048-23 - Lincoln Construction, Inc. - Supplement / Change Order 2DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 CITY OF PORT ORCHARD Authorization for Change Order No. 2 Date: 11/10/2023 Project: City Hall Renovation Contract / Job # C048-23 Contractor: Lincoln Construction, Inc. 118031015t Ave. E. Suite 201 Puyallup, WA 98373 THIS CHANGE ORDER AUTHORIZES (add description). Additional Work/Construction Change Directives: COP 008- Change StronGirts from 24" OC to 16" OC, double the screws needed for the attachment and change to stainless steel #14 x 2" Hex Washer Head Self -Drilling. Change StronGrits from 24" OC to 12" OC at Zone 5. Exterior cladding attachment system. See COP 008 and AIA for breakdown. See memo for more detail. Amount Sales Tax Total Date Appvd by Original Contract $8,245,941.00 $766,872.51 $9,012,813.51 13-Jun-22 council Change Order 1 $44,711.00 $4,698.77 $49,409.77 11-Oct-23 PW Director Change Order 2 $92,579.00 $8,609.85 $101,188.85 10-Nov-23 Council Total Contract $8,383,231.00 $780,181.12 $9,163,412.12 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. 7"low" RmtdeV Contractor Approval Signature Thomas Romberg -Project Manager Printed Name & Title Public Works Dir or Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved: amount established by City Council can be approved by the Public Works Director. Change Orders that do not exceed 10%, with a maximum of Attest $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. DocuSigned by: fimv—v� Mayor Pro-Tem Ma or DocuSigned by: �L� �' 0'6i ' Denuty Citv Clerk 6�B1E6�,r�=2=r6 City Clerk December 12, 2023 Council Approval Date DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 I A Change Order PROJECT: (Name and address) Port Orchard City Hall Building Improvements 216 Prospect Street Port Orchard, WA 98366 Documen 0 - 20 CONTRACT INFORMATION: Contract For: Construction Date: May 23, 2023 CHAN E ORDER INFORMATION: Change Order Number: 002 Date: November 8, 2023 OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) City of Port Orchard Rice Fergus Miller, Inc. Lincoln Construction Inc. 216 Prospect Street 275 51h Street, Suite 100 11803 101st Ave E, Suite 201 Port Orchard, WA 98366 Bremerton, WA 98337 Puyallup, WA 98373 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Change Order Proposal: COP 08 - Additioanl girts for siding attachment $92,579.00 The original Contract Sum was $ 8,245,941.00 The net change by previously authorized Change Orders $ 44,711.00 The Contract Sum prior to this Change Order was $ 8,290,652.00 The Contract Sum will be increased by this Change Order in the amount of $ 92,579.00 The new Contract Sum including this Change Order will be $ 8,383,231.00 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Rice Fergus Miller, Inc. Lincoln Construction City of Port (Orchard ARCHITECT (Firm name) CONTRACTOR (Firm name) OW (Firm -c��-name) � 0�. %`tocuC�d �4y�PJ� SIGNATURE SIGNATURE