7.99
[203]
8.59
[218]
0.48
214
13
8606
8.59
[218]
1 9.19
[233]
0.55
245
1 15
8606N
9.19
[233]
9.19
[233]
-
-
-
8607
9.19
[233]
9.79
[249]
0.62
276
17
8608
9.79
[249]
10.39
[264]
0.69
308
19
8609
10.39
[264]
10.99
[279]
0.76
339
2t
8610
10.99
[279]
11.59
[294]
0.83
371
23
8611
11.59
[294]
12.19
[310]
1 0.90
403
25
8612
12.19
[310]
12.79
[325]
0.97
435
27
8612N
12.79
[325]
12.79
[325]
8613
12.79
[325]
13.39
[340]
1.04
467
29
8614
13.39
[340]
13.99
[355]
1.11
498
31
8615
13.99
[355]
14.59
[471]
1.18
530
33
'REGULARLY FURNISHED UNLESS OTHERWISE SPECIFIED
REV. C DATE: 8/24/10 C.N. NO. 111590
DWG. NO. 82534 PRODUCT NO. Z886-FGF
ZURN INDUSTRIES, LLC ♦ SPECIFICATION DRAINAGE OPERATION ♦ 1801 Pittsburgh Ave. ♦ Erie, PA 16514
Phone: 814W55-0921 ♦ Fax: 814\454-7929 ♦ World Wide Web: www.zurn.com
In Canada: ZURN INDUSTRIES LIMITED ♦ 3544 Nashua Drive ♦ Mississauga, Ontario L4V1L2 ♦ Phone: 905\405-8272 Fax: 905\405-1292
8 TRENCH DRAIN -Z886-FGF SPECIFICATION SHEET
NTS
SYMMETRICAL
ABOUT CENTER LINE OF
WATER MAIN
10' MINIMUM
WATER LINE
UTILITY SEPARATION SECTION C1-2
REQUIRED SEPARATION BETWEEN WATER LINES AND SANITARY SEWERS
PARALLEL CONSTRUCTION
SYMMETRICAL
ABOUT CENTER LINE OF
WATER MAIN
UTILITY SEPARATION SECTION C1-3
REQUIRED SEPARATION BETWEEN WATER LINES AND SANITARY SEWERS
UNUSUAL CONDITIONS PARALLEL CONSTRUCTION
m
m
SANITARY SEWER PIPE
IF�r1 Est. 1890
RESTORATION, TAPS, AND BLOCKING A
DRAWN BY
IDS
_q
ORCHARDSEPARATION
STANDARDS
DATE
SCALE
113012019
NTs
DRAWING NUMBER
800-B
1 1 WATER AND SEWER SEPERATION
/ NTS
PLANE EX. ROADWAY AS
NECESSARY, OVERLAY TO MAINTAIN
EX. FREEBOARD AT CURBS.
2" GRIND AND OVERLAY
SAW CUT (TYP) EXTENTS PER STANDARDS
TOP WIDTH OF
EX. A.C. PAVEMENT TRENCH = D + 36"
SURFACE
12" 12"
z
Z. g
o SEE CHAPTER 6 FOR APPROPRIATE
in PAVEMENT SECTION
WARNING TAPE PER SPECIFICATIONS
N
TRENCH BACKFILL MATERIAL,
COMPACT TO 95%
F6" MIN
PVC SEWER PIPE II
PIPE BEDDING MATERIAL O.D.+24" 0 NDATION STABILIZATION
COMPACT TO 95 % (36" MIN.) MATERIAL (AS REQUIRED)
NOTES:
1) BED THE ENTIRE WIDTH OF THE TRENCH PAVEMENT
2) RESTORATION SHALL BE PER THE APPROPRIATE SECTION IN CHAPTER 6 (PAVEMENT SURFACING).
