116-23 - Resolution - Fee Schedule for DCD and PWDocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
RESOLUTION NO. 116-23
A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON
REPEALING AND REPLACING RESOLUTION NO. 044-22 AND
ESTABLISHING NEW FEE SCHEDULES FOR THE DEPARTMENTS OF
COMMUNITY DEVELOPMENT AND PUBLIC WORKS.
WHEREAS, the City of Port Orchard is responsible for implementing land use
regulations, planning and public works requirements, administering the building code, and other
administrative duties; and
WHEREAS, the City incurs administrative costs associated with the
implementation of city regulations and policies; and
WHEREAS, the City Council has adopted, through ordinance, regulations calling
for the establishment of administrative fees to be set by resolution of the Council; and
WHEREAS, the City's current Community Development and Public Works
Departments administrative fees were adopted on April 26, 2022, with an effective date of May
1, 2022, as set forth in Resolution No. 044-22; and
WHEREAS, the City Council deems it in the best interest of the City of Port Orchard
to periodically review and update the City's administrative fees to ensure the fees are consistent
with the services provided and cover the public cost of providing these services so that the public
is not subsidizing individual benefits derived from public services; now, therefore,
THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON HEREBY
RESOLVES AS FOLLOWS:
THAT: Resolution No. 044-22 is hereby repealed in its entirety effective as of 11:59
pm on January 14, 2024.
THAT: The rates, fees and charges charged by the Community Development and
Public Works Departments for the specified services are here by adopted as set
forth on Exhibit "A" attached hereto, which is adopted by this reference.
THAT: This Resolution shall become effective immediately upon passage, but the
fees set forth on Exhibit "A" shall be levied beginning at midnight, 12:00 a.m.,
January 15, 2024.
THAT: Upon the approval of the City Attorney, the City Clerk is authorized to make
any necessary corrections to this resolution including, but not limited to, the
correction of scrivener's/clerical errors, references, numbering,
section/subsection numbers and any reference thereto.
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Resolution No. 116-23
Page 2 of 2
THAT: Provisions of this Resolution are declared separate and severable. The
invalidity of any clause, sentence, paragraph, subdivision, section, or portion of
this Resolution or the invalidity of the application thereof to any person or
circumstance, shall not affect the validity of the remainder of the Resolution, or
the validity of its application to other persons or circumstances.
PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor
Pro-Tem and attested by the Clerk in authentication of such passage this 12t" day of December
2023.
DocuSigned by:
AFF15B026C3F4D8...
Mark Trenary, Mayor Pro -Tern
ATTEST:
Jeni e Floyd, CM , Deputy City Clerk
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Exhibit A to Resolution 116-23
FEE SCHEDULES FOR
DEPARTMENTS OF COMMUNITY DEVELOPMENT AND PUBLIC WORKS
A. General
1. No permit shall be issued, application accepted, service provided, or appeal filed without
payment of the applicable fee set forth below.
2. Time of collection of fees.
a. Fees shall be collected at the times specified in the City Code or this Fee Resolution. If
not specified, the minimum fee shall be collected at the time of application submittal.
No application will be deemed "counter complete" until the fee due with the
application has been received by the City.
b. For applications that are submitted online, the applicant can pay the fees
electronically or may submit another form of payment in person or via U.S. Mail. The
determination of whether a permit application is "counter complete" will be deferred
for four business days following submittal of the online application submittal. If
payment for the fees is not received by the City by the fourth business day, then the
City will reject the application. In no case will the City take any steps to process an
application until such time as the fees due with the application are received in full.
c. The City may bill an applicant and require payment for accrued fees at any time in the
permit review process.
d. The final fees will be recalculated during review, and any additional amount due shall
be collected prior to the issuance of the permit, approval, denial, decision or
recommendation.
e. At the time an application or permit is denied or canceled, the final fee shall be
determined and collected.
f. Any fee in excess of the final calculated fee shall be refunded pursuant to Refunds
Table 25.
g. All outstanding fees shall be paid prior to scheduling or performing final inspections.
References to the director refer to the director of the Department of Community
Development or his/her designee.
4. Some projects require more than one permit. A project may require the payment of
numerous fees from the tables below.
B. Building, Plumbing, and Mechanical Fee Policies
1. No temporary or final certificate of occupancy will be approved or issued for a project with
any outstanding fees on any permit associated with the project.
2. Some signs require a building permit in addition to a land use (sign) permit. In these
instances, the permit fees are additive. When an applicant is required to obtain a sign permit
and a building permit, separate fees are required for each permit.
3. The applicant for a permit shall provide an estimated construction cost at the time of
application. The amount shall be the contractor's bid price, rounded up to the next whole
dollar. For work not done by a contractor, the construction cost shall include the price of
materials, plus the fair market value of any donated, contributed or found materials,
multiplied by two (2). Construction cost calculated on 100 square feet shall be rounded up to
the next 100 square feet for any portion thereof.
4. Single family home builders who wish to reuse a plan set to construct more than one home
using the same plan set may do so by utilizing a "basic plan" review process. When an
applicant wishes to establish a basic plan set for reuse, the plans shall initially be reviewed
upon payment of the city's standard plan review fee. Once plan review is complete and if the
City finds that the plans conform to the requirements of the Building Code, the plans shall be
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
approved as a basic plan set and marked as such for reuse. For each use of the plan, the
applicant shall pay a reduced plan review fee as established in Table 3 in lieu of the full plan
review fee. The use of an approved basic plan set shall have no effect on the building permit
fee (only the building permit plan review fee). Plans may not be reused if the city's building
code has been updated unless the plans have been re -reviewed (upon payment of the full
plan review fee) and approved for conformance with the updated building code.
TABLE 1: Fee Calculations.
Permit fees and Plan Review fees shall be determined by using the calculations found in Table 1.
Valuations shall be determined using the IBC Building Valuation Data Table (BVD) (currently the
February August 2023 table as attached hereto) except as noted in the BVD Table and as
otherwise set in Tables 2 and 3.
Fee calculations and set fees found in Tables 2 and 3 apply to:
1. Alterations or repairs to existing buildings, based on the construction cost as determined by
either the contractor's bid price or construction materials x 2.