S I G N�ATRIE l Dean Kelly Thomas Romberg -Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND November 8, 2023 DATE 11-15-2023 DATE DA AIA Document G701 — 2017. Copyright @ 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Instit to of Architects. This document was produced at 19:12:33 ET on 11 /08/2023 nder Order No.3104238988 which expires on 07/26/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3139ADA53) DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 CHANGE PROPOSAL REQUEST To: Port Orchard City Hall Attn.: Jason Ritter-Lopatowski A. TOTAL MATERIAL/EQ BASE COST $ B. TOTAL LABOR COST $ Lincoln Construction COP NO: CCD/PR No.: Date: 10/11 /2023 Proj ect: LCI Project No.: M 1257 SUBTOTAL $ - C. OVERHEAD AND PROFIT (15%) $ - SUBTOTAL $ - D. SUBCONTRACT COST $ 80,252.00 E. OVERHEAD AND PROFIT ON SUBCONTRACT COST (12%) $ 9,630.24 SUBTOTAL $ 89,882.24 H. BOND (GC ONLY) 2,696.47 SUBTOTAL $ 2,696.47 TOTAL CHANGE PROPOSAL COST I $ 92,579 CONTRACT TIME ADJUSTMENT DAYS TBD Lincoln Construction, Inc. CONTRACTOR 10/ 11 /2023 DATE 6i"W" R-rske y Tom Romberg U 01114.00 g3.3 (2) DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 Lincoln Construction Change Order Request To: Jason Ritter-Lopatowski RFM Architects Owner COP/CCD/PR #: Re: Port Orchard Citv Hall Please provide a change order for the following work: Per engineering, change the Strongirt System to 160C in lieu of 240C. Date: 10/11 /2023 COP #: 08 Total price per attached breakdown: $ 92,579 State and local sales tax: includ( X not included Extension of time: 0 We have proceeded with the work Work will not proceed without formal authorization This price is good for 5 days from the above date, after which this request is subject to revision Sincerely, DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 Lincoln Construction CHANGE ORDER REQUEST SUMMARY Port Orchard City Hall COP: REV:��DATE: 1 i DESCRIPTION: Owner COP/CCD/PR #: LABOR HOURS RATE TOTAL PROJECT MANAGER X 95.00 = $ SUPERINTENDENT X 88.95 = $ ASSISTANT SUPERINTENDENT X 85.25 = $ CARPENTER X 82.25 = $ LABORER X 73.50 = $ X $ X _ $ - SUBTOTAL $ - SMALL TOOL ALLOWANCE @ 0.0% $ SUBTOTAL $ MARK-UP @ 15.0% $ TOTALLABOR $ - MATERIALS/EQUIPMENT PHASE CODE UNITS RATE 1 X = $ 1 X = $ 1 X = $ 1 X = $ SUBTOTAL $ USE TAX ON MATERIALS AND EQUIPMENT 0.0% $ MARK-UP @ 15.0% $ TOTAL MATERIAL/EQUIPMENT $ - SUBCONTRACTS PHASE CODE UNITS RATE 1 X = $ 1 X 79,897.00 = $ 79,897.00 Commercial Insulation 1 X 355.00 = $ 355.00 1 X = $ 1 X = $ X = $ X = $ X = $ SUBTOTAL $ 80,252.00 MARK-UP @ Sub Direct Cost 79,897 12.0% Less Sub Fee $ 9,630.24 TOTAL SUBCONTRACTS $ 89,882.24 PROPOSAL SUBTOTAL $ 89,882.24 BONDS/Liability/Builders Risk/B&O Tax 3.000% $ 2,696.47 PROPOSAL TOTAL $ 92,578.71 Updated: 9/30/2011 Page 4 of 6 DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 Tom Romberg To: tom romberg Subject: FW: POCH Stainless Steel Screw Option for Exterior Framing at 24" On Center