Loading...
094-23 - Resolution - Amendment with County Line Construction for Crawford Road AbatementDocuSign Envelope ID: AEA884C6-62F7-4F89-BE9B-014A61A8788F RESOLUTION NO. 094-23 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON, APPROVING AN AMENDMENT TO THE SMALL WORKS CONTRACT WITH COUNTY LINE CONSTRUCTION, LLC, FOR THE 2023 CITY OF PORT ORCHARD CRAWFORD ROAD ABATEMENT. WHEREAS, the City of Port Orchard commenced a code enforcement action pertaining to violations of the Port Orchard Municipal Code ("POMC") occurring on real property located at SE Crawford Rd, which is a private road, and real properties located at 1691 SE Crawford Rd, and 1743 SE Crawford Rd, with the code enforcement matter referred to by staff as the Crawford Road Abatement, Public Works Project No. CE17-0049 (the "Project"); and WHEREAS, on June 27, 2023, the City Council adopted Resolution No. 064-23, approving Contract No. CE17-0049 with Countyline Construction, LLC ("Contractor") for the Project, following the Contractor's selection consistent with the City's procurement policies and existing state law; and WHEREAS, the contract authorized the Project for a total not to exceed amount of $76,510.57, of which $43,317.45 was for the abatement of nuisance conditions and associated demolition of structures at 1691 Crawford Road SE (the "Property"); and WHEREAS, on August 3, 2023, the City's Department of Community Development discovered that illegal activities had occurred on the Property, creating additional hazardous conditions on the Property; and WHEREAS, the City's Department of Community Development authorized a change order in the amount of $11,318.56, to authorize the Contractor to clean-up and remediation said hazardous conditions to ensure the safety of the public, Contractor, and staff; and WHEREAS, the City's Procurement Policies, adopted at Resolution No. 036-22, as amended, cap delegated change order authority at 10% of the total contract amount, however the event of an emergency or the need to take immediate or expeditious action necessary to protect or maintain the public health, safety, or welfare, or to prevent damage to public or private property, and with approval of the Mayor, Department Directors are authorized to enact Change Orders in excess of the legally authorized expenditure level, provided they shall timely report such actions to the City Council; and WHEREAS, the City Council finds that the change order and the additional remediation work at the Property was necessary for the complete abatement project and warranted to ensure the safety of the public, Contractor, and staff; now, therefore, DocuSign Envelope ID: AEA884C6-62F7-4F89-BE9B-014A61A8788F Resolution No. 094-23 Page 2 of 2 THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: THAT: It is the intent of the Port Orchard City Council that the recitals set forth above are hereby adopted and incorporated as findings in support of this Resolution. THAT: The City Council ratifies the Mayor's execution of an amendment to Contract No. CE17-0049 attached hereto as Exhibit A, with County Line Construction, LLC for $11,318.56, increasing the total amount to $87,829.13. That: The City Council finds that an emergency condition existed that warranted the execution of this change order, consistent with the City's Procurement Policies at Section 7.0, and ratifies a limited waiver of the City's Procurement Policies and all actions taken consistent with this finding. THAT: The Resolution shall take full force and effect upon passage and signatures hereon. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the City Clerk in authentication of such passage on this 26t" day of September 2023. DocuSigned by: ------E81:58AZn Robert Putaansuu, Mayor ATTEST: DocuSigned by: 6VAJAJ� 0M Ut, Brandy Wallace, MMC, City Clerk DocuSign Envelope ID: AEA884C6-62F7-4F89-BE9B-014A61A8788F CITY OF PORT ORCHARD Authorization for Change Order No. 1 Date: 08-15-2023 Contractor: County Line Construction Project: Crawford Road Abatement Contract / Job # C052-23 14085 Kimber Place SE Olalla, WA 98359 THIS CHANGE ORDER AUTHORIZES THE FOLLOWING CHANGES TO THE CONTRACT: 1. Install parameter fence around 1691 SE Crawford Road (City Request) 2. Time and materials for 1691 SE Crawford not anticipated due to illegal work done by property owner. a. Stoppage of work (hrs.) due to damaged gas line requiring inspection by outside agency (Cascade Natural Gas). b. Separating of debris materials due to unpermitted destruction of building without prior removal of contents Original Contract for 1691 SE Crawford Rd $39,747.00 $3,696.47 $43,443.47 Fence Installation (time and materials) $7,488.00 $696.38 $8,184.38 Down time and materials due to illegal work done by property owner $2,896.00 $269.33 $3,165.33 Total Contract for 1691 SE Crawford Rd $50,131.00 $4,662.18 $54,793.18 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. F�^ (rDocuS�iQg.,ned by: I 1 1/r7a Contractor Approval Signature Director of Community Development Marcus Hooper, Owner County Line Construction LLC. Printed Name & Title Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract amount established by City Council can be approved by the Public Works Director. Nicholas Bond Printed Name Change Orders that do not exceed 10%, with a maximum of DocuSign Envelope ID: AEA884C6-62F7-4F89-BE9B-014A61A8788F DocuSigned by �� P llu 1. SWA, Approved: �O.oRpORgr -{: o. Ma or DocuSignedb/y:''11 IV. 'SEAL, = Attest: •.(P �q, it q A M&E k A� City Clerk September 26,2023 Council Approval Date