2. Processes with a fixed fee.
3. Processes with a fixed fee plus inspection fees.
4. Valuations base on square footage calculations which are not in the BVD Table.
5. Fees as a percentage of permit fee.
Total Valuation
FEES (Permit Fee = 100% Plan Review Fee = 65%)
$1 to $500
$36.00
$36.00 for the first $500 plus $4.00 for each additional $100,
$501 to $2,000
or fraction thereof, to and including $2,000
$96.00 for the first $2,000 plus $17.00 for each additional
$2,001 to $25,000
$1,000, or fraction thereof, to and including $25,000
$487.00 for the first $25,000 plus $12.00 for each additional
$25,001 to $50,000
$1,000, or fraction thereof, to and including $25,000
$787.00 for the first $50,000 plus $9.00 for each additional
$50,001 to $100,000
$1,000, or fraction thereof, to and including $100,000
$1,237.00 for the first $100,000 plus $7.00 for each
additional $1000, or fraction thereof, to and including
$100,001 to $500,000
$500,000
$4,037.00 for the first $500,000 plus $6.00 for each
additional $1,000, or fraction thereof, to and including
$500,001 to $1,000,000
$1,000,000
$7,037.00 for the first $1,000,000 plus $5.00 for each
$1,000,001 and up
additional $1,000, or fraction thereof
TABLE 2:
Residential Single Family
Building Permit Type
Amount
Unit of Measure
Calculate construction
Apply construction
cost at $23.50 per
Unfinished Basement (Group R-3)
cost to Table 1
Square foot
Construction cost
Apply construction
(contract price or
Finish an existing basement
cost to Table 1
materials x 2)
2
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Construction cost
Conversion of an existing garage to residential
Apply construction
(contract price or
space
cost to Table 1
materials x 2)
Calculate construction
Apply construction
cost at $13.04 per
New Foundation only or under existing structure
cost to Table 1
square foot
Calculate construction
New garage, shed, barn, or pole building (attached
Apply construction
cost at $64.19 per
or detached)
cost to Table 1
square foot
Calculate construction
Apply construction
cost at $21.07 per
New covered porch, covered deck;
cost to Table 1
square foot
Calculate construction
Apply construction
cost at $13.04 per
New deck, uncovered
cost to Table 1
square foot
Construction cost
Apply construction
(contract price or
Alteration or addition to deck, uncovered
cost to Table 1
materials x 2)
Construction cost
Alteration, repair, or addition to an existing
Apply construction
(contract price or
covered porch or covered deck
cost to Table 1
materials x 2)
Calculated
construction cost at
New freestanding roof structures and carports,
Apply construction
$21.07 per square
other than porch or deck
cost to Table 1
foot
Construction cost
Apply construction
(contract price or
Residential Interior Remodel
cost to Table 1
materials x 2)
TABLE 3:
Miscellaneous Permit fees:
Building Permit Type
Amount
Unit of Measure
Calculate
construction cost at
Apply construction cost
$118.00 per Linear
Shoreline bulkhead walls
to Table 1
Foot
Demolition
$7S
Each
Calculate
construction cost at
Apply construction cost
$11.74 per Linear
Fences over 6 feet in height
to Table 1
Foot
Calculate
construction cost at
Apply construction cost
$64.19 per square
Garages or Carports, Multiple
to Table 1
foot
Calculate
construction cost at
Apply construction cost
$19.67 per Linear
Retaining walls
to Table 1
Foot
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Construction cost
Tank: Underground or Above Ground,
Apply Construction Cost
(contract price or
Installation or Removal
to Table 1
materials x 2)
Calculate
Apply Construction Cost
construction cost at
Roof: Hot Mop/Cold Mop (flat roof)
to Table 1
$90 per 100 SQ FT
Calculate
Apply Construction Cost
construction cost at
Roof: Composition, Metal
to Table 1
$70 per 100 SQ FT
Calculate
Apply Construction Cost
construction cost at
Roof: Wood Shake
to Table 1
$140 per 100 SQ FT
Calculate
Apply Construction Cost
construction cost at
Roof: Concrete, Tile, Slate
to Table 1
$140 per 100 SQ FT
Calculate
Apply Construction Cost
construction cost at
Roof: Torch Down
to Table 1
$90 per 100 SQ FT
Construction cost
Apply Construction Cost
(contract price or
Residential Misc.
to Table 1
materials x 2)
Construction cost
Apply Construction Cost
(contract price or
Commercial Tenant Improvement and Misc.
to Table 1
materials x 2)
Tenant Certificate of Occupancy for new
business; All other C of O included in building
permit fee.
$75
Each
Revised Certificate of Occupancy for business
name change, or business ownership change, or
property ownership change.
$60
Each
Manufactured or mobile home placed on lot or
first time placement in MH park (Does not
include porches, decks, or other added work
covered under thelRC)
$150
Each
Manufactured or mobile home replacement in
MH park (Does not include porches, decks, or
other added work covered under the IRC)
$75
Each
$75.00.
Inspection fees at the
Modular Units, Field Assembly
hourly rate will apply.
Reactivation fee, for permit expired for less than
50% of original permit
one year, no plan changes
fee
Violator must obtain
the required permit
and pay double the
permit fee, or a
$75.00 minimum
penalty if the permit
Work without a permit — penalty;
Double the permit fee,
fee is less than
or $75 minimum.
$75.00.
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Construction cost
Apply Construction Cost
(contract or materials
Sign (when a building permit is required)
to Table 1
x 2)
Carport or Canopy, pre-fab kit installation
$100
Each
Residential siding replacement: permit required
Calculate
when over 1000 sq. ft. or if any structural work
Apply Construction Cost
construction cost at
is required (POMC 20.200.014)
to Table 1
$70 per 100 SQ FT
Calculate
Apply Construction Cost
construction cost at
Commercial siding replacement
to Table 1
$70 per 100 SQ FT
Single Family Residential plan review using a
basic plan on a site specific lot
$225
For each use
Single Family Residential basic plan review,
Each additional
additional elevation(s) after the first one
$225
elevation
$75.00.
Inspection fees at the
Underground plumbing only
hourly rate will apply.
