Loading...
075-22 - Ceccanti, Inc. - Supplement / Change Order 5:{t"{, j51Y � � 9 '1., !y �5�.. f. �aJ,.• ,"?,;lif'C •, A.. ..n:7G:i4fy ;�L"ry ;q ig^r7•. r .,,t. _ ,is ��::� � '}' � Y � , s 1 ; ':5f „ „WW;;S`r•:s�'� ."��;;k•. ;."�i; t�,� r...l,? :,} . ,}. R.�...a YE � .cF � ... '" t c�;. .11'-c t � '1rn1�: ��1>,.r%5•�.�:7N•.;5's'Sis`i�'r MJi 3�i c.S(:.::$:.�'Sr::�sF.: ix:;i�k;lr;s �.. ..:x�.,t:,, hss ...t�� ,r�. ., r; :.i.; Authorization for Change Order No. 5 Date: 10/30/2023 Contractor: Ceccanti, Inc. McCormick Village Park Splash Pad Treatment Facility Project: Installation Contract / Job # C075-22 THIS CHANGE ORDER AUTHORIZES (add description). 4116 Brookdale Road East Tacoma. WA 98446 Additional work: 1) 4" swing valve installed in reservoir vault to retain water in supply pipe for pump to prime. 2) Remove back pressure valve and replace with spool due to vibrations/water hammer produced from the back pressure valve. 3) Install new ball valve and swing check to separate/isolate the two pumps in the mechanical room. 4) Install conduit and conductor wire for the connection of the pump to the control panel to start, run and stop the feature pump. See attached Cost Summary Sheet for breakdown. 77 „ Amount Sales Tax' �.t ; Total Date 'Appvd by: _., . Original Contract $540,647.00 $49,739.52 $590,386.52 26-Jul-22 council Change Order 1 $126,803.00 $12,333.33 $139,136.33 28-Feb-23 council Change Order 2 $8,393.05 $780.55 $9,173.60 27-Jun-23 council Change Order 3 $6,952.31 $646.56 $7,598.87 12-Jul-23 PW Director Change Order 4 $18,165.86 $1,689.42 $19,855.28 19-Jul-23 Intr. PW Directo Change Order 5 $3,312.36 $308.05 $3,620.41 30-Oct-23 PW Director Total Contract 1 $704,273.58 $65,189.39 $769,771.02 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. �L ld -3v—Z3 Contractor Approval Signature�J Public Works Dire or Printed Name & Title Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Mayor Works Director. Change Orders that do not exceed 105.1, with a maximum of Attest: $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. City Clerk Council Approval Date Cost Summary Sheet Change Order#3 Additional ITEM NO. ITEM DESCRIPTION EST. QTY UNITS UNIT PRICE BID AMOUNT CO#1 Change Order No. 1 0 0 $0.00 $ - CO#2 Force Account Work- Work Change Directive 1-3 0 0 $0.00 $ - CO#3 Work Change Directives 4-5 0 0 $0.00 $ - CO#4 Change Order No. 4 Control Panel 0 0 $0.00 $ - CO#5 4" Swing Valve, Remove BP Valve, Install B Valve, Conduit 0 0 - $ - $ $ Bid Total $ Total Contract $ 769,771.02 CO#1 Break Down to Date jBilled jAnnount Amount per PR Overflow vault PR1 $ 11,000.00 Water res. Vault Installed without pump and mech. PRl $ 32,113.02 $ 43,113.02 Basket strainer vault with internals PR2 $ 14,000.00 Underground pipe between bldg/overflow/water res. PR2 $ 18,000.00 Floor Drain in building- connect to overflow PR2 $ 2,800.00 Additional Clearing PR2 $ 2,500.00 Added 4" Field Valves PR2 $ 3,500.00 $ 40,800.00 Water res. Vault pump and mech. PR3 $ 8,886.98 Second Pump in Building PR3 $ 9,000.00 Two Eyewash Stations PR3 $ 1,500.00 Misc. Additional Piping in building PR3 $ 9,800.00 3" Flow meter PR3 $ 1,900.00 Indicating pressure transmitter PR3 $ 2,800.00 Additional 3" valves PR3 $ 7,000.00 Credit 6 vessels and piping PR3 $ (18,000.00) Add conduit,wire for cutoff floats,chlorine analizer PR3 $ 20,003.00 $ 42,889.98 $ 126,803.00 $ 126,803.00 100% CO#2 Break Down to Date jBilled jAmount Amount per PR Work Change Directive #1- Unsuitable subgrade PR2 $ 4,380.00 Work Change Directive #2- Reloaction of louver PR2 $ 2,213.05 Work Change Directive #3- Solenoid mainifold PR2 $ 960.69 $ 7,553.74 Work Change Directive #3- Solenoid mainifold PR3 $ 839.31 $ 839.31 $ 8,393.05 $ 8,393.05 100% CO#3 Break Down to Date jBilled jAnnount Amount per PR Work Change Directive #4- High water alarm PR3 $ 3,939.01 $ 3,939.01 Work Change Directive #5- Faux rock PR4 $ 3,013.30 $ 3,013.30 $ 6,952.31 $ 6,952.31 100% CO#4 Break Down to Date jBilled jAmount Amount per PR Custom Control Panel $ 18,165.86 $ 18,165.86 $ - 0% CO#5 Break Down to Date jBilled jAmount Amount per PR Work Change Directive 116- $ 3,312.36 $ 3,312.36 $ - 0% Actual QTY UNITS UNIT PRICE AMOUNT 1 CO $ 139,136.33 $ 139,136.33 1 CO $ 9,173.60 $ 9,173.60 1 CO $ 7,598.87 $ 7,598.87 1 CO $ 19,855.28 $ 19,855.28 1 CO 3,620.41 $ 3,620.41 Actual Total $ 179,384.49 $ Actual Total $ - $ 139,136.33 $ 9,173.60 $ 7,598.87 $ 19,855.28 $ 3,620.41 $ - $ 179,384.49 Additional Total $ 179,384.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Credit Total Difference $ 179,384.49