083-22 - SCJ Alliance Consulting Services - Contract Amendment 2DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 CITY OF PORT ORCHARD Authorization for Amendment No. 2 Date: September 26, 2023 Project: Bethel Phase 1- Street Contractor: Shea Carr & Jewel. Inc dba SCJ Alliance 8730 Tallon Ln NE, Ste200 Improvement Project Lacey, WA 98516 Contract / Job # C083-22 THIS AMENDMENT AUTHORIZES THE FOLLOWING CHANGES TO THE AGREEMENT: A contract increase in the amount of $96,230.93, to incorporate 60% design of the area east of the intersection of Salmonberry Rd and Bethel Rd as described (see attached). C083-22, Section 2 Compensation is amended to read as follows: TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed $720,523.38 without written authorization and will be based on the list of billing rates and reimbursable expenses attached hereto as Exhibit "B." In all other respects the Underlying agreement between the parties shall remain in full force and effect, amended as set forth herein, but only as set forth herein. Contract History Amount Sales Tax Total Date Appvd b Original Contract $624,292.45 $0.00 $624,292.45 09-Au -22 Council Amendment 1 $0.00 $0.00 $0.00 10-Feb-23 PW Director Amendment 2 $96,230.93 $0.00 $96,230.93 26-Sep-23 Interim PW Total Contract $720,523.38 $0.00 $720,523.38 have reviewed the Amendment information above and certify that to the best of my knowledge descriptions and c s are true and accura ' Z Consultant Approval Signature Pub c Works Director Scott Sawyer, Principal Jacki Brown Printed Name & Title Public Works Contracts Greater than $3S,000: Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract amount established by City Council can be approved by the Public Works Director. Total Contract Amount shall reset to reflect new Council -approved contract totals authorized prior to the requested change order. $50,000-$100,000 require Mayoral Approval. $100,000 and over require Council Approval. Public Works Contracts under $35,000, change orders that individually do not exceed $7,500 with an aggregate cap of $10,000. Public Works Contracts unbudgeted and under $7,500: All Change Orders that do not exceed an aggregate cap of $7,500 (Excluding underlying value), provided there are departmental funds available in the budget. All Departments: Mayor approves any and all Change orders that do not exceed 10% of either authorized budget limit or contract amount established by City Council. With a maximum aggregate amount of $100,000. Total Contract Amount shall reset to reflect new Council -approved contract totals authorized prior to the requested change order. Any individual Change order that is over $100,000 requires Council approval. Printed Name DocuSigned by: Approved: Er6b �USI DocuSignecmpr Attest: F6VAJAJ" 0JdLVL City Clerk 9/26/2023 Council Approval Date Page 1 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 Amendment No. 2 to Contract No. 083-22 CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT WITH Shea Carr & Jewell, Inc. dba SC./ Alliance THIS AMENDMENT No. 2 to Contract No. 083-22 ("Amendment") is entered into between the City of Port Orchard, a Washington municipal corporation ("City" or "Port Orchard") and Shea Car & Jewell, Inc. dba SCJ Alliance, a Washington corporation ("Consultant"). City and Consultant are each a "Party" and together "Parties" to this Amendment. RECITALS: WHEREAS, on the August 9, 2022, the City executed a Professional Services Agreement for Bethel Phase 1-Street Improvement Project with the Consultant ("Underlying Agreement"); and WHEREAS, on February 10, 2023, Amendment No. 1 was approved, extending the Underlying Agreement's termination date to March 31, 2024; and WHEREAS, continuing services for the Bethel Phase 1-Street Improvement Project are required by the City that will exceed the current value of the Underlying Agreement; and WHEREAS, the Consultant and the City have conferred and agreed to increase the "Time and Materials