Construction cost
Apply Construction Cost
(contract price or
Windows or Doors
to Table 1
materials x 2)
Fire Code Permits
Fire Code permit projects may be reviewed by a consultant under contract services, depending on
city staff workload.
Plan review fee submitted with the application may cover the consultant cost.
TABLE 4:
Fire Code Permit Fees:
Fire Construction
Amount
Calculation
Fire Alarm, new
Construction cost
Apply Table 1
(contract price or
to construction
materials x 2)
cost
Fire Alarm, minor modifications to existing
Construction cost
Apply Table 1
(contract price or
to construction
materials x 2)
cost
Fire Sprinkler, new or major modification
Construction cost
Apply Table 1
(contract price or
to construction
materials x 2)
cost
Fire Sprinkler, modifications 20 heads or fewer
Construction cost
Apply Table 1
(contract price or
to construction
materials x 2)
cost
Fire Suppression System, Class 1 Hood and Duct
Construction cost
Apply Table 1
(contract price or
to construction
materials x 2)
cost
Solar Panels: Solar energy/photovoltaic panel
$235
each
system roof mounted install per WAC 51-51-2300
Sec. M2302
Standpipe System
Construction cost
Apply Table 1
(contract price or
to construction
materials x 2)
cost
5
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Tank: Underground or Above Ground, Installation or
Construction cost
Apply Table 1
Removal
(contract price or
to construction
materials x 2)
cost
Fire Construction permits, other
Construction cost
Apply Table 1
(contract price or
to construction
materials x 2)
cost
Fire Operational
Amount
Calculation
High Piled Storage
$75.00
An inspection fee at
the hourly rate will
apply when an
inspection is
required.
Temporary Tent or Membrane Structure
Permit required. No
permit fee.
Technology fee
applies.
Fire operational permits, other
$75.00
An inspection fee at
the hourly rate will
apply when an
inspection is
required.
Fireworks Display Permit
Pass through from
Kitsap County ILA
Mobile Food Preparation Vehicle
Technology fee
applies.
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Plumbing Permit Fees
Plumbing permit fees shall be calculated using the commercial and residential schedules in Tables
5 and 6.
TABLE 5:
Commercial Plumbing Permit Fees
Commercial Plumbing Fixtures
Fee
Per
Base Fee Applied to All Plumbing Permits
$23.50
Flat Fee
Backflow protective device 2 inches or less
$9.80
Each
Backflow protective device larger than 2 inches
$15.00
Each
Clothes Washing Machine
$9.80
Each
Dish Washer
$9.80
Each
Drainage Pipe or Vent Pipe Repair or Alteration
$9.80
Each
Drinking Fountain
$9.80
Each
Floor Drain
$9.80
Each
Hose Bibbs, each
$1.00
Each
Industrial/Sand Oil Interceptor
$9.80
Each
Grease Interceptor
$9.80
Each
Lawn Sprinkler System with Backflow Device
$9.80
Each
Medical Equipment / Kidney Machine
$9.80
Each
Medical Gas, each additional outlet in excess of
first 5
$5.00
Each
Medical gas system up to 5 outlets
$50.00
Each
Misc. Plumbing fixtures on one trap
$9.80
Each
Roof Drain
$9.80
Each
Sewer Line Repair and/or Replace, Exterior
$50.00
Each
Sewer Pipe Change, Interior
$9,80
Each
Sink (Lavatory, Kitchen, Mop, or Bar Sink)
$9.80
Each
Floor Sink and /or Indirect Waste
$9.80
Each
Multi - Compartment Sink
$9.80
Each
Shampoo Sink w/interceptor
$9.80
Each
Toilet, Water Closet, Bidet, or Urinal
$9.80
Each
Tub with or without Shower, or Shower
$9.80
Each
Water Heater
$9.80
Each
Water Line Repair and/or Replace, Exterior
$50.00
Each
Water Pipe Change, Interior
$9.80
Each
Other
$9.80
Each
7
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
TABLE 6:
Residential and Multi -Family Plumbing Permit Fees
Residential Plumbing Fixtures
Fee
Per
Base Fee applied to all Plumbing Permits
$23.50
Flat Fee
Clothes Washer
$7.00
Each
Dishwasher
$7.00
Each
Floor Drain
$7.00
Each
Hose Bibb
$1.00
Each
Hot Tub
$14.80
Each
Lawn Sprinkler with backflow preventer
$7.00
Each
Sewer Line Repair and/or Replace, Exterior
$50.00
Each
Sewer Pipe Change, Interior
$7.00
Each
Sink (Lavatory, Kitchen, Mop)
$7.00
Each
Tub with or without shower, or shower
$7.00
Each
Toilet, Bidet or Urinal
$7.00
Each
Water Heater
$7.00
Each
Water Line Repair and/or Replace, Exterior
$50.00
Each
Water Pipe Change, Interior
$7.00
Each
Other
$7.00
Each
Mechanical Permit Fees
Mechanical permit fees shall be calculated using the commercial and residential schedules in
Tables 7 and 8.
TABLE 7:
Commercial Mechanical Permit Fees
Commercial Mechanical Fixtures
Fee
Per
Mechanical Permit Base Fee
$23.50
Flat Fee
Air -Handling Unit < 10,000 CFM
$14.80
Each
Air -Handling Unit > 10,000 CFM
$18.10
Each
Type 1 Hood & Duct Systems
$10.65
Each
Type 2 Hood & Duct Systems
$10.65
Each
Clothes Dryer with exhaust
$10.65
Each
Compressors
$14.70
Each
Cook stove only
$10.65
Each
Ducting Change without New Furnace
$13.70
Each
Evaporative Coolers, permanently installed
$10.65
Each
Fan for Bath and/or Exhaust Fan
$7.25
Each
Commercial Furnace & Ducting < 100,000 btu
$14.80
Each
Commercial Furnace & Ducting > 100,000 btu
$18.20
Each
Combo Gas pipe / Water Heater / Furnace
$35.45
Each
Fuel System Outlets in excess of the first 4
$2.00
Each
Fuel Pipe System LPG, Natural Gas, OIL (first 4 outlets)
$10.65
Each
Miscellaneous Mechanical Equipment
$10.65
Each
Mechanical System Pumps (Misc.)
