040-23 - Miles Resources, LLC - Supplement / Change Order 1 - Cost Summary
Cost Summary Sheet Chanee Order#1 Additional ITEM NO. ITEM DESCRIPTION EST. CITY UNITS UNIT PRICE BID AMOUNT CO#1 Change Order No. 1 0 0 $0.00 $ - Bid Total $ Total Contract $ 960,764.82 Engineer's Opinion of Cost 2023 City Wide Pavement Repair Sedgwick Intersection City of Port Orchard Jult 26 2023 Added Work- Lowes/Sedgwick Intersection Spec. Section Item Name Unit Quantity Unit Cost Item Total 1-04.4 SP Minor Change CALC 1 $ 2,500.00 $ 2,500.00 1-09.7 Mobilization (10%) LS 1 $ 10,000.00 $ 10,000.00 1-10.4 Project Temporary Traffic Control(15%) LS 1 $ 12,000.00 $ 12,000.00 4-04 Crushed Surfacing Base Course for Pavement Repair TON 20 $ 60.00 $ 1,200.00 5-04 SP Pavement Repair Excavation Incl. Haul SY 225 $ 70.00 $ 15,750.00 5-04 HMA for Pavement Repair Cl. 1/2 In. PG 58H-22 SY 225 $ 160.00 $ 36,000.00 5-04 Crack Sealing LF 0 $ 2.00 $ 8-20 Induction Loops EA 3 $ 3,750.00 $ 11,250.00 8-22 Paint Line LF 700 $ 1.60 $ 1,120.00 8-22 Plastic Wide Line LF 160 $ 12.00 $ 1,920.00 8-22 Plastic Traffic Arrow EA 3 $ 350.00 $ 1,050.00 8-22 Plastic Stop Line LF 25 $ 18.00 $ 450.00 Schedule total $ 93,240.00 Actual QTY UNITS UNIT PRICE AMOUNT 1 CO $ 93,135.22 $ 93,135.22 $ $ $ Actual Total $ 93,135.22 $ Actual Total $ $ 93,135.22 Additional Total 1 $ 93,135.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Credit Total I$0.00 Difference $ 93,135.22