Loading...
036-23 - Ordinance - Comprehensive Plan UpdatesDocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B ORDINANCE NO. 036-23 AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON, RELATING TO THE PORT ORCHARD COMPREHENSIVE PLAN ADOPTED UNDER THE STATE OF WASHINGTON'S GROWTH MANAGEMENT ACT, CHAPTER 36.70A RCW; ADOPTING AN AMENDMENT TO THE TRANSPORATION IMPROVEMENT PROGRAM AND THE CAPITAL FACILITIES ELEMENT OF THE PORT ORCHARD COMPREHENSIVE PLAN; PROVIDING FOR SEVERABILITY, CORRECTIONS, AND PUBLICATION; AND SETTING AN EFFECTIVE DATE. WHEREAS, with the passage of the Washington State Growth Management Act in 1990 (GMA), Chapter 36.70A RCW, local governments are required to adopt a comprehensive plan that outlines strategies to accommodate the needs of a growing population; and WHEREAS, in June 1995, the City Council adopted a Comprehensive Plan for the City of Port Orchard and its urban growth area pursuant to the requirements set forth in the GMA; and WHEREAS, the City of Port Orchard completed its most recent periodic update of its Comprehensive Plan in June 2016, as required by the GMA; and WHEREAS, on May 9, 2023 the City adopted amendments to the City's Comprehensive Plan pursuant to RCW 36.70A.470 and 36.70A.106; and WHEREAS, the City may consider and adopt amendments to the City's Comprehensive Plan more frequently than once annually in accordance with RCW 36.70A.130(2)(a)(iv); and WHEREAS, the City initiated an amendment of the capital facilities element of the comprehensive plan occurring concurrently with the adoption of the city's budget; and and WHEREAS, the amendment submittal affects the Transportation Improvement Program; WHEREAS, the amendment submittal affects the Capital Facilities Element; and WHEREAS, on September 15, 2023, notice of the proposed amendments to the City's Comprehensive Plan was sent to the Washington State Department of Commerce at least sixty days before the amendments were adopted, in accordance with RCW 36.70A.106; and WHEREAS, on September 28, 2023, a SEPA Determination of Non -Significance was issued, and provided to the public, agencies, and other interested parties in accordance with the requirements of POMC Chapter 20.04.080, and published in the newspaper of record and on the City website, and emailed to the Washington Department of Ecology; and WHEREAS, on September 19, 2023, a Notice of Hearing was published in the City's newspaper of record advertising a public hearing to be held by the Planning Commission on the proposed 2023 Comprehensive Plan amendment, and the notice was provided to the public, DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Ordinance No. 036-23 Page 2 of 3 agencies, and other interested parties in accordance with the requirements of POMC Chapter 20.04.080; and WHEREAS, the Department of Community Development did not receive comments regarding the proposal; and WHEREAS, on October 3, 2023, the Planning Commission held a public hearing and took public testimony on the 2023 Comprehensive Plan amendments; and voted unanimously to recommended approval of the amendments to City Council; and WHEREAS, on November 28, 2023, the City Council held a Regular Meeting, considered all public testimony received, considered the Planning Commission's recommendation, and finds it in the public interest to adopt the proposed amendments to the City's Comprehensive Plan; now, therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION 1. The City Council hereby adopts the above recitals as findings in support of this Ordinance. SECTION 2. The City Council finds that the amendments adopted by this Ordinance are consistent with the goals and policies of the City's adopted 2016 Comprehensive Plan and are consistent with the state Growth Management Act and other applicable law. SECTION 3. The City Council finds that the amendments adopted by this Ordinance will not, individually, or cumulatively, result in adverse effects to the public health, safety, or welfare. SECTION 4. The City Council finds that no adverse impacts to the environment are anticipated to result from the amendments adopted by this Ordinance. SECTION 5. The City Council finds that the amendments adopted by this Ordinance are consistent with the land uses and growth projects which were the basis of the adopted Comprehensive Plan, are compatible with neighboring land uses and surrounding neighborhoods, and are not anticipated to cause adverse impacts to public services or facilities. SECTION 6. Adoption of Amendments to Comprehensive Plan. In accordance with the above -described Findings and Conclusions, the City Council hereby amends the Port Orchard Comprehensive Plan by approving and adopting the 2023 amendments to the Port Orchard Comprehensive Plan. Such amendments are attached to this Ordinance as Exhibit 1 and incorporated herein by this reference as if set forth in full. The amendments include revisions to the update to the Capital Facilities Element of the Port Orchard Comprehensive Plan and the City Transportation Improvement Program. DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Ordinance No. 036-23 Page 3 of 3 SECTION 7. Severability. If any sentence, section, provision, or clause of this Ordinance or its application to any person, entity or circumstance is for any reason held invalid or unconstitutional, the remainder of the Ordinance, or the application of the provision to other persons, entities, or circumstances is not affected. SECTION 8. Corrections. Upon the approval of the city attorney, the city clerk and/or code publisher is authorized to make any necessary technical corrections to this Ordinance, including but not limited to the correction of scrivener's/clerical errors, references, Ordinance numbering, section/subsection numbers, and any reference thereto. SECTION 9. Publication and Effective Date. This Ordinance shall be in full force and effect five (5) days after posting and publication as required by law. A summary of this Ordinance may be published in lieu of the entire Ordinance, as authorized by state law. PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and attested by the Clerk in authentication of such passage this 28t" day of November 2023. ATTEST: Brandy Wallace, MMC, City Clerk APPROVED AS TO FORM: EDOCUS'igned by: 203701F2552045Z.. Charlotte A. Archer, City Attorney PUBLISHED: December 4, 2023 EFFECTIVE DATE: December 9, 2023 ATTACHMENTS: F DocuSigned by: b PlM"6�A-I�t,SWA, E3FHS4aB... Robert Putaansuu, Mayor SPONSOR: C Scott Diener, Councilmember Exhibit 1: 2023 Amendments to the Comprehensive Plan including 1. Transportation Improvement Program 2. Capital Facilities Element DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B City of Port Orchard Six -Year Transportation Improvement Program For 2024-2029 TIER 1 (Reasonably Constrained) Proj# Road Name Total Federal State (TIF Begin Termini Project Total Est. Spent Prior to Future Phase Funding Fund Fund Proj#) Project Title/Project Description End Termini Length Cost 2023 2023 Expenditures 2024 2025 2026 2027 2028 2029 Start Year Status Phase Code Federal Funds Code State Funds Local Funds Capital Projects 1.1 Bay Street Ped. Pathway ROW Phase PO Shoreline: Add 14-ft Multi -Modal (bikes & pedestrians) Sidney Ave. Foot 1.2 2,280,000 1,140,000 1,140,000 0 0 0 0 0 0 0 2013 S ROW STP(U) 1,923,590 0 300,212 waterfront pathway & cantilevered retaining wall Ferry to Annapolis 3,000,000 3,000,000 0 0 0 0 0 0 0 2018 P ROW 0 581,000 following historic Mosquito Fleet trail and pedestrian Foot Ferry N/A bridge across Black Jack Creek. 