$10.65
Each
Radiant Heat Units (wall, ceiling, floor, recessed, etc.)
$10.65
Each
Unit Heater, Suspended or Floor Mount
$14.80
Each
Gas Water Heater Vent & Combustion Air
Propane tank over 2000 gallons
$10.65
Each
I $10.65
I Each
P
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
TABLE 8:
Residential and Multi -Family Mechanical Permit Fees
Residential Mechanical Fixtures
Fee
Per
Air conditioning, separate install from furnace
$14.80
Each
Base Fee applied to all Mechanical Permits
$23.50
Flat Fee
Bath Fan and/or Exhaust Fan
$7.25
Each
Clothes Dryer w/exhaust
$10.65
Each
Cook Stove w/exhaust
$10.65
Each
Fireplace - Gas or Gas log inserts
$12.00
Each
Fireplace - Wood or Wood Stove
$12.00
Each
Furnace — Electric, +/- AC, Heat Pump, ducting
$14.80
Each
Furnace Natural Gas +/- Ducting
$14.80
Each
Furnace Propane +/- Ducting
$14.80
Each
Fuel Pipe System LPG, Natural Gas, Oil
$10.00
Each
Gas pipe stub -out
$10.65
Each
Gas Water heater, Vent and Combustion Air
$10.65
Each
Generator
$10.65
Each
Heater, Wall or Baseboard
$10.65
Each
Mini Split System, AC and/or Heat
$14.80
Each
Misc. Mechanical Equipment
$10.65
Each
Propane Fuel Tank Under 2000 Gallons
$10.65
Each
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
C. Planning and Land Use Fees
The planning and land use permit fees listed in the tables below shall be paid at the time an
application is submitted to the city unless otherwise specified.
TABLE 9:
Subdivisions
Short Subdivision, Preliminary
$1,200
Short Subdivision, Final
$700
Short Subdivision, Preliminary, or Alteration
$600
Short Subdivision, Final, Vacation or
Alteration
$500
Preliminary Subdivision Plats 10-20 lots
$2,100 plus Hearing Examiner Fee
Preliminary Subdivisions Plats 21+ Lots
$2,100 + $50 Per Lot plus Hearing
Examiner Fee
Minor Modifications to a Preliminary Plat
$600
Major Modifications to a Preliminary Plat, 5-
20 lots
$2,100 plus Hearing Examiner fees
Major Modifications to a Preliminary Plat,
21+ lots
$2,100 + $50 per lot plus Hearing
Examiner fees
Boundary Line Adjustment
$300
Final Plat
$1,100 + 50 Per Lot
Final Plat, vacation or alteration
$1,100 + $50 per lot plus Hearing
Examiner fees
Binding Site Plan, Preliminary
$1,200
Binding Site Plan, Preliminary, Alteration
$500
Binding Site Plan, Final
$700
Binding Site Plan, Final, Alteration or Vacation
$500
TABLE 10:
SEPA
Project Checklist Review and Threshold
Determination
$300
Non -Project Checklist Review and Threshold
Determination
$300
Environmental Impact Statement Preparation
Actual Cost, See SEPA Ord.
Environmental Impact Statement Review
Actual Cost, See SEPA Ord.
10
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
TABLE 11:
Shoreline Permits
Administrative Shoreline Substantial
Development Permit
$600
Shoreline Substantial Development Permit
$900 plus Hearing Examiner Fee
Shoreline Exemption (Letter)
$150
Shoreline Conditional Use Permit
$1,275 plus Hearing Examiner Fee
Administrative Shoreline Conditional Use
Permit
$600
Shoreline Variance
$1,275 plus Hearing Examiner Fee
Administrative Shoreline Variance
$600
TABLE 12:
Land Use Permits
Conditional Use Permit
$1,375 plus Hearing Examiner Fee
Critical Areas Exemption Request
$135
Critical Areas Exception
$1,275 plus Hearing Examiner Fee
Critical Areas Variance
$1,275 plus Hearing Examiner Fee
Modification to Overlay District Boundaries
$1,275 plus Hearing Examiner Fee
Rezone (without Comp Plan Amendment)
$1,375 plus Hearing Examiner fee
Temporary Use Permit
$150
Temporary Use Permit Extension
$150
Variance, Administrative
$300
Variance
$1,275 plus Hearing Examiner Fee
Variance, View Protection Overlay District
$1,275 plus Hearing Examiner fee
TABLE 13:
Other Review
Request for a statement of restrictions per
RCW 35.21.475
$75
Accessory Dwelling Units
$75
$75 minimum, an additional deposit may
be required if city attorney review is
required, any city attorney expenses
related to an application for an
Administrative Interpretation (POMC Chapter
administrative application shall be paid by
20.10)
the applicant prior to issuance of a decision
Nonconforming Use
$150
$150 (100% is credited to a subsequent
related land use application if filed within
Pre -Application Meeting
12 months)
11
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
$1,000
Applied to the city's costs including city
attorney fees regardless of whether a
Development Agreements
development agreement is approved
Comp Plan Amendment (Text)
$500
Comp Plan Amendment (Map)
$1,875
Land Use and Development Regulations
Amendment (Text)
$500
Forest Practices Application (Local Approval)
$300
$150 (up to 100% credited to a subsequent
related permit application if filed within 12
Pre -Submittal Design Review
months)
Tax Abatement Exemption Application
$1,500
Zoning Verification Letter
$75
Signs Permits
Signs may also require a building permit. See Section B.2 and Table 3.
TABLE 14:
Sign Permits
A -Board Sign
$25
Permanent Sign
$50
Master Sign Plan Permit
$300
Placement of WSDOT directional sign
$75
Sign Variance
$300
D. Public Works Department Fees
The Public Works Department permit fees listed in the tables below shall be paid at the time an
application is submitted to the city unless otherwise specified.
TABLE 15:
Public Works Department Permits and
Fees
Public Works
Cost
Note
No more than one minor
LDAP may be issued for the
Minor Land Disturbing Activity
same property (parcel
Review and Permit (disturbances
and/or address) in any 365
of less than 1,000 square feet)
$50
day period.
$100 base fee, plus $100
for the first acre of
(Paid at the time of
disturbance + $25 for each
application submittal —
additional acre of
covers Land Disturbing
Disturbance above 1 acre.