Thank you, Tom Romberg ILO lzota& ema wa cm Irxe Set. 15,53 11803 1015Y Ave Ct E, Suite 201 Puyallup, WA 98373 Cell 253-606-8350 Oft 253.847.6414 1 Fax 253.847.6806 From: Phil Clark <phil@devcoengineering.com> Sent: Friday, September 22, 2023 8:35 AM To: Tom Romberg <tom.romberg@lincolnnw.com>; John Saari <John@cisinsulation.com> Cc: John Brown <JohnBrown @cisinsulation.com>; Jeff Tiegs <jeff.tiegs@lincolnnw.com>; Bill Markham <bill.markham@lincolnnw.com>; George Drabner <george@cisinsulation.com>; Brooke Powers <brooke@devcoengineering.com> Subject: RE: POCH Stainless Steel Screw Option for Exterior Framing at 24" On Center Tom/John, The capacities of the proposed alternate screws are comparable to the original screws we specified. However, the 20ga studs at 24" o.c. rather than 16" o.c. does cause issue at the building corners (zone 5 wind loads). This is what will be needed: At zone 5 (12' from building corners): Strongirts at 12" o.c. max. with (2) screws each stud. At zone 4 (the remainder): Strongirts at 16" o.c. max. with (2) screws each stud. The attached pdf shows where the zone 5 locations occur. Note: the entire clock tower would be zone 5. Please review and give feedback. Thanks, Phil Clark CAD/IT/BIM Manager I Devco Engineering, Inc. DeVCO I I 541-757-8991 x212 engineering ins phi I(a)devcoengineering.corn Mail: PO Box 1211, Corvallis, OR 97339 Office: 245 NE Conifer Blvd., Corvallis, OR 97330 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the system manager. Please notify the sender immediately by email if you have received this email by mistake and delete this email from your system. If you are not the intended recipient, you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited. DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 NOTES & LEGEND - FLOOR PLAN 1, DIMENSIONS ARE TO ROUGH FRAMING OR TO FACE OF EXISTING FINISHES. TYP UNO. 2 DIMENSIONS INDICATED AS'MIN' OR'CLR' ARE FROM NEAREST FINISH SURFACE, INCLUDING TRIM. 3, ROUGH DOOR OPENINGS ARE LOCATED 4' FROM NEAREST INTERSECTING WALL FRAMING, TYP UNO- 4. THIS BUILDING WILL REMAIN OPERATIONAL DURING CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE STAGING PLANS TO THE CITY FOR THEIR RECORDS STAGING PLAN MUST ALSO INCLUDE THE COMPLIANCE OF IBC CHAPTER 33 SHOWING PROTECTION OF PUBLIC PROPERTY, INCLUSION OF FIRE EXTINGUISHERS, MAINTENANCE OF MEANS OF EGRESS AND ACCESSIBLE MEANS OF EGRESS AND THE MAINTENANCE OF STANDPIPES - 5. GC TO REFER TO SHEET A0202 FOR DEFERRED SUBMITTALS AND THEIR RESPONSI8IUTY FOR ISSUING THEM. C EXISTING ELEMENT TO REMAIN NEW CONSTRUCTION ELEMENT OUT OF SCOPE KEY NOTES - FLOOR PLAN 0 NOTE DESCRIPTION 1 NEW CLEAR BRICK COATING ON ALL EXPOSED BRICK PRIOR TO APPLICATION, REPAI R ALL GROUT HOLES AND SEALANT CRACKS. TYPICAL ALL BRICK AROUND ENTIRE BUILDING 2 NEW CEMBRIT LAP SIDING OVER R-10 RIGID INSULATION AND WEATHER BARRIER. TYPICAL ALL AREAS WHERE LAP SIDING WAS REMOVED, MATCH EXISTING