1.2 Bay Street Pedestrian Pathway Construction (S#1, S#6-11) The CN phase for the 14-ft Multi -Modal (bike & ped) 1.2 1,115,000 0 0 0 0 0 0 0 2018 650,000 465,000 S CN waterfront pathway/cantilevered retailing wall 3,000,000 0 3,000,000 0 0 0 0 0 0 0 2024 S CN following the historic Mosquito Fleet trail. Includes the demolition/removal of (5) overwater structures. N/A Inrli irioc Cco tR Ari Roariu r)nr Pron 1.3 Bay Street Pedestrian Pathway West Port Orchard Blvd Situational study and Bay St: Ft Ferry 1.5 566,474 0 2023 490,000 0 76,474 to Tremont 0 566,474 0 0 0 0 0 0 P PL N/A 1.4 Old Clifton/ Anderson Hill Intersection Improvements Old Clifton Rd / Intersection Improvements (roundabout) as identified Anderson Hill Rd. 0 258,000 0 0 258,000 0 258,000 0 0 2027 S PE 0 258,000 in the McCormick Urban Village Trans Plan and Intersection 1,738,000 0 0 1,738,000 0 0 0 1,738,000 0 2028 P CN Grant? 1,213,000 525,000 TIF 1.4 partially funded by Bayside Mit Funds. 1.5 Old Clifton Rd Non -Motorized Improvements Old Clifton Road: Rodway Improvements identified in the McCormick Campus PKWY to 0.75 450,000 150,000 0 450,000 0 450,000 0 0 0 2026 P PE 0 450,000 Urban Village Trans Plan. Design and Construction. Anderson Hill Rd. 2,000,000 2,700,000 2027 P CN STP(U), TIB/CS TIF 1.5, 2.07 Seperated pathway and shoulder facilities. RCO 1.7 Bethel/Sedgwick Phase 5a - Bethel/Lincoln RAB Bethel/Lincoln/Lunb Safety and capacity improvements to intersection and erg/ Mitchell 0 3,674,000 326,000 474,000 2021 S PE 800,000 reconfiguration of approaches. 0 0 3,200,000 3200000 2022 S CN HSP 1,S00,000 TIB UAP 1,100,000 700,000 TIF 2.04e 1.8 Bethel/ Sedgwick Cooridor Phase la - Blueberry RAB Bethel Road: blueberry Phase la. Bethel/ Blueberry RAB 60% PE in 2022 0 3,341,000 0 250,000 285,000 160,000 125,000 2022 S PE 0 0 535,000 and start ROW for Phase la/b. Intersection 268,000 134,000 134,000 2024 S ROW 0 268,000 2,788,000 2788000 2026 P CN TIB/ 0 2,788,000 UAP/CS IF 2.04a I I I et e e gwrc orrr or ase - a mon erry Bethel Road: Salmonberry intersection Phase 1b. Bethel/ Salmonberry RAB Round and roadway segment design from Blueberry to Salmonberry. 60% PE in 2022. 0 11,467,000 0 375,000 891,000 497,000 394,000 2023 P PE 0 0 1,272,000 3,206,000 1,603,000 1,603,000 0 2024 P ROW 0 3,206,000 7,370,000 7,370,000 2026 P CN TIB/UAP/ 0 7,370,000 rlF 2.04a CS 1.10 Val lair Ct Connector Bethel Road / Road extension and intersection improvements Walmart Drive 0.25 1,000,000 0 0 1,000,000 0 0 0 0 1,000,000 0 2027 P PE & ROW 0 0 1,000,000 previously included in the Bethel Road Corridor ROW Intersection 1,000,000 0 0 1,000,000 0 0 0 0 0 1,000,000 2028 P CN 0 TIB 0 1,000,000 TIF 1.7 & Construction project. 1.11 Sidney Road SW Design - 60% Sedgwick Rd. to Berry Lake Rd. Sidney Avenue is currently two lanes wide, it needs to 0.95 500,000 500,000 2027 0 0 500,000 be widened to three lanes (additional TWTL) including 0 0 0 0 0 0 0 500,000 p pL TIB bike lanes, sidewalks, traffic calming, and stormwater TIF 2.05 system improvements. (COMPLETE STREET). 9/15/2023 Page 1 of 8 U:\A1_Long Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01 -Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Proj# (TIF Proj#) Proiect Title/Project Description City of Port Orchard Six -Year Transportation Improvement Program For 2024-2029 TIER 1 (Reasonably Constrained) Road Name Total Federal State Begin Termini Project Total Est. Spent Prior to Future Phase Funding Fund Fund End Termini Length Cost 2023 2023 Expenditures 2024 2025 2026 2027 2028 2029 Start Year Status Phase Code Federal Funds Code State Funds Local Funds 1.12 Sedgwick Road West Study - 30% Design SR16 to Sidney Rd. Establish alignments and cross sections. Develop mitigation alternatives and identify right-of-way 300,000 0 0 300,000 300,000 2023 P Study BuildAm 300,000 TIF needs for roadway and identify potential sites to accommodate stormwater run off and mitigation for TIF 2.02,2.03 filling wetlands. Include stormwater element for 1.13 Lippert Sidewalk Retrofit and Pavement Repair Sidney Rd. S. to ADA ramp and driveway retrofits, sidewalk reparis, Pottery 0.95 35,000 0 35,000 0 2021 S PE 35,000 pavement repairs, stormwater retrofit. In house des 778,000 0 2022 S CN CDBP 244,000 544,000 with consulted survey & basemap N/A 788,000 1.14 Sidney Road Sidewalk Sidney Glen Elementary Sidewalk Address gap in sidewalk along school frontage 0.95 1,895,000 0 0 0 235,000 2023 P PE 173,000 62,000 1,660,000 2024 P CN SRTS 1,222,000 438,000 TIF 2.05 1.15 Pottery Avenue Non Motorized Improvements SR16 to Lippert Dr. Address sidewalk gap from Sunset to Clay near Tremont. Road diet and road widening to provide bikeable shoulders and sidewalk improvements. 0.95 840,000 0 35,000 0 2022 P PE 35,000 150,000 2022 P 150,000 655,000 655,000 2024 S CN TIB CS 644,000 0 Safety enhancement at Pottery Lippert Intersection TIF 2.14 and School Crossing. 1.16 SR166/ Bay Street Reconstruction SR166 from Geiger to Frederick Raise street to address sea level rise and improve to current standard in accordance with redevelopment plans. Amount shown does not include water and 3,891,000 200,000 0 1,135,000 1,135,000 0 0 2022 P PE CDS 1,000,000 135,000 2,649,000 2,649,000 2026 P CN KRCC 2,000,000 649,000 sewer utility improvments. N/A City wide corridors, 1.17 Street Lighting Improvements highest priority locatoins Currently funded work includePottery, Sidney Rd. Future applications to be submitted for Tremont 1,100,000 0 0 100,000 0 100 2023 P PE HSIP 0 0 210,000 1,000,000 0 0 1,000,000 2024 P CN HSIP 210,000 0 N/A 1.18 Tremont Phase 2 and 3 Port Orchard Blvd to Sidney Ave. Non motorized connectivity study and design of elements for future ROW and/or CN application 732,000 0 0 732,000 732,000 2023 P PE Ped Bike 732,000 0 P ROW 0 2.12 & 2.30 1.19 SR160/Sedgewick Phase 2a New Intersection New Round About mid way between SR16 and Bethel Rd. Needed to support development on the corridor. City to compelte 60% DN and ROW acquisition for two 1,550,000 0 0 600,000 600,000 2027 P PE BuildAm 600,000 950,000 950,000 2028 P ROW BuildAm 950,000 TIF lane RAB that will be innitially constructed as one 2.046 Total Capital 44biU4/4 L4bb000 1U4CP54/4 JJU/buuu 6J51000 4bbb10U 1bW/0U0 E55ES000 Sbk5C000 1S00uuu 1UIJB!IUU LSISUUU LbbZ/bub Maintenance Projects Total 2,023 Future Exp 2024 2025 2026 2027 2028 2029 1.51 Annual Pavement Maintenance Includes patching, crack -sealing, striping, and other 666,000 53,000 56,500 556,500 56,500 100,000 100,000 100,000 100,000 100,000 On going S CN 556,500 activities 1.52 * Annual Sidewalk & ADA Upgrade Program 9/15/2023 Page 2 of 8 U:\A1_Long Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01 -Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B City of Port Orchard Six -Year Transportation Improvement Program For 2024-2029 TIER 1 (Reasonably Constrained) Proj# Road Name Total Federal State (TIF Begin Termini Project Total Est. Spent Prior to Future Phase Funding Fund Fund Proj#) project Title/Project Description End Termini Length Cost 2023 2023 Expenditures 2024 2025 2026 2027 2028 2029 Start Year Status Phase Code Federal Funds Code State Funds Local Funds Repair and replace concrete sidewalks and curb 976,000 38,000 38,000 900,000 180,000 180,000 180,000 180,000 180,000 0 On going S CN 900,000 ramps as identified in the program 1.53 ** Annual Pavement Management System Paving Projects Pavement replacement projects as identified in the 2,935,000 300,000 535,000 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000 On going S CN 2,100,000 pavement management system program 1.55 Overlay Pavement preparation and overlay. Tremont: PO Tremont Str./ Lund 1.2 1,000,000 0 0 1,000,000 0 0 1,000,000 0 0 0 2025 P PE,CN KRCC 865,000 135,000 Blvd. to Bridge, Old Clifton: SR16 to City Limits, Old Ave./ Old Clifton Rd. Clifton Anderson Hill to McCormick Woods Dr. 865,000 Total Maintenance Projects 5,577,000 391,000 629,500 4,556,500 586,500 630,000 1,630,000 630,000 630,000 450,000 0 3,691,500 * Per 2016 ADA transition plan: $180,000 annually over 20 years to comply on arterial streets. ** Per 2016 Pavement Management Analysis Report: $1.45 million annually to maintain network condition (PCI of 70), $500k to keep network PCI above 65 after 5 years. 