Activity plan review costs).
Area to be rounded up to
Acres of disturbance should
Land Disturbing Activity Permit
the next higher acre. $100
be rounded up to the
Plan Review
minimum fee.
nearest acre.
12
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
$100 for the first acre of
disturbance + $50 for each
(Paid at time of permit
additional acre of
issuance —covers Land
Disturbance above 1 acre.
Disturbing inspection costs).
Area to be rounded up to
Acres of disturbance
the next higher acre. $100
rounded up to the nearest
Land Disturbing Activity Permit
minimum fee.
acre.
$100 for the first 3,000
square feet of new and
replaced hard surface to be
constructed + $25 for each
additional 3,000 square
(Paid at the time of
feet or fraction thereof of
application submittal —
hard surface to be
covers hard surface and
Stormwater Drainage Permit Plan
constructed. $100
stormwater improvement
Review
minimum fee.
plan review costs).
$100 for the first 3,000
square feet of new and
replaced hard surface to be
constructed + $50 for each
Stormwater Drainage
additional 3,000 square
Permit (Paid at time of
feet or fraction thereof of
permit issuance — covers
hard surface to be
hard surface and
constructed. $100
stormwater inspection
Stormwater Drainage Permit
minimum fee.
costs)
Street Use Permit Application Fee
$50
Tree cutting permit
$50
The applicant shall pay the
actual fee, including city
attorney costs, for preparing
Latecomer Agreement Review Fee
$500 Deposit
the latecomer agreement
For uses which do not
include the physical
disturbance of the right -of -
ROW Permit, Tier 1
$50
way.
For activities which alter the
appearance, or disturb the
surface or sub -surface, or
allow long term use of the
ROW Permit, Tier 2
$230
right-of-way.
Violator must obtain the
required permit and pay
double the permit fee or a
$75.00 minimum penalty if
Double the permit fee, or
the permit fee is less than
Work without a Permit — Penalty
$75 minimum.
$75.00.
TABLE 16:
Street Vacations
13
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Street Vacation Petition Fee
$120
Street Vacation Appraisal Fee
(Refundable Deposit)
$500 Deposit, Petitioner shall pay
the actual cost of the appraisal.
TABLE 17:
Impact Fee Deferrals (POMC 20.182.110(4))
Application for Impact Fee Deferral $300 minimum
Lien release for Impact Fee Deferral $300 minimum
TABLE 18:
Residential Parking Permits
Residential Parking Permit
$10
Replacement Parking Permit
$5
Temporary Residential Parking Permit
$10
Bed and Breakfast Parking Permit
$10
Concurrency (POMC 20.180)
1. Concurrency (Capacity Reservation Certificate) applications fees shall be based on the
following table. Each type of application (Transportation, Water, or Sewer) shall include
payment of an application fee (A) plus any consultant fees charged to the city (B) for
concurrency review as applicable.
2. The Director of Public Works shall make all determinations as to whether an application is to
be reviewed by the city or to be sent to the consultant for review.
3. When consultant review is required, the applicant shall pay the actual fee incurred by the city.
Any balance owed shall be paid prior to the issuance of a concurrency certificate.
TABLE 19: Concurrency Review
Type of Review
A
B
Application Fee (also
Review Performed by Consultant:
the total review fee for
A scope and fee shall be obtained from the
applications reviewed
Consultant after the application is received.
in house by the City)
Transportation
$150
Either Tier 1 (limited review) or Tier 2 (full
review) fixed fees listed in consultant fee
schedule. For projects that do not fit the
categories, the fee will be determined on PM
peak hour trip generation, or as determined in
a not -to -exceed task order.
Water
$150
The applicant shall pay the amount shown in
the scope and fee provided by the City's
Consultant.
Sewer
$150
The applicant shall pay the amount shown in
the scope and fee provided by the City's
Consultant.
14
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
E. Hourly Rates.
A minimum of one hour shall be charged per staff member when using the hourly rates. Additional
charges shall be by the quarter hour per staff member.
Plan review fees shall apply to the third and any subsequent submittals when plans are revised
prior to approval. The fee shall be equal to the hourly rate for all staff performing the review, or
the full permit plan review fee, whichever is less.
Plan review fees shall apply to revisions to plans or documents which were previously reviewed
and approved. The fee shall be equal to the hourly rate for all staff performing the review, or the
full permit plan review fee, whichever is less.
When an inspection fee is designated in the fee tables as additional on a permit, the fee shall be
equal to the hourly rate for reinspection, with a minimum of one hour. Additional charges shall be
by the quarter hour per inspection.
The hourly rates shall be used to calculate deductions to refunds.
A Reinspection fee is charged at the hourly rate for reinspection after the same inspection fails for
the second time.
TABLE 20.
Type
Hourly Rate
Notes
Plan Review, Building/Fire
$75
Plan Review, Planning - DCD
$75
Plan Review, Engineering —Public Works
$85
Administrative, Permit Center
$60
Reinspection, Building/Fire
$75
After two prior inspections for
same work
Reinspection, Public Works
$75
After two prior inspections for
same work
Reinspection, Planning
$75
After two prior inspections for
same work
Inspections outside of normal business
Hourly rate x
Minimum charge: 2 hours
hours, Public Works
1.5 $75
Alternate methods and materials review,
$75
Building
F. Work by Outside Consultants: Building and Fire Codes.
The jurisdiction may send permit applications to third -party consultants for plan review. The
plan review fee paid as described in Section B covers the City's consultant cost, except for the
following reviews:
a. Third and subsequent submittals. The applicant shall pay the actual hourly costs as
listed in table 21 for all 3rd and subsequent submittals.
b. Projects with total valuation exceeding $10,000,000, or projects of a significant
complexity that require outside review such as courthouses, schools, hospitals as
determined by the Building Official. For projects as described in this subsection, the
initial plan review fee shall be applied to the 3rd party consultant review fee. If that
15
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
fee is inadequate to fully pay the actual plan review fee then the applicant shall be
billed for the additional cost as described in subsection 3 below.
2. The city may provide inspections by contracted services. Permit fees cover the consultant's
inspection charges except for afterhours inspection.