PROFILES 3 NEW VANDOW TO MATCH EXISTING DESIGN. CONTRACTOR TO FIELD VERIFY ALL ROUGH OPENINGS- WINDOWS AT GROUND LEVEL TO BE FIXED, NON -OPERABLE. ALL UPPER LEVELS TO BE OPERABLE SIMILAR TO EXISTING DESIGN. PREPARE ROUGH OPENING PER MANUFACTURERS RECOMMENDED DETAILS FOR WR8 SYSTEM. NEW FLASHING TO BE INSTALLED TO WEATHERIZE CONNECTION BETWEEN WINDOW AND BRICK. TYPICAL ALL VANDOW LOCATIONS 4 HOLLOW METAL DOOR AND FRAME TO MATCH EXISTING DIMENSIONS AND RATING. CONTRACTOR TO FIELD VERIFY ROUGH OPENINGS- PAINT TO MATCH NEW SIDING MATERIAL 5 INFILL WALL FRAMING WHERE CLOCK FACES WERE REMOVED- MATCH ADJACENT FRAMING TYPE AND THICKNESS. NEW EXTERIOR SHEATHING AND WRB SYSTEM TO BE INSTALLED. TYPICAL ALL (4) FACES OF CLOCK TOWER 6 NEW ROLL4OWN DOOR AND AUTOMATIC OPENER TO FIT IN EXISTING ROUGH OPENING. CONTRACTOR TO FIELD VERIFY ROUGH OPENING 7 NEW 30-YEAR COMPOSITE SHINGLES OVER SELF ADHERED UNDERLAYMENT COVERED WITH SYNTHETIC UNDERLAYMENT OVER ROOFING BOARD OVER VENT STRIPS OVER NEW RIGID INSULATION OVER NEW VAPOR BARRIER OVER EXISTING METAL DECK 8 GUTTER AND DOWN SPOUTS TO BE INSTALLED TO ALIGN WITH NEW ROOFING ELEVATION. MAINTAIN ORIGINAL DOWN SPOUT LOCATIONS AND CONNECTION TO STORM DRAIN. TYPICAL AROUND BUILDING HI-PERF RIDGE VENT SLOPE TO SLOPE SHINGLED VERSION 9 10 WIPVENT 11 PRE -FABRICATED VENTED METAL FASCIA WITH DRIP, SIZE PER MANUFACTURER RECOMMENDATION, BASIS OF DESIGN: METAL -ERA HI-PERF VENTED FASCIA 12 NEW FALL PROTECTION ANCHOR. REFER TO STRUCTURAL FOR BLOCKING DETAILS 13 NEW EXHAUST LOWER, SEE MECHANCAL. 14 EXISTING EXHAUST LOWER TO REMAIN 15 NEW CONCRETE SLAB WHERE FOOTINGS WERE INSTALLED. MATCH ADJACENT FINISH AND COLOR 16 NEW TOWER CLOCK WITH BACKGROUND MOUNTING. (BASIS OF DESIGN. ELECTRICTIME114D SILHOUETTE -MARKERS ON BACKGROUND). TYPICAL (4] SIDES OF CLOCK TOWER 17 INEW GATE TO MATCH EXISTING. MATCH MATERIALS, STYLE, AND HARDWARE. RICEfOgIMMLER ARCMILOURL INURIORS PLANNING VIILAB 275 FIFTH STREET, SUITE 100 BREMERTON, WA 98337 360-377-8773 RFMARCH.COM 20104400 �� REGISTERED I ARCOITFCT r-- DEAN E. KEL STATE OF WASHI J In I J J Q U) W M W 0 W CL 0 010-00 C) f _ o N� L� o 0- C.D � CD LEI `0 LU Q co � �o 0 Ld Q 0 _ C/) U Q of 0-0 C,fl F- N � PROJECT # 2020013 BID DOCUMENTS ISSUE DATE APR IL 7, 2023 REVISION SCHEDULE *I* ROOF - PLAN Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always verify Scal SHEET # A21 ol 5 DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 mmercial Insulation Service 79 Center St. SW Tum ter. WA 98501 P:253-241-9140 John Brown acisinsulation.com CIS Job Ntymber Job Name Labor 2342 Date 10/3/2023 Port Orchard City Hall Renovations Qty UM Rate Total Foreman HR $ 97.59 $ - Journeyman 96 HR $ 92.63 $ 8,892.48 Journeyman 6 HR $ 92.63 $ 5,187.28 Journeyman OT HR $ 138.95 $ - Subtotal $ 14,079.76 Materials StronGirts 560 A $ 53.76 $ 30,105.60 Screws 22,400 EA $ 0.30 $ 6,720.00 Credit screws 5,040 EA (0.19) $ (957.60) StronGirts 300 EA $ 53.76 $ 16,128.00 