9/15/2023 Page 3 of 8 U:\AI_Long Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01 -Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Capital Projects 2.01 Sidney Avenue (North of SR 16) Tremont Street to 1 3,750,000 3,750,000 0 2029 P PE/RW STP(U) 0 0 3,750,000 The design, permitting, right-of-way acquisition Fireweed 6,750,000 6,750,000 0 2031 P CN STP(U) 0 0 6,750,000 and construction for this project with bike lanes, storm drainage and sidewalks. (COMPLETE TIF 2.01 STREET) 2.02A Sedgwick Road West - Design, Permitting & ROW SR 16 Interchange to 0.4 462,428 462,428 0 2029 P PE STP(U) 400,000 0 62,428 The design, permitting and right-of-way Sidney Avenue 693,642 693,642 0 2030 P RW STP(U) 600,000 0 93,642 acquisition phase for this widening project with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) TIF 2.02 2.02B Sedgwick Road West - Construction SR 16 Interchange to 0.4 3,468,208 3,468,208 0 2031 P CN STP(U) 3,000,000 0 468,208 The construction phase for this widening project Sidney Rd. with 3 lanes (continuous TWTL), bike lanes, sidewalks and box culvert across Blackjack Creek.) TIF 2.02 2.04A.2 Ramsey Road Widening Sedgwick Road to Widen road to two travel lanes with bike lanes, Salmonberry Road 0.5 2,500,000 0 21500,000 2029 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.04A Bethel/Sedgwick Corridor Phase 2 - Design, Sedgwick Road: SR-16 2.0413 ROW and Construction interchange to Bethel 1,110,000 1,110,000 0 2030 P PE 0 0 1,110,000 Design, ROW acquisition and construction of the 0.7 2,802,000 2,802,000 0 2031 P RW 0 0 2,802,000 second phase of the street improvements per the 12,757,000 12,757,000 0 2032 P CN 12,725,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04E Bethel/Sedgwick Corridor Phase 3 - Design, Bethel Road: Blueberry 2.04C ROW and Construction to Sedgwick 422,000 422,000 0 2032 P PE 0 0 422,000 Design, ROW acquisition and construction of the 0.25 541,000 541,000 0 2033 P RW 0 0 541,000 third phase of the street improvements per the 4,859,000 4,859,000 0 2034 P CN 4,859,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04C Bethel/Sedgwick Corridor Phase 4 - Design, Bethel Road: Lund to 2.04D ROW and Construction Salmonberry 616,000 0 616,000 2034 P PE 0 0 616,000 Design, ROW acquisition and construction of the 0.5 1,041,000 0 1,041,000 2035 P RW 0 0 1,041,000 fourth phase of the street improvements per the 7,087,000 0 7,087,000 2036 P CN 7,087,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04D Bethel/Sedgwick Corridor Phase 5 - Design, Bethel Road: Mile Hill 2.04E ROW and Construction Drive to Lund 720,000 0 720,000 2036 P PE 0 0 720,000 Design, ROW acquisition and construction of the 1.1 1,532,000 0 1,532,000 2037 P RW 0 0 1,532,000 fifth phase of the street improvements per the 8,283,000 0 8,283,000 2038 P CN 8,283,000 0 0 Bethel/Sedgwick Corridor Plan (2018). TIF 2.04E 9/15/2023 PIaIg)p64cd&g Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01- Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds 2.05 Sidney Road SW Widening Sidney Road SW: Sidney Avenue is currently two lanes wide, it SR 16 Overpass to 0.95 500,000 500,000 0 2028 P PE 0 0 500,000 needs to be widened to three lanes (additional Sedgwick Road 5,761,850 5,761,850 0 2029 P CN STP(U) 3,600,000 TIB 1,600,000 561,850 TWTL) including bike lanes, sidewalks, traffic calming, and stormwater system improvements. TIF 2.05 (COMPLETE STREET). 2.06 Pottery Avenue Widening Pottery Avenue: Widen road to two travel lanes with bike lanes, Tremont Place to 0.22 1,600,000 1,600,000 0 2029 P ALL 0 0 1,600,000 sidewalks and stormwater system improvements. Melcher Street TIF 2.06 2.07 Old Clifton Rd Shoulder & Pedestrian Improvements Old Clifton Road: Design and construction of shoulder widening, Anderson Hill to 1.35 2,700,000 2,700,000 0 2028 P CN 0 0 2,000,000 street lighting, watermain extension and grade- Westerly City Limits seperated Pedestrian Path as identified in the TIF 2.07 McCormick Urban Village Trans Plan. 2.08 O. Clifton Rd & McC. Woods Dr. Intersection Old Clifton Rd/ Design and construction of intersecion McCormick Woods Dr. 0 250,000 0 250,000 2032 P PE 0 0 250,000 (roundabout) improvements including street Intersection 750,000 0 750,000 2033 P CN 0 0 750,000 lighting, as identified in the McCormick Urban TIF 2.08 Village Trans Plan. 2.09 Melcher Street Widening Melcher Street West is currently a narrow two- Melcher Street: 0.4 600,000 0 600,000 2032 P ALL 0 0 750,000 lane road. The reconstruction would widen the Pottery Avenue to road to allow two safe travel lanes, bike lanes, Sherman Avenue sidewalks and a stormwater system. TIF 2.09 2.10 Fireweed Road Widening Fireweed is currently a narrow two lane road. The Fireweed Road: 0.25 375,000 0 375,000 2035 P ALL 0 0 750,000 reconstruction would widen the road to allow for Sidney Avenue to safe travel lanes, bike lanes, sidewalks and a South Flower Avenue TIF 2.10 stormwater system. 2.11 Sherman Avenue Widening Sherman Avenue: Sherman Avenue is currently a narrow two-lane Fireweed Road to 0.35 525,000 0 525,000 2032 P ALL 0 0 750,000 road. The reconstruction would widen the road to Terminus at SR 16 allow two safe travel lanes, bike lanes, sidewalks and a stormwater system. TIF 2.12 2.12 Tremont St Widening - Port Orchard Blvd (Ph. 2) Port Orchard Blvd. Construct roundabouts at Tremont Street/PO Blvd. Tremont Street to 1.1 and Bay Street (SR166)/PO Blvd. and curb, gutter, Ba Street SR166 Y ( ) 809,250 0 809,250 2033 P PE STP(U) 700,000 0 109,250 bike lanes, sidewalks, street lighting, storm 520,231 0 520,231 2035 P RW STP(U) 450,000 0 70,231 drainage and Schedule 74 Undergrounding. 7,225,434 0 7,225,434 2037 P CN STP(U) 6,250,000 0 975,434 TIF 2.13 2.13 Pottery Avenue Widening Tremont to SR16 Pottery Avenue Pottery is currently a two-lane road, it needs to be Tremont Street 0.95 500,000 500,000 0 2030 P PE STP(U) 432,500 67,500 widened to a four -lane road, with sidewalks, SR 16 Overpass traffic calming and upgrades to the stormwater 750,000 750,000 0 2031 P RW STP(U) 648,750 101,250 TIF 2.14 system. 