102-23 - Kitsap Transit - ContractDocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
Contract No. 102-23
INTERLOCAL AGREEMENT BETWEEN
THE CITY OF PORT ORCHARD
AND
KITSAP TRANSIT
FOR
FUNDING OF THE DESIGN OF THE RUBY CREEK LIFT
STATION SEWER PROJECT
THIS AGREEMENT is made and entered into by and between the City of Port
Orchard, a municipal corporation of the State of Washington ("City" or "Port Orchard")
and Kitsap County Public Transportation Benefit Area Authority, a Washington municipal
corporation, ("Kitsap Transit") (collectively "Parties" or individually a "Party").
RECITALS:
A. Kitsap Transit is constructing a park and ride facility known as the Ruby
Creek Park and Ride ("Project") which is located within the City of Port Orchard at SW
Sedgwick Rd. and Sidney Rd. SW.
B. The Project will require Kitsap Transit to construct sewer improvements to
support the development ("Sewer Improvements"). These improvements must be
designed and constructed to City standards and will be dedicated to the City once
completed, approved, and accepted.
C. In addition, Kitsap Transit has requested that the City enter into a Latecomer
Agreement under Chapter 13.08 of the Port Orchard Municipal Code for the Sewer
Improvements once the improvements have been constructed.
D. Kitsap Transit has requested that the City perform the design work for the
Sewer Improvements and that the City perform the permitting applications for Kitsap
Transit for the Sewer Improvements. In exchange, Kitsap Transit will reimburse the City
for the design and permitting costs.
E. Once permits for the Sewer Improvements are issued, Kitsap Transit will
build the Sewer Improvements.
F. Port Orchard and Kitsap Transit each have the legal authority enter into
design contracts, design capital improvements, and apply for permits. Pursuant to the
Interlocal Cooperation Act, Chapter 39.34 RCW, public agencies may contract with one
another to perform governmental functions or services.
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 1
10754084.4 - 366922 - 0053
DocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
AGREEMENT:
In furtherance of the foregoing and in consideration of the following terms and
conditions, the Parties agree as follows:
1. Purpose. The purpose of this Agreement is for Port Orchard to perform or
contract to perform design and permitting work for certain Sewer Improvements that must
be constructed by Kitsap Transit as part of its Park and Ride Development Project.
2. Effective Date; Duration. This Agreement shall be effective upon
execution by both Parties ("Effective Date"). There shall be no fixed term associated with
this Agreement, however, this Agreement may be terminated by mutual agreement of the
Parties per RCW 39.34.030(3).
3. Property Ownership. Unless otherwise expressly provided herein,
ownership of any real and personal property acquired or owned by a Party before and
during the term of this Agreement shall remain vested in said Party upon termination.
4. No Separate Entity Created. The Parties do not by this Agreement create
any separate legal or administrative entity. The City of Port Orchard Mayor, or his designee
shall be responsible for working with the Kitsap Transit Executive Director, or his designee
to administer the terms of this Agreement. Except as expressly provided herein, the Parties
do not intend to jointly own any real or personal property as part of this undertaking. The
Parties will cooperatively work together to further the intent and purpose of this
Agreement.
5. Tasks Performed by Port Orchard. Port Orchard agrees undertake the
following tasks for Kitsap Transit:
5.1 Task Order for Pre -Design Work. Port Orchard has begun pre -
design work with its on -call sewer consultant to identify the design
parameters for the Sewer Improvements as described in Sections 5.3 and
5.4 below.
5.2 Contract for Design Work. Port Orchard will enter into a contract
with a consultant of Port Orchard's choosing to design the Sewer
Improvements as described in Sections 5.3 and 5.4 below. The contract
between Port Orchard and the consultant shall include language
requiring the consultant to have insurance and to indemnify both Port
Orchard and Kitsap Transit for design defects. In addition, the
agreement will require the consultant to name both Port Orchard and
Kitsap Transit as additional insureds on the consultant's insurance
policies that are required by the agreement.