Screws 3000 EA $ 0.30 $ 900.00 Sub Total $ 52,896.00 Equipment - Boom Lift / Fuel 1 EA $ 1,400.00 $\2,50 0 Sundries 1 EA $ 250.00 $0 Boom / Sundries 1 EA $ 850.00 $0 Sub Total $0 Grand -Subtotal $ 69,475. Consumables $ - B&O Use Tax $ - Environmental Fee $ - Sub Total $ 69,475.8 Cost of Time Time Extension day 0.00 $ - Delays day 0.00 $ - Sub Total $ - Descriation of work COR 1 REV-1 $2,593.64 Zone 5 add If this number was to go from 24" Credit to 12" than 16" to 12" should be an $8,064 add. Zone 5 add tttt//// Zone 5 add Should be $450 $425 Zone 5 add Labor, Materials, Equipment Total $11,532.64 to be remove from this COP (+/-) $ 69,475.76 $-11,532.64 $ 57,943.12 Change StronGirts from 24" oc to 16" oc, double the screws needed for attachment and change to Stainless Steel #14 x 2" Hex Washer Head Self - Drilling. Change StronGirts from N" oc to 12" oc at Zone 5. Subtotal $\69,5.76 This should be 16" oc Allowed Markup 15% $10,421. 6 Additional Working Days COR 1 REV-1 Total This proposal excludes sales tax and includes any and all necessary adjustments to the construction schedule and all direct indirect costs based on information provided by the owner. Contractor: John Brown - Estimator/ - a 10/3/2023 Signature REVISED ON FOLLOWING Approved by: SHEET. NO CHANGE IN Signature PRICE $79,897 DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 Commercial Insulation Service 7930 Center St. SW P: 253-241-9140 Tumwatcr. WA 98501 John Brown acisinsulation.com CIS Job Number 2342 Date 10/23/2023 COR 1 REV-2 Job Name Port Orchard City Hall Renovations Qty UM Rate Total Labor Foreman HR $ 97.59 $ - Journeyman 96 HR $ 92.63 $ 8,892.48 24" to 16" change Journeyman 56 HR $ 92.63 $ 5,187.28 Zone 5 add 16" to 12" change Journeyman OT HR $ 138.95 $ - Subtotal $ 14,079.76 Materials StronGirts 560 EA $ 53.76 $ 30,105.60 24" to 16" change Screws 22,400 EA $ 0.30 $ 6,720.00 Credit screws 5,040 EA $ (0.19) $ (957.60) Credit StronGirts 300 EA $ 53.76 $ 16,128.00 Zone 5 add 16" to 12" change Screws 3000 EA $ 0.30 $ 900.00 Zone 5 add 16" to 12" change Sub Total $ 52,896.00 Equipment $ - Boom Lift / Fuel 1 EA $ 1,400.00 $ 1,400.00 Sundries 1 EA $ 250.00 $ 250.00 Boom / Sundries 1 EA $ 850.00 $ 850.00 Zone 5 add Sub Total $ 2,500.00 Grand -Subtotal $ 69,475.8 Labor, Materials, Equipment Consumables $ - B&O Use Tax $ - Environmental Fee $ - Sub Total $ 69,475.8 »» Total $ 69,475.76 Cost of Time Time Extension day 0.00 $ - Delays day 0.00 $ - Sub Total $ - $ - )escrlptlon of work Change StronGirts from 24" oc to 16" oc, double the screws needed for attachment and change to Stainless Steel #14 x 2" Hex Washer Head Self - Drilling. Change StronGirts from 16" oc to 12" oc at Zone 5. Subtotal $ 69,475.76 Allowed Markup 15% $10,421.36 Additional Working Days COR 1 REV-2 Total $79,897 This proposal excludes sales tax and includes any and all necessary adjustments to the construction schedule and all direct and indirect