2,950,000 2,950,000 0 2033 P CN STP(U) 2,292,250 0 657,750 9/15/2023 PNg)0acd&g Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01- Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds 2.14 Old Clifton Berry Lake Road Intersection 0 0 0 0 0 0 0 Intersection Improvement by Kitsap County 2.15 Blueberry Road Widening Geiger Road to Bethel Widen road to two travel lanes with bike lanes, Road 0.4 600,000 0 600,000 2036 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.16 2.16 Geiger Road Widening Sedgwick Road to Widen road to two travel lanes with bike lanes, Blueberry Road 0.25 375,000 0 375,000 2034 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.17 2.17 Salmonberry Road Widening Ramsey Road to Bethel Widen road to two travel lanes with bike lanes, Road 0.15 225,000 0 225,000 2028 P ALL 0 0 0 sidewalks and stormwater system improvements. TIF 2.18 2.18 Piperberry Way Extention Geiger Road to Ramsey Provide an extetion of Piperberry from Ramsey to Road 0.25 575,000 0 575,000 2034 P ALL 0 0 0 Geiger and a new street connection to the proposed round about on Sedgwick. TIF 2.19 2.19 Old Clifton & Feilgly Intersection Feigly intersection Complete streets improvemets indentified in the 0 2,800,000 0 21800,000 2040 P ALL 0 0 0 McCormicks Urban Village Transportation Plan. Continuation of 1.5A TIF 2.21 2.20 Bay Street Pathway - West Tremont to Footferry Continuation of project following study in 1.8 0 4,000,000 4,000,000 0 2030 P ALL 0 0 0 2.21 Walmart to Salmonberry Connector Salmonberry Complete roadway connnection 0 800,000 0 800,000 2040 P ALL 0 0 0 TIF 2.04A 2.22 Downtown Bay Street Study Port Orchard Blvd to Study main street in downtown port orchard for Mile Hill Dr intersection 0 1,000,000 0 11000,000 2033 P ALL 0 0 0 complete streets with bikelanes and streetscape with Bay Street. for pedestrians and storefronts. Study to address traffic cirulcation and raising streets for seal level rise and assocated stormwater and other utility imnrnvpmantc 2.23 Bay Street Improvements Port Orchard Blvd to Complete Street and utlitiy improvements. Refer Mile Hill Dr intersection 0 10,000,000 0 10,000,000 2040 P ALL 0 0 0 to Study. with Bay Street. 2.24 Bay St. & Port Orchard Blvd Intersection Bay Street at Port 9/15/2023 Pllg\AELcd&g Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01- Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Priority Begin Termini Project Start Funding Federal State Fund Number Project Title/Project Description End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Single Lane Round About to address safety and Orchard Bulivard 0 3,000,000 0 31000,000 2040 P ALL 0 0 0 capacity. Bay Street Pathway crossing. Assumed creek is not impacted by project/ no major mitigation. 2.25 Bay St. & Kitsap Street Intersection Improvement Bay Street at Kitsap Re -align Kitsap intersection to addres safety and Street 0 2,000,000 0 2,000,000 2040 P ALL 0 0 0 capacity. Cline to end at Kitsap. Relocate flag pole. Signalized Intersection? 2.26 Bay St. & Mitchell and Wetzil Bay Street at Mitchell Reconfigure intersections to address safety and Avenue and Guy Wetzil 0 2,500,000 0 2,500,000 2040 P ALL 0 0 0 capacity. Rd. 2.27 Sidney Avenue Improvements Prospect St. to the Sidewalk and streetscape improvements. Waterfront 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Developer Imrpovements? 2.28 Harrison Avenue Improvements Bay Street to the Sidewalk and streetscape improvements. Signal Waterfront 0 1,000,000 0 1,000,000 2040 P ALL 0 0 0 replacement? Developer Project? 2.28 Fredrickson Ave Impr. Cline St. to Sidney Ave. Convert to two way street with angled parking. 0 1,500,000 0 1,500,000 2040 P ALL 0 0 0 Provide sidewalk and streetscape impr. 2.29 New Waterfront Street Cline Street to Harrson Sidewalk and streetscape improvements. "Shared Avenue 0 2,500,000 0 21500,000 2040 P ALL 0 0 0 Street" concept. Developer Improvement? Port Orchard Blvd. to 2.30 Tremont St Widening - Port Orchard Blvd (Ph. 3) Sidney Ave. Center median, bike lane, sidewalk, and 0 5,000,000 0 51000,000 2041 P ALL STP(U) 0 FIB, Ped Biki 0 0 streetscape improvements on Tremont and Sidney. Round about at the Tremont/ Sidney intersection for non -motorized safety. Total Tier 2 Capital Projects 86,986,043 52,377,128 34,608,915 51,327,500 1,600,000 29,801,543 9/15/2023 PI1g)02cd&g Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01- Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Priority Number Project Title/Project Description City of Port Orchard Transportation Improvement Program (TIP) For 2030-2043 TIER 2 (Unconstrained) Road Name Total Phase Begin Termini Project Start Funding Federal State Fund End Termini Length Total Est. Cost 2029-2034 2035-2042 Year Status Phase Fund Code Federal Funds Code State Funds Local Funds Maintenance Project 2.51 Cline Avenue Repairs Replace sidewalk and parking strip. Cline Avenue: 0.13 200,000 0 0 P ALL 200,000 Kitsap Street to Dwight Street Total Tier 2 Maintenance Projects 200,000 0 0 0 0 200,000 9/15/2023 PNg)0acd&g Range Projects\2023\02 - Plans\LR23-PLAN-03 - 2023 Comprehensive Plan Amendments\01- Working Folder\2022-2041 TIP.8_14_2023.draftsincolor DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1 BOCA906369B Chapter 9: Capital Facilities Chapter 9. Capital Facilities 9.1. Introduction This Capital Facilities Element of the 2016 Comprehensive Plan provides information about the City's existing public facilities, and the need for future facilities to address the requirements of a growing population. The Capital Facilities Element, in conjunction with the City's Capital Facilities Plan (CFP) and Capital Improvements Program (CIP), provide guidance for the City to achieve its goals of providing the appropriate public facilities and desirable levels of public services to its residents and businesses. Capital Facilities Vision Provide outstanding community facilities that serve the needs of a growing and changing city. Maintain existing community facilities and develop additional facilities to address the city'sgrowth and evolving needs. New facilities should address multiple objectives, such as creating new open space and enhancing neighborhood Ensuring that public facilities are available when growth occurs is critical to the quality of life for Port Orchard's residents. The implementation of the Capital Facilities Element and related plans will help realize the community's vision for outstanding community facilities, as well as the vision and goals of the Land Use Element. This Element also functions in coordination with the Comprehensive Plan's Utilities, Parks and Transportation elements and functional system plans for water, wastewater and stormwater. These are discussed in more detail in Section 9.3. character, even as they serve basic The state requires the City to demonstrate that all functional requirements. capital facilities serving its population have been considered and that planning is done in a coordinated and comprehensive fashion. The Public Facilities and Services Goal of the Growth Management Act (GMA) requires that the level of service ("LOS") of public facilities and services necessary to support development shall be adequate to serve the development at the time the development is available for occupancy and use, without decreasing current service levels below locally established minimum standards ("the concurrency requirement"). Kitsap County's Countywide Planning Policies also require the City to ensure that its growth plans are consistent with the CIP and that adequate public facilities and services are or will be available to serve the City's population allocation through the planning period. If limited funding or other circumstances would prevent the city from providing adequate facilities and services, the Growth Management Act requires the city to re-evaluate the Land Use Element and make sure that capital facilities plans and land use plans are consistent. The City of Port Orchard owns and manages a variety of capital facilities, including roads, parks, utility systems, police facilities, and administrative buildings. In addition to the facilities owned and managed by the City, there are publicly -owned capital facilities managed by other entities which meet some of Port Orchard's capital facility needs. These include, but are not limited to, schools, library, sewage treatment, and public transit. Privately owned utilities (electrical, natural gas, and telecommunications) conduct their own planning processes and maintain their own system plans. The City influences private system Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Chapter 9: Capital Facilities planning through its authority to regulate land uses and its obligation to develop and maintain a Comprehensive Plan. The City uses its capital facilities and functional plans, with guidance from the Comprehensive Plan, to make planning and budgetary decisions about the need and timing for construction of new facilities, improvements to existing facilities, the levels of service provided by those facilities, and how to fund and maintain these needs. Planning decisions should also address the evolving and adaptive role of technology in the provision of capital facilities. The complete list of capital facility improvements planned in the next seven years is provided in the City's Capital Improvements Program (CIP), which is described in Section 9.3. The CIP and the functional plans provide a complete facility inventory, as well as needs, projected costs, and funding sources. 