Not to Exceed" amount, Section 2 (Compensation), of the agreement from $624,292.45 to $720,523.38 in anticipation of the additional work; and WHEREAS, the parties wish to memorialize their agreement and so modify the Underlying Agreement; NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by and between the parties thereto as follows: FOURTH AMENDMENT TO AGREEMENT: 1. Amendment. a. Section 2 Compensation of the Agreement is hereby amended to read as follows: TIME AND MATERIALS NOT TO EXCEED. Compensation for these services shall not exceed $720,523.38, inclusive of all amounts paid prior to the execution of Amendment No. 2 to this Agreement, without written authorization and will be based on the list of billing rates and reimbursable expenses attached hereto as Exhibit B. 2. Severability. The provisions of this Amendment are declared to be severable. If any provision of this Amendment is, for any reason, held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other provision. Amendment No. 2 to Agreement between City of Port Orchard and Shea Car & Jewell, Inc. dba SO Alliance Contract No. C083-22 Updated 4/2022 IBDR Page 2 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 3. Entire Agreement. The written provisions and terms of this Amendment shall supersede all prior verbal statements of any officer or other representative of the parties, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner whatsoever, this Amendment. The entire agreement between the Parties with respect to the subject matter hereunder is contained in the Agreement and exhibits thereto, any prior executed amendments and this Amendment. Should any language in any of the Exhibits to the Agreement or prior amendments conflict with any language contained in this Amendment, then this Amendment shall prevail. Except as modified by this Amendment, all other provisions of the original Agreement and any amendments thereto not inconsistent with this Amendment shall remain in full force and effect. 4. Effective date. This Amendment shall be effective as of September 26, 2023. DATED this 26th day of September, 2023. CI �k RaTb,)RCHARD, WASHINGTON jQb� �ln1GlA,bt,SIA.U. '? R QrAQ 9 F'jF5Rd7n Robert Putaansuu, Mayor AT %TJ,AAWTAgNTICATED: bvaln o� UJAU U- Brandy Wallace, MMC, City Clerk A /&3b&D ASYTO FORM: 9CF9AD01C15A437.. Charlotte A. Archer, City Attorney CO ULTANT Signature Scott Sawyer, Principal Printed Name and Title \ TORT i `�OG�R4 O R 9'.•��`''.�' �G•2 0. SEAL 0 FtiYAt';��``��• Amendment No. 2 to Agreement between City of Port Orchard and Shea Car & Jewell, Inc. dba SCJ Alliance Contract No. C083-22 Updated 4/2022 IBDR Page 3 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 SCJ ALLIANCE CONSULTING SERVICES Exhibit A — Amendment 2 Scope of Work Bethel Road Port Orchard, WA Prepared For: Chris Hammer, PE, Assistant City Engineer Prepared By: Patrick Holm, PE, Project Manager Date Prepared: March 28, 2023 Overview Development is planned east of the intersection of Salmonberry Road and Bethel Road. The City is putting together a development agreement to plan for the design and construction of the frontage improvements needed for these developments. This amendment incorporates the 60% design of this area into the contract. The work will consist of the following Tasks: ♦ Task 11— Roadway Design ♦ Task 20 —Topographic Survey and Right of Way Mapping - (Parametrix) ♦ Task 21— Stormwater Design - (Parametrix) ♦ Task 22 — Utility and Illumination Design and Coordination - (Paramterix) Task 11 — Roadway Design 11.1 Data Collection 1) Data Collection: Collect available CITY as -built plans. 2) Photographs: Walk the site and provide photo documentation. 11.2 Roadway Layout 1) Horizontal Layout: ♦ Define alignment data (bearing and curve data) for the centerline and define alignment data (station/offset and curve data) for medians, curbs, and edges of pavement. ♦ Develop typical sections for Salmonberry Road. 2) Vertical Layout: ♦ Develop centerline profiles and flowline profiles for Salmonberry Road. Page 4 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 1-410.