costs based on information provided by the owner. Contractor: John Brown - Estimator/PM 253-241-9140 Date 10/23/2023 Signature Approved by: Date Signature DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 NOTES & LEGEND - FLOOR PLAN 1, DIMENSIONS ARE TO ROUGH FRAMING OR TO FACE OF EXISTING FINISHES. TYP UNO. 2 DIMENSIONS INDICATED AS'MIN' OR'CLR' ARE FROM NEAREST FINISH SURFACE, INCLUDING TRIM. 3, ROUGH DOOR OPENINGS ARE LOCATED 4' FROM NEAREST INTERSECTING WALL FRAMING, TYP UNO- 4. THIS BUILDING WILL REMAIN OPERATIONAL DURING CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE STAGING PLANS TO THE CITY FOR THEIR RECORDS STAGING PLAN MUST ALSO INCLUDE THE COMPLIANCE OF IBC CHAPTER 33 SHOWING PROTECTION OF PUBLIC PROPERTY, INCLUSION OF FIRE EXTINGUISHERS, MAINTENANCE OF MEANS OF EGRESS AND ACCESSIBLE MEANS OF EGRESS AND THE MAINTENANCE OF STANDPIPES - 5. GC TO REFER TO SHEET A0202 FOR DEFERRED SUBMITTALS AND THEIR RESPONSI8IUTY FOR ISSUING THEM. C EXISTING ELEMENT TO REMAIN NEW CONSTRUCTION ELEMENT OUT OF SCOPE KEY NOTES - FLOOR PLAN 0 NOTE DESCRIPTION 1 NEW CLEAR BRICK COATING ON ALL EXPOSED BRICK PRIOR TO APPLICATION, REPAI R ALL GROUT HOLES AND SEALANT CRACKS. TYPICAL ALL BRICK AROUND ENTIRE BUILDING 2 NEW CEMBRIT LAP SIDING OVER R-10 RIGID INSULATION AND WEATHER BARRIER. TYPICAL ALL AREAS WHERE LAP SIDING WAS REMOVED, MATCH EXISTING PROFILES 3 NEW VANDOW TO MATCH EXISTING DESIGN. CONTRACTOR TO FIELD VERIFY ALL ROUGH OPENINGS- WINDOWS AT GROUND LEVEL TO BE FIXED, NON -OPERABLE. ALL UPPER LEVELS TO BE OPERABLE SIMILAR TO EXISTING DESIGN. PREPARE ROUGH OPENING PER MANUFACTURERS RECOMMENDED DETAILS FOR WR8 SYSTEM. NEW FLASHING TO BE INSTALLED TO WEATHERIZE CONNECTION BETWEEN WINDOW AND BRICK. TYPICAL ALL VANDOW LOCATIONS 4 HOLLOW METAL DOOR AND FRAME TO MATCH EXISTING DIMENSIONS AND RATING. CONTRACTOR TO FIELD VERIFY ROUGH OPENINGS- PAINT TO MATCH NEW SIDING MATERIAL 5 INFILL WALL FRAMING WHERE CLOCK FACES WERE REMOVED- MATCH ADJACENT FRAMING TYPE AND THICKNESS. NEW EXTERIOR SHEATHING AND WRB SYSTEM TO BE INSTALLED. TYPICAL ALL (4) FACES OF CLOCK TOWER 6 NEW ROLL4OWN DOOR AND AUTOMATIC OPENER TO FIT IN EXISTING ROUGH OPENING. CONTRACTOR TO FIELD VERIFY ROUGH OPENING 7 NEW 30-YEAR COMPOSITE SHINGLES OVER SELF ADHERED UNDERLAYMENT COVERED WITH SYNTHETIC UNDERLAYMENT OVER ROOFING BOARD OVER VENT STRIPS OVER NEW RIGID INSULATION OVER NEW VAPOR BARRIER OVER EXISTING METAL DECK 8 GUTTER AND DOWN SPOUTS TO BE INSTALLED TO ALIGN WITH NEW ROOFING ELEVATION. MAINTAIN ORIGINAL DOWN SPOUT LOCATIONS AND CONNECTION TO STORM DRAIN. TYPICAL AROUND BUILDING HI-PERF RIDGE VENT SLOPE TO SLOPE SHINGLED VERSION 9 10 WIPVENT 11 PRE -FABRICATED VENTED METAL FASCIA WITH DRIP, SIZE PER MANUFACTURER RECOMMENDATION, BASIS OF DESIGN: METAL -ERA HI-PERF VENTED FASCIA 12 NEW FALL PROTECTION ANCHOR. REFER TO STRUCTURAL FOR BLOCKING DETAILS 13 NEW EXHAUST LOWER, SEE MECHANCAL. 