5.3 Design of Sewer Improvements. The City will contract with a
consultant to create a design for the Sewer Improvements which are
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 2
10754084.4 - 366922 - 0053
DocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
compliant with Port Orchard's standards. These improvements will
include the following components:
5.3.1 Approximately 430 linear feet of 10-inch sewer force
main located within Sidney Road connecting the
proposed Ruby Creek Lift Station to the City
constructed sewer force main located at the south
property line of Parcel 102301-1-053-2000. The
associated Capital Project (including the City
constructed portions) is Project SD in Table 7-1 of the
June 2022 City of Port Orchard Comprehensive Plan.
The total project is approximately 4,800 linear feet of
10-inch sewer force main project beginning at the
proposed Ruby Creels Lift Station and discharging to
the Cedar Heights Sewer Lift Station located
approximately one mile to the north. Project SD is
being constructed in phases associated with upcoming
road projects. The southernmost section of this force
main will be designed and constructed in conjunction
with the Ruby Creels Lift Station as described above.
5.3.2 Approximately 1,640 linear feet of 15-inch Sewer
Gravity line extending from the existing manhole
located at the intersection of SW Hayworth Drive and
Sidney Road SW to the proposed location of the Ruby
Creek Lift Station. The associated Capital Project is
Project SB in Table 7-1 of the June 2022 City of Port
Orchard Capital Plan which includes the construction
of the lift station described in the following section
5.3.3.
5.3.3 Ruby Creek Lift Station which includes the
following:
5.3.3.1 Wet well, sized to meet the
requirements listed in applicable
design manuals;
5.3.3.2 Submersible pumps, duplex pump
system meeting the capacity needs of
the proposed system with an additional
spare pump provided to the City;
5.3.3.3 Weather protection, in accordance with
the applicable design manuals and City
Standards;
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 3
10754084.4 - 366922 - 0053
DocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
5.3.3.4 Backup generator;
5.3.3.5 Backup diesel pump, sized for full
system buildout;
5.3.3.6 Electrical equipment;
5.3.3.7 Mechanical equipment, including but
not limited to flow meter; and
5.3.3.8 Communications equipment, to be
integrated into the City's SCADA
system.
5.4 Location of Se>7�er Improvements. The location and description of the
above -described Sewer Improvements are shown on the site plan
attached to this Agreement as Exhibit A and incorporated herein by this
reference as if set forth in full.
5.5 Application for Permits. Once the design of the Sewer Improvements
is complete, City will apply for the required local (Port Orchard) permits
required for construction. The permits will be assigned to Kitsap Transit.
5.6 Design Plans; Permits. Once the design plans for the Sewer
Improvements are complete and permits issued, the City will transfer
and/or assign the design plans and permits to Kitsap Transit for its use or
the use of its contractors. There shall be no additional payment required
for such transfer.
6. Kitsap Transit's Obligation to Reimburse City for Costs of Design.
Kitsap Transit agrees to reimburse City for its costs incurred in doing the Tasks listed in
Section 5 above.
6.1. Anticipated Maximum Cost. At the time of this Agreement, the
Parties anticipate that the cost of the design work (including pre -design)
for the Sewer Improvements will not exceed $750,000.00, not including
permit costs. If the design work is anticipated to exceed this amount, the
City will give notice to Kitsap Transit and the Parties will work in good
faith to reduce the costs to extent feasible.
6.2. Procedure for Payment for Pre -Design and Design Work. When
City receives an invoice for the pre -design or design work, it will first
review the invoice and, if acceptable, approve it for payment. The City
will then send an invoice to Kitsap Transit with the underlying
consultant invoice attached. Kitsap Transit will make payment to City
within 30 days of the date of the City's invoice to Kitsap Transit.