O' L Est. 1890
'jJWT
ORCHARD
TRENCHES AND PIPE CONNECTIONS A
SEWER TRENCH DETAILS
DRAWN BY
DATE
SCALE
IDS
1/23/2019
Nrs
DRAWING NUMBER
900
2 SEWER TRENCH DETAILS
l NTS
MONUMENT REMOVAL PERMIT PROCESS
NO SURVEY MONUMENT SHALL BE REMOVED OR DESTROYED (THE PHYSICAL DISTURBANCE OR
COVERING OF A MONUMENT SUCH THAT THE SURVEY POINT IS NO LONGER VISIBLE OR READILY
ACCESSIBLE) BEFORE A PERMIT IS OBTAINED FROM THE DEPARTMENT OF NATURAL RESOURCES
(DNR), WAC 332-120-030(2) STATES "IT IS THE RESPONSIBILITY OF THOSE PERFORMING
CONSTRUCTION WORK OR OTHER ACTIVITY (INCLUDING ROAD AND STREET RESURFACING
PROJECTS) TO ADEQUATELY SEARCH THE RECORDS AND THE PHYSICAL AREA OF THE PROPOSED
CONSTRUCTION WORK OR OTHER ACTIVITY FOR THE PURPOSE OF LOCATING AND REFERENCING
ANY KNOWN OR EXISTING SURVEY MONUMENTS." CONSTRUCTION SHALL NOT COMMENCE UNTIL
WAC OUTLINED IN CHAPTER 332-120 IS COMPLIED WITH.
P.O. IND. PARK LOT 18
DETAIL AND NOTES
PLANE EX. ROADWAY AS N
OVERLAY TO MAINTAIN EX. f
AT(
2" GRIND AND OVER�AY
EXTENTS PPR STANf1A n.q
SAW CUT
EX. A.C. PAVEN
SURF
SEE ROADWAY STANDARDS FOR
APPROPRIATE PAVEMENT SECTION
-WARNING TAPE PER SPECIFICATIONS
TRENCH BACKFILL MATERIAL,
COMPACT TO 95% IN 6" LIFTS
MIN
F
CL52 DI WATER LIN ZRI
APPROVED EQUAL
PIPE BEDDING MATE AL O.D.+24" OUNDATION STABILIZATION
COMPACT TO 95% (36" MIN.) MATERIAL (AS REQUIRED)
NOTES:
1) BED THE ENTIRE WIDTH OF THE TRENCH PAVEMENT
2) RESTORATION SHALL BE PER THE APPROPRIATE SECTION IN CHAPTER 6 (PAVEMENT SURFACING).
3) INSTALL TRACER WIRE PER SPECIFICATIONS
O�j�,. Est. 1890 RESTORATION, TAPS, AND BLOCKING B DRAWN BY IDS
O-��/ DATE 1/31/2019
ORCHARD WATER MAIN TRENCH SCALE NTs
DRAWING NUMBER 801
3 WATER MIAN TRENCH
/ NTS
GRAVITY SEWER
6" TWO-WAY CLEANOUT
ASSEMBLY
6"x4" ECCENTRIC REDUCER
4" SEWER LATERAL
SERVICE
6' SERVICE CONNECTION PIPE,
CONNECTION
SLOPE AT 1/4" PER FT. (MIN.)
WYE FITTING
PLAN
PROPERTY LINE
6' GLUE -ON -SCREW -ON CAP
FIBERGLASS VALVE
EXTEND THE LATERAL
BOX AND COVER,
BEYOND THE PROPERTY
CARSON INDUSTRIES
LINE AND UTILITIES.
OR APPROVED EQUAL
— N
w E
J
Q
3 F
�j ?
W
® �
o
6" RISER PIPE
FIRST PIPE
e
LENGTH
ro z
3'-0" (MAX.)
2E16"
TWO-WAY CLEANOUT
GRAVITY
TO BUILDING
SEWER
6'x4" ECCENTRIC REDUCER
6" SERVICE
CONNECTION PIPE
PIPE BEDDING MATERIAL
AS SPECIFIED
SECTION
INSTALL LOCATOR WIRE ON ALL
LATERALS TO THE SEWER MAIN
NOTE:
CONNECT ALL SERVICE
CONNECTIONS 8" AND LARGER
AT MANHOLE.