9.2. Inventory and Identified Needs 9.2.1 Administration and Service Facilities Facility Location Size (sq ft) City Hall (includes Police Station and Municipal Court) 216 Prospect Street 28,370 Public Works Shop 1535 Vivian Court 6,000 South Shed 2051 Sidney Avenue 3,811 Active Club 1026 Tacoma Avenue 7,500 Police Shooting Range 1278 Lloyd Parkway N/A Library 87 Sidney Avenue 8,586 Community Development Department Building 720 Prospect Street 2,925 Property Acquisition for City Administration Offices and Public and City Employee Parking Various Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-lBOCA906369B Chapter 9: Capital Facilities The City's Capital Facilities Plan provides a detailed description and analysis of the City's current capital facilities, as summarized below: A City Hall The primary municipal building is the City Hall, which was built in 1999. It contains all of the City's departments and staff, except for the Public Works crew. The UP established the level of service for administrative space (including police and courts) at --- 2,408 sq ft per 1,000 residents. The state's Office of Financial Management estimated the City's 2015 population at 9,950. The City's 2036 target population allocation is 20,558. City Hall also requires some maintenance and improvements, as identified in the CFP. In 2016, the City contracted with Rice Fergus Miller, Inc to prepare a facilities space analysis for the City Hall. This analysis, which has been included in Appendix B of the City's Comprehensive Plan (Plans Adopted by Reference), found that the Port Orchard City Hall's net usable area was approximately 64% of the area provided in the city halls for Gig Harbor and Poulsbo, which are smaller cities. The analysis recommended that approximately 10,592 gross square feet be added to City Hall through 2025, based on the City's projected population growth, in order to maintain and improve work space and customer service. Parking should also be provided for an expansion. The Police Department currently occupies approximately 5,500 sq ft on the ground floor of City Hall. The Police Department has indicated that it requires approximately 10,000-15,000 additional square feet of office space with 3,000-5,000 sq ft of storage to meet its needs for the next 20 years. The City should review options for providing the additional space needed to maintain an appropriate level of police services. Public Works — Shop and South Shed The Public Works shop houses this department's foreman and crew and a majority of the City's maintenance vehicles and equipment. The shop has sufficient capacity to support staff throughout the capital facilities planning period. There is a current level of service for enclosed maintenance facilities of 833 sq ft per 1,000 residents. However, there is not enough covered parking for City vehicles and equipment, and the City has identified the need for a second four -bay carport to cover and protect City vehicles and equipment from the elements. The south shed is anticipated to continue being used as a storage facility and staging area through the planning period. No construction, remodeling or expansion need is anticipated. Active Club 01— Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Chapter 9: Capital Facilities The Active Club is the only community recreational building owned by the City. It provides space for a number of recreational, sports and civic organizations to conduct activities. Police Shooting Range The police shooting range provides a convenient and safe location for officers to train and practice with firearms. Library The library building is owned by the City and houses the local branch of the Kitsap Public Library. 9.2.2 Parks and Recreational Facilities The City has a number of parks and recreational facilities, listed below. Current Parks Facilities Park Name Size Facilities Van Zee 8.3 Acres Picnic Areas and shelters, trails, two baseball diamonds, playground, sports field, lighted tennis courts, horseshoe court, restroom Clayton Park 1.4 Acres Picnic tables, playground, sports field, basketball court, picnic shelter Givens Field 6.7 Acres 2 Baseball Diamonds (under lease, not available for public use), lighted tennis courts, lighted horseshoe courts, restrooms, picnic area, playground, Active Club Lundberg Park 4.8 Acres Not open to the public, no facilities Paul Powers, Jr. 3.75 Acres Field, playground, basketball court Park Boat Ramp 0.3 Acres Municipal boat ramp, restroom, parking DeKalb 4.1 Acres 169 feet of pier, 359 feet of floats, picnic tables Pedestrian Pier Etta Turner Park 0.6 Acres Gazebo, benches, view of Sinclair Inlet, trail connection McCormick 28.6 Acres Trails, restrooms Village Park Seattle Ave 1.88 Acres Trail connection Waterway *tidelands Property included Waterfront Park 1.9 Acres Sidewalks, picnic table, bench, viewing platform Westbay N/A Trail connection, beach access Easements Bethel South 5.3 Acres Not open to the public, no facilities; a portion planned for Property construction of dog park Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-lBOCA906369B Chapter 9: Capital Facilities In addition to the properties in the above table, which are owned and operated by the City, Port Orchard residents also have a number of non -City parks and private facilities that are available for public recreational use. The City's Parks Plan provides a comparison of current recreational facilities and services within the City against the recommended levels of service used by the state's Interagency Council for Outdoor Recreation and by Kitsap County. This comparison is used to establish the LOS for recreational needs of the City's existing and future population. City -owned, non -City publicly owned, and private recreational facilities are all considered by the City when determining levels of service. In general, the City has adequate park and recreational facilities to serve the population during the planning period, with existing deficits in bike paths, boat launches and pedestrian trails, and projected deficits in community and neighborhood parks. Additional information on the City's parks and more detailed planning strategies can be found in the City's Parks Plan and in the Parks Element of this Comprehensive Plan. 9.2.3 Utilities and Transportation The City owns, maintains and manages its water system and wastewater collection system. It is also responsible for City roads and other aspects of the City's transportation system. More information on these facilities is provided in the City's functional plans and other Elements of the Comprehensive Plan (Utilities, Transportation). 