� Bethel Road SCJ ALLIANCE March 28, 2022 CONSULTING SERVICES Page 2 of 3 11.3 Frontage Design 1) Frontage Design: Profile proposed back of sidewalk or edge of pavement for each impacted parcel on Salmonberry Road to the east. Design each site to integrate proposed improvements with the existing conditions. 2) Frontage Exhibits: Create a frontage conformance exhibit for each impacted parcel (up to 16 parcels). Each exhibit will include sufficient detail to show the public what the site will look like. The exhibits will include a site plan showing the roadway, sidewalk, existing structures, parking, landscaping, and retaining walls. The exhibits may include cross sections and profiles as necessary to demonstrate how the site will be graded. Each exhibit will be at a scale to fit attractively on 11x17 inch paper. 3) Submit frontage conformance exhibits to the CITY for review. Incorporate revision from one CITY review. 4) Review Workshop with CITY: Part of Phase 6. 5) Technical Memorandum: Add to the memorandum prepared in Phase 6. ♦ Describe standards used to layout the roadway. Explain any variances from these standards. ♦ Discuss the features of the frontage designs. Attach frontage conformance exhibits and roundabout exhibits. 11.4 Channelization 1) Channelization: Review and revise conceptual channelization developed in the Bethel Road and Sedgwick Road Corridor Study. 2) Technical Memorandum: Add to the traffic technical memorandum prepared in Phase 6 11.5 Environmental Clearances 1) Area of Potential Effect: Coordinate with the City and CONSULTANT team to prepare an exhibit showing the Area of Potential Effect (APE) to be used in the permitting process. 2) Site Visit: Conduct a site visit to evaluate the project considering anticipated NEPA/SEPA documentation and permitting requirements 3) WSDOT Meeting: Conduct meeting with WSDOT Local Programs to review project and identify potential discipline reports if future project actions/funding required NEPA documentation. 11.6 60% Plans Prepare the following plan types at 1"=20' scale (unless noted otherwise). The number of plan sheets per plan type is shown in parentheses. ♦ Alignment Plans (1 sheet) ♦ Typical Roadway Sections (1 sheet) ♦ Removal Plans (1 sheet) ♦ Temporary Erosion and Sediment Control Plans (1 sheet) ♦ Right -of -Way Plan (1 sheet) (scoped as part of a different task) ♦ Roadway Plan and Profile Sheets (2 sheets) ♦ Stormwater Plans (2 sheets) (scoped as part of a different task) ♦ Sidewalk Ramp Details (1 sheets) Page 5 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 1�-44W SCJ ALLIANCE CONSULTING SERVICES ♦ Driveway Details (1 sheet) ♦ Paving Plans (1 sheet) ♦ Illumination Plans (1 sheets) (scoped as part of a different task) ♦ Signing and Pavement Marking Plans (1 sheets) ♦ Utility Removal/Relocation Plans (1 sheets) (scoped as part of a different task) ♦ Maintenance of Traffic/Staging Plans (2 sheets) 11.7 60% Cost Estimate 1) Cost Estimate ♦ Revise the cost estimate in Phase 6. 11.8 Basis for Design Report 1) Basis for Design Report: Revise the Basis of Design Report from Phase 6. Bethel Road March 28, 2022 Page 3 of 3 Task 11 Understanding ♦ The layout will follow the general layout from the Bethel Road and Sedgwick Road Corridor Study. ♦ The project will utilize traffic modeling from the Bethel Road and Sedgwick Road Corridor Study project. We will also use this data as a part of the pavement design in Task 3. Additional modeling is not required. ♦ There will be an over the shoulder review by the CITY prior to the 60% package is delivered. Task 11 Deliverables ♦ 60% plans, specials, and Engineer's estimate in PDF submitted via email. ♦ Basis for Design Report in PDF submitted via email. ♦ AG132 data files submitted via email. ♦ AutoCAD files including Civi13D in DWG format submitted via email. END OF