Loading...
040-23 - Miles Resources, LLC - Supplement / Change Order 2CITY OF PORT ORCHARD Change Order No. 2 Date: 11/27/23 Project: 2023 City Wide Asphalt Repair Contractor: Miles Resources, LLC 400 Vallev Ave NE Contract / Job # C040-23 Puyallup, WA 98372 THIS CHANGE ORDER AUTHORIZES (add description). Additional; 009 Planing Bituminous Pavement, 015 Adjust Valve Box, 018 Plastic Crosswalk Line (Type A Thermoplastic), 104 Pavement Repair Excavation Incl. Haul, 106 HMA CL. 1/2" PG 58.22 (Roadway Reconstruction), 107 Crack Sealing, 109 Paint tine, 204 Removing Cement Concrete Sidewalk, 208 Crack Sealing, 210 Cement Concrete Pedestrian Curb, 211 Cement Concrete Traffic Curb and Gutter, 213 Cement Concrete Sidewalk, 214 Paint line, 303 HMA CL. 1/2" PG 58 22 (Paved Lot) 4" depth, 504 Pavement Repair Excavation Incl. Haul, 506 HMA CL. 1/2" PG 58.22 (Roadway Reconstruction) Credit: 001 Minor Change, 005 Remove Asphalt Conc. Curb, 006 Crushed Surfacing Base Course (Shoulder Ballasting), 007 HMA CL. 1/2" PG 58.22 (Overlay), 008 HMA CL. 1/2" PG 58.22 (Roadway Reconstruction), 010 Pavement Repair Excavation Incl. Haul, 0114" HMA Wedge Curb, 012 Crack Sealing, 013 Adjust Catch Basin, 017 Paint Line, 019 Plastic Stop line (Type A Thermoplastic), 020 Plastic Traffic Arrow (Type A Thermoplastic), 101 Minor Change, 105 Crushed Surfacing Base Course for Pavement Repair, 110 Plastic Crosswalk line (Type A Thermoplastic), 111 Plastic Stop Line (Type A Thermoplastic), 112 Plastic Traffic Arrow (Type A Thermoplastic), 201 Minor Change, 205 Pavement Repair Excavation Incl. Haul, 206 Crushed Surfacing Base Course for Pavement Repair, 207 HMA CL, 1/2" PG 58-22 (Roadway Reconstruction), 217 Plastic Traffic Arrow (Type A Thermoplastic), 301 Minor Change, 401 Minor Change, 403 HMA CL. 1/2" PG 58 22 (Paved lot) 4" depth, 501 Minor Change, 505 Crushed Surfacing Base Course for Pavement Repair, 507 Crack Sealing, 508 Paint line See request for payment number 2 for quantities and cost summary sheet for break down. Contract History Amount Sales Tax Total Date Apovd b Original Contract $867,629.60 $0,00 $867,629.60 09-Ma -23 council Change Order #1 $93 135.22 $0.00 $93,135.22 08-Au -23 Council Change Order q2 - 22 456.20 $0.00 - 22 456.20 27-Nov 23 PW Directo Total Contract $938 308.62 $0.00 $938 308.62 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Co a r Approval Signature Ptu' Printed Name 8t Title Pri Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget rimit or contract Approved: amount established by City Council can be approved by the Public Works Director Change Orders that do not exceed 10% with a maximum of Attest: 5100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. f�r Director Name Mayor City Clerk Council Approval Date Page 1