DETAILS TO BE APPROVED BY CITY ENGINEER.
�O ' L Est. 1890
'}JWr
ORCHARDSINGLE
LATERALS AND SERVICE CONNECTIONS B
SERVICE CONNECTION
DRAWN BY
DATE
SCALE
IDS
1/31/2019
NTs
DRAWING NUMBER
941
4 1 SEWER SINGLE SERVICE CONNECTION, TYP.
l NTS
QI Inln rLANGE OR
ER PIPE SIZE
CROSS
TIE BACK
SEE STANDARD
DRAWING 1103-B
CAPPED CROSS
TEE
ND FLANGE
900 BEND
TEE
11 1/40 BEND 22 1/20 BEND 450 BEND
I I 3 X PIPE DIA. MIN TABLE A - THRUST BLOCK
CONCRETE BLOCK
SYMMETRICAL TOP
& BOTTOM
_BLOCK SHALL BE
PLASTIC BARRIER AGAINST
UNDISTURBED EARTH
TYPICAL CROSS-SECTION
Plug
PIPE
SIZE
Q
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT.
4"
rn
2
2
1
1
6"
4
2
1
8"
11
6
rn
2
12"
22
16
12
3
16"
38
27
1 21
1 10
1 6
18"
48
34
1 26
1 14
1 7
24"
84
59
1 45
23
13
MIN. BEARING AREA AGAINST UNDISTURBED SOIL
SEE DRAWING 1103-B FOR ADDITIONAL NOTES
� D I ' Est. 1890
0RCH
= BARD
RESTORATION, TAPS, AND BLOCKING
THRUST BLOCKING AND TIE BACKS
DRAWN BY
DATE
SCALE
IDS
1/15/2019
NTs
DRAWING NUMBER
803-A
5 � THRUST BLOCKING AND TIE BACKS, TYP
l NTS
PROPERTY
LINE
I
OUBLE CHECK BACKFLOW PREVENTER
MEETING AWWA CROSS -CONNECTION
STANDARDS
:POSE
Est. 1890 SERVICES G IDRAWN BY IIDS
DATE 1/23/2019
ORCHARD DOUBLE CHECK BACKFLOW ASSEMBLY SCALE NTS
(IN BASEMENT)
DRAWING NUMBER 866
6 BACKFLOW ASSEMBLY (IN BASEMENT) TYP.
NTS
w
z
}J
F
w
w
O T MIN.
O_
a
�.ir1�111►C
CABLE
TIES
LANDSCAPE FABRIC
1/2 CU. YD. MIN. WASHED J t
GRAVEL PASSED 1-1/2" &
RETAINED ON 1/4" MESH FOR
DRAIN
16" x 8" x 4"MIN
CONCRETE BLOCK
2-3/4" HOT DIPPED GALV. SHACKLE -
RODS CONNECT USING DUC LUGS
OR 90 DEGREE I -BOLT (CORTEN
STEEL). TIE BACK BLOCK PER
STANDARD 1103A/B IS REQUIRED
FOR PIPE RUNS GREATER THAN 18'.
PUMPER CONNECTION 5" QUICK
CONNECT STORZ COUPLING FOR NST
2-1/2" NST HOSE CONNECTION REMOVED
CHAINS FROM 2-1/2" CAPS
Z Q TWO PIECE CAST IRON
g g VALVE BOX & DEEP LID
a0 00
N
ALUMINUM ANGLE 3/4"
X 1/20 " X 2'
—LOCATOR WIRE -GAUGE #14
COLOR OF INSULATION -BLUE
6" GATE VALVE " T'
(FLxMJ)
6" DIP, CLASS 52 WITH MEGA
LUGS, LENGTH NOT TO
EXCEED 50' FROM VALVE.