14 EXISTING EXHAUST LOWER TO REMAIN 15 NEW CONCRETE SLAB WHERE FOOTINGS WERE INSTALLED. MATCH ADJACENT FINISH AND COLOR 16 NEW TOWER CLOCK WITH BACKGROUND MOUNTING. (BASIS OF DESIGN. ELECTRICTIME114D SILHOUETTE -MARKERS ON BACKGROUND). TYPICAL (4] SIDES OF CLOCK TOWER 17 INEW GATE TO MATCH EXISTING. MATCH MATERIALS, STYLE, AND HARDWARE. RICEfOgIMMLER ARCMILOURL INURIORS PLANNING VIILAB 275 FIFTH STREET, SUITE 100 BREMERTON, WA 98337 360-377-8773 RFMARCH.COM 20104400 �� REGISTERED I ARCOITFCT r-- DEAN E. KEL STATE OF WASHI J In I J J Q U) W M W 0 W CL 0 010-00 C) f _ o N� L� o 0- C.D � CD LEI `0 LU Q co � �o 0 Ld Q 0 _ C/) U Q of 0-0 C,fl F- N � PROJECT # 2020013 BID DOCUMENTS ISSUE DATE APR IL 7, 2023 REVISION SCHEDULE *I* ROOF - PLAN Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always verify Scal SHEET # A21 ol 5 DocuSign Envelope ID: 77F5F89C-4330-4117-A788-61088F983560 T-4 HARD. Memorandum TO: File FROM: K. Chris Hammer, PE, PMP — City Engineer �kn DATE: October 31, 2023 REGARDING: C01?-oo8; Girt spacing Lincoln and their subcontractor Commercial Insultation Service allege that a different girt system is needed than what was specified in the bid documents. Girts at 24 inches on center vertically were provided in the bid. The specifications require that the Contractor provide engineering for the new girt system. Engineering by Devco indicates that tighter spacing for the Girts is needed to meet wind criteria. The City's consultant team could have provided engineering for the Girt system and specified the size and spacing of the girts at different locations in the building so that adequate information was provided for bidding. It was not practical for bidders to complete engineering of the girt system to bid the project. The assumption that exterior studs are at 16 inches on center and girts at 24 inches on center was a reasonable assumption at the time of bidding. Exterior metal stud spacing of 16 inches on center is common for building construction. Both the Contractors Engineer and the City's Consultants agree that locations with type 4 and type 5 wind loads need tighter girt spacing. Type 5 locations include building corners and the clock tower. Refer to the redline plans provided in COP-oo8. This necessitates the addition of girts and modifications to insulation. Girts are needed at 16 inches on center in most location and 12 inches on center at corners and the clock tower. The City's consultant should have provided more information on the girt system at the time of bidding including the existing stud size and spacing and preliminary girt size and spacing. The bidder did not have adequate information to bid the project. The bidder made reasonable assumptions in bidding on the project. Therefore, the City agrees with the Contractors' basis for the change proposal. PUBLIC WORKS PHONE (360)876.49911 FAX (360) 876.4980 216 PROSPECT ST PORT ORCHARD, WA 98366 EMAIL: PUBLICWORKS@PORTORCHARDWA.GOV WWW. PORTORCHARDWA.GOV