9.3. Planning and Policy Connections A complete list of capital facility improvements planned in the next seven years is included in the city's Capital Improvements Program (CIP), which is described in this section. The CIP and the functional plans listed in the following table identify facility inventories, needs, projected costs, and funding sources. Capital improvement recommendations are drawn primarily from functional plans specific to each capital facility or City department. Utilities such as water, sewer, and stormwater have specific requirements according to state and federal law. Each City department forecasts needed improvements for at least a twenty-year. Each plan contains an inventory of the system and a forecast of system demand and capacity based on population and regulatory mandates. The functional plans identify capital investments required to meet future demand and to replace or Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-lBOCA906369B Chapter 9: Capital Facilities maintain existing facilities for continued service. The plans also define the customer service level for each facility provide and system -specific operating policies. The CIP uses many revenue sources to fund the capital improvement projects identified in the plan, including sales tax, business and occupation tax, utility rates, state revenues, bonds, and grants. Impact feesl and other specific revenues allowed under the Growth Management Act also offer potential funding sources. Coordinating City Functional Plans and Capital Improvements Program Capital Improvements Program Funding: plan updated biennially. This is the city's seven-year financing and implementation plan in which needed capital improvements to the city's public facilities and infrastructure are identified and prioritized. Water System Plan Functional Plan: updated on a 6-10 year cycle, as This plan provides a basis for capital improvement needed. planning for six years and forecasts anticipated needs to a 20-year planning horizon. Wastewater System Plan Functional Plan: updated on a 6-10 year cycle, as This plan addresses aging infrastructure, system needed. expansion to accommodate development, revised policies and practices, data, finances, revised growth forecasting, and recommended improvements. Storm and Surface Water System Plan Functional Plan: updated on a 6-10 year cycle, as This plan establishes the city's storm and surface water needed. policy. Parks Plan Functional Plan: updated on a 6-10 year cycle, as This plan is the primary tool to guide the long-term needed. growth and development of Port Orchard's parks and open space system. The core of the plan is a set of 20- year capital project recommendations, which are reviewed and updated approximately every six years. Transportation Plan Functional Plan: updated every two years. This six -year plan indicates needs for maintenance and improvement of the City's transportation network. 9.4. Future Needs A key feature of the capital facilities planning process is asset management, which continually monitors the condition of existing facilities and infrastructure, identifies the levels of maintenance needed, and determines when facilities need to be replaced. The city's capital facilities policies ensure that the city plans in advance for maintenance and infrastructure replacement to maintain levels of service. These Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Chapter 9: Capital Facilities policies also tie capital facilities planning to land use, making sure that assumptions about future growth are consistent. The City of Port Orchard owns, operates, and maintains over $3.5 billion of infrastructure to provide drinking water, wastewater, and stormwater and surface water services to its residents and businesses. Continued investment in this infrastructure is necessary for continued delivery of utility services that are critical for human health and safety, economic development, as well as supporting a sustainable, healthy environment. Capital facility investment helps to ensure that the City can continue to deliver the high quality municipal utility services customers expect. The City of Port Orchard has a rapidly growing population. To provide adequate capital facilities, the City is working to address substandard infrastructure and comply with new regulations. While there are unique challenges to specific capital facility services, several issues apply broadly to Port Orchard: Accommodating Increased Demand. Increased demand will require investment for building and maintaining facilities for services like water, wastewater, stormwater, parks, fire, police, transportation, and municipal buildings. Non -city providers, such as school districts, libraries and solid waste processors, will also experience increased demand for services and will need to plan for new or improved facilities. Aging Infrastructure. Some of Port Orchard's capital facilities are aging or inadequate for current service needs, and will require repairs and replacement over the next twenty years. The costs of replacing utility infrastructure and roads are substantial and take years for planning and implementation. Likewise, facilities such as parks and municipal buildings require ongoing maintenance, improvements, or replacement. City departments maintain plans and strategies for funding and building necessary improvements, which are scheduled and assigned funding in the city's seven-year CIP. Compliance with New Laws and Regulations. Changing state and federal mandates governing capital facilities systems require the city to monitor and review its systems to ensure compliance. For example, compliance with the city's National Pollutant Discharge Elimination System Municipal Stormwater Permit (NPDES), a Federal Clean Water Act mandate that affects programs citywide, will have significant long-term impacts on the way the city does business, on city expenses, and on private development costs. In February 2010, stormwater regulations were significantly expanded under the NPDES Phase II permit. These new regulations, along with associated stormwater requirements that must be incorporated into City code by 2017, places significant additional requirements on the City's planning and regulatory functions. The City of Port Orchard benefits from its proximity to centers for recreation, open space, and sports fields outside City Limits and/or held by other agencies or groups, such as the South Kitsap School District and Kitsap County. Creating and strengthening regional partnerships will enable Port Orchard and its partners to provide greater facilities and opportunities than would be possible alone. The City of Port Orchard is already working with Kitsap County and other nearby jurisdiction to create and expand a regional water trail including shoreline access with launch points, rest areas, parking facilities. 