FOR NEW WATER MAIN
LOCATE WIRE SHALL BE
CONTINUOUS THROUGH
THE HYDRANT AND FOR
EXISTING WATER MAIN,
SPLICE LOCATOR WIRE TO
WIRE ALONG MAIN USING
3M SPLICE KIT
CONCRETE -BLOCKING, SEE
STANDARD DETAIL 1103
DUCTILE IRON TEE WITH 6"
FLANGE ON SIDE
1. MAIN VALVE OPENING SHALL BE 5-1/4" IN DIAMETER EQUAL TO M&H 929. 6" MECHANICAL JOINT INLET.
1-1/2" PENTAGON OPERATING NUT. THE CITY WILL PAINT THE HYDRANT.
2. LOCATOR WIRE TO BE PROTECTED WITH ANGLE ALUMINUM (3/4" X 1/20" X 2' LONG) STRAP TO THE
HYDRANT BURY WITH CABLE TIES (36" LENGTH, 175 LB TENSILE, COLOR BLACK, MANUFACTURED BY 3M).
LOCATION SHALL BE BELOW THE LOWER FLANGE OF THE HYDRANT BELOW THE PUMPER PORT. LOCATE
WIRE SHALL HAVE 6" SLACK FOR CONNECTING TO LOCATING DEVICE.
3. IF THE PIPE BETWEEN THE VALVE AND THE HYDRANT IS MORE ONE FULL STICK OF DUCTILE IRON PIPE,
THEN A TIE BACK THRUST SHALL BE INSTALLED AND FIELD-LOK GASKETS AND MEGA LUGS SHALL BE
USED.
Est. 1890
OW
SYSTEM APPURTENANCES B
DRAWN BY
ORCHARDFIRE
HYDRANT ASSEMBLY
DATE
SCALE
1/23/2019
NTS
DRAWING NUMBER
881
7 \ FIRE HYDRANT ASSEMBLY. TYP
NTS
w
z
6" MINIMUM TO ALLOW
FOR TOUCH READ
ROADWAY
d
O
CURB
FINISHED GRADE
O
FINISH GRADE 24" MIN. COVER
PROPERTY LINE
36" MIN.
COVER (TYP)
3 \
\
1 _1
2 WARNING WIRE AND LOCAIOR
NOTES: TAPE ARE REQUIRED
FOR ALL
SERVICES AND MAINS
1. EXISTING WATER MAIN
2. 1" (IP THREAD) SINGLE STRAP SADDLE ROMAC STYLE 101S OR APPROVED EQUAL
3. 1" BRASS NIPPLE, 3" LONG
4. CORP. STOP, FORD FB1100 OR APPROVED EQUAL
5. 1" POLYETHYLENE PIPE, MAINTAIN 36" COVER FROM WATER MAIN TO WITHIN 48" OF METER BOX
6. 1" METER SETTER MUELLER 1434 OR APPROVED EQUAL HORIZONTAL IN, HORIZONTAL OUT.
M.I.P. THREAD ENDS.
7. SCHEDULE 40 1" PVC THREADED PLUG. REMOVED WHEN CONNECTION MADE TO CUSTOMER
LINE
8. BRASS CURB STOP, FORD B41-444-NL OR EQUAL.
9. WATER METER - TO BE SUPPLIED BY THE CITY
10.METER BOX SHALL BE SIGMA RAVEN HDPE METER BOX MODEL 1324-SW. PROVIDE HDPE LID
WITH TOUCH READ AND METER READER LID. PLACE BACK OF METER BOX FLUSH
WITH
PROPERTY LINE.III
Est. 1890
,O'
SERVICES A
DRAWN BY
IDS
W
ORCHARD5/8,
3/4, OR 1-INCH WATER SERVICE
DATE
SCALE
1/22/2019
NTs
DRAWING NUMBER
860
WATER SERVICE CONNECTION, TYP.