PROPOSAL Page 6 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 Consultant Fee Determination Summary SCJ Alliance Client: City of Port Orchard Project: Bethel Road Job #: 21-P00836 File Name: Bethel Road Fee Estimate 60% 2023-0328.xism Consultant Fee Determination DIRECT SALARY COST Classification Hours Fully Burdened Rate Principal 0.0 $286.00 PM3 Project Manager 21.0 $184.00 E3 Engineer 87.0 $127.00 Senior Technician 105.0 $149.00 PM1 Project Manager 0.0 $149.00 Senior Planner 0.0 $154.00 T1 Technician 0.0 $100.00 TOTAL SALARY COST SUBCONSULTANTS Parametrix Parametrix Parametrix REIMBURSABLE EXPENSES PHASE 20 PHASE 21 PHASE 22 Subconsultant Fee Subtotal: $0 Subconsultant Markup: 10% SCJ ALLIANCE Template Version: 4/4/2022 Contract Type: Billing Rate Schedule Amount $0.00 $3,864.00 $11,049.00 $15,645.00 $0.00 $0.00 $0.00 Total Salary Cost $30,558.00 Topographic Survey and Right of W; Stormwater Design (PMX) Utility and Illumination Design and i $32,624 $18,175 $8,845 $59,643.57 $5,964.36 Copies, Printing, etc. 0.0% of the Total Salary Costs $0.00 Mileage 100 miles at $0.650 per mile $65.00 Expenses Subtotal: $65.00 Expenses Markup: 0% $0.00 SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses) $96,230.93 MANAGEMENT RESERVE FUND (MRF) Management Reserve: $0 $0.00 Total Estimated Budget: $96,230.93 3/28/2023 Page 7 of 16Page 1 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 Bethel Road PHASE SUMMARY TABLE log SCJ ALLIANCE Project #: 21-P00836 Phase # Phase Title SO Hours SG Direct Labor Total Cost PHASE 11 Roadway Design 213.0 $30,558 $30,558 Subtotal 213.0 $30,558.00 $30,558.00 PHASE 20 Parametrix $32,624 PHASE 21 Parametrix $18,175 PHASE 22 Parametrix $8,845 Subconsultant Markup: $5,964 Subtotal $65,607.93 Phase 99 Reimbursable Expenses $65 Reimbursable Markup: $0 Subtotal $65.00 Total $96,230.93 Page 8 of 16 DocuSign Envelope ID: 48883E6O-45OC-4FA6-8542-BO9E4F5348B7 Consultant Labor Hour Estimate SO Alliance Client: City of Port Orchard Project: Bethel Road Job a: 21-POO836 File Name: Bethel Road Fee Estimate 60% 2023-0328.xism Template version: 4/4/2022 Contract Type: Billing Rate Schedule i� Sci ALLIANCE Scott Sawyer Patrick Holm Sam Dunn W Matt h GTrent Ryan Shea Eva Ordonez Phase & Phase &Task Title Task No. Principal PM3 Project Manager E3 Engineer Senior Technician PM1 Project Manager Senior Planner T3 Technician Total Direct Labor Hours & Cost PHASE 11 Roadway Design Task 01 Data Collection 1 'Data Collection 2.0 2.0 2 Photographs 1.0 1.0 1.0 3.0 Subtotal Hours: 1.0 3.0 1.0 5.0 Task 02 Roadway Layout 1 Horizontal Layout 1.0 6.0 8.0 15.0 2 Vertical Layout 1.0 10.0 12.0 23.0 Subtotal Hours: 2.0 16.0 20.0 38.0 Task 03 Frontage Design 1 Frontage design 1.0 6.0 6.0 13.0 2 Frontage exhibits 1.0 1.0 3 Review workshop with City 4 Technical Memorandum 1.0 2.0 2.0 5.0 Subtotal Hours: 3.0 8.0 8.0 19.0 Task 04 Channelization 1 Channelization 1.0 3.0 6.0 10.0 2 Technical Memorandum 1.0 3.0 4.0 Subtotal Hours: 2.0 6.0 6.0 14.0 Task 05 Environmental Clearances 1 Area of Potential Effect 1.0 2.0 3.0 2 Site visit 1.0 1.0 3 WSDOT Meeting Subtotal Hours: 2.0 2.0 4.0 Task 06 Task Title 1 60% plans X Cover sheet X Alignment Plans (1 sheet) 1.0 2.0 2.0 5.0 X Typical Roadway sections (1 Sheet) 2.0 2.0 4.0 X Removal Plans (1 Sheet) 1.0 2.0 4.0 7.0 X TESC Plans (1 Sheet) 1.0 2.0 4.0 7.0 X Roadway Plan and Profile (1 Sheets) 1.0 8.0 10.0 19.0 X Sidewalk Ramp Details (1 Sheets) 1.0 8.0 10.0 19.0 X Driveway Details (1 Sheets) 1.0 8.0 8.0 17.0 X Paving Plans (1 Sheets) 1.0 4.0 8.0 13.0 X Signing and Pavement Marking Plans (1 Sheets) 1.0 2.0 4.0 7.0 X Maintenance of Traffic/Staging Plans (2 Sheets) 1.0 8.0 8.0 17.0 Subtotal Hours: 9.0 46.0 60.0 115.0 Task 07 60% Cost Estimate 1 60% Cost Estimate 1.0 4.0 4.0 9.0 Subtotal Hours: 1.0 4.0 4.0 9.0 Task 08 Basis for Design 1 Basis for Design Report 1.0 4.0 4.0 9.0 Subtotal Hours: 1.0 4.0 4.0 222.0 Total Phase Hours: 21.0 87.0 105.0 213.0 Total Phase Direct Labor: $3,864.00 $11,049.00 $15,645.00 $30,558.00 2 of 2 Page 9 of 16/28/2023 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 Consultant Labor Hour Estimate SO Alliance Client: City of Port Orchard Project: Bethel Road Job s: 21-P00836 File Name: Bethel Road Fee Estimate 60% 2023-0328.xism Template version: 4/4/2022 Contract Type: Billing Rate Schedule i� Sci ALLIANCE Scott Sawyer Patrick Holm Sam Dunn Matt Trent Ryan Shea Eva Ordonez Weyrauch Gratham Total Direct Phase & Phase &Task Title Principal PM3 Project E3 Engineer Senior PM1 Project Senior T1 Labor Hours & Task No. Manager Technician Manager Planner Technician Cost PHASE 20 Topographic Survey and Right of Way Mapping (PMX) PHASE 21 Stormwater Design (PMX) PHASE 22 Utility and Illumination Design and Coordination (PMX) Total Hours All Phases) 21.0 87.0 105.0 213.0 Total Direct Labor Estimate All Phases $3,864.00 $11,049.00 $15,645.00 $30,558.00 2 of 2 Page 10 of 1 6/28/2023 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 i►-4100- l��-4F 400. SCJ ALLIANCE CONSULTING SERVICES Task 20 — Topographic Survey and Right of Way Mapping — Offsite Area (Parametrix) 20.1 Right of Way Determination The CONSULTANT will determine the right way along Salmonberry Road within the limits delineated out in Exhibit C as Offsite Area. The lateral boundary lines adjacent to the right of way lines will also be determined by obtaining title reports for the following Kitsap County tax parcel numbers (also graphically represented in Exhibit C), for a total of 19 parcels: 1. 012301-3-032-2003 1694 SE Salmonberry Road 2. 012301-3-029-2008 1720 SE Salmonberry Road 3. 012301-3-028-2009 1746 SE Salmonberry Road 4. 012301-3-023-2004 1776 SE Salmonberry Road S. 012301-3-022-2005 1804 SE Salmonberry Road 6. 012301-3-020-2007 1858 SE Salmonberry Road 7. 012301-3-019-2000 1880 SE Salmonberry Road 8. 012301-3-018-2001 1906 SE Salmonberry Road 9. 012301-2-079-2009 1601 SE Salmonberry Road 10. 012301-2-171-2006 No Address Found 11. 012301-2-099-2005 1637 SE Salmonberry Road 12. 012301-2-078-0200 1695 SE Salmonberry Road 13. 012301-2-077-2001 1805 SE Salmonberry Road 14. 012301-2-185-2000 No Address Found 1S. 8183-001-001-0009 3992 Thimbleberry Place SE 16. 012301-2-183-2002 No Address Found 17. 012301-2-074-2004 1935 SE Salmonberry Road 18. 012301-2-073-2005 2031 SE Salmonberry Road 19. 012301-3-132-2002 No Address Found A DRAFT right of way plan will be provided that details existing right of way limits and lateral parcel lines abutting the right of way along Salmonberry Road. Two iterations of updates to the right of way plan based on engineering design needs for additional right of way are included in this scope of work. 20.2 Topographic Survey and Base Map The limits of the topographic survey for this task are delineated in Exhibit C as Offsite Area. The CONSULTANT will perform field topographic survey depicting the following: ♦ Existing road centerlines ♦ Location and size of driveway cuts ♦ Sidewalk expansion joints at the project limits Page 11 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 1 -ow SCJ ALLIANCE CONSULTING SERVICES ♦ Sidewalk, curb, median, and shoulder locations ♦ Edge of pavement and edge of gravel ♦ Grade breaks in pavement ♦ Channelization lines ♦ Buildings, structures, and improvements ♦ Retaining walls ♦ Fences, including size, type, and height ♦ Signs and sign structures including description, size, and post material ♦ Signal poles ♦ Light poles ♦ Tops/ toes of slopes ♦ Trees over 6-inch diameter measured at 4.5 feet above ground level ♦ Critical areas delineators/flags Bethel Road —Amendment 1 March 28, 2023 Page 2 of 4 ♦ Prominent landscape features (hedges, brush lines, boulders, etc.) ♦ Storm drainage structures, including Structures types, pipe sizes, and invert elevations ♦ Sanitary sewer structures, including Structures types, pipe sizes, invert elevations ♦ Water line structures ♦ Water valves, including measurement to top of nut, meters, blow