3. The plan review fees and afterhours inspection fees as described in Sections 1 and 2 shall be
billed at the rates provided in table 21.
4. The fees charged listed in table 21 shall are based on an hourly rate must be paid in full prior
to the issuance of the permit, approval, denial, decision or recommendation, final inspection,
or issuance of Certificate of Occupancy, as applicable to the type of permit and when the work
is performed.
5. When the hourly rate is used for consultants, the fee may be rounded to the quarter hour.
TABLE 21. Building and Fire Code: Consultant Services Hourly Rates.
Types listed represent the most frequently used rates. Note that a Technician's time is often
included with plan review, and will be reflected when billing at an hourly rate.
Type
Rate
Notes
Plan Review, 3rd and subsequent reviews
$110 / hour
Subject to current contract
Plan Review, revisions to approved plans
$110 / hour
Subject to current contract
Fire Code Plan Review: Reviewer
$110 / hour
Subject to current contract
Technician
$85 / hour
Subject to current contract
Inspections, outside of normal business hours
$120 / hour
Subject to current contract
G. Work by Outside Consultants: Other Services.
The applicant shall be required to pay the actual cost of 3rd party review by qualified consultants
under contract with the city.
1. Special Reports Review.
a. When an application includes the submittal of special reports and/or plans such as
habitat management plans, geotechnical reports, or traffic impact analyses requiring
review beyond the capabilities of city staff, the city will obtain a fee estimate from its
consultant for the scope of work, and provide that estimate to the applicant for
payment to the city. The city shall authorize the consultant to proceed once the
payment has been received.
b. If additional special review by the consultant is required, and amended scope of work
and new estimate shall be obtained by the city for payment by the applicant before
the additional work by the consultant can proceed.
c. If the consultant's fee total is less than the full amount paid by the applicant, the
remainder shall be refunded according to section K. and table 25.
2. Alternative Forms Review.
When the applicant proposes to use an alternative form instead of the city's standard
approved form, the city may request review by the city attorney of the alternative form if
a legal determination is required to ensure that the language in the proposed form
adequately addresses the city's interests. The cost of review shall be paid by the applicant
at the attorney's hourly rate.
16
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
H. Appeal Fees.
Fees are collected when the appeal is filed. Any appeal statement must be filed on the deadline
established in the City's code relating to the specific appeal, together with a certified check in the
amount of the appeal fee.
If the City Council is the decision -maker on the appeal, only the appeal fee shall be charged.
If any appellant believes that the payment of the appeal fee creates a financial hardship, it shall
submit a request for an appeal waiver with the appeal statement on or before the deadline
established in the City's code relating to the specific appeal. This request for an appeal waiver
shall describe the appellant's financial situation and why payment of the appeal fee creates a
financial hardship. As an example, the appellant may provide evidence that the appellant resides
in a low-income household, which would include a single person, family or unrelated persons
living together, whose adjusted income is less than eighty percent of the median family income,
adjusted for household size, for Kitsap County.
TABLE 22:
Appeal Type
Appeal Body
Amount
Abatement
Hearing Officer
$100
Building Code
Building Board of Appeals
$450
(BBOA)
Concurrency Denial
Public Works Director
$100
Development Agreement
Same as underlying
Depends on underlying permit.
permit or associated
legislative approval
Director's Code
Superior Court
Appeals and any associated fees
Interpretation
go directly to Superior Court.
Fire Authority's Decision
Building Board of Appeals
$450
(BBOA)
Illicit Discharge Detection
City Council
$450
and Elimination (IDDE)
Notice and Order,
revocation of permit, or
assessment of costs of
abatement
IDDE Appeal, independent
City Council
Consultant services, actual costs
consultant services
to be paid. See Section F for
consultant fees.
Impact Fee Amount
Director
$100
Reconsideration
Impact Fee Amount
Hearing Examiner
$450
Established Upon
Reconsideration by the
Director
Impact Fee Credit
Director
$100
Reconsideration
Impact Fee Credit
Hearing Examiner
$450
Established Upon
Reconsideration by the
Director
18
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
SEPA Appeal
Same as underlying
$450
permit
Street Use Permit
Hearing Examiner
$100
Type I, Director's Decision
Superior Court
Appeals and any associated fees
go directly to Superior Court.
Type II Permit
Hearing Examiner
$450.
Type II Permit, Deposit for
Hearing Examiner
Deposit is based on fee
a certified transcription of
estimate from transcription
hearing for appeal from
service. After the final invoice,
Hearing Examiner's
any remainder of the deposit
decision
shall be refunded. Any fees in
excess of the deposit shall be
paid by the applicant.
Type II Permit, appeal of
Superior Court
Appeals and any associated fees
Hearing Examiner's appeal
go directly to Superior Court.
decision
Type III permit, appeal of
Superior Court
Appeals and any associated fees
Hearing Examiner's
go directly to Superior Court.
decision
I. Hearing Examiner Fees.
Hearing Examiner fees (excluding appeals to the Hearing Examiner) shall be the Hearing
Examiner's actual costs, plus an administrative fee.
Fees and deposits are required to be paid when the application is submitted.
Hearing examiner fees will be secured from the deposited amount and any remainder shall be
refunded to the applicant at the end of the appeal period.
Hearing Examiner fees in excess of the deposit amount will be billed to the applicant. The
outstanding Hearing Examiner fees shall be paid by the applicant after notification of the amount
due. Subsequent permits related to the hearing examiner decision may be withheld until hearing
examiner fees are paid.
City projects which require Hearing Examiner services are exempt from the deposit requirement.
Instead, the bill from the Hearing Examiner shall be routed to the appropriate department for
payment.
TABLE 23:
Type
Amount
TYPE III Hearing, Administrative fee
$250 (non-refundable)
Type III Hearing, deposit
$3,000 deposit
Appeal fee, for appeal of Hearing Examiner
decision
See Table 22. Appeal Fees
Appeal fee, for appeals to the Hearing Examiner
See Table 22. Appeal Fees.