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 4
10754084.4 - 366922 - 0053
DocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
6.3. Procedurefor Payment for Permits. The City will send invoices for
all permit fees to Kitsap Transit when due. Kitsap Transit will make
payment to City within 30 days of the date of the City's invoice for such
fees to Kitsap Transit. Permit fees will be based on the standard charges
imposed by Port Orchard based on adopted fees the same as are charged
to other applicants. Kitsap Transit acknowledges that delay in payment
of permit fees will result in delays in issuance of such permits.
6.4. Previously Incurred Expenses. This Agreement includes
reimbursement by Kitsap Transit for all pre -design expenses that are or
were incurred in accordance with Section 5.1, including expenses that
were incurred prior to the effective date of this Agreement. Following
the effective date of this Agreement, the City will provide to Kitsap
Transit invoices as described in Section 6.2 for all work performed to
date.
7. Administrative Fees. The Parties agree to fund their respective
administrative costs and fees, and not seek reimbursement from each other for the same.
8. Indemnification.
8.1.Port Orchard agrees to indemnify and hold Kitsap Transit, its elected
officials, officers, employees, agents and volunteers harmless from any and
all claims, demands, losses, actions, and liabilities (including costs and all
attorneys' fees) to or by any and all persons or entities, including, without
limitation, their respective agents, licensees, or representatives arising from,
resulting from, or connected with this Agreement to the extent caused by the
negligent acts, errors, or omissions of Port Orchard, its elected officials,
officers, employees, agents, and volunteers, or by Port Orchard's breach of
this Agreement.
8.2.Kitsap Transit agrees to indemnify and hold Port Orchard, its elected
officials, officers, employees, agents, and volunteers harmless from any and
all claims, demands, losses, actions, and liabilities (including costs and all
attorneys' fees) to or by any and all persons or entities, including, without
limitation, their respective agents, licensees, or representatives arising from,
resulting from, or connected with this Agreement to the extent caused by the
negligent acts, errors, or omissions of Kitsap Transit, its elected officials,
officers, employees, agents, and volunteers or by Kitsap Transit's breach of
this Agreement.
8.3.In the event of a claim, loss, or liability based upon the alleged
concurrent or joint negligence of the Parties, the Parties shall bear their
respective liability, including cost, in accordance with their respective
liability established in accordance with the laws of the State of Washington.
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 5
10754084.4 - 366922 - 0053
DocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
8.4.FOR PURPOSES OF INDEMNIFICATION ONLY, THE
PARTIES, BY MUTUAL NEGOTIATION, HEREBY WAIVE, AS
RESPECTS THE OTHER PARTY ONLY, ANY IMMUNITY THAT
WOULD OTHERWISE BE AVAILABLE AGAINST SUCH CLAIMS
UNDER THE INDUSTRIAL INSURANCE PROVISIONS OF TITLE 51
RC W.
8.5.The provisions of this section shall survive the expiration or
termination of this Agreement with respect to acts and omissions occurring
during the term hereof.
9. Insurance. Both Port Orchard and Kitsap Transit shall maintain
membership in AWC or WCIA liability and risk pool or have equivalent limits of liability
from another insurance program or liability pool.
10. Jurisdiction; Venue. This Agreement shall be governed in all respects by
the laws of the State of Washington. The Venue for any dispute related to this Agreement
shall be Kitsap County Superior Court, with both Parties expressly agreeing to personal
jurisdiction in the same. In any suit or action instituted to enforce any right granted in this
Agreement, the substantially prevailing party shall be entitled to recover its costs,
disbursements, and reasonable attorney fees from the other Party.
11. No Assignment. Neither Party may assign this Agreement or any interest,
obligation, or duty therein without the express written consent of the other Party.
12. Entire Agreement. This Agreement constitutes the complete and final
agreement of the Parties and replaces and supersedes all oral and/or written proposals and
agreements heretofore made by the Parties on the subject matter. No provision of this
Agreement may be amended or added to except by agreement, in writing, signed by both
Parties.