offs, and hydrants ♦ Aboveground power and other franchise utility structures, including cabinets, pedestals, utility poles, guy anchors, risers and overhead wires ♦ Other below- and above- ground franchise utilities including vaults, junction boxes, and conduits CONSULTANT will perform survey data backup by downloading and backing up survey data daily. Survey data will be compiled into a digital AutoCAD base map. A field check of topographic survey map will occur and updates to the survey map will be completed based on field edits. Task 20 Understanding ♦ CONSULTANT has accounted for the cost of an independent utility locating service to identify the location of existing underground conductible utilities. ♦ Survey work will not require agency permits. ♦ Traffic control deemed necessary to complete survey work will be provided and coordinated by the City of Port Orchard. ♦ CONSULTANT personnel will not access any area/roadway that is deemed unsafe for any reason. ♦ City of Port Orchard will obtain right of entry within the project site. CONSULTANT will provide City of Port Orchard a list of properties for which right of entry needed. ♦ No field staking will be required. ♦ A Record of Survey is not required, this task does include setting of monuments at the property corners. ♦ This task does not include resolution of physical encroachments/occupations that may be disclosed by a field survey. ♦ Survey work will be performed under the supervision of a Professional Land Surveyor (PLS) licensed in the State of Washington. Page 12 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 1 _4W ON- Bethel Road —Amendment 1 SCJ ALLIANCE March 28, 2023 CONSULTING SERVICES Page 3 of 4 ♦ Project mapping limits are delineated in the attached Exhibit C. ♦ City of Port Orchard will provide available maps related to the existing right —of --way for roads described in the project limits. ♦ The horizontal control and vertical datum for the project will be: ♦ Horizontal — North American Datum 1983 with a Realization of 2011 (NAD83/11) ♦ Vertical — North American Vertical Datum of 1988 (NAVD 88) ♦ Units will be US survey feet. ♦ Aerial mapping survey will be contained within the project limits as delineated in Exhibit C. ♦ Base map will be developed using CONSULTANT survey mapping standards. ♦ Field measurements will be captured sufficient to generate a surface file at one -foot contours. ♦ City of Port Orchard will be responsible for the recording and fees associated with the right of way exhibits. ♦ Two revisions to the right of way plan (2 sheets total) are requested by Client. ♦ Up to 19 title reports will be obtained by the CONSULTANT to complete legal description and exhibit map work. Fees for obtaining title reports are included in the survey fee proposal. Parcels are based on preliminary right of way plan from the Bethel Road corridor study. ♦ The lateral property lines adjacent to the right of way will be determined; this does not include the entirety of the parcels. ♦ It is understood that any additional services beyond those included in this scope of work will be authorized in writing by the Client prior to commencement of the "additional service(s)," and the Client will compensate the CONSULTANT for said additional services Task 20 Deliverables ♦ AutoCAD file of topographic survey ♦ Existing surface TIN file ♦ DRAFT right of way plan detailing existing right of way limits and lateral parcel lines abutting the right of way along Salmonberry Road ♦ FINAL right of way plan following two iterations of updates on right of way plan based on engineering design needs for additional right of way and response to City comments Task 21 — Stormwater Design — Offsite Area (Parametrix) This task consists of the sizing and design of stormwater Best Management Practices (BMPs) within Offsite Area as delineated in Exhibit C. This additional project area will be included in all stormwater design calculations and deliverables associated with