9.5. Goals and Policies Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1 BOCA906369B Chapter 9: Capital Facilities Goal I. Provide an efficient distribution and mixture of public facilities, including parks, parking areas, non -motorized transportation connections, and other facilities and services. Policy CF-1 The City should explore opportunities for acquisition of surface parking areas within the downtown core to serve the general public and municipal purposes. Policy CF-2 The City should consider development of multi -use facilities that can serve more than one public need. The City should coordinate with other jurisdictions and agencies that also provide public facilities, such as Kitsap County, Kitsap Transit and the Port of Bremerton, to encourage cooperative planning of future facilities and reduce redundancy. The City should also explore opportunities for public/private partnerships and funding sources that could provide a mix of public facilities and other uses such as commercial and residential within the same development, where appropriate. Policy CF-3 Encourage public awareness and consider public input when considering the need for and proposed locations of new public facilities. Develop public facilities according to the specific needs, locations and levels of service identified in the City's functional plans and capital improvements program. Policy CF-4 Encourage thejoint use of utility corridors for open space and non -motorized pathways and trails, provided that such joint use is consistent with limitations prescribed by applicable law and prudent utility practice. Policy CF-5 Encourage private property owners and developers to donate public trail access and parcels for park development in areas identified for future municipal parks and trail connections. Goal 2. The City shall establish minimum levels of service for provision of urban services (i.e. fire, police, garbage disposal, parks, library, and other appropriate services). Policy CF-6 It is the City's intent that adequate school facilities be provided for the community. Individual school levels of service should be maintained as adopted and funded by the South Kitsap School District School Board. Goal 3. Ensure that infrastructure, facilities, and services are adequate to serve new projects at the time buildings are available for occupancy and use, without decreasing service levels below locally established minimum standards. Policy CF-7 Require that urban level facilities and services are provided priorto or concurrent with development. These services include, but are not limited to, transportation Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-lBOCA906369B Chapter 9: Capital Facilities infrastructure, parks, potable water supply, sewage disposal, stormwater and surface water management, and solid waste management. Policy CF-8 Facilitate adequate planning for services and facilities by coordinating with utility providers on annual updates of population, employment and development projections. Policy CF-9 Regularly monitor and update LOS standards for public facilities to reflect community preferences for quality of service delivery. Policy CF-10 Encourage providers to improve accessibilityto public services by making information available, convenient and complete. Policy CF-11 Maintain an inventory of existing capital facilities owned by public entities Policy CF-12 The City should acquire property sufficient to provide capital facility services at established levels of service, according to the identified deficiencies and future needs for such services as provided in the City's functional plans. Goal 4. Ensure that the provision of capital facilities meets the needs of the present without compromising the ability of future generations to meet their own needs. Policy CF-13 Provide public facilities and services conveniently and equitably throughout the community and do not unduly affect any one group of people or geographic area by the siting or expansion of essential public facilities. Policy CF-14 Ensure that the provision of capital facilities is environmentally sensitive, safe and reliable, aesthetically compatible with surrounding land uses, and economical to consumers. Policy CF-15 Ensure that new growth and development pay a fair, proportionate share of the cost of new facilities needed to serve such growth and development. Policy CF-16 Direct growth within the community where adequate public facilities exist or can be efficiently provided. Policy CF-17 Seek to reduce the per unit cost of public facilities and services by encouraging urban intensity development within the City and adjacent Urban Growth Areas. Policy CF-18 Coordinate the construction of public facility improvements such as utility and road improvements to help minimize project costs. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1 BOCA906369B Chapter 9: Capital Facilities Policy CF-19 Ensure the efficient and equitable siting of capital facilities through cooperative and coordinated planning. Policy CF-20 Coordinate and cooperate with other jurisdictions in the implementation of multijurisdictional utility facility expansions and improvements. Policy CF-21 Provide meaningful opportunities for community involvement in the planning of capital facilities. Goal 5: Support provision of adequate, timely and efficient fire protection and emergency medical service within the City. Policy CF-22 Coordinate with South Kitsap Fire and Rescue on planning for the location of new fire stations to ensure that they are dispersed throughout the City and located near areas of high population concentration. Policy CF-23 Encourage consolidation of duplicate services between Fire Districts to use resources more effectively. Goal 6: Reduce crime risks within the City. Policy CF-24 Design and locate capital facility improvements to optimize public safety through increased visibility at joint use facilities (e.g., streets, public buildings, etc.) Policy CF-25 Ensure that there are enough commissioned officers and support staff to support the established LOS in the City. Goal 7. Coordinate land use and school district capital facilities planning. Policy CF-26 Recognize that schools provide a unifying social and physical amenity that are key foci for successful neighborhoods. Encourage elementary schools to be located in or near neighborhood centers and middle schools, junior high schools and senior high schools to be located near community centers. Policy CF-27 Coordinate with the South Kitsap School District to develop strategies to ensure that students are not forced to attend a school outside their neighborhood. Policy CF-28 Coordinate with the South Kitsap School District to develop strategies to provide and enhance safe multi -modal access to the schools. Policy CF-29 Review and update school impact fees at least every 4 years. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1 BOCA906369B Chapter 9: Capital Facilities Policy CF-30 Explore opportunities to develop joint use facilities with the South Kitsap School District, such as recreational and community center facilities. Goal 8: Develop and maintain adequate and convenient parks, recreation, and open space areas and facilities for all age groups to serve both the existing and future population of Port Orchard and surrounding areas. Policy CF-31 Preserve open space considered scenic in value by a. enhancing and expanding park facilities. b. discouraging obstructions of scenic views. Policy CF-32 Increase the size and number of parks and open spaces by: a. establishing partnerships with other agencies to jointly utilize public facilities. b. promoting through public and private investments, the acquisition of open space facilities and assuring proper maintenance thereof. c. providing for public input when developing plans for public parks. d. providing for a mixture of active and passive open spaces within residential and commercial areas with consideration of nearby public facilities. e. providing input on development plans for public parks within Port Orchard's Urban Growth Boundary. Policy CF-33 Monitor and maintain the LOS for park facilities as established in the City's comprehensive Parks Plan. Policy CF-34 The Active Club should continue to be maintained and improved. Policy CF-35 Reevaluate the City's established park impact fee at least every four years to ensure that the fee is appropriate based on the City's LOS for parks acquisition, improvement and maintenance. Policy CF-36 Correct LOS deficiencies in park facilities through capital improvements. Policy CF-37 Collaborate with Kitsap Countyto explore formation of a Municipal Parks District to help fund and develop community and neighborhood scale parks throughout the city and the Urban Growth Area. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Chapter 9: Capital Facilities Policy CF-38 Develop neighborhood parks adjacent to school sites whenever possible in order to promote facility sharing. Facilities on the neighborhood park site should supplement uses that the school does not provide such as trails, open space, picnic areas, playground equipment, and multi -purpose paved sport courts. Policy CF-39 Encourage implementation of the County's Greenways Plan that outlines a citywide system of trails that will serve park, recreation, and open space needs. Link a system of trails between neighborhoods and parks, school sites, and other public property. Utilize public lands and existing rights -of -way for trail purposes whenever feasible. Policy CF-40 Place interpretive signs along trails to encourage community, historical, and environmental awareness and place distance markers along the trail for walkers and runners. Policy CF-41 The City should maximize the use of state and federal grants for future parks improvements whenever possible. Policy CF-42 Create new parks in recently annexed areas or update existing parks within newly annexed portions of the City. Policy CF-43 In conjunction with partners, develop the South Kitsap Community Events Center as a recreational and civic amenities hub for Port Orchard and the South Kitsap region. Goal 9. Ensure that an adequate water supply is available to support the level of population growth and land development projected within the City. Policy CF-44 Maintain drinking water quality in accordance with State and Federal standards to ensure the quality of drinking water delivered to customers of the water system. Policy CF-45 Provide high quality domestic and fire protection service to all areas within the retail service area. Policy CF-46 Utilize City -owned and operated sources of supply to maximize efficiency and cost effectiveness of the water system. Policy CF-47 Maintain water system facilities to ensure a high level of service is provided to all customers and maximize the life of facilities to protect the investment of ratepayers. Policy CF-48 Construct new facilities as required to serve the existing and future populations of the established water service area and South Kitsap Urban Growth Area. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1BOCA906369B Chapter 9: Capital Facilities Policy CF-49 Interconnect the City's main water system with the independent facilities serving the City's 580 and 660 Pressure Zones (McCormick Woods System). This will allow for combining the two existing systems under one water system identification number. Policy CF-50 Implement and maintain water use efficiency and conservation programs to discourage water waste, promote the prudent use of water resources and support protection of habitat and the environment. Policy CF-51 Work with neighboring water utilities, participate in regional water planning efforts to establish common goals of uniform water system standards and facilitate coordination of efforts toward the adequate provision of water service throughout the region. Policy CF-52 Conduct water system operations in a manner that insures high quality service in accordance with all applicable rules and regulations, at the lowest reasonable cost. Policy CF-53 Encourage land uses and programs that promote water conservation. Policy CF-54 Revise water service boundaries in cases where the designated water service provider cannot provide timely or reasonable service. Policy CF-55 Ensure that land uses permitted in aquifer recharge areas do not lead to contamination of water resources. Policy CF-56 Encourage new developments adjacent to properties with private wells or existing septic systems to connect to the City's water system or, if not feasible, ensure that adverse impacts to existing wells or septic systems from new development is avoided or mitigated. Goal 10. Provide safe, reliable and timely sewer service to consumers at a fair and reasonable price. Policy CF-57 Coordinate construction of sewage improvements with other utilities. The City shall require all new development to connect to public sewer and water systems, unless physically or financially infeasible. Goal I I. Ensure that all utility infrastructure expansion provides an adequate level of public service to support new development consistent with the City's policies, criteria, and standards. In addition, utility expansion should also be consistent with current land use plans and development regulations of the State of Washington, Kitsap County, and appropriate local planning agencies. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023 DocuSign Envelope ID: A5707FCC-3CEF-4ECE-9C2C-1 BOCA906369B Chapter 9: Capital Facilities Policy CF-58 Utilize best construction methods and practices and innovative techniques in the design and construction of utilities. Policy CF-59 Whenever possible, utility construction should be scheduled to minimize disruption of access to area residences and businesses. Policy CF-60 Schedule utility construction activities to avoid sensitive times in the lifecycle offish and wildlife, such as spawning, nesting, and migration. Goal 12. Minimize development related impacts to existing hydrologic conditions and functions, and strive to correct current deficiencies resulting from past development practices such as stormwater-related flooding. Policy CF-61 Identify areas within and adjacent to the City and its UGA which are highly sensitive to changes in hydrologic conditions and functions. Within these highly sensitive areas, establish standards that provide for near zero change in hydraulic and hydrologic function on a property, such as no net increase in the peak flow or volume of runoff or erosion products leaving a site post- development. Policy CF-62 Ensure development regulations adequately prevent new development from increasing flooding and minimize the possibility of damage from flooding events. Policy CF-63 Encourage Low Impact Development (LID) strategies for stormwater management through incentives and flexibility in application of regulatory requirements. Policy CF-64 Utilize new inventories of flood hazard -prone properties in the decision making process to prioritize stormwater system improvements. Policy CF-65 Coordinate the basin planning process with the community planning process to address surface water runoff and flooding issues. Policy CF-66 Integrate public regional stormwater detention and retention facilities into the natural environment. Policy CF-67 Recognize that regional facilities can provide aesthetics, recreation, and fish and wildlife habitat in a community park -like or open space setting. Policy CF-68 Implement planned activities and continue current activities in the 2014 Stormwater Management Plan. Port Orchard Comprehensive Plan Adopted: June 2016 Revised: November 2023