13. No Third -Party Beneficiaries. This Agreement is executed for the sole and
exclusive benefit of the signatory Parties. Nothing in this Agreement, whether express or
implied, is intended to confer any right, remedy, or other entitlement upon any person other
than the Parties hereto, nor is anything in this Agreement intended to relieve or discharge
the obligation or liability of any third party, nor shall any provision herein give any third
party any right of action against any Party hereto.
14. Written Notice. Any notice or information required or permitted to be
given to the Parties under this Agreement may be sent to the following addresses unless
otherwise specified. Unless otherwise specified, any written notice hereunder shall become
effective upon the date of both emailing and mailing by registered or certified mail, and
shall be deemed sufficiently given if sent to the addressee at the address stated below:
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 6
10754084.4 - 366922 - 0053
DocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
City of Port Orchard:
City of Port Orchard
Attn: Rob Putaansuu, Mayor
216 Prospect Street
Port Orchard, WA 98366
Kitsap Transit:
Kitsap Transit
Attn: Steffani Lillie, Capital Director
60 Washington Ave. Suite 200
Bremerton, WA 98337
15. Website Posting. Each Party shall post a copy of this fully executed
Agreement on its respective website in accordance with RCW 39.34.040. If a Party does
not have a website for posting this Agreement, then that Party shall cause the Agreement to
be filed with the Kitsap County Auditor and shall pay any fees for the same.
16. Modification. No waiver, alteration, or modification of any of the
provisions of this Amendment Agreement shall be binding unless in writing and signed by
a duly authorized representatives of the City and McCormick.
17. Severability. Should any clause, phrase, sentence or paragraph of this
Agreement or its application be declared invalid or void by a court of competent
jurisdiction, the remaining provisions of this Agreement or its applications of those
provisions not so declared shall remain in full force and effect.
18. Counterparts. This Agreement may be executed in multiple counterparts,
each of which shall be deemed an original, and all counterparts together shall constitute one
agreement.
IN WITNESS WHEREOF, authorized representatives of the Parties hereto have
signed their names in the spaces below:
CITY OF PORT ORCHARD
gne
FkA
y:
ocu/d bq,y'r� fi Mayor Pro-Tem
Robert Putaansuu
Mayor
Date: 12/13/2023
Attested to:
DocuSigned by: II
�1.I�lblL F(h�a Mayor Pro-Tem
RSfI � FRF'I RFdFdRF
Brandy Wallace
City Clerk
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 7
10754084.4 - 366922 - 0053
KITSAP TRANSIT
J W. Clauson
xecutive Director
Date: 12 III LZy2 3
Attested to:
Jacquelyn Bidon
Clerk of the Board, Interim
DocuSign Envelope ID: F80B9A8D-4C30-40B2-A263-447DA0011565
Approved as to form:
�?Qq7n
cuSigned by:
Charlotte A. Archer
City Attorney
Interlocal Agreement between Port Orchard and
Kitsap Transit for Sewer Improvement Design
Page 8
10754084.4 - 366922 - 0053
Approved as to form:
David Weibel
Attorney for Kitsap Transit
DocuSign Envelope ID: F80B9A8D-4C30-4OB2-A263-447DA0011565
e
co
c 35, r
E W N
O N
E O s o 'a 3s MAN, c `o „ e ` v v
.. E - n a a
R 'n w L. Y c c � E � o
E d /T) N i O M
.a E 2 3 E e
. O
El
+ LL m"
� ro
a S n8 1311_dtl -
a
00
Zz t —
U F N Z E 0
O Z t } Q
n F Ka
f oan op4 zo�
—_
oao aNF�'. 6oY xN
a1x-o NY tangy d m W Z I ._..
c �M1m Y.a I 0
a w z
orwu C73 wmo
`11 Utnx
1��i5 I (OJ O N O \ + J
T \
n
t \� CD... _......
I I .fa
L z_
0
z f
I R
roN o
C
a ei n��s R
W R
r O N Z Z Z 0
i tt O U V.� Z F, 410y .�I
L
3. o to h tan �1'l'^•'a>> 0
CL
' h150tl 3NVT,`'
fl'