Task 7 of the initial contract as executed on August 30, 2022. The scope, understanding, and deliverables associated with Task 7 apply to this task. Up to two additional plan sheets will be included to capture this new area. There are no separate design deliverables that will be included as part of this task. The budget associated with this task accounts for the time needed to include this additional area into the overall project deliverables. Page 13 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 s� 1. �-4w 1 -400- 40- Bethel Road —Amendment 1 SC.J ALLIANCE March 28, 2023 CONSULTING SERVICES Page 4 of 4 Task 22 — Utility and Illumination Design and Coordination — Offsite Area (Parametrix) This task consists of coordinating with the utility purveyors to obtain as -built information for existing utilities within the project limits known as Offsite Area on Exhibit C, preparing a potholing plan, coordinating private utility relocation as necessary during the 60% design phase of the project, and developing 60% franchise utility removal/relocation plans for Bethel Road. This additional project area will be included in all illumination design calculations and deliverables associated with Task 8 of the initial contract as executed on August 30, 2022. The scope, understanding, and deliverables associated with Task 8 apply to this task. Up to two additional plan sheets will be included to capture this new area. There are no separate design deliverables that will be included as part of this task. The budget associated with this task accounts for the time needed to include this additional area into the overall project deliverables. Page 14 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 Client: SCJ Alliance Project: Bethel Road Project No: 233-5491-029 O c v f6 ° CO v i c c - '~ v N ° > v M U1 O J V h0 -0 h0 a t N i m > J O C -O E- U Y C Q m V) O F Q O Y C 2 Q Y Q N N > LJ U ° -O C U N Q L Z C U N O N C Y 41 C C t0 O aT+ > N C E U N K N N Y N Y O o O o U C N u O Q N p- C N Q O N N O O y O C al u C 'pA N O a) U N In v '� to w N tw w N on T (UO ;' U a).O C a0 N 'p T N OL a C w a) t u O u) Vl LN W N N $108W $134d $131.W $130.n $172N $136.262 $119t/1 $1418/3 $234.(7 86 $940 $137.86 $142.60 Billing Rates: Task Subtask Description Labor Dollars Labor Hours 20 Topographic Survey and Right -of -Way Mapping - Offsite Area $19,055.27 133 0 0 0 0 0 34 0 0 0 0 17 4 0 4 46 28 20 01 Right of Way Determination $9,632.75 65 4 11 2 2 18 28 20 02 Topographic Survey and Base Map $9,422.51 68 30 6 2 2 28 21 Preliminary Stormwater Design - Offsite Area $18,175.27 122 0 24 5 0 38 0 2 35 6 6 0 0 6 0 0 0 21 01 Stormwater Management Plan $1,570.89 11 3 6 2 21 02 60% Plans $2,657.48 21 12 6 3 21 03 60% Cost Estimate $2,657.48 21 12 6 3 21 04 Specifications $2,300.94 14 6 8 21 05 Basis of Design Report $1,625.30 11 2 6 3 21 06 Task Management $7,363.18 44 8 2 16 6 6 6 22 Preliminary Utility and Illumination Design and Coordination - Offsite Area $8,844.73 40 34 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 22 01 Utility Coordination $1,713.93 8 8 22 02 Illumination Design $1,285.45 6 6 22 03 60% Plans $2,999.37 14 14 22 04 60% Cost Estimate $428.48 2 2 22 05 Specifications 1 $428.481 2 2 22 06 Basis of Design Report 1 $428.481 21 2 22 07 CA/QC 1 $1,560.541 61 1 1 6 Labor Totals: $46,075.271 2951 341 241 51 61 381 341 21 351 61 61 171 41 61 41 461 28 Totals: 1 $46,075.271 1 $7,284.191 $2,602.511 $672.701 $1,560.541 $4,999.431 $4,429.961 $344.291 $6,613.081 $819.701 $715.171 $3,344.341 $567.301 $1,408.391 $379.441 $6,341.42 $3,992.80 Subconsultants Applied Professional Services Inc $2,600.00 Title Reports $7,328.30 Subconsultants Total: $9,928.30 Other Direct Expenses Mileage $120.00 Survey Equipment ($160/Use) $3,520.00 Other Direct Expenses Total: $3,640.00 Project Total $59,643.57 3/28/2023 BudgetReport_2335491029_Amend 1.xlsx Page 15 of 16 DocuSign Envelope ID: 48883E60-450C-4FA6-8542-B09E4F5348B7 Exhibit C Page 16 of 16