19
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
J. Other Fees.
TABLE 24:
Other Fees
Electronic documents on digital storage
media or devices
Actual cost
Photocopies, 8 % x 11
$0.15 per page
Public Notice signs
Actual cost + 25%
Published Notice in the city's official
newspaper for Notice of Application, Notice
of Hearing, SEPA Notice
$300 each
Mailing fee for Developer's issued permit
package
USPS Priority Flat Rate + 25%
Technology Fee, for each permit application
$10 (non-refundable, unless due to
entered in the electronic permitting system.
city oversight )
The applicant is responsible for paying
recording fees for permit -related documents
required to be recorded with the Kitsap
Actual cost of recording is paid
County Auditor.
directly to the County Auditor.
$75 for each occurrence on a
permitted project.
(See Work Without a Permit
Posted Stop Work
penalty for non -permitted work)
Notary Service for signatures on permit
application documents, including sureties.
$10 per stamp
K. Refunds.
The applicant may request a refund when an application or permit is cancelled or withdrawn.
Refunds may also be requested when a fee is overpaid. Refund requests must be submitted using
the Permit Center's refund request form.
Refund requests must be made within one year of the original payment date.
Refund requests must be made prior to the expiration of the permit or application.
Overpayment of a fee or fees paid on a cancelled or withdrawn application shall not be credited to
another fee owed on the subject application or other associated applications or permits.
Refunds shall be issued as authorized by the director.
Prior to release of any refund,
• All fees or charges owed on the subject application or permit will be deducted.
• Expended staff hours for application review, processing or inspection will be deducted.
Staff hours shall be calculated at the hourly rate in Table 20.
The following items shall not be eligible for refund, unless applied incorrectly:
• Technology fee.
• Plan review fees once the permit has been issued.
• Charges for work without a permit.
20
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
• Convenience fee for credit/debit card payment.
• Public Notice signs if posted on the property.
• Consultant fee after work has been performed.
21
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
TABLE 25:
Type
Amount
Plan Review fees for withdrawn,
Expended staff hours shall be deducted.
cancelled or returned building or fire
No refund shall exceed 80% of the plan review fee.
permit application prior to issuing a
permit:
Building or Fire Permit Fees:
If the permit fee was paid and the application
cancelled or withdrawn prior to issuance, 100% of
the permit fee may be refunded provided no staff
hours have been expended for inspections or
preparing the permit for issuance.
Expended staff hours shall be deducted after a
permit has been issued.
No refund shall exceed 80% of the permit fee after
a permit has been issued.
Land Use Permit/Application Fees:
Expended staff hours shall be deducted.
No refund shall exceed 80% of the initial
application fee.
Plan Review fees for withdrawn,
Expended staff hours shall be deducted.
cancelled or returned Public Works
No refund shall exceed 80% of the plan review fee.
LDAP or SDP permit applications prior
to issuing a permit:
LDAP or SDP Permit Fees:
If the permit fee was paid and the application
cancelled or withdrawn prior to issuance, 100% of
the permit fee may be refunded.
Expended staff hours shall be deducted after a
permit has been issued.
No refund shall exceed 80% of the permit fee after
a permit has been issued.
Consultant Fees
If consultant fees are less than the initial estimate,
the remainder shall be refunded after the
consultant work is completed.
22
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Building Valuation Data - August 2023
Important Points
The BVD is not intended to apply to alterations or repairs to existing buildings. Because the scope of
alterations or repairs to an existing building varies so greatly, the Square Foot Construction Costs table
does not reflect accurate values for that purpose. However, the Square Foot Construction Costs table
can be used to determine the cost of an addition that is basically a stand-alone building which happens
to be attached to an existing building. In the case of such additions, the only alterations to the existing
building would involve the attachment of the addition to the existing building and the openings between the
addition and the existing building.
• The Square Foot Construction Cost does not include the price of the land on which the building is built.
The Square Foot Construction Cost takes into account everything from foundation work to the roof
structure and coverings but does not include the price of the land. The cost of the land does not affect the
cost of related code enforcement activities and is not included in the Square Foot Construction Cost.
Square Foot Construction Costs a, b,
Group ( International Building Code)
IA
B
IIA
11113
IIIA
111113
IV
VA
VB
A-1 Assembly, theaters, with stage
335.89
324.58
316.94
304.93
286.87
278.00
295.62
266.02
257.55
A-1 Assembly, theaters, without stage
307.39
296.08
288.44
276.42
258.37
249.50
267.12
237.51
229.05
A-2 Assembly, nightclubs
269.94
261.93
254.48
245.85
230.56
223.99
237.02
209.57
202.79
A-2 Assembly, restaurants, bars, banquet halls
268.94
260.93
252.48
244.85
228.56
222.99
236.02
207.57
201.79
A-3 Assembly, churches
311.88
300.57
292.93
280.91
263.30
254.43
271.60
242.45
233.98
A-3 Assembly, general, community halls, libraries,
museums
266.07
254.76
246.12
235.10
216.33
208.46
225.80
195.47
188.01
A-4 Assembly, arenas
306.39
295.08
286.44
275.42
256.37
248.50
266.12
235.51
228.05
B Business
260.69
251.13
241.86
231.65
210.99
202.73
222.56
186.21
177.81
E Educational
273.46
263.96
255.62
245.04
228.69
217.00
236.61
200.36
193.94
F-1 Factory and industrial, moderate hazard
160.20
152.78
143.34
138.64
123.55
117.41
132.48
102.44
95.93
F-2 Factory and industrial, low hazard
159.20
151.78
143.34
137.64
123.55
116.41
131.48
102.44
94.93
H-1 High Hazard, explosives
149.46
142.04
133.60
127.90
114.12
106.97
121.74
93.00
N.P.°
H234 High Hazard
149.46
142.04
133.60
127.90
114.12
106.97
121.74
93.00
85.50
H-5 HPM
260.69
251.13
241.86
231.65
210.99
202.73
222.56
186.21
177.81
23
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
1-1 Institutional, supervised environment
262.22
252.95
244.31
235.67
215.42
209.47
235.71
193.82
187.73
1-2 Institutional, hospitals
434.15
424.59
415.32
405.12
383.35
N.P.°
396.02
358.57
N.P.°
1-2 Institutional, nursing homes
302.01
292.45
283.18
272.97
253.83
N.P.°
263.88
229.05
N.P.°
1-3 Institutional, restrained
295.86
286.31
277.03
266.83
247.95
238.69
257.74
223.17
212.77
1-4 Institutional, day care facilities
262.22
252.95
244.31
235.67
215.42
209.47
235.71
193.82
187.73
M Mercantile
201.37
193.36
184.91
177.28
161.72
156.15
168.45
140.73
134.95
R-1 Residential, hotels
264.67
255.41
246.77
238.13
218.35
212.40
238.17
196.75
190.67
R-2 Residential, multiple family
221.32
212.06
203.42
194.78
175.96
170.01
194.82
154.36
148.28
R-3 Residential, one- and two-familyd
209.61
203.74
198.94
195.12
188.41
181.45
191.77
175.86
165.67
R-4 Residential, care/assisted living facilities
262.22
252.95
244.31
235.67
215.42
209.47
235.71
193.82
187.73
S-1 Storage, moderate hazard
148.46
141.04
131.60
126.90
112.12
105.97
120.74
91.00
84.50
S-2 Storage, low hazard
147.46
140.04
131.60
125.90
112.12
104.97
119.74
91.00
83.50
U Utility, miscellaneous
114.09
107.37
99.89
95.60
85.13
79.54
90.99
67.39
64.19
a. Private Garages use Utility, miscellaneous c. N.P. = not permitted
b. For shell only buildings deduct 20 percent d. Unfinished basements (Group R-3) = $23.20 per sq. ft.
24
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Port Orchard, WA-2024 Fees & Deliverables
EXHIBIT A - SCOPE OF SERVICES AND FEE SCHEDULE
1. LIST OF SERVICES
As -Requested Building, Plumbing, Mechanical Inspection Services
✓ Consultant utilizes an educational, informative approach to improve the customer's experience.
✓ Perform code compliance inspections to determine that construction complies with approved plans
✓ Meet or exceed agreed upon performance metrics regarding inspections
✓ Provide onsite inspection consultations to citizens and contractors while performing inspections
✓ Return calls and emails from permit holders in reference to code and inspection concerns
✓ Identify and document any areas of non-compliance
✓ Leave a copy or provide an electronic version of the inspection results and discuss inspection results
with site personnel
As -Requested Remote Plan Review Services
✓ Provide plan review services electronically or in the traditional paper format
✓ Review plans for compliance with adopted building codes, local amendments or ordinances
✓ Be a resource to applicants on submittal requirements and be available throughout the process
✓ Provide feedback to keep plan review process on schedule
✓ Communicate plan review findings and recommendations in writing
✓ Return a set of finalized plans and all supporting documentation
✓ Provide review of plan revisions and remain available to applicant after the review is complete
Remote Plan Conveyance
✓ Electronic plan submittals will be reviewed and returned electronically
✓ Applicant will submit number of hardcopies required by Municipality
✓ Consultant will return plans and supporting documents
Reporting Services
✓ Consultant will work with Municipality to develop a mutually agreeable reporting schedule and format
2. MUNICIPAL OBLIGATIONS
✓ Municipality will issue permits and collect all fees
✓ Municipality will provide Consultant with a list of requested inspections and supporting documents
✓ Municipality will intake plans and related documents for pick up by Consultant or submit
electronically
TIME OF PERFORMANCE
✓ Consultant will perform Services during normal business hours excluding Municipal holidays
✓ Services will be performed on an as -requested basis
✓ Inspectors will be dispatched on an as -requested basis
✓ Consultant representative(s) will be available by phone and email
Deliverables
INSPECTION SERVICES
Perform inspections received from the Municipality prior to 4:00 pm next
business day
PRE -SUBMITTAL MEETINGS
Provide pre -submittal meetings to applicants by appointment
PLAN REVIEW
Provide comments within the following timeframes:
Day 1 = first full business day after receipt of plans and all supporting documents
DocuSign Envelope ID: 4332D489-5BB9-4060-98BC-BF5F7C565C39
Port Orchard, WA-2024 Fees & Deliverables
TURNAROUND TIMES
Proiect Type:
First Comments
Second Comments
✓ Single-family within
10 business days
5 business days or less
✓ Multi -family within
10 business days
5 business days or less
✓ Small commercial within
10 business days
5 business days or less
(under $2M in valuation)
✓ Large commercial within
20 business days
10 business days or less
4. FEE SCHEDULE
✓ Municipality and Consultant will review the Municipal Fee Schedule and valuation tables annually to
discuss making adjustments to reflect increases in the costs incurred by Consultant to provide
Services.
✓ Beginning January 01, 2025 and annually thereafter, the hourly rates listed shall be increased based
upon the annual increase in the Department of Labor, Bureau of Labor Statistics or successor thereof,
Consumer Price Index (United States City Average, All Items (CPI-U), Not Seasonally adjusted, All
Urban Consumers, referred to herein as the "CPI") for the Municipality or, if not reported for the
Municipality the CPI for cities of a similar size within the applicable region from the previous calendar
year, such increase, however, not to exceed 4% per annum. The increase will become effective upon
publication of the applicable CPI data. If the index decreases, the rates listed shall remain unchanged.
✓ Consultant fees for Services provided pursuant to this Agreement will be as follows:
Service Fee Schedule:
Inspection Services
$114.00 per hour — one (1) hour minimum
• Building, Mechanical, Plumbing
Plan Review Services — Residential & Commercial:
Initial plan review
55% of Municipal Plan Check Fee as established by
Up -to two (2) re -reviews
ordinance or resolution
• Excludes fire review
Additional Plan Review Fee — Residential & Commercial:
• After two (2) re -reviews
• Other Building Plan Reviews not listed or changes
to previously approved plans.
$120.00 per hour — one (1) hour minimum
• Stand-alone mechanical or plumbing permits
• Meetings of plans examiner outside of plan
review % of fee plan review work.
Fire Plan Review Services
$162.00 per hour — one (1) hour minimum
Pre -Submittal Meetings
$130.00 per hour — one (1) hour minimum
Structural Engineering Plan Review
$162.00 per hour — one (1) hour minimum
After Hours/Emergency Inspection Services
$135.00 per hour —two (2) hour minimum
Hourly time tracked will start when Consultant checks in at Municipality or first inspection site.